SlideShare a Scribd company logo
1 of 33
Instrument Approach Procedures
GSR 751 E Provision & PANS -OPS
Arvind Kumar Singh
CHQ,New Delhi
Instrument Approach to Land
(IAL) procedures
6/20/2020 2
Why are they required?
Clear sky and great visibility
6/20/2020 3
6/20/2020 4
Shallow Fog
6/20/2020 5
Dense Fog/Cloud
 A series of predetermined manoeuvres
 By reference to flight instruments
 With specified protection from obstacles from the initial
approach fix, or where applicable, from the beginning of a
defined arrival route to a point from which a landing can be
completed and
 Thereafter, if a landing is not completed, to a position at which
holding or en-route obstacle clearance criteria apply.
6/20/2020 6
IAL Procedure
Role of PANS-OPS in NOC
 Flight procedures are designed for normal operations as per the provisions
of ICAO DOC 8168 Vol-II.
 As any structure erected around an airport may adversely impact the Flight
Procedures.
 Regulate the permissible height of the proposed structure with respect to
Flight Procedures.
 Any adverse impact on Flight procedures due to any structure will adversely
impact the aircraft operations.
 To protect Flight procedures, permissible height of an structures needs to be
regulated from PANS-OPS criteria.
 Accordingly, NOC for height issued to any structure is the least of AGA, CNS
and PANS-OPS.
 Minimum Sector Altitude (MSA)
 Minimum Holding Altitude (MHA)
 Minimum Vectoring Altitude (MVA)
 Minimum Altitude of Initial and Intermediate Segments
 OCA/H (Straight-in-and Circling) for all aircraft categories
 STARs /SIDs procedure altitude.
 Basic ILS Surface
6/20/2020 8
PANS-OPS Criteria(GSR 751 E)
Segments of IAP
 Instrument Approach Procedure segments to be
protected:
1. Arrival Route
2. Initial Approach Segment
3. Intermediate Approach Segment
4. Final Approach Segment
5. Missed Approach Segment
6. In addition, an area for Visual Circling is
considered
6/20/2020 9
10
IAF
FAF IF
MAPt
Intermediate
Approach
Segment
Runway
Segments of IAP
6/20/2020 11
Types of Instrument Approach
Procedures
1. Non Precision Approach-VOR/DME, NDB
2. Precision Approach-ILS
3. RNAV (GNSS)
LNAV,LNAV/VNAV,LPV& RNP AR
6/20/2020 12
Non-Precision Approach
• In India MDH 400 Ft OR More
• Taking a fictitious obstacle of 45 M AGL
• DGCA CAR Section 8 (Aircraft Operations) Series C Part 1
(AWO)
• Visibility Requirement
MDH FALS IALS BALS NALS
400 1100 1400 1600 1800
6/20/2020 13
Precision Approach Categories
CATEGORY DH (ft) VIS (M) RVR( M)
I >=200 800 550
II >=100 - 350
III A 50-100 - 175
III B <50 - 50
III C NO - NO
6/20/2020 14
VOR/NDB Protection Area
6/20/2020 15
Basic ILS Surface Area
6/20/2020 16
Protection Area For RNAV (GNSS)
Approach Slope For Safe Landing
6/20/2020 17
PANS-OPS Criteria
Minimum Sector Altitude(MSA) – 30 NM around a nav-aid or
significant point of the airport, providing at least 1000 ft of MOC
over any obstacle.
Minimum Holding Altitude(MHA) – At least 1000 ft of MOC over
any obstacle in the specified area.
Initial Approach Altitude - At least 1000 ft of MOC over any
obstacle in the specified area.
Intermediate Approach Altitude - At least 500 ft of MOC over any
obstacle in the specified intermediate approach area.
Obstacle Clearance Altitude(OCA straight –in) - At least 300/250 ft
of MOC over any obstacle in the specified final approach area.
Obstacle Clearance Altitude(OCA Circling) - At least 300/400 ft of
MOC over any obstacle in the specified circling approach area.
6/20/2020 19
Minimum Sector Altitute
MSA: 2300 Ft
Controlling Obstacle
2300-1000=1300 ft
6/20/2020 20
Visual Circling
OCA: 770 Ft
Controlling Obstacle
770-300=470 ft
6/20/2020 21
VOR Procedure
OCA: 670 Ft
Controlling Obstacle
670-250=420 ft
6/20/2020 22
ILS Procedure
OCA: 530 Ft
Controlling Obstacle
530-161=369 ft
6/20/2020 23
LNAV VNAV Procedure
OCA(LNAV): 670 Ft
Controlling Obstacle
670-250=420 ft
OCA(LNAV/VNAV): 590 Ft
Controlling Obstacle
590-161=429 ft
6/20/2020 24
LPV Procedure
OCA: 520 Ft
Controlling Obstacle
520-161=359 ft
CASE STUDIES
VOR-VOMM RWY 07
ILS-VOMM RWY 25
6/20/2020 25
6/20/2020 26
Analysis Case
Study-1
OCA: 810(770 Ft)
Controlling
Obstacle
810-250=560 Ft
6/20/2020 27
x=1.8NM, y=0.6NM
TE 700ft
Analysis Case Study-1
Analysis Case Study-1
 X=1.8 NM
 Y=0.6 NM
 AGA=45M+THR ELEV(12 M)=57M
 PANS OPS=170M(560 Ft)
 REQUESTED TE=213M(700 ft)
6/20/2020 28
6/20/2020 29
Analysis Case
Study-1
OCA: 330(278)
Controlling Obstacle
330-161=169 ft
Basic ILS
6/20/2020 30
Analysis Case Study-2
6/20/2020 31
x=3 NM, y=0.6NM
TE 160M
Analysis Case Study-2
Analysis Case Study-2
 X=3 NM
 Y=0.6 NM
 AGA=45M+THR ELEV(12 M)=57M
 PANS OPS=154M
[{(0.00355X3+0.143X.6)X1852-36.66}+12(THR Ele.)]
 REQUESTED TE=160M
6/20/2020 32
6/20/2020 33

