SlideShare a Scribd company logo
1 of 2
Download to read offline
1
Veolia pre-schedules radioactive waste shipments throughout each year in order to provide
clients with the opportunity for cost savings. These cost savings are realized through shared
transportation costs with other radioactive waste generators.
The shipment dates for waste intended for Veolia-Alaron, EnergySolutions (non-refrigerated),
DSSI and Perma-Fix of Florida will begin on or around the week of:
January 23rd
March 27th
June 5th
August 7th
October 2nd
December 4th
The shipment dates for waste intended for EnergySolutions on a refrigerated trailer will begin
on or around the week of:
February 6th
May 15th
August 21th
November 13th
For your convenience, direct/dedicated shipments can always be scheduled in addition to the
pre-scheduled dates listed above.
Please feel free to contact me directly should you wish to inquire about Veolia’s LLRW
management capabilities at (973) 691-3940 or andrew.marinelli@veolia.com.
New Jersey Branch
2017 Radioactive Material
Transportation Schedule
On-Site Services
Collecting low-level radioactive waste from
individual labs and transferring waste to the
waste storage room
Packaging and labeling containers
Tracking and keeping records of radioactive
material in containers, including material
stored for decay
Coordinating waste shipments
Manage incoming package receipts
Training
Perform audits
Review procedures and programs
Lab surveys
Low-Level Radioactive Waste
Field Service Division
Waste Services
Veolia’s trained field personnel identify and classify radioactive and mixed wastes,
including dry active waste, scintillation vials/fluids, solvents, corrosive materials,
aqueous liquids, sludges, resins, biological wastes, soils, sealed sources, contaminated
lead, metals and equipment.
Our trained professionals are experienced in obtaining approvals for processing and
disposing waste at our own facilities and at third-party sites that pass our strict audit
program. Wastes are packaged efficiently and cost effectively, in compliance with all
EPA, DOT, State and Waste Acceptance Criteria standards. Manifests and shipping
papers are completed and presented for signature prior to shipment. Veolia arranges
all transportation and ensures arrival at the selected processing facilities.
On-Site Service
Many on-site service programs are available and can be customized to meet the needs
of each individual generator. Among the services offered are: collecting low-level
radioactive waste from individual labs and transferring waste to the waste storage
room; packaging and labeling containers; tracking and keeping records of radioactive
material in containers, including material stored for decay; conducting lab surveys and
coordinating waste shipments.
Veolia personnel are available for properly managing incoming package receipts, in
accordance with each generator’s procedures and surveys, as specified in the company’s
radioactive materials license. In addition, our experienced radioactive project managers
provide training, perform audits, and review procedures and programs to suggest
recommendations that ensure total compliance.
46

More Related Content

Similar to 2017 Rad Schedule

VFS Encompass Oct 2014
VFS Encompass Oct 2014VFS Encompass Oct 2014
VFS Encompass Oct 2014Nick Morgan
 
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...IES / IAQM
 
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1Dereck Johnson
 
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...How do hydrovac contractors in the Bay Area handle disposal of excavated mate...
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...Tec
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profilelindinger123
 
Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln
 
WyattWaroResumeQC2
WyattWaroResumeQC2WyattWaroResumeQC2
WyattWaroResumeQC2Wyatt Waro
 
Ecology_and_Biodiversity_Leaflet_Highres
Ecology_and_Biodiversity_Leaflet_HighresEcology_and_Biodiversity_Leaflet_Highres
Ecology_and_Biodiversity_Leaflet_HighresMatthew Hopkins
 
Prevention of water pollution | weyer special
Prevention of water pollution | weyer specialPrevention of water pollution | weyer special
Prevention of water pollution | weyer specialweyer gruppe
 
Who Is Talon/LPE?
Who Is Talon/LPE?Who Is Talon/LPE?
Who Is Talon/LPE?Talon/LPE
 
Urban waste management
Urban  waste  managementUrban  waste  management
Urban waste managementMadhukar Priya
 

Similar to 2017 Rad Schedule (14)

VFS Encompass Oct 2014
VFS Encompass Oct 2014VFS Encompass Oct 2014
VFS Encompass Oct 2014
 
Univwastetalk
UnivwastetalkUnivwastetalk
Univwastetalk
 
Beavis EPA Bio
Beavis EPA BioBeavis EPA Bio
Beavis EPA Bio
 
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
Brian McVeigh, IES/IBN Discussion meeting: Waste soils on development sites o...
 
