SlideShare a Scribd company logo
1 of 16
Download to read offline
Baijan Savalan – Senior Safety Engineer
TECHNIP, ABU DHABI
Risk Based Flare Location
Study - A Case Study
2015 HSED E-Seminar
2015 HSED E-Seminar
2
Table of contents
1. Safety Moment
2. Introduction To Topic
3. Case Study
4. Conclusion
5. Way Forward
2015 HSED E-Seminar
3
Safety Moment - Tyre Safety and Suitability
2015 HSED E-Seminar
4
 Safe flare location is conventionally decided based on thermal
radiation and dispersion modelling of worst case flaring scenarios
consequence. However due to constraints in meeting large
separation distance/ stack height , risk based flare location study
was used to define safe location. This study was performed for an
offshore EPC Project.
Introduction
2015 HSED E-Seminar
5
Case Study – Offshore Complex
Facility
Flare Stacks
2015 HSED E-Seminar
6
Separator/s
Well
Fluid
Flare KO
2X100%
VRU
2 X 100%
GDU
2X100%
GSU
1X100%
Pressure
Control
Valve
GLC –
1st &
2nd
Stage
GLC
3rd &
4th
stage
Sweet gas
to Fuel Gas
Conditioning
and then to
Consumers
Compressed
Gas to GLC
suction
Off-
Gas
GDU
Off-Gas
GSU/
Acid
Gas
To Gas Lift
Wells & Gas
Injection
Compressor
Vent/Flare Header
QOV
Assist Gas –
Normally
Fuel Gas
Other Vent
Streams, BDVs,
PSVs
Simplified Scheme – Flare/Vent Gas Recovery
Zero flaring concept
2015 HSED E-Seminar
7
Flaring Scenarios - Assessed
Flaring Scenarios
 Emergency Flaring – Limiting for Radiation – No dispersion concern
 Start-up case – No radiation concern- No dispersion concern
 Operating upset (Vapor Recovery Unit Failure Case) – less flow (1% of
emergency/design flow) and very high H2S content 29% - Limiting scenario
for flare location.
 Flare design is a single tip (HP tip)
 No normal flaring
Specific Case - Flare flameout toxic dispersion is limiting
case for flare location
2015 HSED E-Seminar
8
The Concern…
Worst Case - Toxic Dispersion - PHAST
GTP RP SP UTP AP
CD
MD
WD
AWD
2015 HSED E-Seminar
9
Possible Mitigations
 Relocate the flare stack – 750m from nearest process platform –
Not feasible at EPC..!
 Elevate the Flare to reduce impact on nearest platform
 Stack is already 70m MSL
 Further increase means
 Cost & Schedule impact
 Installation/ constructability issues
 Maintenance/ Tip handling issues
Conventional approach resulted in infeasible solution for
flare location
2015 HSED E-Seminar
10
The Solution..
 It was decided to apply risk based approach to determine flare
location
 Perform the flame-out dispersion using CFD for worst case
 Perform FMEA Workshop & fault-tree analysis to arrive at
likelihood of event
 Compare the risk using client risk matrix – using likelihood and
consequence
2015 HSED E-Seminar
11
Fault Tree Inputs
Flare System Design
 Redundant flares (duty & standby)
 Redundant pilots (6 pilots per flare tip)
 Continuously lit pilots (three)
 Redundant ignition systems – High energy +
continuous sparking
 Redundant pilot gas supplies
 SIL 2 PLC for Flare Package
 Redundant thermocouples per pilot (2+2 spares)
 Redundant electrical power supply to ignition
systems
 2 electrical feeders
 EDG supply
 Independent UPS supply to each feeder
2015 HSED E-Seminar
12
Results – Fault Tree Analysis
2015 HSED E-Seminar
13
CFD Dispersion Results
Results indicated H2S exposure to around 24-35 ppm at 2 m/s and <5 ppm at 5 m/s.
2015 HSED E-Seminar
14
Conclusion
 Overall likelihood of event 3.6x10-5 /yr
 Low consequence of flameout event.
 Based on clients risk matrix - low risk
2015 HSED E-Seminar
15
Way Forward..
 For facility handling sour gas i.e. high H2S content – potentially
large separation distance may be required to satisfy toxic
exposure criteria during flame-out conditions.
 Use of risk based approach may be advisable to predict feasible
separation distances for flare.
 For such system, in terms of design
 Recommended to have redundancy in pilots and ignition
system
 Reliable pilot gas system
 Pilot gas back-up system.
www.technip.com
Thank you

