SlideShare a Scribd company logo
1 of 3
Download to read offline
AZLAN BIN MOHD NOOR
NO1, JALAN ALOR ARA,
KUBANG GAJAH, 02600 ARAU, PERLIS
Tel: +60147431799 Email: azlan_noor88@yahoo.com
Bachelor of System Electrical Engineering (Hons), UNIMAP Malaysia, 2012
Age: 28 years old
Objective
To exceed expectations in a position that contributes to the success of a growing organization. Experience
problem solving, decision-making using data and interest in learning new skills. Interested in travel and
willing to relocate.
Education Background
Bachelor Degree in Electrical System Engineering
CGPA: 2.64/4.0
Universiti Malaysia Perlis (UNIMAP) , 2012
Executive Summary
Mr Azlan, Degree holder in Electrical System Engineering, age 28 years old and has about 4 years of working
experience in First Solar, Qdos Flexcircuit Sdn Bhd and also contract work at Forster Thermal engineering.
Experience includes:
 Lead Operations group to ensure Process & Quality and business objectives/goals are met.
 Planning, organizing, controlling of daily activities & allocation of resources to achieve required
volume and orders.
 Chairman for weekly operation review of inefficiencies and losses within team together with corrective
actions to improve and sustain results.
 Provide leadership on assigned projects to develop proficiency, establish methods, practices, and
concepts that are weighted by Six Sigma methodology and focused on Lean Manufacturing Principles.
Working Experience
Company Name : First Solar (M) Sdn Bhd
Position Title : Manufacturing Engineering Engineer I
Duration : Jan 2015 – Present
Reporting to : Engineering Manager
Main Responsibilities:
 Experience in Vacuum technology RGA, helium leak check, vacuum Pump, piping system, operation and
maintenance
 Understanding of Surface Chemistry and spectroscopy .
 Maintain cross-functional communication with Production, Process Engineering, Facilities and
Installation teams
 Able to use statistical analysis tool such as JMP and SQL Database to analyze any issue regarding to
line
 Able to perform scripting in both JMP and SQL
 Planning, organizing, controlling of daily activities & allocation of resources to achieve required volume
and orders.
 Chairman for weekly operation review of inefficiencies and losses within team together with corrective
actions to improve and sustain results.
 Strategize with management to ascertain top priorities and how best to drive process and culture
change.
 Incorporate Six Sigma principles in product analyses (DOE, acceptance criteria, sampling, root cause
analysis, control charts, capability analysis, etc.).
 Drive KAIZEN across a variety of areas using the breadth of the lean toolbox (DMAIC approach, PDCA
cycle) to drive continuous improvement in work standardization which relates to material and
information flow.
 Working with 100% real time Statistical Process Control (SPC) monitoring for machine
parameters/output parameters and reach back on the tolerance provided.
 Ensure that all WI, SOPs and quality control plans are completed and ensure quality standards and
procedures are followed during shift to produce good quality products.
 Involve in quality issue discussion to provide short term, long term preventive action on any excursion in
operation and applied root cause analysis using problem solving tools (5 why analysis, ishikawa
diagram, etc.) when goals are not met.
Company Name : Qdos Flexcircuit Sdn Bhd
Position Title : Process Engineer
Duration : Jan 2014 – Jan 2015
No. of Subordinates : 2 Technicians
Reason for Leaving : Looking for better career opportunity
Main Responsibilities:
Area of Proficiency : Process & Maintenance
 Overall process control regarding the mechanical cluster
 Focus understanding in machinery CNC laser drilling, CNC Drilling, UV laser, Plasma Etching, Pick and
place machine (assembly)
 Responsible for the overall yield improvement of assembly processes. Ensuring the process works at the
optimum level, to the right rate and quality of output, in order to meet supply needs.
 Reviewing existing data to see if more research and information need to be collated for yield
improvement activities
 Leads projects and teams investigation, problem analysis and implementation of solutions. Develop
action plans to analyze performance variance and implement or recommend corrective action.
 Develop and perform verification and validation plans and protocols associated with product/process
quality according to ISO, internal and customer requirements.
 Lead cross-functional teams to analyze and drive solutions to product quality problems.
 Lead process and quality data analysis and reporting, including product data reporting as required by
customers.
 Working closely with other specialists, including: QA responsible for the quality control of raw
materials, intermediates and finished products; engineers responsible for plant maintenance;
commercial colleagues on product specifications and production schedules; and the operating crew.
 Attends to all customer issues, provides data analysis and their corrective and preventive measures.
 Provide Engineering report on process performance, current activities and project status through Pareto
Analysis.
 Knowledge & Skills
 Design of Experiment, DOE
 FMEA
 Statistical Process Control, SPC
 Product Development
 Fundamental Problem Solving: Quality Improvement and Problem Solving (7QC Tools & 8D Principles).
 Familiar with 5 why analysis, Pareto, Histogram & Ishikawa diagram.
 Lean Six Sigma & Value Stream Mapping/lean manufacturing experiences.
 Occupational Safety and Health Awareness
 ISO 9001:2000 Quality Management System
 ISO 14001:2004 Environmental Management System
 AutoCAD for construct basic engineering drawing
 Programming C++ language,JM
 MAXIMO, JMP 10, Datalyzer, Minitab, Microsoft Project, Microsoft Office
Professional Accomplishments
 Coordinate new product introduction (NPI) and product transfer as project leader and responsible to
ensure product qualification meet specification.
 Experienced in equipment, tooling and process improvements activities which required to cooperate
with vendors and First solar to improve yield and production.
 Conducted training or briefing to all trainers regarding any new work instruction introduced in
production line.
 Experienced in installation projects, hands on problem solving, cost estimating, technical writing,
blueprint and specification interpretation, cost reduction techniques, and quality requirements.
 Familiar with ISO 9001:2000 and ISO 14001:2004
 Able to handle projects and managed man power after completed a project management
 Experienced in equipment and materials handling in hazzardous enviroment
Language
Well Spoken & Written : Bahasa Malaysia, English
References
Mohd Azrul Shah
Production Supervisor,
Qdos Flexcircuit Sdn Bhd, Penang
Tel: +601129250174
Suresh Nalikrishnan
Construction Manager,
Foster Thermal Engineering
Shah Alam, Selangor Darul Ehsan, Malaysia
Tel: 012- 2449014,
Email: suresh@fostermsia.com
Kamarulnizam Dzulkifli
Mfg Engineer
First Solar SDN BHD (Kulim)
Kamarulnizam.Dzulkifli@firstsolar.com
Tel: +60134222232
Notice Period: 2 months
Education
2004 – 2008
Bachelor of Engineering (Electrical System) (Hons)
Universiti Malaysia Perlis
2nd Class Upper
2003 – 2004 Perlis Matriculation College (Science) CGPA 3.48
2000 – 2005 Sekolah Menengah Kebangsaan Dato Sheikh Ahmad SPM, PMR