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1
ELI - STATEMENT OF QUAILIFICATIONS UPDATED RF1
 
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...How do hydrovac contractors in the Bay Area handle disposal of excavated mate...
How do hydrovac contractors in the Bay Area handle disposal of excavated mate...
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profile
 
Ecology and Planning
Ecology and PlanningEcology and Planning
Ecology and Planning
 
Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015
 
WyattWaroResumeQC2
WyattWaroResumeQC2WyattWaroResumeQC2
WyattWaroResumeQC2
 
Ecology_and_Biodiversity_Leaflet_Highres
Ecology_and_Biodiversity_Leaflet_HighresEcology_and_Biodiversity_Leaflet_Highres
Ecology_and_Biodiversity_Leaflet_Highres
 
Prevention of water pollution | weyer special
Prevention of water pollution | weyer specialPrevention of water pollution | weyer special
Prevention of water pollution | weyer special
 
Who Is Talon/LPE?
Who Is Talon/LPE?Who Is Talon/LPE?
Who Is Talon/LPE?
 
Urban waste management
Urban  waste  managementUrban  waste  management
Urban waste management
 

2017 Rad Schedule

  • 1. 1 Veolia pre-schedules radioactive waste shipments throughout each year in order to provide clients with the opportunity for cost savings. These cost savings are realized through shared transportation costs with other radioactive waste generators. The shipment dates for waste intended for Veolia-Alaron, EnergySolutions (non-refrigerated), DSSI and Perma-Fix of Florida will begin on or around the week of: January 23rd March 27th June 5th August 7th October 2nd December 4th The shipment dates for waste intended for EnergySolutions on a refrigerated trailer will begin on or around the week of: February 6th May 15th August 21th November 13th For your convenience, direct/dedicated shipments can always be scheduled in addition to the pre-scheduled dates listed above. Please feel free to contact me directly should you wish to inquire about Veolia’s LLRW management capabilities at (973) 691-3940 or andrew.marinelli@veolia.com. New Jersey Branch 2017 Radioactive Material Transportation Schedule
  • 2. On-Site Services Collecting low-level radioactive waste from individual labs and transferring waste to the waste storage room Packaging and labeling containers Tracking and keeping records of radioactive material in containers, including material stored for decay Coordinating waste shipments Manage incoming package receipts Training Perform audits Review procedures and programs Lab surveys Low-Level Radioactive Waste Field Service Division Waste Services Veolia’s trained field personnel identify and classify radioactive and mixed wastes, including dry active waste, scintillation vials/fluids, solvents, corrosive materials, aqueous liquids, sludges, resins, biological wastes, soils, sealed sources, contaminated lead, metals and equipment. Our trained professionals are experienced in obtaining approvals for processing and disposing waste at our own facilities and at third-party sites that pass our strict audit program. Wastes are packaged efficiently and cost effectively, in compliance with all EPA, DOT, State and Waste Acceptance Criteria standards. Manifests and shipping papers are completed and presented for signature prior to shipment. Veolia arranges all transportation and ensures arrival at the selected processing facilities. On-Site Service Many on-site service programs are available and can be customized to meet the needs of each individual generator. Among the services offered are: collecting low-level radioactive waste from individual labs and transferring waste to the waste storage room; packaging and labeling containers; tracking and keeping records of radioactive material in containers, including material stored for decay; conducting lab surveys and coordinating waste shipments. Veolia personnel are available for properly managing incoming package receipts, in accordance with each generator’s procedures and surveys, as specified in the company’s radioactive materials license. In addition, our experienced radioactive project managers provide training, perform audits, and review procedures and programs to suggest recommendations that ensure total compliance. 46