SlideShare a Scribd company logo
1 of 2
Download to read offline
Raja Zain Khalid
House-74-C, Askari 2, Scheme 3, Rawalpindi Cant
Phone: +92345-5001962
Email: rajazainkhalid@hotmail,com
LinkedIn: www.linkedin.com/in/raja-zain-khalid-00592555
To secure a responsible career opportunity in a challenging working environment, where I can fully utilize my
experience and trainings while making a significant contribution to the success of the organization.
WORK EXPERIENCE
DWDM Transport Planning Officer, Telenor Pakistan October 2014-Present
Major Responsibilities:
 Working on Fiber Sharing project / Fiber RFQ
 TP DWDM network optimization and issuing traffic shifting plans.
 Rollout Hardware dimensioning.
 Hands on:
- ZTE DWDM M820
- Huawei OSN 7500/3500
- ZTE S385 (Ng-SDH)
- DWDM Protection Techniques (WASON, OP)
 Working on MORAN project.
 Building new and maintaining existing 3rd party interconnects.
 Planning new solutions in network.
 Monitor the performance stats of the network and ensure timely issuance of WO for
expansions.
IP Core Planning Intern, Telenor Pakistan July 2014-September 2014
Major Responsibilities:
 To perform network audit for updating IP Core inventory
 To perform network audit for duplicate/missing IP address in IP Core database
 Preparation of Visio diagrams for IP Core integration with PS, VAS, CS etc
 Understanding of IP Core Network and flow of services
PIE Intern, PTCL Islamabad June 2012-August 2012
Major Responsibilities:
 O&M of Core Routers.
 Learned Basic Networking Protocols.
PROJECTS
USF Working:
 Hardware and Fiber Planning.
 Preparation of Business Case.
3g Rollout Planning:
 Preparation of HLD/LLD’s of DWDM Rollout Scope.
 Follow up with relevant stake holders to meet project timeline.
Third Party TDM Interconnects:
 Maintaining and Upgrading POI’s
 Issuing Traffic shifting plans
LTE Fiber Working:
 Backhaul Fiber working of around 1200 new fiber nodes to cater high BW LTE traffic.
 Multiples cases were considered including 1.3MHZ refarming, 5MHz carrier and 20MHz dual band.
EDUCATION
Electrical (Telecommunication) Engineering BS(EE) NUST 2010- 2014 CGPA 3.18
FSC Pre-Engineering Sir Syed College, Islamabad 2008-2010 A Grade
Matriculation APS, Bahawalpur Cant 2006-2008 A Grade
SKILL SET
Products: ZXMP M820, Huawei OSN 7500/3500, ZTE S385
Protocols: OSPF, BGP, HSRP, VRRP, LSP, MPLS-TE, MPLS-TP, SDN/NFV architecture.
Application Packages: Microsoft Visio, Microsoft Excel, Microsoft Power Point, Google Earth
Network Design & Optimization:
 DWDM Rollout Hardware/Fiber Planning.
 Upgrading Protection Mechanism on Long Haul Backbone Network,
 Offloading unnecessary equipment to Optimize Power and Space.
PROFESSIONAL TRAININGS
 IP-MPLS and Routing 2016
 Mobile IP Core & Internet Gateway Layer Design 2015
 IP Based Transport for UMTS and LTE by Exuberant 2015
 ZTE DWDM Network Planning and Maintenance 2015
CO-CURRICULAR ACTIVITIES
 Voluntary member of organization within the university campus working for the welfare of the needy.
 Merit based scholarships in engineering degree.
 Horse Riding.
 Member of Telenor Cricket Team.
 Member of Telenor FIFA club.
 Counter Strike Champion of Telenor North Region.
ACHIEVEMENTS
 Spot On Value Champion of Network Engineering Department, Telenor Pakistan 2015
 Final Year Project Funded By Islamabad Traffic Police 2014
 Merit Based Scholarship on achieving High Semester GPA 2012
REFERENCES
 Ata ul Ghayyur
AM Transport Core Planning, NED Telenor Pakistan
Contact: 03455003177, Email: ata.ghayyur@telenor.com.pk
 Ali Abbas
Team Lead Metro Transport Planning, NED Telenor Pakistan
Contact: 03452022328, Email: zaidi.syed@telenor.com.pk

More Related Content

What's hot (20)

Amit singh(Resume)
Amit singh(Resume)Amit singh(Resume)
Amit singh(Resume)
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 
Senior_Network_Engineer
Senior_Network_EngineerSenior_Network_Engineer
Senior_Network_Engineer
 
Rajesh Jindal's cv
Rajesh Jindal's  cv Rajesh Jindal's  cv
Rajesh Jindal's cv
 
Resume
ResumeResume
Resume
 
Taimur-CV
Taimur-CVTaimur-CV
Taimur-CV
 
Yogesh_2015
Yogesh_2015Yogesh_2015
Yogesh_2015
 
CV_guyroger_updated
CV_guyroger_updatedCV_guyroger_updated
CV_guyroger_updated
 
Ramith cv
Ramith cvRamith cv
Ramith cv
 
Fictoria_Edwin_2Aresume
Fictoria_Edwin_2AresumeFictoria_Edwin_2Aresume
Fictoria_Edwin_2Aresume
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
shriram2016
shriram2016shriram2016
shriram2016
 
