SlideShare a Scribd company logo
1 of 2
Download to read offline
Customer Case Study
Implementation, Training
AutoCAD
Autodesk Revit
Autodesk Navisworks Manage
Autodesk Building Design Suite
“
We will be using more BIM and Revit
with energy modeling on all sustainable
projects moving forward.”
Keith G. Pehl, P.E., LEED
President/Electrical Engineer
Optima Engineering, P.A.
Optima Engineering, P.A.
www.optimaengineering.com
1927 South Tryon Street Suite 300
Charlotte, North Carolina 28203
333 Fayetteville Street, Suite 311
Raleigh, NC 27601
®
®
®
®
Embracing Sustainability with Clash
Detection and BIM
Optima Engineering utilized Autodesk Navisworks Manage clash detection
during the design phase of the Warriors in Transition building for the Army
Company Overview
Optima Engineering is a multi discipline,
professional engineering firm
specializing in mechanical, electrical,
plumbing, fire protection, lighting,
sustainable design, commissioning and
energy audit services. The firm has
positioned itself as a leader in
sustainable design for the industries it
serves. Over the past 8 years, Optima
has positioned itself as a pioneer in the
green building industry in North
Carolina. Five years ago, they decided to
practice what they’ve preached in
constructing the first LEED Platinum
building in Charlotte, North Carolina.
Working through the LEED process for
their headquarters, with a solar PV
system and solar water heating, Optima
found they were motivated to truly
embrace sustainability. With the
industry focused on energy
consumption, efficiency and savings
within building systems, Optima is
endorsing the 2030 Challenge. Keith G.
Pehl, P.E.,LEED AP BD+C,
President/Electrical Engineer says, “We
are striving for net zero energy and
carbon impact by 2030. In order to make
this a reality, we are actively seeking
visionary clients.”
Business Problem/Compelling Event
In 2009, Optima was awarded a contract
for The Warriors in Transition (WIT)
building for the U.S. Army Corps of
Engineers who mandated BIM. The
3-story office
building, designated for the Warriors
Transition Unit in Ft. Stewart, GA had to
meet strict federal guidelines with
efficient, sustainable design, while
providing a quantifiable cost savings
within the building systems.
This is where the design-build team’s
collaboration in Autodesk Revit became
necessary. Optima needed to align all of
the project partners through Building
Information Modeling (BIM) in order to
coordinate clash detection using
Autodesk Navisworks Manage and Revit
software. In order to do this, they needed
to upgrade their entire software system
with AutoCAD, AutoCAD MEP, Revit MEP,
Navisworks Manage and Building Design
Suite Ultimate.
The Solution
Optima turned to Advanced Solutions
early in the BIM process to guide them
through the project. Over a six month
timespan Advanced Solutions helped
them implement an entirely new software
with systems upgrade, they provided
customized personal training with each
member of their team, as well as all
collaborative partners. Advanced
Solutions phased in each new software
system and used it within the WIT project
using actual models and specifications,
giving a “real world” training experience.
The continued flexibility of the Advanced
Solutions trainer and being able to adapt
the training in conjunction with the
challenges of the actual project created a
strong partnership between each firm, the
Optima Project, Charlotte, NC
® ®
Platinum Partner
Architecture, Engineering & Construction
Manufacturing
Government Specialized
Advanced Solutions
1901 Eastpoint Parkway, Suite 301
Louisville, KY 40223
www.AdvancedSolutions.com
1-877-GET-ASI-1
client and Advanced Solutions.
The training and implementation of
Autodesk Navisworks Manage enabled
clash detection, which alerted the team
to a potential $75,000-$100,000 error
within the initial Warriors in Transition
project specifications. With what could
have easily been a costly mistake in the
field, detected within the modeling
stages of the project, Optima was able
to see the immediate ROI of this new
software integration.
Performance
Optima came to rely on more than just
the customized, project-specific
training provided by Advanced
Solutions during the BIM adoption
process, as even network and hardware
issues were addressed during the
process. As a result, a hardware
upgrade was necessary in conjunction
with the software adoption to allow
consistent access to Autodesk Revit for
everyone on the project. “Advanced
Solutions was very flexible, adapting to
what we were seeing with the project,
what others involved were noticing and
with any and all challenges thrown
their way,” said Pehl.
In addition to being provided all costs
and training time estimates in advance,
Optima was able to purchase a block of
service hours to be used at their
discretion enabling the team to call on
Advanced Solutions’ specific areas of
expertise when needed.
Results & Benefits
By the end of 2013, Optima expects over
half of their major projects will be
completed in Autodesk Revit. They are
seeing the transition take place with over
120 of their current customers. Optima
recognizes they would not have been able
to cultivate a majority of their newer
clients without having the latest MEP
software. “Given the choice our guys
would rather work in Revit on all
projects,” says Pehl.
Using Autodesk Navisworks Manage on
the back end of this project has been
beneficial in their design process and has
enabled better BIM capabilities with a
drastic decrease in change orders
resulting in a noticeable return on
investment.
Final Thoughts
Evolving each team member’s perspective
with the project specific software
implementation has been one of the
major building blocks in working with
Advanced Solutions. A level of trust has
been cultivated, which has allowed the
entire team on the Warriors in Transition
project to grow beyond expectations. The
continued collaboration with regards to
time, financial constraints and a real
world training situation, has shown a true
valued partnership with a willingness to
solve challenges as a team.
“We will be using more BIM and Revit with
energy modeling on all sustainable projects
moving forward,” says Pehl. “We now have a
long term relationship with BIM and
Advanced Solutions,” he added.
Avoiding costly mistakes with Autodesk
Navisworks Manage and Autodesk Revit
Optima Project, Charlotte, NC
Platinum Partner
Architecture, Engineering & Construction
Manufacturing
Government Specialized

