Case Study: EU ENG Escalation (RNT)
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
EU & CA RNT
A dedicated team in GBS Clark that handles email customer service
support for 8 Europe countries (Austria, Belgium, Switzerland,
Denmark, France, Great Britain/United Kingdom, Ireland, Netherlands)
and Canada.
The team uses Oracle RightNow Tool (RNT), a customer relationship
management (CRM) software for enterprise organizations.
Overview
Case Study: EU ENG Escalation (RNT)
1 supervisor 2 coaches 1 senior agent
27 Agents (Handling Europe Emails)
4 Agents
(Handling Canada Emails)
They serve 2
shifts:
 6:00AM to 3 PM
 3PM to 12MN
Current Team Staffing
GBS Clark Industrial Engineering Department | Clark Quality Group
 236 Email Escalation are overdue (not resolved on or before their due)
 Emails received between 12:01am and 3:00 PM are due to be answered by
12MN on the same day, otherwise they become overdue
 Escalations received from 3PM to 11:59PM are due to be answered within 24
hours, otherwise they become overdue.
 Of the overdue emails, 90% have not been assigned (212), while only 10%
(24) are assigned to a senior agent, coach or supervisor.
Case Study: EU ENG Escalation (RNT)
Current Challenge: Escalation
As of 6:00 PM - April 19, 2017 (Manila):
GBS Clark Industrial Engineering Department | Clark Quality Group
Corporate Audits that have not been reviewed (Release Status)
 45 Corporate CA Email audits and 5 Forms audit
 9 Corporate EU Email audits and 1 Forms audit
 2 CA IIP
Case Study: EU ENG Escalation (RNT)
Current Challenge: Untimely Quality/Performance Review
As of 6:00 PM - April 19, 2017 (Manila):
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Coach/SR Productivity on Escalation
Coach/Senior Rep. Rachelle Cham Lawrence
Total Handled Escalation (Mar-April) 268 110 835
Daily Average 12.33 12.22 24.56
Estimated dedicated hours on
escalation
4.11 2.99 6.02
Data from individual escalation tracker:
Rachelle spends 4.11 hours a day while Cham allocates 3 hours per day in handling email escalations. Their daily tasks include:
 Creating and updating trackers, hourly and daily reports
 Facilitation of team meetings together with the supervisor
 Facilitation of Service Briefings
 Review and attendance in Corporate calibration
 Quality Review (Corporate audit, IIP)
 Assignment of emails to agents
Lawrence spends 6.02 hours on escalation because it is her primary task, second only is floor support.
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Time Study
Procedure: The coach was observed as she handled escalated emails at random times during the day.
The steps taken were categorized into:
 Reads – involves opening the email from the queue and understanding what the email is about.
 Researches – involves navigating through the systems to find a solution to the issue
 Replies – involves selecting the appropriate template and/or free-typing the response
composition
 Logs – involves copying the RNT Reference number, opening the escalation tracker and saving it
there for documentation
In addition, escalations are classified into:
 Follow-up (F/U) – Email escalations worked previously but are still pending. These are handled
first and are part of tasks in at the start of the coaches’ shift.
 New Escalation – Escalation emails that are handled for the first time.
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Time Study: Summary
Type
Reads
(in seconds)
Researches
(in seconds)
Replies
(in seconds)
Logs
(in seconds)
Total
(in seconds)
Total
(in minutes)
Average 83 223 248 44 597 10.0
% of total time 14% 37% 41% 7%
Follow-up
Type
Reads
(in seconds)
Researches
(in seconds)
Replies
(in seconds)
Logs
(in seconds)
Total
(in seconds)
Total
(in minutes)
Average 129.1 384.3 333.2 38.3 884.9 14.7
% of total time 15% 43% 38% 4%
New Escalations
Average Handle Time:
 Follow-up – 10 minutes
