SlideShare a Scribd company logo
1 of 8
Vision:
We strive to be the acknowledged leader
and preferred partner in helping each of our valued
clients succeed in the worlds rapidly evolving
Safety, Health, Environmental and Quality markets.
Competency knowledge & Skills Basis
The benefit of siding with us is that You will get the best available information by asking the question.
• Initial GAP analysis of current situation and status.
• Drafting of a custom package to suit your business requirements.
• We are flexible and can adapt.
• We do our own design. (Documentation, Formats, Systems)
• We are here to walk with and support You all the way.
We do have a combined experience and knowledge base that span over 80 years in the following fields.
• Systems development and implementation for ISO 19001
• Bulk earth works
• Road building
• Traffic Management
• Civil works and buildings
• Fabrication
• Manufacturing
• Electrification
• Steel work erection
• Cabling LV/MV/HV
• Regulating and stringing of MV/and HV up to 400KV
• All plant pre inspection and verification audits
• Fleet management
• Galvanizing inspections
• Dimensional checks on manufactured equipment and material
• Petro Chemical industry operational requirements
• Mining industry
• Working at heights
• Steel fabrication industry
Company safety management system requirements
• Gap analysis regarding current system.
• Creation of custom tailored system according to ISO and NOSA standards.
• Training of employees and role out and implementation of systems.
• Auditing of systems drafting of corrective and preventative measures.
• Assisting in determining of “Suitability and Effectiveness” of systems.
• System maintenance when required.
• Training needs analysis.
• Awareness programs and propaganda (Safety, Health, Environmental, Quality, Security).
Safety Profile
• Safety stats analysis in determining leading and lagging indicators.
• Documented Hazard identification and Risk assessment.
• Drafting of Base line / issue based risk assessments
• Drafting and implementation of mitigation.
• Coaching in mitigation.
• Planned task observation coaching and implementation.
• Safety behaviour observation coaching and implementation.
• Assisting with the development of Method statements, Work instructions, Safe working procedures
coaching of staff with regards to the use thereof.
• Accident investigations and report writing.
• Facilitation of accident and incident investigations.
• Creation of legal appointments.
• Creation and approval of Safety plans.
• Maintenance of Site/Project Safety files.
• Creation and maintenance of Legal registers (Safety, Environment).
• Drafting and implementation of Fall protection plans.
• Drafting of traffic management plans.
• Emergency contingency planning.
• Creation and maintenance of Medical surveillance data base.
• Fleet management coal logistics (coal transporters).
Quality Profile
• Document and data control (Templates and document registers)
• Drafting, implementation and coaching regarding Quality management plans
• Drafting of ITP(inspection and tests plans)
• Creation and maintenance of asset register
• Creation of all registers required (Data pack per activity)
• Creation of database that will enable compliance regarding of calibration of equipment
• Site inspection on current process.
• Galvanizing pre and post inspections
• Review of lab reports
• Product non conformance and rework investigations and report writing
• Customer satisfaction reports and analysis.
• Management of system deficiency reports ( corrective and preventative actions).
• Record keeping of reworks
• Preventative and corrective maintenance records.
Environmental Profile
• Waste management/Waste Streams
• Hazardous chemical management
• Environmental Law
• Environmental risk registers
• Environmental awareness campaigns
Pricing Profile
• Daily consulting fee: R 4 000.00 daily rate.
• Hourly consulting fee: R 650.00 hourly rate.
• System maintenance weekly: R 650.00 per week.
• System maintenance monthly: R 2 600.00 per month.
• Accident/Incident investigations daily rate: R 4 000.00 per day.
• Rework or product failure investigation daily rate: R 4 000.00 per day.
• System design project specific: R 4 500.00 per project.
• System implementation: R 2 500.00 per hour.
• SHEQ tender file compilation client specifications: R 5 000.00 per project.
• SHEQ tender file compilation BML documentation: R 8 000.00 per project.
• Coaching staff on SHEQ system implementation: R 4 000.00 per day.
• In house training development: R 2 500.00 per module.
• In house training workshops: R 5 000.00 per day.
• Incident, accidents, reworks analysis and trending: R 2 500.00 per project.
• Facilitation of statutory meetings and drafting of R 2 500.00 per meeting.
minutes and agenda
All accommodation and travelling substance allowances will be based on current and local AA rates.
For all questions and further enquiry please do not hesitate to contact us 24/7 leave your detail in our mailbox and we will contact You.
We can also source and assist with the placement of competent personnel.
No job to big or to small
Our contact detail is:
bmlsheqsolutions@gmail.com