More Related Content

What's hot

AVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
 
30 days of cloud
30 days of cloud30 days of cloud
30 days of cloudDSCMESCOE
 
Epdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FEpdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FZero Wait-State
 
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...flashnewsrelease
 
Breitburn Energy Winwire V4 (2)
Breitburn Energy Winwire V4 (2)Breitburn Energy Winwire V4 (2)
Breitburn Energy Winwire V4 (2)thomduclos
 
bestronics_wow_final - Copy
bestronics_wow_final - Copybestronics_wow_final - Copy
bestronics_wow_final - CopyPam Crowley
 
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverAccelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverHamish McMinn
 
Elecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordElecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordBen Taunt
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeCCT International
 
Session T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsSession T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsProject Controls Expo
 
Data Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyData Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyCisco Canada
 
Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
 
Agile Architecture Belfast Software Architecture User Group
Agile Architecture   Belfast Software Architecture User GroupAgile Architecture   Belfast Software Architecture User Group
Agile Architecture Belfast Software Architecture User GroupPaul Wallace
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceCCT International
 
AVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsAVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsVanessa Erickson
 
[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform
[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform
[SriusCon 2020] Sirius to the Web with Obeo Cloud PlatformObeo
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
 
Create Radically Better Products with Design Optimization and 3D Printing
Create Radically Better Products with Design Optimization and 3D PrintingCreate Radically Better Products with Design Optimization and 3D Printing
Create Radically Better Products with Design Optimization and 3D PrintingDesign World
 

What's hot (20)

AVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsons
 
30 days of cloud
30 days of cloud30 days of cloud
30 days of cloud
 
Epdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FEpdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 F
 
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...
CCE’s EnSuite-Cloud ReVue is the Perfect Alternative to Zoom for Engineering ...
 
Breitburn Energy Winwire V4 (2)
Breitburn Energy Winwire V4 (2)Breitburn Energy Winwire V4 (2)
Breitburn Energy Winwire V4 (2)
 
bestronics_wow_final - Copy
bestronics_wow_final - Copybestronics_wow_final - Copy
bestronics_wow_final - Copy
 
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverAccelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
 
Elecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordElecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB Guildford
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
Session T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsSession T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project Controls
 
Beyond Scrum and SAFe
Beyond Scrum and SAFeBeyond Scrum and SAFe
Beyond Scrum and SAFe
 
Data Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyData Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud Journey
 
Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...
 
