SlideShare a Scribd company logo
1 of 1
CapstoneProject
This is a hands-on demonstration of student abilities as a technician and understandingof the concepts and technologies studied for
the past18 months. This is where you, the student, prove what you have learned by designinga fully functioningnetwork that
includes the items listed below. The student will givea presentation on their design that should includetheir thought process on the
project, and the strength and weakness of both the network and the student’s ability. The student will complete the network on his
own with very little assistance from Instructors or other students! Once the project is complete, student will schedulewith the
instructor a time to present, this should includebusinessdress and invitationsto all NetworkingInstructors. No preconfigured or
turnkey solution accepted and any negative effects on the lab performance such as IPs handed out, etc will result in loss of points.
 BuildCat5e cable to fittheirneed,be careful toterminate properly,andbe organized
 Install/Configure CiscoRouterStudentmayonlyuse 1 WAN IP to accomplishall below
 Install/Configure CiscoSwitch
 Studentwill create 2VLANSall servers, labdesktop computerand1Linux client will be onone andat leastone
WindowsClientonVLAN 2(student’slaptopisoktouse for thispurpose).
 Apache WebserverrunningonCentOS7available fromoutside firewall.Basicwebpage is OK
 RDP serveravailable from outside firewall usingport33890
 Internal DNSservertobe able toaccess webpage byname fromall clients
 Both VLAN will receive clientIP’sfromone DHCPserversoVLAN 2 computerswill needtoaccessDHCPon VLAN
1-- IPscheme shouldbe determinedusing subnettingskills
 AD controllerkeepinguptime andredundancyinmind
 At least25 Users,we will randomlypickusertotest.Needthese usersdistributedbetween4departments.(RD,
Accounting,Sales,Engineering)
 Personal Drivesmappedviagrouppolicyforall users toserver,shouldonlyhave accesstotheirs
 FolderRedirectionandOffline Filesimplemented
 Map a Printerforeach department andavailableforthose usersatlogon usinglogonscript
 PasswordPolicyforall users (8-characters,30 day expiration,defaultcomplexity)
 Once the studentsExchange serversare upand functioninginExchange class itshouldserve email tothe
networkusers included in project,each usershouldhave email accountanduse Outlook tosend/receive ona
windowsclient.
 Utilize WSUSserverwithWindowsUpdatesapprovedforclientsmachines.
 Use VeeamBackuptobackup yourVMs (A free editionisavailable.If usingatrial be mindful of yourtrial period.
It mustfunctionthroughcompletionof the projectforpoints)
 Create a disasterrecoveryplan.(Documentandorganize whatisneededtoensure thisnetworkwouldbe
available if facedwithadisaster.)
 Openfilershouldbe usedforaNFSsolutionforVMware andaddedto ESXi as Datastore
 Vmware vMotionconfigured usingvCenter
 PXE bootsolutionforrapiddeployment.Use FOGor Windows DeploymentServer.Sysprepimage andbe able to
demonstrate functionality.
 SQUID proxyserverformonitoringinternettraffic.Setsome rules andbe able toverifyoperation.
 SecurityAudit- Use Kali Linux toolssuchas nmap,OpenVAS,andNikto.Documentandapplyappropriate
securitymeasurestonetwork.Includebefore/afterauditreportswithdocumentationonce completedto
establishbaseline
 Thoroughnetworkdocumentation.Be able to answerquestionsduringpresentation.
 PresentationMUSTbe set byMay 2 or itwill be scheduledforyou.
This is the only grade for this class. As this is the final project, students should expect stringent grading of the above. A rubricfor
each step will be used for grading, failure to complete a step fully will results in a 0 for that entire task if completed successfully it
will be a 1.

More Related Content

Similar to Capstone Project

NSA Capstone Project III final pp
NSA Capstone Project III final ppNSA Capstone Project III final pp
NSA Capstone Project III final pp
Alfonso Zamorano
 
V.S.VamsiKrishna
V.S.VamsiKrishnaV.S.VamsiKrishna
V.S.VamsiKrishna
vamsisvk
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015
Peter Gervais
 
9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products
Prakash S M
 
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
BMIS 520IT Infrastructure Project Designing LAN Networks AssignBMIS 520IT Infrastructure Project Designing LAN Networks Assign
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
JeniceStuckeyoo
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol
TatianaMajor22
 

Similar to Capstone Project (20)

NSA Capstone Project III final pp
NSA Capstone Project III final ppNSA Capstone Project III final pp
NSA Capstone Project III final pp
 
Identity based encryption
Identity based encryptionIdentity based encryption
Identity based encryption
 
Gopikrishanan
GopikrishananGopikrishanan
Gopikrishanan
 
V.S.VamsiKrishna
V.S.VamsiKrishnaV.S.VamsiKrishna
V.S.VamsiKrishna
 
David nickerson resume--gd
David nickerson resume--gdDavid nickerson resume--gd
David nickerson resume--gd
 
Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015
 
9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products9 yrs of Testing Exp_STB and DSL gateway products
9 yrs of Testing Exp_STB and DSL gateway products
 
Christopher_Reder_2016
Christopher_Reder_2016Christopher_Reder_2016
Christopher_Reder_2016
 
Ajay Singh
Ajay SinghAjay Singh
Ajay Singh
 
Resume piyush agarwal (1)(1)
Resume piyush agarwal (1)(1)Resume piyush agarwal (1)(1)
Resume piyush agarwal (1)(1)
 
Lasitha_Konara_CV
Lasitha_Konara_CVLasitha_Konara_CV
Lasitha_Konara_CV
 
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
BMIS 520IT Infrastructure Project Designing LAN Networks AssignBMIS 520IT Infrastructure Project Designing LAN Networks Assign
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
 
Julio andradecv
Julio andradecvJulio andradecv
Julio andradecv
 
Mini Project- Virtual Network Project
Mini Project- Virtual Network ProjectMini Project- Virtual Network Project
Mini Project- Virtual Network Project
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol
 
Resume (5)
Resume (5)Resume (5)
Resume (5)
 
Rakesh_M
Rakesh_MRakesh_M
Rakesh_M
 
Dattatray Resume
Dattatray ResumeDattatray Resume
Dattatray Resume
 
Satish A (1)
Satish A (1)Satish A (1)
Satish A (1)
 

Capstone Project

  • 1. CapstoneProject This is a hands-on demonstration of student abilities as a technician and understandingof the concepts and technologies studied for the past18 months. This is where you, the student, prove what you have learned by designinga fully functioningnetwork that includes the items listed below. The student will givea presentation on their design that should includetheir thought process on the project, and the strength and weakness of both the network and the student’s ability. The student will complete the network on his own with very little assistance from Instructors or other students! Once the project is complete, student will schedulewith the instructor a time to present, this should includebusinessdress and invitationsto all NetworkingInstructors. No preconfigured or turnkey solution accepted and any negative effects on the lab performance such as IPs handed out, etc will result in loss of points.  BuildCat5e cable to fittheirneed,be careful toterminate properly,andbe organized  Install/Configure CiscoRouterStudentmayonlyuse 1 WAN IP to accomplishall below  Install/Configure CiscoSwitch  Studentwill create 2VLANSall servers, labdesktop computerand1Linux client will be onone andat leastone WindowsClientonVLAN 2(student’slaptopisoktouse for thispurpose).  Apache WebserverrunningonCentOS7available fromoutside firewall.Basicwebpage is OK  RDP serveravailable from outside firewall usingport33890  Internal DNSservertobe able toaccess webpage byname fromall clients  Both VLAN will receive clientIP’sfromone DHCPserversoVLAN 2 computerswill needtoaccessDHCPon VLAN 1-- IPscheme shouldbe determinedusing subnettingskills  AD controllerkeepinguptime andredundancyinmind  At least25 Users,we will randomlypickusertotest.Needthese usersdistributedbetween4departments.(RD, Accounting,Sales,Engineering)  Personal Drivesmappedviagrouppolicyforall users toserver,shouldonlyhave accesstotheirs  FolderRedirectionandOffline Filesimplemented  Map a Printerforeach department andavailableforthose usersatlogon usinglogonscript  PasswordPolicyforall users (8-characters,30 day expiration,defaultcomplexity)  Once the studentsExchange serversare upand functioninginExchange class itshouldserve email tothe networkusers included in project,each usershouldhave email accountanduse Outlook tosend/receive ona windowsclient.  Utilize WSUSserverwithWindowsUpdatesapprovedforclientsmachines.  Use VeeamBackuptobackup yourVMs (A free editionisavailable.If usingatrial be mindful of yourtrial period. It mustfunctionthroughcompletionof the projectforpoints)  Create a disasterrecoveryplan.(Documentandorganize whatisneededtoensure thisnetworkwouldbe available if facedwithadisaster.)  Openfilershouldbe usedforaNFSsolutionforVMware andaddedto ESXi as Datastore  Vmware vMotionconfigured usingvCenter  PXE bootsolutionforrapiddeployment.Use FOGor Windows DeploymentServer.Sysprepimage andbe able to demonstrate functionality.  SQUID proxyserverformonitoringinternettraffic.Setsome rules andbe able toverifyoperation.  SecurityAudit- Use Kali Linux toolssuchas nmap,OpenVAS,andNikto.Documentandapplyappropriate securitymeasurestonetwork.Includebefore/afterauditreportswithdocumentationonce completedto establishbaseline  Thoroughnetworkdocumentation.Be able to answerquestionsduringpresentation.  PresentationMUSTbe set byMay 2 or itwill be scheduledforyou. This is the only grade for this class. As this is the final project, students should expect stringent grading of the above. A rubricfor each step will be used for grading, failure to complete a step fully will results in a 0 for that entire task if completed successfully it will be a 1.