CV WITH 7.6 YEARS
CV WITH 7.6 YEARSCV WITH 7.6 YEARS
CV WITH 7.6 YEARS
 
Pradeep_CV_Networking
Pradeep_CV_NetworkingPradeep_CV_Networking
Pradeep_CV_Networking
 
suresh resume
suresh resumesuresh resume
suresh resume
 
RESUME VISHAL
RESUME VISHALRESUME VISHAL
RESUME VISHAL
 
Sample_CV
Sample_CVSample_CV
Sample_CV
 
CV_Lalit
CV_LalitCV_Lalit
CV_Lalit
 
jees_Resume2
jees_Resume2jees_Resume2
jees_Resume2
 
Martin Aleksiuk Resume
Martin Aleksiuk ResumeMartin Aleksiuk Resume
Martin Aleksiuk Resume
 

Similar to Resume 7June2016

Similar to Resume 7June2016 (20)

Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Telecom/IT Engineer
Telecom/IT EngineerTelecom/IT Engineer
Telecom/IT Engineer
 
BASKAR. K
BASKAR. KBASKAR. K
BASKAR. K
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
Tejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom EngineerTejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom Engineer
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
Resume_SyedAtifShamim
Resume_SyedAtifShamimResume_SyedAtifShamim
Resume_SyedAtifShamim
 
parkash kr latest (1)
parkash kr latest (1)parkash kr latest (1)
parkash kr latest (1)
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Imran Talib Network Engineer
Imran Talib Network EngineerImran Talib Network Engineer
Imran Talib Network Engineer
 
MubashirResume
MubashirResumeMubashirResume
MubashirResume
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
resume
resumeresume
resume
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
m.zaheer ali (1)
m.zaheer ali (1)m.zaheer ali (1)
m.zaheer ali (1)
 
Udit
UditUdit
Udit
 

Resume 7June2016

  • 1. Raja Zain Khalid House-74-C, Askari 2, Scheme 3, Rawalpindi Cant Phone: +92345-5001962 Email: rajazainkhalid@hotmail,com LinkedIn: www.linkedin.com/in/raja-zain-khalid-00592555 To secure a responsible career opportunity in a challenging working environment, where I can fully utilize my experience and trainings while making a significant contribution to the success of the organization. WORK EXPERIENCE DWDM Transport Planning Officer, Telenor Pakistan October 2014-Present Major Responsibilities:  Working on Fiber Sharing project / Fiber RFQ  TP DWDM network optimization and issuing traffic shifting plans.  Rollout Hardware dimensioning.  Hands on: - ZTE DWDM M820 - Huawei OSN 7500/3500 - ZTE S385 (Ng-SDH) - DWDM Protection Techniques (WASON, OP)  Working on MORAN project.  Building new and maintaining existing 3rd party interconnects.  Planning new solutions in network.  Monitor the performance stats of the network and ensure timely issuance of WO for expansions. IP Core Planning Intern, Telenor Pakistan July 2014-September 2014 Major Responsibilities:  To perform network audit for updating IP Core inventory  To perform network audit for duplicate/missing IP address in IP Core database  Preparation of Visio diagrams for IP Core integration with PS, VAS, CS etc  Understanding of IP Core Network and flow of services PIE Intern, PTCL Islamabad June 2012-August 2012 Major Responsibilities:  O&M of Core Routers.  Learned Basic Networking Protocols. PROJECTS USF Working:  Hardware and Fiber Planning.  Preparation of Business Case. 3g Rollout Planning:  Preparation of HLD/LLD’s of DWDM Rollout Scope.  Follow up with relevant stake holders to meet project timeline. Third Party TDM Interconnects:  Maintaining and Upgrading POI’s  Issuing Traffic shifting plans LTE Fiber Working:  Backhaul Fiber working of around 1200 new fiber nodes to cater high BW LTE traffic.  Multiples cases were considered including 1.3MHZ refarming, 5MHz carrier and 20MHz dual band. EDUCATION Electrical (Telecommunication) Engineering BS(EE) NUST 2010- 2014 CGPA 3.18 FSC Pre-Engineering Sir Syed College, Islamabad 2008-2010 A Grade Matriculation APS, Bahawalpur Cant 2006-2008 A Grade SKILL SET Products: ZXMP M820, Huawei OSN 7500/3500, ZTE S385 Protocols: OSPF, BGP, HSRP, VRRP, LSP, MPLS-TE, MPLS-TP, SDN/NFV architecture. Application Packages: Microsoft Visio, Microsoft Excel, Microsoft Power Point, Google Earth
  • 2. Network Design & Optimization:  DWDM Rollout Hardware/Fiber Planning.  Upgrading Protection Mechanism on Long Haul Backbone Network,  Offloading unnecessary equipment to Optimize Power and Space. PROFESSIONAL TRAININGS  IP-MPLS and Routing 2016  Mobile IP Core & Internet Gateway Layer Design 2015  IP Based Transport for UMTS and LTE by Exuberant 2015  ZTE DWDM Network Planning and Maintenance 2015 CO-CURRICULAR ACTIVITIES  Voluntary member of organization within the university campus working for the welfare of the needy.  Merit based scholarships in engineering degree.  Horse Riding.  Member of Telenor Cricket Team.  Member of Telenor FIFA club.  Counter Strike Champion of Telenor North Region. ACHIEVEMENTS  Spot On Value Champion of Network Engineering Department, Telenor Pakistan 2015  Final Year Project Funded By Islamabad Traffic Police 2014  Merit Based Scholarship on achieving High Semester GPA 2012 REFERENCES  Ata ul Ghayyur AM Transport Core Planning, NED Telenor Pakistan Contact: 03455003177, Email: ata.ghayyur@telenor.com.pk  Ali Abbas Team Lead Metro Transport Planning, NED Telenor Pakistan Contact: 03452022328, Email: zaidi.syed@telenor.com.pk