More Related Content

What's hot

What's hot (20)

Lewis FINALDRAFT810
Lewis FINALDRAFT810Lewis FINALDRAFT810
Lewis FINALDRAFT810
 
David mackin resume 1 (2)
David mackin resume 1 (2)David mackin resume 1 (2)
David mackin resume 1 (2)
 
Product Quality
Product Quality Product Quality
Product Quality
 
Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016
 
Resume updated
Resume updatedResume updated
Resume updated
 
PMP : Webinar on Quality Planning
PMP : Webinar  on Quality PlanningPMP : Webinar  on Quality Planning
PMP : Webinar on Quality Planning
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Resume 6-18-2016
Resume 6-18-2016Resume 6-18-2016
Resume 6-18-2016
 
Project quality management
Project quality managementProject quality management
Project quality management
 
resume G.Roul
resume G.Roulresume G.Roul
resume G.Roul
 
V5.0.1
V5.0.1V5.0.1
V5.0.1
 
Donna Firks CV1
Donna Firks CV1Donna Firks CV1
Donna Firks CV1
 
Pashkin Stan
Pashkin StanPashkin Stan
Pashkin Stan
 
Ismael_Rdguez_resume11
Ismael_Rdguez_resume11Ismael_Rdguez_resume11
Ismael_Rdguez_resume11
 
Designing for performance
Designing for performanceDesigning for performance
Designing for performance
 