 New Escalation – 14.7 minutes
Most time-consuming task:
 Follow-up – Replies: 41% of the total average handle time
 New Escalation – Research: 43% of the total average handle time
See Appendix A for complete data
See Appendix B for complete data
GBS Clark Industrial Engineering Department | Clark Quality Group
Findings and Recommendations
Case Study: EU ENG Escalation (RNT)
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
First Finding:
 Current Support cannot accommodate the escalation volume
Using a two-
month average,
19 emails are
escalated daily
These escalations
add up to the 200+
overdue emails, about
90% of which
remained unassigned The current three supports
have a combined handle
rate of 49.11 emails per
day
On average, coaches and SR resolve
67% of the emails, or about 33, while 17
needs follow-up and adds up to the queue
on the following day
All emails for follow-up adds up to the
escalation queue on the following day
Resolved
Resolved
Resolved
Resolved
For Follow-up
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Recommendation on first finding:
1. Add additional escalation support to clear up the escalation backlogs
based on the time study data where an the Average Escalation Handle Time is 0.245 hours (14.7 minutes):
 236 emails can be resolved in 57.82 hours
 Theoretically, This equates to 7.5 days that is an a 8-hour shift (without personal allowances, quality reviews, etc.)
 Realistically, it is between 8.5-9 days that is an 8-hour shift
Add one (1) employee to
help with the escalation:
Escalation overdue will
greatly improve in 8.5 to 9
days
Add one (2) employees to
help with the escalation:
Escalation overdue will
greatly improve in 4-4.5
days
Add one (3) employees to
help with the escalation:
Escalation overdue will
greatly improve in 2-3 days Figures are
estimate
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Second Finding:
2. No comprehensive hand-off of escalation from agent to coach/SR
When an agent reassigns an email to the escalation queue (EU ENG Redirect), only a private note is attached that tells who
approved the reassignment to that queue. Majority do not indicate what the coach or SR must do or why exactly the email
was escalated.
Agent asks permission to
escalate the email from a
coach or SR, once
approved, he/she
reassigns it to the
escalation queue.
The coach or SR takes the
escalated email from the
queue and assigns it to
herself
Researches and
responds to the
escalation
The coach/SR reads the
entire email thread to
identify why it is escalated
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Recommendation on Second Finding:
2. Make it an SOP to indicate what the coach/SR must act on in the Private Note
This will allow a faster hand-off and will reduce the time on reading the entire email thread as well as in researching on the
problem.
Agent asks permission to
escalate the email from a
coach or SR, once
approved, he/she
reassigns it to the
escalation queue.
The coach or SR takes the
escalated email from the
queue and assigns it to
herself
Researches and
responds to the
escalation
Make it an SOP to indicate a
detailed explanation in the
Private Note.
Currently, 43% of the total
handle time is for “research”
which can be reduced by this
step.
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Third Finding:
3. Dual shifts set-up puts pressure on the PM shift to close all emails due by 12MN
There are only two shifts per day: AM and PM shifts.
 Emails received in the queue between 12:01 AM and 3PM (15 hours) must be closed by 12MN
 Emails received between 3:01 PM to 11:59 AM (9 hours) may be closed within 24 hours.
 PM Shift tend to prioritize emails that are due by 12MN, causing them to rush on their work.
3:00 PM to 12:00 MN6:00 AM to 3:00 PM
6:00 AM 12:00 MN3:00 PM
All unfinished email in the
queue received before
3:00PM
Emails received from 3PM
