Evolution of TPM:
 1940 – Breakdown Maintenance ( If it isn't broken, don’t fix it)
 1950 – Preventive Maintenance ( Time based Maintenance)
 1960 – Productive Maintenance ( Condition Monitoring, Maintability
improvement )
 1970 – TPM (Productive Maintenance + Total Employee
Participation)
 1980 – Predictive Maintenance ( Condition based Maintenance)
 1990 – Maintenance Prevention Design
 2000 – TPM in “The Factory of The Future”
2
z
Concept of TPM:
 There are many definition of TPM but most simple one is this:
 TPM is a philosophy of manufacturing that focuses on the effective
relationship of workers to equipment and meaning (identity) &
elimination of waste.
 Total Productive Maintenance is a holistic approach to equipment
maintenance that integrates maintenance activities with the
manufacturing process. It seeks to reduce time and production waste,
eliminate small stops and breakdowns, eradicate workplace accidents
and achieve perfect production. As a lean manufacturing strategy and
cornerstone of loss reduction, TPM manufacturing depends on your
workers taking proactive measures to prevent downtime and
environmental issues, as well as encourage a safe and healthy work
environment—all while improving productivity.
3
z Why Implement TPM in Your Factory?
•A goal of TPM is to keep machines running in their optimal condition. By properly maintaining
equipment and proactively mitigating wear and breakdown risks, plant managers can reduce
the amount of scrap and product defects that result from the process.
Reduce waste and
product defects
•TPM calls for workers to actively step up and take care of their equipment—even before an
issue arises. As a result, workers are accomplishing much more than just clocking into the
factory each day. Rather, they’re taking greater ownership of their machines, which adds a
valuable social aspect to their job function.
Empower your workers
•Expanding on the previous point, TPM minimizes manufacturing scrap and product defects,
reducing material costs. Maximizing uptime through proper equipment care also means you
can ship goods quickly once they come off production lines, which lowers your inventory
costs.
Reduce operating costs
• TPM seeks to eliminate health and safety risks, leading to a safer workplace that has
no adverse effects on workers’ physical or mental health.
Minimize safety issues
• By nature, less equipment breakdowns means your machines are running
for longer periods of time, increasing your overall output.
Increase productivity
rates
• TPM requires taking preventative, rather than just reactive, quality checks, ensuring all
systems and processes are contributing to the production of high-quality products.
Not only does this reduce the amount of product defects, but it can also minimize the
amount of customer complaints.
Take a proactive
approach to quality
4
z
The Goals of TPM
 Based on the discussed reasons, we can say that the goal of TPM
manufacturing is to eliminate the following plant issues in order to
achieve a perfect production:
5
Perfect
Production
•Equipment
breakdowns
•Product
defects and
scrap
•Small stops or
slow-running
machinery
•Safety and
environmental
issues
z The True Cost of Maintenance:
6
Easy to measure
Low Impact on
Profit
Labour,
Material/spares,
outside services
Change overs
Setup & Adjust
Idling and minor
stoppages
Breakdown
Running at
Reduced Speed
Start up
losses
Late Delivery
Ineffective use
of skill
Poor Image
Low Flexibility
Difficult to
measure
High Impact on
Profit
z The eight TPM Pillars
7
z Focused Improvement
 All operators and technical personnel are encouraged to work together with the
common goal of achieving regular improvements in equipment operation. These
continuous improvement activities—also known as “kaizen” from a lean
manufacturing perspective—go a long way toward identifying and resolving recurring
production issues.
 This pillar supports all the other TPM pillars, as it can help plant managers determine
which aspect of their manufacturing operation needs improvement based on the
company’s overall vision. For example, one company may want to reduce the number
of safety incidents, while another may want to reduce its raw material cost per ton.
Once a goal is identified, this pillar supports various plans of action that can maximize
equipment efficiency and reduce operational losses.
 These activities can include:
● Implementing root cause analyses (RCA) to eliminate breakdowns.
● Creating quality management matrices to identify quality issues.
● Instituting recurring kaizen-based meetings to manage teams and brainstorm
solutions.
8

More Related Content

Similar to Introduction To TPM by Ashish Trivedi.pptx

Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14ranviry49
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
Anintroductiontototalproductivemaintenance[1]
Anintroductiontototalproductivemaintenance[1]Anintroductiontototalproductivemaintenance[1]
Anintroductiontototalproductivemaintenance[1]DEC
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsPaul Robere
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfHimanshuGupta26467
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd Patterson
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsRohit Singh
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 

Similar to Introduction To TPM by Ashish Trivedi.pptx (20)