CustomerCopy_doc_doc
CustomerCopy_doc_docCustomerCopy_doc_doc
CustomerCopy_doc_doc
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Omar Alvarado Resume (07FEB2017)
Omar Alvarado Resume (07FEB2017)Omar Alvarado Resume (07FEB2017)
Omar Alvarado Resume (07FEB2017)
 
Six Sigma & Process Capability
Six Sigma & Process CapabilitySix Sigma & Process Capability
Six Sigma & Process Capability
 
Dana maureeengruszczinski
Dana maureeengruszczinskiDana maureeengruszczinski
Dana maureeengruszczinski
 

Similar to Resume-Azlan-Nov16

Similar to Resume-Azlan-Nov16 (20)

jhon_dechavez resume
jhon_dechavez resumejhon_dechavez resume
jhon_dechavez resume
 
Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6
 
Mohammed Ayyad Resume
Mohammed Ayyad ResumeMohammed Ayyad Resume
Mohammed Ayyad Resume
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315
 
TLDSumanth_profile
TLDSumanth_profileTLDSumanth_profile
TLDSumanth_profile
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017
 
Priyesh
PriyeshPriyesh
Priyesh
 
RESUME2
RESUME2RESUME2
RESUME2
 
SHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CVSHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CV
 
Ajit Kumar
Ajit KumarAjit Kumar
Ajit Kumar
 
Ajit Kumar
Ajit KumarAjit Kumar
Ajit Kumar
 
Sagar r.cv
Sagar r.cvSagar r.cv
Sagar r.cv
 
1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 p1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 p
 
1b1 mukund kamdar-resume-6 p
1b1 mukund kamdar-resume-6 p1b1 mukund kamdar-resume-6 p
1b1 mukund kamdar-resume-6 p
 
production engineer
production engineerproduction engineer
production engineer
 
Abhishek resume
Abhishek resumeAbhishek resume
Abhishek resume
 
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Resume @ 20150608
Resume @ 20150608Resume @ 20150608
Resume @ 20150608
 