– 12AM
Volume that the PM
shift needs to clear,
prioritizing those due
by 12MN
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Recommendation on Third Finding:
3. Split the team into three shifts
This will result to more floor coverage because between 10am and 7pm, the coaches will meet and can work
together in addressing the pending quality and performance reviews with their agents. Also, the supervisor will
meet all employees within the overlapping times.
For example:
3:00 PM to 12:00 MN6:00 AM to 3:00 PM
6:00 AM 12:00 AM
Additional staffing within this
overlap will help clear emails
due by 3PM, while also
reducing emails passed on to
the 3PM – 12MN shift
10:00 AM to 7:00 PM
Additional staffing within this
overlap will help clear emails
due by 12MN
GBS Clark Industrial Engineering Department | Clark Quality Group
Thank you.
Succeeding slides contain the following appendices:
Prepared by:
Case Study: EU ENG Escalation (RNT)
APPENDIX A: Time Study on Follow-up Escalations
APPENDIX B: Time Study on New Escalations
APPENDIX C: Inbound Queues (escalation queue)
APPENDIX D: Escalation Breakdown
Case Study: EU ENG Escalation (RNT)
APPENDIX A: Time Study on Follow-up Escalations
Escalation Time Study conducted for a week.
Type Reads Researches Replies Logs Total Minutes
F/U 45 97 337 22 501 8.4
F/U 33 82 367 32 514 8.6
F/U 70 155 35 15 275 4.6
F/U 25 306 368 27 726 12.1
F/U 70 276 125 55 526 8.8
F/U 58 107 270 67 502 8.4
F/U 95 120 140 102 457 7.6
F/U 50 331 296 37 714 11.9
F/U 95 301 545 44 985 16.4
F/U 83 132 212 63 490 8.2
F/U 120 205 112 45 482 8.0
F/U 75 356 230 41 702 11.7
F/U 156 326 501 27 1010 16.8
F/U 108 157 180 33 478 8.0
F/U 145 230 65 67 507 8.5
F/U 100 381 182 27 690 11.5
Total 1328 3562 3965 704 9559 159
Average 83 223 248 44 597 10.0
% 14% 37% 41% 7%
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
APPENDIX B: Time Study on New Escalations
Escalation Time Study conducted for a week.
Type Reads Researches Replies Logs Total (Seconds) Total (Minutes)
New Esc 115.0 452.9 307.1 19.1 894.1 14.9
New Esc 127.0 288.3 343.9 27.8 787.0 13.1
New Esc 86.0 383.0 229.6 13.1 711.6 11.9
New Esc 136.0 308.7 257.1 23.5 725.4 12.1
New Esc 125.0 492.8 333.8 47.9 999.4 16.7
New Esc 115.0 261.1 373.8 58.3 808.1 13.5
New Esc 98.0 422.9 261.7 88.7 871.3 14.5
New Esc 148.0 336.0 293.0 32.2 809.2 13.5
New Esc 137.0 532.8 365.8 38.3 1073.9 17.9
New Esc 127.0 288.3 409.6 54.8 879.7 14.7
New Esc 110.0 462.9 293.7 39.2 905.7 15.1
New Esc 160.0 363.2 328.9 35.7 887.8 14.8
New Esc 149.0 572.8 397.8 23.5 1143.1 19.1
New Esc 139.0 315.5 445.5 28.7 928.8 15.5
New Esc 122.0 276.9 325.7 58.3 783.0 13.0
New Esc 172.0 390.4 364.8 23.5 950.7 15.8
Total 2066.0 6148.4 5331.7 612.5 14158.6 236.0
Average 129.1 384.3 333.2 38.3 884.9 14.7
% 15% 43% 38% 4%
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
APPENDIX C: Inbound Queues (escalation queue)
Date Escalation Queue Number of Escalated Emails
04/04/17 EU Eng Redirects 18
04/05/17 EU Eng Redirects 10
04/06/17 EU Eng Redirects 16
04/07/17 EU Eng Redirects 11
04/08/17 EU Eng Redirects 0
04/09/17 EU Eng Redirects 3
04/10/17 EU Eng Redirects 27
04/11/17 EU Eng Redirects 27
04/12/17 EU Eng Redirects 23
04/13/17 EU Eng Redirects 17
04/14/17 EU Eng Redirects 1
04/15/17 EU Eng Redirects 0
04/16/17 EU Eng Redirects 12
04/17/17 EU Eng Redirects 23
GBS Clark Industrial Engineering Department | Clark Quality Group
Case Study: EU ENG Escalation (RNT)
Challenges Encountered
As of 6:00 PM - April 19, 2017 (Manila):
Label Count Escalation Type
New 46 Past 15-days GSR and callback requests
Re-Assigned 140 Newly escalated emails from Email agents
Updated by Customer 33 Already addressed but the customer replied back
Working 17 Pending status from other UPS department
Grand Total 236
APPENDIX D: Escalation Breakdown
GBS Clark Industrial Engineering Department | Clark Quality Group