More Related Content

Similar to Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location study.pdf

Solar PV Systems
Solar PV SystemsSolar PV Systems
Solar PV Systems
Emad Ezzat
 
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
COSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docxCOSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docx
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
voversbyobersby
 
IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016
L.W. Wong
 
Manir_TECK_Presentation_1
Manir_TECK_Presentation_1Manir_TECK_Presentation_1
Manir_TECK_Presentation_1
Manir Al Faisal
 
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenobleThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
Thomas Vattappillil
 
20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy
Shabir nasir
 

Similar to Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location study.pdf (20)

Combined Cycle Gas Turbine Operations
Combined Cycle Gas Turbine Operations Combined Cycle Gas Turbine Operations
Combined Cycle Gas Turbine Operations
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
 
irfan final cv (2)
irfan final cv (2)irfan final cv (2)
irfan final cv (2)
 
Ahmed Reedy CVf
Ahmed Reedy CVfAhmed Reedy CVf
Ahmed Reedy CVf
 
Synopsis REPORT FINAL.docx
Synopsis REPORT FINAL.docxSynopsis REPORT FINAL.docx
Synopsis REPORT FINAL.docx
 
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & EnvironmentDMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdf
 
Solar PV Systems
Solar PV SystemsSolar PV Systems
Solar PV Systems
 
Final thesis: Technological maturity of future energy systems
Final thesis: Technological maturity of future energy systemsFinal thesis: Technological maturity of future energy systems
Final thesis: Technological maturity of future energy systems
 
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
COSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docxCOSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docx
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
 
IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016IECPM Profile_ALL Updated March2016
IECPM Profile_ALL Updated March2016
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
 
Manir_TECK_Presentation_1
Manir_TECK_Presentation_1Manir_TECK_Presentation_1
Manir_TECK_Presentation_1
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
ID-109.pdf
ID-109.pdfID-109.pdf
ID-109.pdf
 
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenobleThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
ThomasVATTAPPILLIL_MScThesisPres_Sep2015_INPGrenoble
 
Compling with terminal process safety
Compling with terminal process safetyCompling with terminal process safety
Compling with terminal process safety
 
20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy
 

More from Baijan (7)

Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location st...
Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location st...Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location st...
Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location st...
 
Adsorption activated carbon
Adsorption activated carbonAdsorption activated carbon
Adsorption activated carbon
 
Capacity of facility
Capacity of facilityCapacity of facility
Capacity of facility
 
Baijan Savalan - How to use drones in your refinery
Baijan Savalan - How to use drones in your refineryBaijan Savalan - How to use drones in your refinery
Baijan Savalan - How to use drones in your refinery
 
Baijan Savalan, Senior Process Engineer Technip FMC - NL
Baijan Savalan, Senior Process Engineer Technip FMC - NL Baijan Savalan, Senior Process Engineer Technip FMC - NL
Baijan Savalan, Senior Process Engineer Technip FMC - NL
 
68 optimize-troubleshoot-reactors
68 optimize-troubleshoot-reactors68 optimize-troubleshoot-reactors
68 optimize-troubleshoot-reactors
 
Biogas posterweb
Biogas posterwebBiogas posterweb
Biogas posterweb
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

Baijan SAVALAN Abu Dhabi - Presentation Slides - Risk based flare location study.pdf