More Related Content

What's hot

Airport Apron in aviation industry.
Airport Apron in aviation industry.Airport Apron in aviation industry.
Airport Apron in aviation industry.cidroypaes
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATIONAiDY
 
Traffic alert and collision avoidance system
Traffic alert and collision avoidance system  Traffic alert and collision avoidance system
Traffic alert and collision avoidance system Юра Камкін
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Mike Joseph
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and DesignMohsen, S Ab
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towertitu11
 
Fundamentals of Air Traffic Control
Fundamentals of Air Traffic ControlFundamentals of Air Traffic Control
Fundamentals of Air Traffic Controlcrystalboy024
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)ARVIND KUMAR SINGH
 
Ramp safety
Ramp safetyRamp safety
Ramp safetymahchu12
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bayssrinivas2036
 

What's hot (20)

Airport Apron in aviation industry.
Airport Apron in aviation industry.Airport Apron in aviation industry.
Airport Apron in aviation industry.
 
Airport layout
Airport layoutAirport layout
Airport layout
 
Atc unit 1
Atc unit 1Atc unit 1
Atc unit 1
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATION
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
Traffic alert and collision avoidance system
Traffic alert and collision avoidance system  Traffic alert and collision avoidance system
Traffic alert and collision avoidance system
 
1.introduction
1.introduction1.introduction
1.introduction
 
Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and Design
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+tower
 
Flight Basics
Flight BasicsFlight Basics
Flight Basics
 
Fundamentals of Air Traffic Control
Fundamentals of Air Traffic ControlFundamentals of Air Traffic Control
Fundamentals of Air Traffic Control
 
Navigation aids
Navigation aidsNavigation aids
Navigation aids
 
4. initial climb
4. initial climb4. initial climb
4. initial climb
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)
 
Ramp safety
Ramp safetyRamp safety
Ramp safety
 
Profit maximization
Profit maximizationProfit maximization
Profit maximization
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
Airport marking
Airport markingAirport marking
Airport marking
 

Similar to Instrument approach procedures GSR 751 E provision & PANS OPS ops

FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfFLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfssuser1edd921
 
Cat i;ii;iii operations jakub muransky
Cat i;ii;iii operations jakub muranskyCat i;ii;iii operations jakub muransky
Cat i;ii;iii operations jakub muranskyJakub Muransky
 
Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Suhanto Tuban
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).IHSTFAA
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt chengguestb793fe2
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt chengAiDY
 
Visual approach
Visual approachVisual approach
Visual approachAbuRoma
 
DEVELOPMENT OF FIXED WING VTOL UAV.
DEVELOPMENT OF FIXED WING VTOL UAV.DEVELOPMENT OF FIXED WING VTOL UAV.
DEVELOPMENT OF FIXED WING VTOL UAV.IRJET Journal
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10vtsiri
 
Brochure Grand New
Brochure Grand New Brochure Grand New
Brochure Grand New Leonardo
 
Terminal Part 2
Terminal Part 2Terminal Part 2
Terminal Part 2tomrickard
 
Design of the pinpoint landing GNC of Space Rider
Design of the pinpoint landing GNC of Space RiderDesign of the pinpoint landing GNC of Space Rider
Design of the pinpoint landing GNC of Space RiderSENER
 