More Related Content

Similar to Case study: UK RNT Escalation

PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI FrameworkUzma Khan
 
BSBMGT516Assessment 1 Marking Criteria Student Name.docx
BSBMGT516Assessment 1 Marking Criteria Student Name.docxBSBMGT516Assessment 1 Marking Criteria Student Name.docx
BSBMGT516Assessment 1 Marking Criteria Student Name.docxAASTHA76
 
Scrum Project Health Standards
Scrum Project Health StandardsScrum Project Health Standards
Scrum Project Health StandardsHass Howard
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.pptTecnicoItca
 
Shane Ireland - 1st Rotation
Shane Ireland - 1st RotationShane Ireland - 1st Rotation
Shane Ireland - 1st RotationShane Ireland
 
Final PPT Presentation
Final PPT PresentationFinal PPT Presentation
Final PPT PresentationAdam Lu
 
Charles Einarson Greenbelt Presentation
Charles Einarson Greenbelt PresentationCharles Einarson Greenbelt Presentation
Charles Einarson Greenbelt PresentationCharles Einarson
 
David Garrard-Engineering CV
David Garrard-Engineering  CVDavid Garrard-Engineering  CV
David Garrard-Engineering CVDave Garrard
 
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...Fiona Phillips
 
20140311 - Catel 01_ Effective lean deployment to FDA approval
20140311 - Catel 01_ Effective lean deployment to FDA approval20140311 - Catel 01_ Effective lean deployment to FDA approval
20140311 - Catel 01_ Effective lean deployment to FDA approvalCyrille Catel
 
Cognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting EducationCognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting EducationNona Press
 
Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013SchoolDude
 

Similar to Case study: UK RNT Escalation (20)

PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI Framework
 
BSBMGT516Assessment 1 Marking Criteria Student Name.docx
BSBMGT516Assessment 1 Marking Criteria Student Name.docxBSBMGT516Assessment 1 Marking Criteria Student Name.docx
BSBMGT516Assessment 1 Marking Criteria Student Name.docx
 
Questions
QuestionsQuestions
Questions
 
Scrum Project Health Standards
Scrum Project Health StandardsScrum Project Health Standards
Scrum Project Health Standards
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.ppt
 
Shane Ireland - 1st Rotation
Shane Ireland - 1st RotationShane Ireland - 1st Rotation
Shane Ireland - 1st Rotation
 
bpr (2).pdf
bpr (2).pdfbpr (2).pdf
bpr (2).pdf
 
Scrum.Pre_.PSM-II.by_.VCEplus.180q-DEMO.pdf
Scrum.Pre_.PSM-II.by_.VCEplus.180q-DEMO.pdfScrum.Pre_.PSM-II.by_.VCEplus.180q-DEMO.pdf
Scrum.Pre_.PSM-II.by_.VCEplus.180q-DEMO.pdf
 
End User ServicesV1.0 training.ppt
End User ServicesV1.0 training.pptEnd User ServicesV1.0 training.ppt
End User ServicesV1.0 training.ppt
 
Final PPT Presentation
Final PPT PresentationFinal PPT Presentation
Final PPT Presentation
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Charles Einarson Greenbelt Presentation
Charles Einarson Greenbelt PresentationCharles Einarson Greenbelt Presentation
Charles Einarson Greenbelt Presentation
 
Chap03
Chap03Chap03
Chap03
 
David Garrard-Engineering CV
David Garrard-Engineering  CVDavid Garrard-Engineering  CV
David Garrard-Engineering CV
 
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
A Comparative Study Of Scrum And Kanban Approaches On A Real Case Study Using...
 