TQM TPM
TQM TPMTQM TPM
TQM TPM
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Anintroductiontototalproductivemaintenance
AnintroductiontototalproductivemaintenanceAnintroductiontototalproductivemaintenance
Anintroductiontototalproductivemaintenance
 
Anintroductiontototalproductivemaintenance[1]
Anintroductiontototalproductivemaintenance[1]Anintroductiontototalproductivemaintenance[1]
Anintroductiontototalproductivemaintenance[1]
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenance
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Introduction To TPM by Ashish Trivedi.pptx

  • 1. z Introduction To Total Productive Maintenance Prepared By: Ashish Trivedi – Lead Engineer Production Nayan Prajapati – Engineer N.F. Ashapura Perfoclay Limited- Bhuj
  • 2. z Evolution of TPM:  1940 – Breakdown Maintenance ( If it isn't broken, don’t fix it)  1950 – Preventive Maintenance ( Time based Maintenance)  1960 – Productive Maintenance ( Condition Monitoring, Maintability improvement )  1970 – TPM (Productive Maintenance + Total Employee Participation)  1980 – Predictive Maintenance ( Condition based Maintenance)  1990 – Maintenance Prevention Design  2000 – TPM in “The Factory of The Future” 2
  • 3. z Concept of TPM:  There are many definition of TPM but most simple one is this:  TPM is a philosophy of manufacturing that focuses on the effective relationship of workers to equipment and meaning (identity) & elimination of waste.  Total Productive Maintenance is a holistic approach to equipment maintenance that integrates maintenance activities with the manufacturing process. It seeks to reduce time and production waste, eliminate small stops and breakdowns, eradicate workplace accidents and achieve perfect production. As a lean manufacturing strategy and cornerstone of loss reduction, TPM manufacturing depends on your workers taking proactive measures to prevent downtime and environmental issues, as well as encourage a safe and healthy work environment—all while improving productivity. 3
  • 4. z Why Implement TPM in Your Factory? •A goal of TPM is to keep machines running in their optimal condition. By properly maintaining equipment and proactively mitigating wear and breakdown risks, plant managers can reduce the amount of scrap and product defects that result from the process. Reduce waste and product defects •TPM calls for workers to actively step up and take care of their equipment—even before an issue arises. As a result, workers are accomplishing much more than just clocking into the factory each day. Rather, they’re taking greater ownership of their machines, which adds a valuable social aspect to their job function. Empower your workers •Expanding on the previous point, TPM minimizes manufacturing scrap and product defects, reducing material costs. Maximizing uptime through proper equipment care also means you can ship goods quickly once they come off production lines, which lowers your inventory costs. Reduce operating costs • TPM seeks to eliminate health and safety risks, leading to a safer workplace that has no adverse effects on workers’ physical or mental health. Minimize safety issues • By nature, less equipment breakdowns means your machines are running for longer periods of time, increasing your overall output. Increase productivity rates • TPM requires taking preventative, rather than just reactive, quality checks, ensuring all systems and processes are contributing to the production of high-quality products. Not only does this reduce the amount of product defects, but it can also minimize the amount of customer complaints. Take a proactive approach to quality 4
  • 5. z The Goals of TPM  Based on the discussed reasons, we can say that the goal of TPM manufacturing is to eliminate the following plant issues in order to achieve a perfect production: 5 Perfect Production •Equipment breakdowns •Product defects and scrap •Small stops or slow-running machinery •Safety and environmental issues
  • 6. z The True Cost of Maintenance: 6 Easy to measure Low Impact on Profit Labour, Material/spares, outside services Change overs Setup & Adjust Idling and minor stoppages Breakdown Running at Reduced Speed Start up losses Late Delivery Ineffective use of skill Poor Image Low Flexibility Difficult to measure High Impact on Profit
  • 7. z The eight TPM Pillars 7
  • 8. z Focused Improvement  All operators and technical personnel are encouraged to work together with the common goal of achieving regular improvements in equipment operation. These continuous improvement activities—also known as “kaizen” from a lean manufacturing perspective—go a long way toward identifying and resolving recurring production issues.  This pillar supports all the other TPM pillars, as it can help plant managers determine which aspect of their manufacturing operation needs improvement based on the company’s overall vision. For example, one company may want to reduce the number of safety incidents, while another may want to reduce its raw material cost per ton. Once a goal is identified, this pillar supports various plans of action that can maximize equipment efficiency and reduce operational losses.  These activities can include: ● Implementing root cause analyses (RCA) to eliminate breakdowns. ● Creating quality management matrices to identify quality issues. ● Instituting recurring kaizen-based meetings to manage teams and brainstorm solutions. 8