Rcapa proposal2
Rcapa proposal2Rcapa proposal2
Rcapa proposal2sUAS News
 

Similar to Instrument approach procedures GSR 751 E provision & PANS OPS ops (20)

Gbas
GbasGbas
Gbas
 
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfFLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
 
FINAL ROPS (1).pptx
FINAL ROPS (1).pptxFINAL ROPS (1).pptx
FINAL ROPS (1).pptx
 
Cat i;ii;iii operations jakub muransky
Cat i;ii;iii operations jakub muranskyCat i;ii;iii operations jakub muransky
Cat i;ii;iii operations jakub muransky
 
Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)
 
Faa icao
Faa icaoFaa icao
Faa icao
 
Aerodrome Operating Minima
Aerodrome Operating MinimaAerodrome Operating Minima
Aerodrome Operating Minima
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt cheng
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt cheng
 
2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF
 
Visual approach
Visual approachVisual approach
Visual approach
 
Advanced Remote Air-Ground (RAG) System
Advanced Remote Air-Ground (RAG) SystemAdvanced Remote Air-Ground (RAG) System
Advanced Remote Air-Ground (RAG) System
 
DEVELOPMENT OF FIXED WING VTOL UAV.
DEVELOPMENT OF FIXED WING VTOL UAV.DEVELOPMENT OF FIXED WING VTOL UAV.
DEVELOPMENT OF FIXED WING VTOL UAV.
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10
 
Brochure Grand New
Brochure Grand New Brochure Grand New
Brochure Grand New
 
Terminal Part 2
Terminal Part 2Terminal Part 2
Terminal Part 2
 
Design of the pinpoint landing GNC of Space Rider
Design of the pinpoint landing GNC of Space RiderDesign of the pinpoint landing GNC of Space Rider
Design of the pinpoint landing GNC of Space Rider
 
Circular Runway
Circular RunwayCircular Runway
Circular Runway
 
Rcapa proposal2
Rcapa proposal2Rcapa proposal2
Rcapa proposal2
 

More from ARVIND KUMAR SINGH

Implementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxImplementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxARVIND KUMAR SINGH
 
Design &amp; application of cdo for ahmedabad airport within ahmedabad tma
Design &amp; application of cdo for ahmedabad airport within ahmedabad tmaDesign &amp; application of cdo for ahmedabad airport within ahmedabad tma
Design &amp; application of cdo for ahmedabad airport within ahmedabad tmaARVIND KUMAR SINGH
 
Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic ManagementARVIND KUMAR SINGH
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)ARVIND KUMAR SINGH
 

More from ARVIND KUMAR SINGH (6)

Implementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxImplementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptx
 
Design &amp; application of cdo for ahmedabad airport within ahmedabad tma
Design &amp; application of cdo for ahmedabad airport within ahmedabad tmaDesign &amp; application of cdo for ahmedabad airport within ahmedabad tma
Design &amp; application of cdo for ahmedabad airport within ahmedabad tma
 
Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic Management
 
ATC Contingencies
ATC ContingenciesATC Contingencies
ATC Contingencies
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)
 
