Author: Muhammad Jabakhanji | Alpin Limited
Content:
- Understanding main concepts of the UK BIM (and ISO) standards
- Recognition of the role of BIM in the project lifecycle
- Appreciation of steps required to adopt best practices, if not the entire standards
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
1. 1Muhammad Jabakhanji – Alpin Limited
Perspectives on UK BIM Standards
& Local Adoption
Muhammad Jabakhanji
Head of VDC + BIM
ALPIN Limited
2. 2Muhammad Jabakhanji – Alpin Limited
Agenda...
• Motivation for BIM policy and adoption
• Approach
• The Solution: BS1192 Suite of Standards
• ISO19650 Key Concepts
• Food for Thought
4. 4Muhammad Jabakhanji – Alpin Limited
Consistent Findings
Latham Report
1994
Egan Report
1998
Never Waste
A Good Crisis
2009
Accelerating
Change
2002
5. 5Muhammad Jabakhanji – Alpin Limited
Enough is enough !
There is a detailed programme of measures
Government will take that will reduce costs
by up to 20% by the end of this parliament.
Government will require fully collaborative
3D BIM (with all project and asset
information, documentation and data being
electronic) as a minimum by 2016. A staged
plan will be published with mandated
milestones showing measurable progress at
the end of each year.
Construction
Strategy
2011
6. 6Muhammad Jabakhanji – Alpin Limited
Let’s set objectives…
0 - Unmanaged CAD probably 2D, with paper (or
electronic paper) as the most likely data exchange
mechanism.
1 - Managed CAD in 2 or 3D format using BS
1192:2007 with a collaboration tool providing a
common data environment, possibly some standard
data structures and formats. Commercial data
managed by standalone finance and cost
management packages with no integration.
2 - Managed 3D environment held in separate
discipline “BIM” tools with attached data.
Commercial data managed by an Enterprise Resource
Planning System (ERP). Integration on the basis of
proprietary interfaces or bespoke middleware could
be regarded as “pBIM” (proprietary). The approach
may utilise 4D Programme data and 5D cost
elements.
3 - Fully open process and data integration enabled by
IFC / IFD. Managed by a collaborative model server.
Could be regarded as iBIM or integrated BIM
potentially employing concurrent engineering
processes.
7. 7Muhammad Jabakhanji – Alpin Limited
Core Documents
PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2015
Soft Landings Classification Digital Plan of WorkBIM Protocol
BS1192-2007
8. 8Muhammad Jabakhanji – Alpin Limited
Supporting Documentation
Post Contract Award
BIM Execution Plan
CPIx BIM
Assessment
CPIx IT
Assessment
Pre-Contract
BIM Execution Plan
9. 9Muhammad Jabakhanji – Alpin Limited
More Supporting Documentation
CIC Scope of Service CIC Indemnity
Insurance Guide
BIM Task Group
EIR Guide
10. 10Muhammad Jabakhanji – Alpin Limited
No more blockers for adoption!
– Need for Change
– Resources for Change
– Legal Implications
– Contractual Arrangements
– Professional Indemnity
– Ownership
– SMPs
11. 11Muhammad Jabakhanji – Alpin Limited
ISO19650
As a response to an International Drive for BIM level 2
ISO 19650 series is being developed
“Organization of information about construction works -
Information management using BIM”
17. 17Muhammad Jabakhanji – Alpin Limited
Image from PAS 1192-3:2014
Employer’s
Information
Requirements
18. 18Muhammad Jabakhanji – Alpin Limited
Image from PAS 1192-3:2014
Non-Graphical ModelGraphical Model
What is a model?
19. 19Muhammad Jabakhanji – Alpin Limited
Employers Decision Points
• “When the Employer requires information to
make decisions…”
• Suppliers information exchanges as required to
provide information
22. 22Muhammad Jabakhanji – Alpin Limited
Procurement: BEP
Pre Contract BIM Execution
Plan:
Is prepared by the supplier to
demonstrate his proposed
approach, and the capability,
capacity and competence of
his firm and his supply chain
to meet the Employers
Information Requirements.
25. 25Muhammad Jabakhanji – Alpin Limited
Contract Management & Handover
Image from PAS 1192-2:2013
26. 26Muhammad Jabakhanji – Alpin Limited
Common Data Environment (CDE)
CDE
Work in Progress
WIP
Non-verified data
used by one team
only
Document
Published
coordinated and
validated data
Share
Verified data that
can be shared
between teams
Archive
Data maintained for
knowledge and
legacy
CoordinatedPrivate Published
Production Deliverable output
Stored
Project / programme controlLocal control
27. 27Muhammad Jabakhanji – Alpin Limited
Information Management Roles
• Project Delivery Manager
• Project Information Manager
• Lead Designer
• Task Team Manager
• Task Information Manager
• Task Interface Manager
30. 30Muhammad Jabakhanji – Alpin Limited
BIM Education & Certification Pathway
BIM International
Foundation Course
STAGE 1
EDUCATION EXAM AWARD
2 days
Information Management
STAGE 2
EDUCATION EXAM AWARD
2 days
Project Delivery Management
STAGE 3
EDUCATION EXAM AWARD
1 day
BIM Level 2 / ISO19650
Certificated Professional
Project/Task Information
Manager
BIM Level 2 / ISO19650
Certificated Professional
Project Delivery Manager
Certificated Professionals
31. 31Muhammad Jabakhanji – Alpin Limited
Thank You!
BIM International
Foundation Course
STAGE 1
EDUCATION EXAM AWARD
2 days
BIM International 2 Day Course
DECEMBER 14-15, DOHA
Register on :
alpinme.com/courses/
OR
bre.co.uk/academy/training.jsp
Enter the following code for a 15% Discount:
“BIMInternational15”