Webb Control Tollgate 15 DEC 14 Final Version
Webb Control Tollgate  15 DEC 14 Final VersionWebb Control Tollgate  15 DEC 14 Final Version
Webb Control Tollgate 15 DEC 14 Final Version
 
20140311 - Catel 01_ Effective lean deployment to FDA approval
20140311 - Catel 01_ Effective lean deployment to FDA approval20140311 - Catel 01_ Effective lean deployment to FDA approval
20140311 - Catel 01_ Effective lean deployment to FDA approval
 
Cognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting EducationCognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting Education
 
Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
 

More from Angelo Yutuc

PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...
PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...
PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...Angelo Yutuc
 
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)Angelo Yutuc
 
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...Angelo Yutuc
 
Marketing Management: Laundry Service with Pickup and Delivery Research
Marketing Management: Laundry Service with Pickup and Delivery ResearchMarketing Management: Laundry Service with Pickup and Delivery Research
Marketing Management: Laundry Service with Pickup and Delivery ResearchAngelo Yutuc
 
Feasibility Report
Feasibility ReportFeasibility Report
Feasibility ReportAngelo Yutuc
 
Nestle Philippines Greening the Supply Chain
Nestle Philippines Greening the Supply Chain Nestle Philippines Greening the Supply Chain
Nestle Philippines Greening the Supply Chain Angelo Yutuc
 

More from Angelo Yutuc (6)

PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...
PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...
PROPOSED IMPROVEMENTS IN THE FACILITY LAYOUT AND DESIGN OF A SMALL-SCALE FURN...
 
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)
Project Feasibility Study of a Modular Bamboo Bhair (Yutuc, Maniago, Luciano)
 
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...
Systematizing In-Store Traffic and Minimization of Service Quality Gaps of a ...
 
Marketing Management: Laundry Service with Pickup and Delivery Research
Marketing Management: Laundry Service with Pickup and Delivery ResearchMarketing Management: Laundry Service with Pickup and Delivery Research
Marketing Management: Laundry Service with Pickup and Delivery Research
 
Feasibility Report
Feasibility ReportFeasibility Report
Feasibility Report
 
Nestle Philippines Greening the Supply Chain
Nestle Philippines Greening the Supply Chain Nestle Philippines Greening the Supply Chain
Nestle Philippines Greening the Supply Chain
 

Recently uploaded

RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDRafezzaman
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 217djon017
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]📊 Markus Baersch
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxdolaknnilon
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfchwongval
 

Recently uploaded (20)

RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptx
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdf
 