Separation Standard
Separation StandardSeparation Standard
Separation Standard
 

Recently uploaded

Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 

Instrument approach procedures GSR 751 E provision & PANS OPS ops

  • 1. Instrument Approach Procedures GSR 751 E Provision & PANS -OPS Arvind Kumar Singh CHQ,New Delhi
  • 2. Instrument Approach to Land (IAL) procedures 6/20/2020 2 Why are they required?
  • 3. Clear sky and great visibility 6/20/2020 3
  • 6.  A series of predetermined manoeuvres  By reference to flight instruments  With specified protection from obstacles from the initial approach fix, or where applicable, from the beginning of a defined arrival route to a point from which a landing can be completed and  Thereafter, if a landing is not completed, to a position at which holding or en-route obstacle clearance criteria apply. 6/20/2020 6 IAL Procedure
  • 7. Role of PANS-OPS in NOC  Flight procedures are designed for normal operations as per the provisions of ICAO DOC 8168 Vol-II.  As any structure erected around an airport may adversely impact the Flight Procedures.  Regulate the permissible height of the proposed structure with respect to Flight Procedures.  Any adverse impact on Flight procedures due to any structure will adversely impact the aircraft operations.  To protect Flight procedures, permissible height of an structures needs to be regulated from PANS-OPS criteria.  Accordingly, NOC for height issued to any structure is the least of AGA, CNS and PANS-OPS.
  • 8.  Minimum Sector Altitude (MSA)  Minimum Holding Altitude (MHA)  Minimum Vectoring Altitude (MVA)  Minimum Altitude of Initial and Intermediate Segments  OCA/H (Straight-in-and Circling) for all aircraft categories  STARs /SIDs procedure altitude.  Basic ILS Surface 6/20/2020 8 PANS-OPS Criteria(GSR 751 E)
  • 9. Segments of IAP  Instrument Approach Procedure segments to be protected: 1. Arrival Route 2. Initial Approach Segment 3. Intermediate Approach Segment 4. Final Approach Segment 5. Missed Approach Segment 6. In addition, an area for Visual Circling is considered 6/20/2020 9
  • 11. 6/20/2020 11 Types of Instrument Approach Procedures 1. Non Precision Approach-VOR/DME, NDB 2. Precision Approach-ILS 3. RNAV (GNSS) LNAV,LNAV/VNAV,LPV& RNP AR
  • 12. 6/20/2020 12 Non-Precision Approach • In India MDH 400 Ft OR More • Taking a fictitious obstacle of 45 M AGL • DGCA CAR Section 8 (Aircraft Operations) Series C Part 1 (AWO) • Visibility Requirement MDH FALS IALS BALS NALS 400 1100 1400 1600 1800
  • 13. 6/20/2020 13 Precision Approach Categories CATEGORY DH (ft) VIS (M) RVR( M) I >=200 800 550 II >=100 - 350 III A 50-100 - 175 III B <50 - 50 III C NO - NO
  • 15. 6/20/2020 15 Basic ILS Surface Area
  • 16. 6/20/2020 16 Protection Area For RNAV (GNSS)
  • 17. Approach Slope For Safe Landing 6/20/2020 17
  • 18. PANS-OPS Criteria Minimum Sector Altitude(MSA) – 30 NM around a nav-aid or significant point of the airport, providing at least 1000 ft of MOC over any obstacle. Minimum Holding Altitude(MHA) – At least 1000 ft of MOC over any obstacle in the specified area. Initial Approach Altitude - At least 1000 ft of MOC over any obstacle in the specified area. Intermediate Approach Altitude - At least 500 ft of MOC over any obstacle in the specified intermediate approach area. Obstacle Clearance Altitude(OCA straight –in) - At least 300/250 ft of MOC over any obstacle in the specified final approach area. Obstacle Clearance Altitude(OCA Circling) - At least 300/400 ft of MOC over any obstacle in the specified circling approach area.
  • 19. 6/20/2020 19 Minimum Sector Altitute MSA: 2300 Ft Controlling Obstacle 2300-1000=1300 ft
  • 20. 6/20/2020 20 Visual Circling OCA: 770 Ft Controlling Obstacle 770-300=470 ft
  • 21. 6/20/2020 21 VOR Procedure OCA: 670 Ft Controlling Obstacle 670-250=420 ft
  • 22. 6/20/2020 22 ILS Procedure OCA: 530 Ft Controlling Obstacle 530-161=369 ft
  • 23. 6/20/2020 23 LNAV VNAV Procedure OCA(LNAV): 670 Ft Controlling Obstacle 670-250=420 ft OCA(LNAV/VNAV): 590 Ft Controlling Obstacle 590-161=429 ft
  • 24. 6/20/2020 24 LPV Procedure OCA: 520 Ft Controlling Obstacle 520-161=359 ft
  • 25. CASE STUDIES VOR-VOMM RWY 07 ILS-VOMM RWY 25 6/20/2020 25
  • 26. 6/20/2020 26 Analysis Case Study-1 OCA: 810(770 Ft) Controlling Obstacle 810-250=560 Ft
  • 27. 6/20/2020 27 x=1.8NM, y=0.6NM TE 700ft Analysis Case Study-1
  • 28. Analysis Case Study-1  X=1.8 NM  Y=0.6 NM  AGA=45M+THR ELEV(12 M)=57M  PANS OPS=170M(560 Ft)  REQUESTED TE=213M(700 ft) 6/20/2020 28
  • 29. 6/20/2020 29 Analysis Case Study-1 OCA: 330(278) Controlling Obstacle 330-161=169 ft
  • 31. 6/20/2020 31 x=3 NM, y=0.6NM TE 160M Analysis Case Study-2
  • 32. Analysis Case Study-2  X=3 NM  Y=0.6 NM  AGA=45M+THR ELEV(12 M)=57M  PANS OPS=154M [{(0.00355X3+0.143X.6)X1852-36.66}+12(THR Ele.)]  REQUESTED TE=160M 6/20/2020 32