M3 - An overview of High Speed 2
M3 - An overview of High Speed 2M3 - An overview of High Speed 2
M3 - An overview of High Speed 2
 
Agile Architecture Belfast Software Architecture User Group
Agile Architecture   Belfast Software Architecture User GroupAgile Architecture   Belfast Software Architecture User Group
Agile Architecture Belfast Software Architecture User Group
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a Glance
 
AVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsAVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker Solutions
 
[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform
[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform
[SriusCon 2020] Sirius to the Web with Obeo Cloud Platform
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
Create Radically Better Products with Design Optimization and 3D Printing
Create Radically Better Products with Design Optimization and 3D PrintingCreate Radically Better Products with Design Optimization and 3D Printing
Create Radically Better Products with Design Optimization and 3D Printing
 

Similar to optima-engineering-case-study

Cynoteck - Salesforce Presentation - Consulting Services
Cynoteck  -  Salesforce Presentation - Consulting ServicesCynoteck  -  Salesforce Presentation - Consulting Services
Cynoteck - Salesforce Presentation - Consulting ServicesRosa Aguiar Catraio
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
 
Raywell business model
Raywell business modelRaywell business model
Raywell business modelRaywell Studio
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKClarke Morrison
 
Resume_Arindom-March-3rd
Resume_Arindom-March-3rdResume_Arindom-March-3rd
Resume_Arindom-March-3rdArindom Biswas
 
Asite BIM Breakfast seminar
Asite BIM Breakfast seminar Asite BIM Breakfast seminar
Asite BIM Breakfast seminar Lisa Murphy
 
BIM for Owners.pptx
BIM for Owners.pptxBIM for Owners.pptx
BIM for Owners.pptxUkashaRauf2
 
Edited BIM for Owners deck FINAL.pptx
Edited BIM for Owners deck FINAL.pptxEdited BIM for Owners deck FINAL.pptx
Edited BIM for Owners deck FINAL.pptxNatnaelZewude
 
Bim for owners deck final
Bim for owners deck final Bim for owners deck final
Bim for owners deck final JerrySanon
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Jitesh Pandit
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012NEERAJ SRIVASTAVA
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...IRJET Journal
 

Similar to optima-engineering-case-study (20)

Cynoteck - Salesforce Presentation - Consulting Services
Cynoteck  -  Salesforce Presentation - Consulting ServicesCynoteck  -  Salesforce Presentation - Consulting Services
Cynoteck - Salesforce Presentation - Consulting Services
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
 
Raywell business model
Raywell business modelRaywell business model
Raywell business model
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESK
 
Resume_Arindom-March-3rd
Resume_Arindom-March-3rdResume_Arindom-March-3rd
Resume_Arindom-March-3rd
 
Asite BIM Breakfast seminar
Asite BIM Breakfast seminar Asite BIM Breakfast seminar
Asite BIM Breakfast seminar
 
BIM Service Summary
BIM Service SummaryBIM Service Summary
BIM Service Summary
 
BIM for Owners.pptx
BIM for Owners.pptxBIM for Owners.pptx
BIM for Owners.pptx
 
Edited BIM for Owners deck FINAL.pptx
Edited BIM for Owners deck FINAL.pptxEdited BIM for Owners deck FINAL.pptx
Edited BIM for Owners deck FINAL.pptx
 
Bim for owners deck final
Bim for owners deck final Bim for owners deck final
Bim for owners deck final
 
MTECH Company Profile
MTECH Company ProfileMTECH Company Profile
MTECH Company Profile
 
Revit MEP Training
Revit MEP TrainingRevit MEP Training
Revit MEP Training
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
Bim
BimBim
Bim
 
Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16
 
Er.Vivek Kumar
Er.Vivek KumarEr.Vivek Kumar
Er.Vivek Kumar
 
RajendraJResume
RajendraJResumeRajendraJResume
RajendraJResume
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012
 
Mechanical, Electrical and Plumbing (MEP) Course.pdf
Mechanical, Electrical and Plumbing (MEP) Course.pdfMechanical, Electrical and Plumbing (MEP) Course.pdf
Mechanical, Electrical and Plumbing (MEP) Course.pdf
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
 

