The document provides an erection sequence for a 400kV GIS substation. It outlines the step-by-step process for assembling and installing the various components of the substation, including unpacking GIS carts, aligning circuit breakers, erecting current transformers and disconnectors, assembling walkway platforms, installing internal and main buses, erecting bus ducts and supports, testing and filling circuit breakers with SF6 gas, installing gas insulated buses, erecting bushing, line traps, and testing equipment. The sequence shows the substation being fully assembled and tested over numerous steps.