Case study: UK RNT Escalation

  • 1. A study collaboration of GBS Clark IE and CQG UPS Global Business Services - Clark Case Study: EU ENG Escalation (RNT)
  • 2. GBS Clark Industrial Engineering Department | Clark Quality Group Case Study: EU ENG Escalation (RNT) EU & CA RNT A dedicated team in GBS Clark that handles email customer service support for 8 Europe countries (Austria, Belgium, Switzerland, Denmark, France, Great Britain/United Kingdom, Ireland, Netherlands) and Canada. The team uses Oracle RightNow Tool (RNT), a customer relationship management (CRM) software for enterprise organizations. Overview
  • 3. Case Study: EU ENG Escalation (RNT) 1 supervisor 2 coaches 1 senior agent 27 Agents (Handling Europe Emails) 4 Agents (Handling Canada Emails) They serve 2 shifts:  6:00AM to 3 PM  3PM to 12MN Current Team Staffing GBS Clark Industrial Engineering Department | Clark Quality Group
  • 4.  236 Email Escalation are overdue (not resolved on or before their due)  Emails received between 12:01am and 3:00 PM are due to be answered by 12MN on the same day, otherwise they become overdue  Escalations received from 3PM to 11:59PM are due to be answered within 24 hours, otherwise they become overdue.  Of the overdue emails, 90% have not been assigned (212), while only 10% (24) are assigned to a senior agent, coach or supervisor. Case Study: EU ENG Escalation (RNT) Current Challenge: Escalation As of 6:00 PM - April 19, 2017 (Manila): GBS Clark Industrial Engineering Department | Clark Quality Group
  • 5. Corporate Audits that have not been reviewed (Release Status)  45 Corporate CA Email audits and 5 Forms audit  9 Corporate EU Email audits and 1 Forms audit  2 CA IIP Case Study: EU ENG Escalation (RNT) Current Challenge: Untimely Quality/Performance Review As of 6:00 PM - April 19, 2017 (Manila): GBS Clark Industrial Engineering Department | Clark Quality Group
  • 6. Case Study: EU ENG Escalation (RNT) Coach/SR Productivity on Escalation Coach/Senior Rep. Rachelle Cham Lawrence Total Handled Escalation (Mar-April) 268 110 835 Daily Average 12.33 12.22 24.56 Estimated dedicated hours on escalation 4.11 2.99 6.02 Data from individual escalation tracker: Rachelle spends 4.11 hours a day while Cham allocates 3 hours per day in handling email escalations. Their daily tasks include:  Creating and updating trackers, hourly and daily reports  Facilitation of team meetings together with the supervisor  Facilitation of Service Briefings  Review and attendance in Corporate calibration  Quality Review (Corporate audit, IIP)  Assignment of emails to agents Lawrence spends 6.02 hours on escalation because it is her primary task, second only is floor support. GBS Clark Industrial Engineering Department | Clark Quality Group
  • 7. Case Study: EU ENG Escalation (RNT) Time Study Procedure: The coach was observed as she handled escalated emails at random times during the day. The steps taken were categorized into:  Reads – involves opening the email from the queue and understanding what the email is about.  Researches – involves navigating through the systems to find a solution to the issue  Replies – involves selecting the appropriate template and/or free-typing the response composition  Logs – involves copying the RNT Reference number, opening the escalation tracker and saving it there for documentation In addition, escalations are classified into:  Follow-up (F/U) – Email escalations worked previously but are still pending. These are handled first and are part of tasks in at the start of the coaches’ shift.  New Escalation – Escalation emails that are handled for the first time. GBS Clark Industrial Engineering Department | Clark Quality Group
  • 8. Case Study: EU ENG Escalation (RNT) Time Study: Summary Type Reads (in seconds) Researches (in seconds) Replies (in seconds) Logs (in seconds) Total (in seconds) Total (in minutes) Average 83 223 248 44 597 10.0 % of total time 14% 37% 41% 7% Follow-up Type Reads (in seconds) Researches (in seconds) Replies (in seconds) Logs (in seconds) Total (in seconds) Total (in minutes) Average 129.1 384.3 333.2 38.3 884.9 14.7 % of total time 15% 43% 38% 4% New Escalations Average Handle Time:  Follow-up – 10 minutes  New Escalation – 14.7 minutes Most time-consuming task:  Follow-up – Replies: 41% of the total average handle time  New Escalation – Research: 43% of the total average handle time See Appendix A for complete data See Appendix B for complete data GBS Clark Industrial Engineering Department | Clark Quality Group
