1. Antonio Delmo
Senior Piping Design Engineer
Email: tony_delmo68@yahoo.com
antonio.delmo@fluor.com
Mobile : +639757482985
Professional Qualification:
• BS Mechanical Engineering : Batangas State University
• Year Graduated : 1989
_________________________________________________________________________
Summary of Experience:
• Over twenty two (22) years of experience.
• Engineering experience; Front End Engineering Design, Detailed Engineering and
Construction of Refineries, Petrochemical Plant, Pharmaceutical, Semi-conductor
Industries, Water Treatment, Power and Industrial Plant.
• With wide knowledge in using international codes and standard such as ASME, API,
ASTM,etc.
• Capable of using different software such as Micro Station, PDS, SP3D, PDMS,Smart
Sketch, Navis Work and Optimeyes.
_________________________________________________________________________
Professional Skills:
• Preparation of Piping Procedure.
• Unit Plot Plan, Equipment Layout , Pipe Rack Layout
• Nozzle Orientation
• Pipe Support and Basic Stress Analysis
• Piping Study and Preparation of Piping General Arrangement
• PDS generated Isometric Sketch and Drawing Preparation
• SP3D generated Isometric sketch and Drawing Preparation
• Technical Bid Evaluation and Vendor Drawing Review
• Man-hour Estimate
• Preparation of scope of work
ML20130311-xxx.docx
2. <Name>
Page 2 of 7
_________________________________________________________________________
Key Responsibility:
• Developing and directing project plans with the Engineering Project Manager (e.g.
budget, schedule and change management requirements, etc.)
• Reviewing and approving mechanical standards and specification and utilizing sector
and safety best practices.
• Reviewing, monitoring and ensuring compliance requirements are met for design.
(e.g. standards, specification and local codes regulation, etc)
• Coordinating with other engineering and design discipline team members.
• Developing, implementing and maintaining design standards, guides and procedures.
• Responding to reports and request for information.
• Communicating change orders and executing change management processes.
• Reviewing stamped and finalized drawings (including piping plans and section,
piping, isometrics, piping supports, tank and vessel layouts and details, etc.)
• Ensuring engineering design quality and technical accuracy of drawing, 3d models,
material quantities, specifications and procedures.
• Reviewing and monitoring all piping deliverables.
• Assisting project decisions.
_________________________________________________________________________
Specific Experience
FLUOR DANIEL, INC. (Dec. 5, 2007 to present)
Asian Star Building. Alabang, Muntinlupa City
3D Model Looker/Checker LyondellBasell
April 16, 2016 – Present Petrochemical Complex
Houston Texas
Responsibilities:
• Ensure that the piping layout is in accordance with the client standard and best
engineering practices.
• Ensure that the layout is in accordance to the P&ID and process requirements.
• Ensure that the FEED deliverables such as material specs & quantities and Plot
Drawing is correct.
• Do the cost saving analysis.
• Mentoring the designer for proper equipment and piping layout.
• Conducted design clinic for all major comments on design layout.
• Line to line checking on the 3D models.
ML20130311-xxx.docx
3. <Name>
Page 3 of 7
Piping Lead Engineer PTTGC AMERICA Feed Project
Nov. 04, 2015-April 15, 2016 Petrochemical Complex
Dilles Bottom Ohio
Responsibilities:
• Primary function is to lead the Pre FEED Phase of the Project using Optimeyes
software.
• Responsible to deliver high quality of MTO since this is a competitive bidding project
and in consideration of a Lump Sump project. One of the strategy implemented to
the project is modelling all lines to avoid manual manipulation vs CWP & Modular
index.
• Do the man-hour estimate for the engineering Hrs required based on on the current
Optimeyes model.
• Ensure that all deliverables are submitted on time. Do the coordination for the issues
and concern of the project to the client. Responsible for the cost saving analysis for
the piping related cost of labor and materials of the project.
Piping Lead Engineer Lemongrass Menthol Project
Nov. 25, 2013 – Sept 30, 2015 Kuantan Integrated Site
Kuantan, Malaysia
Responsibilities:
• Primary function is to lead the FEED and Detailed Engineering design of piping
works.