  • 1. Baijan Savalan – Senior Safety Engineer TECHNIP, ABU DHABI Risk Based Flare Location Study - A Case Study 2015 HSED E-Seminar
  • 2. 2015 HSED E-Seminar 2 Table of contents 1. Safety Moment 2. Introduction To Topic 3. Case Study 4. Conclusion 5. Way Forward
  • 3. 2015 HSED E-Seminar 3 Safety Moment - Tyre Safety and Suitability
  • 4. 2015 HSED E-Seminar 4  Safe flare location is conventionally decided based on thermal radiation and dispersion modelling of worst case flaring scenarios consequence. However due to constraints in meeting large separation distance/ stack height , risk based flare location study was used to define safe location. This study was performed for an offshore EPC Project. Introduction
  • 5. 2015 HSED E-Seminar 5 Case Study – Offshore Complex Facility Flare Stacks
  • 6. 2015 HSED E-Seminar 6 Separator/s Well Fluid Flare KO 2X100% VRU 2 X 100% GDU 2X100% GSU 1X100% Pressure Control Valve GLC – 1st & 2nd Stage GLC 3rd & 4th stage Sweet gas to Fuel Gas Conditioning and then to Consumers Compressed Gas to GLC suction Off- Gas GDU Off-Gas GSU/ Acid Gas To Gas Lift Wells & Gas Injection Compressor Vent/Flare Header QOV Assist Gas – Normally Fuel Gas Other Vent Streams, BDVs, PSVs Simplified Scheme – Flare/Vent Gas Recovery Zero flaring concept
  • 7. 2015 HSED E-Seminar 7 Flaring Scenarios - Assessed Flaring Scenarios  Emergency Flaring – Limiting for Radiation – No dispersion concern  Start-up case – No radiation concern- No dispersion concern  Operating upset (Vapor Recovery Unit Failure Case) – less flow (1% of emergency/design flow) and very high H2S content 29% - Limiting scenario for flare location.  Flare design is a single tip (HP tip)  No normal flaring Specific Case - Flare flameout toxic dispersion is limiting case for flare location
  • 8. 2015 HSED E-Seminar 8 The Concern… Worst Case - Toxic Dispersion - PHAST GTP RP SP UTP AP CD MD WD AWD
  • 9. 2015 HSED E-Seminar 9 Possible Mitigations  Relocate the flare stack – 750m from nearest process platform – Not feasible at EPC..!  Elevate the Flare to reduce impact on nearest platform  Stack is already 70m MSL  Further increase means  Cost & Schedule impact  Installation/ constructability issues  Maintenance/ Tip handling issues Conventional approach resulted in infeasible solution for flare location
  • 10. 2015 HSED E-Seminar 10 The Solution..  It was decided to apply risk based approach to determine flare location  Perform the flame-out dispersion using CFD for worst case  Perform FMEA Workshop & fault-tree analysis to arrive at likelihood of event  Compare the risk using client risk matrix – using likelihood and consequence
  • 11. 2015 HSED E-Seminar 11 Fault Tree Inputs Flare System Design  Redundant flares (duty & standby)  Redundant pilots (6 pilots per flare tip)  Continuously lit pilots (three)  Redundant ignition systems – High energy + continuous sparking  Redundant pilot gas supplies  SIL 2 PLC for Flare Package  Redundant thermocouples per pilot (2+2 spares)  Redundant electrical power supply to ignition systems  2 electrical feeders  EDG supply  Independent UPS supply to each feeder
  • 12. 2015 HSED E-Seminar 12 Results – Fault Tree Analysis
  • 13. 2015 HSED E-Seminar 13 CFD Dispersion Results Results indicated H2S exposure to around 24-35 ppm at 2 m/s and <5 ppm at 5 m/s.
  • 14. 2015 HSED E-Seminar 14 Conclusion  Overall likelihood of event 3.6x10-5 /yr  Low consequence of flameout event.  Based on clients risk matrix - low risk
  • 15. 2015 HSED E-Seminar 15 Way Forward..  For facility handling sour gas i.e. high H2S content – potentially large separation distance may be required to satisfy toxic exposure criteria during flame-out conditions.  Use of risk based approach may be advisable to predict feasible separation distances for flare.  For such system, in terms of design  Recommended to have redundancy in pilots and ignition system  Reliable pilot gas system  Pilot gas back-up system.