Resume-Azlan-Nov16

  • 1. AZLAN BIN MOHD NOOR NO1, JALAN ALOR ARA, KUBANG GAJAH, 02600 ARAU, PERLIS Tel: +60147431799 Email: azlan_noor88@yahoo.com Bachelor of System Electrical Engineering (Hons), UNIMAP Malaysia, 2012 Age: 28 years old Objective To exceed expectations in a position that contributes to the success of a growing organization. Experience problem solving, decision-making using data and interest in learning new skills. Interested in travel and willing to relocate. Education Background Bachelor Degree in Electrical System Engineering CGPA: 2.64/4.0 Universiti Malaysia Perlis (UNIMAP) , 2012 Executive Summary Mr Azlan, Degree holder in Electrical System Engineering, age 28 years old and has about 4 years of working experience in First Solar, Qdos Flexcircuit Sdn Bhd and also contract work at Forster Thermal engineering. Experience includes:  Lead Operations group to ensure Process & Quality and business objectives/goals are met.  Planning, organizing, controlling of daily activities & allocation of resources to achieve required volume and orders.  Chairman for weekly operation review of inefficiencies and losses within team together with corrective actions to improve and sustain results.  Provide leadership on assigned projects to develop proficiency, establish methods, practices, and concepts that are weighted by Six Sigma methodology and focused on Lean Manufacturing Principles. Working Experience Company Name : First Solar (M) Sdn Bhd Position Title : Manufacturing Engineering Engineer I Duration : Jan 2015 – Present Reporting to : Engineering Manager Main Responsibilities:  Experience in Vacuum technology RGA, helium leak check, vacuum Pump, piping system, operation and maintenance  Understanding of Surface Chemistry and spectroscopy .  Maintain cross-functional communication with Production, Process Engineering, Facilities and Installation teams  Able to use statistical analysis tool such as JMP and SQL Database to analyze any issue regarding to line  Able to perform scripting in both JMP and SQL  Planning, organizing, controlling of daily activities & allocation of resources to achieve required volume and orders.  Chairman for weekly operation review of inefficiencies and losses within team together with corrective actions to improve and sustain results.  Strategize with management to ascertain top priorities and how best to drive process and culture change.
  • 2.  Incorporate Six Sigma principles in product analyses (DOE, acceptance criteria, sampling, root cause analysis, control charts, capability analysis, etc.).  Drive KAIZEN across a variety of areas using the breadth of the lean toolbox (DMAIC approach, PDCA cycle) to drive continuous improvement in work standardization which relates to material and information flow.  Working with 100% real time Statistical Process Control (SPC) monitoring for machine parameters/output parameters and reach back on the tolerance provided.  Ensure that all WI, SOPs and quality control plans are completed and ensure quality standards and procedures are followed during shift to produce good quality products.  Involve in quality issue discussion to provide short term, long term preventive action on any excursion in operation and applied root cause analysis using problem solving tools (5 why analysis, ishikawa diagram, etc.) when goals are not met. Company Name : Qdos Flexcircuit Sdn Bhd Position Title : Process Engineer Duration : Jan 2014 – Jan 2015 No. of Subordinates : 2 Technicians Reason for Leaving : Looking for better career opportunity Main Responsibilities: Area of Proficiency : Process & Maintenance  Overall process control regarding the mechanical cluster  Focus understanding in machinery CNC laser drilling, CNC Drilling, UV laser, Plasma Etching, Pick and place machine (assembly)  Responsible for the overall yield improvement of assembly processes. Ensuring the process works at the optimum level, to the right rate and quality of output, in order to meet supply needs.  Reviewing existing data to see if more research and information need to be collated for yield improvement activities  Leads projects and teams investigation, problem analysis and implementation of solutions. Develop action plans to analyze performance variance and implement or recommend corrective action.  Develop and perform verification and validation plans and protocols associated with product/process quality according to ISO, internal and customer requirements.  Lead cross-functional teams to analyze and drive solutions to product quality problems.  Lead process and quality data analysis and reporting, including product data reporting as required by customers.  Working closely with other specialists, including: QA responsible for the quality control of raw materials, intermediates and finished products; engineers responsible for plant maintenance; commercial colleagues on product specifications and production schedules; and the operating crew.  Attends to all customer issues, provides data analysis and their corrective and preventive measures.  Provide Engineering report on process performance, current activities and project status through Pareto Analysis.  Knowledge & Skills  Design of Experiment, DOE  FMEA  Statistical Process Control, SPC  Product Development  Fundamental Problem Solving: Quality Improvement and Problem Solving (7QC Tools & 8D Principles).
  • 3.  Familiar with 5 why analysis, Pareto, Histogram & Ishikawa diagram.  Lean Six Sigma & Value Stream Mapping/lean manufacturing experiences.  Occupational Safety and Health Awareness  ISO 9001:2000 Quality Management System  ISO 14001:2004 Environmental Management System  AutoCAD for construct basic engineering drawing  Programming C++ language,JM  MAXIMO, JMP 10, Datalyzer, Minitab, Microsoft Project, Microsoft Office Professional Accomplishments  Coordinate new product introduction (NPI) and product transfer as project leader and responsible to ensure product qualification meet specification.  Experienced in equipment, tooling and process improvements activities which required to cooperate with vendors and First solar to improve yield and production.  Conducted training or briefing to all trainers regarding any new work instruction introduced in production line.  Experienced in installation projects, hands on problem solving, cost estimating, technical writing, blueprint and specification interpretation, cost reduction techniques, and quality requirements.  Familiar with ISO 9001:2000 and ISO 14001:2004  Able to handle projects and managed man power after completed a project management  Experienced in equipment and materials handling in hazzardous enviroment Language Well Spoken & Written : Bahasa Malaysia, English References Mohd Azrul Shah Production Supervisor, Qdos Flexcircuit Sdn Bhd, Penang Tel: +601129250174 Suresh Nalikrishnan Construction Manager, Foster Thermal Engineering Shah Alam, Selangor Darul Ehsan, Malaysia Tel: 012- 2449014, Email: suresh@fostermsia.com Kamarulnizam Dzulkifli Mfg Engineer First Solar SDN BHD (Kulim) Kamarulnizam.Dzulkifli@firstsolar.com Tel: +60134222232 Notice Period: 2 months Education 2004 – 2008 Bachelor of Engineering (Electrical System) (Hons) Universiti Malaysia Perlis 2nd Class Upper 2003 – 2004 Perlis Matriculation College (Science) CGPA 3.48 2000 – 2005 Sekolah Menengah Kebangsaan Dato Sheikh Ahmad SPM, PMR