optima-engineering-case-study

  • 1. Customer Case Study Implementation, Training AutoCAD Autodesk Revit Autodesk Navisworks Manage Autodesk Building Design Suite “ We will be using more BIM and Revit with energy modeling on all sustainable projects moving forward.” Keith G. Pehl, P.E., LEED President/Electrical Engineer Optima Engineering, P.A. Optima Engineering, P.A. www.optimaengineering.com 1927 South Tryon Street Suite 300 Charlotte, North Carolina 28203 333 Fayetteville Street, Suite 311 Raleigh, NC 27601 ® ® ® ® Embracing Sustainability with Clash Detection and BIM Optima Engineering utilized Autodesk Navisworks Manage clash detection during the design phase of the Warriors in Transition building for the Army Company Overview Optima Engineering is a multi discipline, professional engineering firm specializing in mechanical, electrical, plumbing, fire protection, lighting, sustainable design, commissioning and energy audit services. The firm has positioned itself as a leader in sustainable design for the industries it serves. Over the past 8 years, Optima has positioned itself as a pioneer in the green building industry in North Carolina. Five years ago, they decided to practice what they’ve preached in constructing the first LEED Platinum building in Charlotte, North Carolina. Working through the LEED process for their headquarters, with a solar PV system and solar water heating, Optima found they were motivated to truly embrace sustainability. With the industry focused on energy consumption, efficiency and savings within building systems, Optima is endorsing the 2030 Challenge. Keith G. Pehl, P.E.,LEED AP BD+C, President/Electrical Engineer says, “We are striving for net zero energy and carbon impact by 2030. In order to make this a reality, we are actively seeking visionary clients.” Business Problem/Compelling Event In 2009, Optima was awarded a contract for The Warriors in Transition (WIT) building for the U.S. Army Corps of Engineers who mandated BIM. The 3-story office building, designated for the Warriors Transition Unit in Ft. Stewart, GA had to meet strict federal guidelines with efficient, sustainable design, while providing a quantifiable cost savings within the building systems. This is where the design-build team’s collaboration in Autodesk Revit became necessary. Optima needed to align all of the project partners through Building Information Modeling (BIM) in order to coordinate clash detection using Autodesk Navisworks Manage and Revit software. In order to do this, they needed to upgrade their entire software system with AutoCAD, AutoCAD MEP, Revit MEP, Navisworks Manage and Building Design Suite Ultimate. The Solution Optima turned to Advanced Solutions early in the BIM process to guide them through the project. Over a six month timespan Advanced Solutions helped them implement an entirely new software with systems upgrade, they provided customized personal training with each member of their team, as well as all collaborative partners. Advanced Solutions phased in each new software system and used it within the WIT project using actual models and specifications, giving a “real world” training experience. The continued flexibility of the Advanced Solutions trainer and being able to adapt the training in conjunction with the challenges of the actual project created a strong partnership between each firm, the Optima Project, Charlotte, NC ® ® Platinum Partner Architecture, Engineering & Construction Manufacturing Government Specialized
  • 2. Advanced Solutions 1901 Eastpoint Parkway, Suite 301 Louisville, KY 40223 www.AdvancedSolutions.com 1-877-GET-ASI-1 client and Advanced Solutions. The training and implementation of Autodesk Navisworks Manage enabled clash detection, which alerted the team to a potential $75,000-$100,000 error within the initial Warriors in Transition project specifications. With what could have easily been a costly mistake in the field, detected within the modeling stages of the project, Optima was able to see the immediate ROI of this new software integration. Performance Optima came to rely on more than just the customized, project-specific training provided by Advanced Solutions during the BIM adoption process, as even network and hardware issues were addressed during the process. As a result, a hardware upgrade was necessary in conjunction with the software adoption to allow consistent access to Autodesk Revit for everyone on the project. “Advanced Solutions was very flexible, adapting to what we were seeing with the project, what others involved were noticing and with any and all challenges thrown their way,” said Pehl. In addition to being provided all costs and training time estimates in advance, Optima was able to purchase a block of service hours to be used at their discretion enabling the team to call on Advanced Solutions’ specific areas of expertise when needed. Results & Benefits By the end of 2013, Optima expects over half of their major projects will be completed in Autodesk Revit. They are seeing the transition take place with over 120 of their current customers. Optima recognizes they would not have been able to cultivate a majority of their newer clients without having the latest MEP software. “Given the choice our guys would rather work in Revit on all projects,” says Pehl. Using Autodesk Navisworks Manage on the back end of this project has been beneficial in their design process and has enabled better BIM capabilities with a drastic decrease in change orders resulting in a noticeable return on investment. Final Thoughts Evolving each team member’s perspective with the project specific software implementation has been one of the major building blocks in working with Advanced Solutions. A level of trust has been cultivated, which has allowed the entire team on the Warriors in Transition project to grow beyond expectations. The continued collaboration with regards to time, financial constraints and a real world training situation, has shown a true valued partnership with a willingness to solve challenges as a team. “We will be using more BIM and Revit with energy modeling on all sustainable projects moving forward,” says Pehl. “We now have a long term relationship with BIM and Advanced Solutions,” he added. Avoiding costly mistakes with Autodesk Navisworks Manage and Autodesk Revit Optima Project, Charlotte, NC Platinum Partner Architecture, Engineering & Construction Manufacturing Government Specialized