More Related Content

What's hot

2016_AC_template_4-3_Final
2016_AC_template_4-3_Final2016_AC_template_4-3_Final
2016_AC_template_4-3_Final
Naveen Nemani
 
Resume Andy Hoch_2016(revised)
Resume Andy Hoch_2016(revised)Resume Andy Hoch_2016(revised)
Resume Andy Hoch_2016(revised)
Andy Hoch
 
Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2
Brian Woolery
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
Sohail Akbar
 

What's hot (10)

2016_AC_template_4-3_Final
2016_AC_template_4-3_Final2016_AC_template_4-3_Final
2016_AC_template_4-3_Final
 
Resume Andy Hoch_2016(revised)
Resume Andy Hoch_2016(revised)Resume Andy Hoch_2016(revised)
Resume Andy Hoch_2016(revised)
 
Testing for building safety
Testing for building safetyTesting for building safety
Testing for building safety
 
Midlands EIT
Midlands EITMidlands EIT
Midlands EIT
 
Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2
 
Tsd 1910 120 p treatment disposals storage
Tsd 1910 120 p treatment disposals storageTsd 1910 120 p treatment disposals storage
Tsd 1910 120 p treatment disposals storage
 
NICELY, HERMAN
NICELY, HERMAN NICELY, HERMAN
NICELY, HERMAN
 
GIS based sewer maintenance using MapWindow Open Source GIS
GIS based sewer maintenance using MapWindow Open Source GISGIS based sewer maintenance using MapWindow Open Source GIS
GIS based sewer maintenance using MapWindow Open Source GIS
 
John E - CV 2015
John E - CV 2015John E - CV 2015
John E - CV 2015
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
 

Viewers also liked

C_Michael_Posey_2016_Resume
C_Michael_Posey_2016_ResumeC_Michael_Posey_2016_Resume
C_Michael_Posey_2016_Resume
Mike Posey
 
Drafting equipment and_procedures
Drafting equipment and_proceduresDrafting equipment and_procedures
Drafting equipment and_procedures
BCAarchitecture
 
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
D.d. Lhiin
 
Coursera rprog 2016
Coursera rprog 2016Coursera rprog 2016
Coursera rprog 2016
Sanne Smith
 
appreciation bulk tech
appreciation bulk techappreciation bulk tech
appreciation bulk tech
Anil Seth
 
Engineering fair project
Engineering fair projectEngineering fair project
Engineering fair project
STEM2
 
Christie Arnold Resume 2015 revised
Christie Arnold Resume 2015 revisedChristie Arnold Resume 2015 revised
Christie Arnold Resume 2015 revised
Christie Arnold
 
Playing with the stars.A!.PRINT
Playing with the stars.A!.PRINTPlaying with the stars.A!.PRINT
Playing with the stars.A!.PRINT
Martyn Hayes
 
Tipos de investigación
Tipos de investigaciónTipos de investigación
Tipos de investigación
Juanpa Peña
 
Performance Appraisal
Performance AppraisalPerformance Appraisal
Performance Appraisal
Syeda Mehvish
 

Viewers also liked (19)

Uso Catia v5
Uso Catia v5Uso Catia v5
Uso Catia v5
 
C_Michael_Posey_2016_Resume
C_Michael_Posey_2016_ResumeC_Michael_Posey_2016_Resume
C_Michael_Posey_2016_Resume
 
What to know, process, reflect, understand, and transfer
What to know, process, reflect, understand, and transferWhat to know, process, reflect, understand, and transfer
What to know, process, reflect, understand, and transfer
 
Drafting equipment and_procedures
Drafting equipment and_proceduresDrafting equipment and_procedures
Drafting equipment and_procedures
 
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
 
Module 5 module 3 draft electrical and electronic layout and details
Module 5   module 3 draft electrical and electronic layout and detailsModule 5   module 3 draft electrical and electronic layout and details
Module 5 module 3 draft electrical and electronic layout and details
 