  • 9. Findings and Recommendations Case Study: EU ENG Escalation (RNT) GBS Clark Industrial Engineering Department | Clark Quality Group
  • 10. Case Study: EU ENG Escalation (RNT) First Finding:  Current Support cannot accommodate the escalation volume Using a two- month average, 19 emails are escalated daily These escalations add up to the 200+ overdue emails, about 90% of which remained unassigned The current three supports have a combined handle rate of 49.11 emails per day On average, coaches and SR resolve 67% of the emails, or about 33, while 17 needs follow-up and adds up to the queue on the following day All emails for follow-up adds up to the escalation queue on the following day Resolved Resolved Resolved Resolved For Follow-up GBS Clark Industrial Engineering Department | Clark Quality Group
  • 11. Case Study: EU ENG Escalation (RNT) Recommendation on first finding: 1. Add additional escalation support to clear up the escalation backlogs based on the time study data where an the Average Escalation Handle Time is 0.245 hours (14.7 minutes):  236 emails can be resolved in 57.82 hours  Theoretically, This equates to 7.5 days that is an a 8-hour shift (without personal allowances, quality reviews, etc.)  Realistically, it is between 8.5-9 days that is an 8-hour shift Add one (1) employee to help with the escalation: Escalation overdue will greatly improve in 8.5 to 9 days Add one (2) employees to help with the escalation: Escalation overdue will greatly improve in 4-4.5 days Add one (3) employees to help with the escalation: Escalation overdue will greatly improve in 2-3 days Figures are estimate GBS Clark Industrial Engineering Department | Clark Quality Group
  • 12. Case Study: EU ENG Escalation (RNT) Second Finding: 2. No comprehensive hand-off of escalation from agent to coach/SR When an agent reassigns an email to the escalation queue (EU ENG Redirect), only a private note is attached that tells who approved the reassignment to that queue. Majority do not indicate what the coach or SR must do or why exactly the email was escalated. Agent asks permission to escalate the email from a coach or SR, once approved, he/she reassigns it to the escalation queue. The coach or SR takes the escalated email from the queue and assigns it to herself Researches and responds to the escalation The coach/SR reads the entire email thread to identify why it is escalated GBS Clark Industrial Engineering Department | Clark Quality Group
  • 13. Case Study: EU ENG Escalation (RNT) Recommendation on Second Finding: 2. Make it an SOP to indicate what the coach/SR must act on in the Private Note This will allow a faster hand-off and will reduce the time on reading the entire email thread as well as in researching on the problem. Agent asks permission to escalate the email from a coach or SR, once approved, he/she reassigns it to the escalation queue. The coach or SR takes the escalated email from the queue and assigns it to herself Researches and responds to the escalation Make it an SOP to indicate a detailed explanation in the Private Note. Currently, 43% of the total handle time is for “research” which can be reduced by this step. GBS Clark Industrial Engineering Department | Clark Quality Group
  • 14. Case Study: EU ENG Escalation (RNT) Third Finding: 3. Dual shifts set-up puts pressure on the PM shift to close all emails due by 12MN There are only two shifts per day: AM and PM shifts.  Emails received in the queue between 12:01 AM and 3PM (15 hours) must be closed by 12MN  Emails received between 3:01 PM to 11:59 AM (9 hours) may be closed within 24 hours.  PM Shift tend to prioritize emails that are due by 12MN, causing them to rush on their work. 3:00 PM to 12:00 MN6:00 AM to 3:00 PM 6:00 AM 12:00 MN3:00 PM All unfinished email in the queue received before 3:00PM Emails received from 3PM – 12AM Volume that the PM shift needs to clear, prioritizing those due by 12MN GBS Clark Industrial Engineering Department | Clark Quality Group