• Do the man-hour estimate and control the budget hour of the project. Ensure that all
deliverables are submitted on time.
• Do the coordination for the issues and concern of the project to the client.
• Responsible for the cost saving analysis for the piping related labor cost and
materials of the project.
• Responsible for all piping related activities of the project including support for the
construction.
Area Lead /Lead Checker SADARA PROJECT – CHEM II
July 9, 2012 – Nov. 22, 2013 Al-Jubail, Saudi Arabia
Responsibilities:
ML20130311-xxx.docx
4. <Name>
Page 4 of 7
• Primary function is to improve design from feed to detailed engineering design in
accordance to project standard and licensor requirements.
• Supervision and mentoring designer’s daily activities.Responsible for the preparation
and actual model review with the client.
• Managed the Model review comment resolution in coordination with other discipline.
• Ensure that all model tags have been approved prior to issuance of isometric.
• Responsible for the technical issues arises during the isometric checking.
Area Lead SUPER ABSORBENT POLYMER PROJECT
April 04, 2011 –July 6, 2012 Al-Jubail, Saudi Arabia
Responsibilities:
• Primary function is to improve design of the area of responsibility in accordance to
project, client and licensor requirements.
• Supervision and mentoring designer modelling of piping system. Do the
communication about issues and changes to meet the process requirements.
• Resolving all review comments that will satisfy client requirements.
• Work interface with all discipline.
• Monitoring of work progress of the designer on a weekly basis.
• Checking of SPR to verify if line had been routed base on code and standard.
• Pink off - Yellow off P&ID.
Area Lead/Checker SATAH AL RAZBOOT (SARB)
(Sept. 6, 2010 - March 2, 2011) Artificial Island Field Development Project
Abu Dhabi, UAE (Offshore)
Responsibilities:
• Primary function is to prepare feed stage transposition with a total of 86 Well Heads
from two Artificial Island.
• Checking of plot plan base on codes and standards. Supervision of piping modelling
using optimeyes as per given info such as P&ID’s, plot plan and some sketches from
client as reference.
• Do the communication about issues and changes to meet the process requirements.
• Resolving all review comments that will satisfy client requirements. Work interface
with all discipline.
• Monitoring of work progress of the designer on a weekly basis. Checking of SPR to
verify if line had been routed base on code and standard.
• Pink off - Yellow off P&ID.
• Do the manual sketching of small bore for MTO purposes as part of scope of work..
Checker/Senior Designer LDK Polysilicon Project
(Aug. 11,2010 – Aug. 31, 2010) Xinyu City, Jiangxi, China
Responsibilities:
• Primary function is to label the Piping Plan prepared by the designer and do the first
check.
ML20130311-xxx.docx
5. <Name>
Page 5 of 7
• Coordinate with the designer regarding some changes for the drawing index and
elevation during the process of doing the piping plan.
• Do back check for final checking prior to issuance of the piping plan.
Area Lead/Checker Lubrizol Additives
(Jan. 19, 2010 – July 18, 2010)) Tianjin China Plant
Zhuhai, Guanqdong, China
Responsibilities:
• Primary function is to prepare feed stage transposition of two Area of responsibility
including DA PIBSA Area and Utility Area.
• Supervision of piping modelling as per P&ID’s .
• Do the communication about issues and changes to be done to meet the process
requirements.
• Resolving all review comments that will satisfy client requirements. Checking Plot
Plan arrangements based on codes and standards.
• Monitoring and reporting progress of work done by the designer on weekly basis.
Work interface with all discipline.
• Line to line checking of model based on P&ID and line list.
• Update P&ID and Line list for all the changes made. Pink off- yellow off P&ID.
Checker/Senior Designer Dow Corning
( Feb. 26, 2009 to Jan. 18, 2010) Third Pillar Project
190 kt/a Seloxane
Zhangjiagang (Phase 2), China
Responsibilities:
• Primary function is to do the first check of isometric produced by the designer based
in Shanghai, China and ensure that all codes and standards, categories, client
regulation, requirements and procedure such as annotation, supports, instruments,
spacing, master P&ID check, material specs, clearance compliance, specialty items,
support and stress, vents and drains, MTO check, mark number, isometric
continuation, SPR check and the design practices have been met. NavisWork
Model had been used also for isometric checking as reference.