Development pro forma(3)
Development pro forma(3)Development pro forma(3)
Development pro forma(3)
 
Coursera rprog 2016
Coursera rprog 2016Coursera rprog 2016
Coursera rprog 2016
 
appreciation bulk tech
appreciation bulk techappreciation bulk tech
appreciation bulk tech
 
Engineering fair project
Engineering fair projectEngineering fair project
Engineering fair project
 
Christie Arnold Resume 2015 revised
Christie Arnold Resume 2015 revisedChristie Arnold Resume 2015 revised
Christie Arnold Resume 2015 revised
 
Playing with the stars.A!.PRINT
Playing with the stars.A!.PRINTPlaying with the stars.A!.PRINT
Playing with the stars.A!.PRINT
 
Tipos de investigación
Tipos de investigaciónTipos de investigación
Tipos de investigación
 
Performance Appraisal
Performance AppraisalPerformance Appraisal
Performance Appraisal
 
Gerencia de proyectos
Gerencia de proyectosGerencia de proyectos
Gerencia de proyectos
 
Proyecto inf grupo5
Proyecto inf grupo5Proyecto inf grupo5
Proyecto inf grupo5
 
BIOMktg0066
BIOMktg0066BIOMktg0066
BIOMktg0066
 
Reference from SaS
Reference from SaSReference from SaS
Reference from SaS
 
Neuroscience BS C.V.
Neuroscience BS C.V.Neuroscience BS C.V.
Neuroscience BS C.V.
 

Similar to BML Business Profile

Sreevatsa Chakravarthy Resume (revised)
Sreevatsa Chakravarthy Resume (revised)Sreevatsa Chakravarthy Resume (revised)
Sreevatsa Chakravarthy Resume (revised)
Sree Chakravarthy
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
Roger Boyette
 
David Reynolds Rev 01 2016
David Reynolds Rev 01 2016David Reynolds Rev 01 2016
David Reynolds Rev 01 2016
David Reynolds
 
Trey Gallaway Resume
Trey Gallaway ResumeTrey Gallaway Resume
Trey Gallaway Resume
Trey Gallaway
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015
Nathan Ting
 
Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016
Jake Essig
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
Mach Cao Xuan
 
Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2
Alan Stewart
 

Similar to BML Business Profile (20)

CV2015 Linkedin
CV2015 LinkedinCV2015 Linkedin
CV2015 Linkedin
 
Standardization of IT Processes
Standardization of IT ProcessesStandardization of IT Processes
Standardization of IT Processes
 
Samaa CV
Samaa CVSamaa CV
Samaa CV
 
Sreevatsa Chakravarthy Resume (revised)
Sreevatsa Chakravarthy Resume (revised)Sreevatsa Chakravarthy Resume (revised)
Sreevatsa Chakravarthy Resume (revised)
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
Faruk_Syed_Engineer
Faruk_Syed_EngineerFaruk_Syed_Engineer
Faruk_Syed_Engineer
 
Nithya resume
Nithya resumeNithya resume
Nithya resume
 
Projects DWDobbs 2016a
Projects DWDobbs 2016aProjects DWDobbs 2016a
Projects DWDobbs 2016a
 
David Reynolds Rev 01 2016
David Reynolds Rev 01 2016David Reynolds Rev 01 2016
David Reynolds Rev 01 2016
 
Res Technical recruitment & training profile
Res Technical recruitment & training profile Res Technical recruitment & training profile
Res Technical recruitment & training profile
 
Trey Gallaway Resume
Trey Gallaway ResumeTrey Gallaway Resume
Trey Gallaway Resume
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015
 
new hemant chauhan
new hemant chauhannew hemant chauhan
new hemant chauhan
 
Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
 
Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2
 
Editable Elements
Editable ElementsEditable Elements
Editable Elements
 
2509- CV2016
2509- CV20162509- CV2016
2509- CV2016
 
Timburge resume 2019
Timburge resume 2019Timburge resume 2019
Timburge resume 2019
 