  • 15. Case Study: EU ENG Escalation (RNT) Recommendation on Third Finding: 3. Split the team into three shifts This will result to more floor coverage because between 10am and 7pm, the coaches will meet and can work together in addressing the pending quality and performance reviews with their agents. Also, the supervisor will meet all employees within the overlapping times. For example: 3:00 PM to 12:00 MN6:00 AM to 3:00 PM 6:00 AM 12:00 AM Additional staffing within this overlap will help clear emails due by 3PM, while also reducing emails passed on to the 3PM – 12MN shift 10:00 AM to 7:00 PM Additional staffing within this overlap will help clear emails due by 12MN GBS Clark Industrial Engineering Department | Clark Quality Group
  • 16. Thank you. Succeeding slides contain the following appendices: Prepared by: Case Study: EU ENG Escalation (RNT) APPENDIX A: Time Study on Follow-up Escalations APPENDIX B: Time Study on New Escalations APPENDIX C: Inbound Queues (escalation queue) APPENDIX D: Escalation Breakdown
  • 17. Case Study: EU ENG Escalation (RNT) APPENDIX A: Time Study on Follow-up Escalations Escalation Time Study conducted for a week. Type Reads Researches Replies Logs Total Minutes F/U 45 97 337 22 501 8.4 F/U 33 82 367 32 514 8.6 F/U 70 155 35 15 275 4.6 F/U 25 306 368 27 726 12.1 F/U 70 276 125 55 526 8.8 F/U 58 107 270 67 502 8.4 F/U 95 120 140 102 457 7.6 F/U 50 331 296 37 714 11.9 F/U 95 301 545 44 985 16.4 F/U 83 132 212 63 490 8.2 F/U 120 205 112 45 482 8.0 F/U 75 356 230 41 702 11.7 F/U 156 326 501 27 1010 16.8 F/U 108 157 180 33 478 8.0 F/U 145 230 65 67 507 8.5 F/U 100 381 182 27 690 11.5 Total 1328 3562 3965 704 9559 159 Average 83 223 248 44 597 10.0 % 14% 37% 41% 7% GBS Clark Industrial Engineering Department | Clark Quality Group
  • 18. Case Study: EU ENG Escalation (RNT) APPENDIX B: Time Study on New Escalations Escalation Time Study conducted for a week. Type Reads Researches Replies Logs Total (Seconds) Total (Minutes) New Esc 115.0 452.9 307.1 19.1 894.1 14.9 New Esc 127.0 288.3 343.9 27.8 787.0 13.1 New Esc 86.0 383.0 229.6 13.1 711.6 11.9 New Esc 136.0 308.7 257.1 23.5 725.4 12.1 New Esc 125.0 492.8 333.8 47.9 999.4 16.7 New Esc 115.0 261.1 373.8 58.3 808.1 13.5 New Esc 98.0 422.9 261.7 88.7 871.3 14.5 New Esc 148.0 336.0 293.0 32.2 809.2 13.5 New Esc 137.0 532.8 365.8 38.3 1073.9 17.9 New Esc 127.0 288.3 409.6 54.8 879.7 14.7 New Esc 110.0 462.9 293.7 39.2 905.7 15.1 New Esc 160.0 363.2 328.9 35.7 887.8 14.8 New Esc 149.0 572.8 397.8 23.5 1143.1 19.1 New Esc 139.0 315.5 445.5 28.7 928.8 15.5 New Esc 122.0 276.9 325.7 58.3 783.0 13.0 New Esc 172.0 390.4 364.8 23.5 950.7 15.8 Total 2066.0 6148.4 5331.7 612.5 14158.6 236.0 Average 129.1 384.3 333.2 38.3 884.9 14.7 % 15% 43% 38% 4% GBS Clark Industrial Engineering Department | Clark Quality Group
  • 19. Case Study: EU ENG Escalation (RNT) APPENDIX C: Inbound Queues (escalation queue) Date Escalation Queue Number of Escalated Emails 04/04/17 EU Eng Redirects 18 04/05/17 EU Eng Redirects 10 04/06/17 EU Eng Redirects 16 04/07/17 EU Eng Redirects 11 04/08/17 EU Eng Redirects 0 04/09/17 EU Eng Redirects 3 04/10/17 EU Eng Redirects 27 04/11/17 EU Eng Redirects 27 04/12/17 EU Eng Redirects 23 04/13/17 EU Eng Redirects 17 04/14/17 EU Eng Redirects 1 04/15/17 EU Eng Redirects 0 04/16/17 EU Eng Redirects 12 04/17/17 EU Eng Redirects 23 GBS Clark Industrial Engineering Department | Clark Quality Group
  • 20. Case Study: EU ENG Escalation (RNT) Challenges Encountered As of 6:00 PM - April 19, 2017 (Manila): Label Count Escalation Type New 46 Past 15-days GSR and callback requests Re-Assigned 140 Newly escalated emails from Email agents Updated by Customer 33 Already addressed but the customer replied back Working 17 Pending status from other UPS department Grand Total 236 APPENDIX D: Escalation Breakdown GBS Clark Industrial Engineering Department | Clark Quality Group