Checker/Senior Designer IPS 2 Expansion Project
( Jan. 26, 2009 to Feb. 16, 2009) BASF YPC Company Ltd.
Nanjing, China
Responsibilities:
• Primary function is to provide sketch of the line routing base on Area and Line
requirements as reference of the designer to do the optimeyes layout for estimate.
Checker/Senior Designer Marathon Garyville Major Expansion Project
( Jan. 3, 2008 to Jan. 23, 2009) Marathon Refining Company
Louisiana, USA
Responsibilities:
ML20130311-xxx.docx
6. <Name>
Page 6 of 7
• Primary function is to check isometric produced by the designer to ensure that all
codes and standards, categories, client regulation, requirements and procedure such
as annotation, supports, instruments, spacing, master P&ID check, material specs,
clearance compliance, specialty items, support and stress, vents and drains, MTO
check, mark number, isometric continuation, SPR check and the design practices
have been met.
BIO SOURCE INC.
October 1999 – August 2005
Project Supervisor
PROJECT HANDLED
Stephan Philippines
• Installation of piping system of ammonia lines, controls and instruments,
Including testing and commissioning.
• Upgrading of PLC controller for the operation of Water Treatment Plant and
Ammonia System.
• Rehabilitation of Dryer and installation of additional steam tracing.
St. Thomas Square Mall
• Installation of water system and fire fighting system.
Wyeth Philippines
• Supply and installation of additional Demineralized Water Treatment Plant
• including supply and distribution line for boiler feed.
• Rehabilitation of waste treatment plant including installation of UV, Ultra Sonic level
transmitter, chemical feed pump and Diffusers.
• Re-piping of water lines from Galvanized pipes to Stainless pipes.
United Laboratories
• Turn key Project of Automatic Deionizer for Liquid Department.
• Turn key project for Neutralization process for Waste Treatment Plant
AQUA TECHNOLOGIES, INC.
1501 Sto. Sepulcro Street, Paco, Manila
May 1992 – Aug 1999
Project Supervisor
Projects Handled:
- Mc Donald’s water treatment
- Batangas Power Plant (ENRON PROJECT) supply of Skid Deionizer for water
cooling system flashing.
RCM CONSTRUCTION
In-house Contractor
Shell Tabangao, Batangas
Project Engineer
Project Handled:
ML20130311-xxx.docx
7. <Name>
Page 7 of 7
- Fabrication of Flat-form for Satellite Antenna at Shell Housing.
- Rehabilitation of piping system at Clark power plant.
ISLAND GAS AIR PRODUCT
Project Engineer
- Installation of LPG supply lines to clients.
TIGER CEMENT MANUFACTURING COMPANY
- Raw and Finish Mill Supervisor.
Training:
1. Health and Safety (DTI)
2. Phase III – Piping Engineering Checking – Isometric ( Fluor Daniel Inc, Philippines )
3. Smart Plant Review ( Fluor Daniel Inc, Philippines)
4. Phase III – Plot Plan Layout ( Fluor Daniel Inc, Philippines)
5. Smart Sketch Training ( Fluor Daniel Inc, Philippines)
6. PDMS Training ( Fluor Daniel Inc, Philippines)
7. 3rd
Generation Modular Execution (Fluor Daniel Inc. Philippines)
8. Fluor’s Quality Management System and Internal Quality Audit (FDIP)
9. Lead Office Mindset Training
10. DDI Leadership Training
Personal Data:
Date of Birth : June 13, 1968
Place of Birth : Bauan, Batangas
Sex : Male
Height : 1.70M
Weight : 100kgs
Civil Status : Married
Citizenship : Filipino
Religion : Roman Catholic
Home Address : B2L1 San Antonio Village
Bolbok, Lipa City
Batangas, Philippines
4217
Email Address` : tony_delmo68@yahoo.com
Mobile Phone : 0639757482985
ML20130311-xxx.docx