BML Business Profile

  • 1.
  • 2. Vision: We strive to be the acknowledged leader and preferred partner in helping each of our valued clients succeed in the worlds rapidly evolving Safety, Health, Environmental and Quality markets.
  • 3. Competency knowledge & Skills Basis The benefit of siding with us is that You will get the best available information by asking the question. • Initial GAP analysis of current situation and status. • Drafting of a custom package to suit your business requirements. • We are flexible and can adapt. • We do our own design. (Documentation, Formats, Systems) • We are here to walk with and support You all the way. We do have a combined experience and knowledge base that span over 80 years in the following fields. • Systems development and implementation for ISO 19001 • Bulk earth works • Road building • Traffic Management • Civil works and buildings • Fabrication • Manufacturing • Electrification • Steel work erection • Cabling LV/MV/HV • Regulating and stringing of MV/and HV up to 400KV • All plant pre inspection and verification audits • Fleet management • Galvanizing inspections • Dimensional checks on manufactured equipment and material • Petro Chemical industry operational requirements • Mining industry • Working at heights • Steel fabrication industry
  • 4. Company safety management system requirements • Gap analysis regarding current system. • Creation of custom tailored system according to ISO and NOSA standards. • Training of employees and role out and implementation of systems. • Auditing of systems drafting of corrective and preventative measures. • Assisting in determining of “Suitability and Effectiveness” of systems. • System maintenance when required. • Training needs analysis. • Awareness programs and propaganda (Safety, Health, Environmental, Quality, Security).
  • 5. Safety Profile • Safety stats analysis in determining leading and lagging indicators. • Documented Hazard identification and Risk assessment. • Drafting of Base line / issue based risk assessments • Drafting and implementation of mitigation. • Coaching in mitigation. • Planned task observation coaching and implementation. • Safety behaviour observation coaching and implementation. • Assisting with the development of Method statements, Work instructions, Safe working procedures coaching of staff with regards to the use thereof. • Accident investigations and report writing. • Facilitation of accident and incident investigations. • Creation of legal appointments. • Creation and approval of Safety plans. • Maintenance of Site/Project Safety files. • Creation and maintenance of Legal registers (Safety, Environment). • Drafting and implementation of Fall protection plans. • Drafting of traffic management plans. • Emergency contingency planning. • Creation and maintenance of Medical surveillance data base. • Fleet management coal logistics (coal transporters).
  • 6. Quality Profile • Document and data control (Templates and document registers) • Drafting, implementation and coaching regarding Quality management plans • Drafting of ITP(inspection and tests plans) • Creation and maintenance of asset register • Creation of all registers required (Data pack per activity) • Creation of database that will enable compliance regarding of calibration of equipment • Site inspection on current process. • Galvanizing pre and post inspections • Review of lab reports • Product non conformance and rework investigations and report writing • Customer satisfaction reports and analysis. • Management of system deficiency reports ( corrective and preventative actions). • Record keeping of reworks • Preventative and corrective maintenance records.
  • 7. Environmental Profile • Waste management/Waste Streams • Hazardous chemical management • Environmental Law • Environmental risk registers • Environmental awareness campaigns
  • 8. Pricing Profile • Daily consulting fee: R 4 000.00 daily rate. • Hourly consulting fee: R 650.00 hourly rate. • System maintenance weekly: R 650.00 per week. • System maintenance monthly: R 2 600.00 per month. • Accident/Incident investigations daily rate: R 4 000.00 per day. • Rework or product failure investigation daily rate: R 4 000.00 per day. • System design project specific: R 4 500.00 per project. • System implementation: R 2 500.00 per hour. • SHEQ tender file compilation client specifications: R 5 000.00 per project. • SHEQ tender file compilation BML documentation: R 8 000.00 per project. • Coaching staff on SHEQ system implementation: R 4 000.00 per day. • In house training development: R 2 500.00 per module. • In house training workshops: R 5 000.00 per day. • Incident, accidents, reworks analysis and trending: R 2 500.00 per project. • Facilitation of statutory meetings and drafting of R 2 500.00 per meeting. minutes and agenda All accommodation and travelling substance allowances will be based on current and local AA rates. For all questions and further enquiry please do not hesitate to contact us 24/7 leave your detail in our mailbox and we will contact You. We can also source and assist with the placement of competent personnel. No job to big or to small Our contact detail is: bmlsheqsolutions@gmail.com