2. ABADAN REFINARY
- Cooling ,Process Water and Demineralized
Water for ABADAN REFINARY
- Desalination & demineralization plant treats
30.000 mg/lt Sea Water to 0,1 μs/cm demin
water
--Subcontract Execution ,commissioning and
Startup
SYSTEM CAPACITIES
CLARIFICATION System 4000 m3/h
ULTRAFILTRATION System 1500 m3/h
MULTI-STAGE SWRO System 975 m3/h
2nd PASS RO System 780 m3/h
DEMINERALIZATION System 780 m3/h
Abadan refinery’s 90yrs Old design used river water from the Arvand River for cooling and water
consumption this ment 350’000 CMD of fresh river water was returned back to its source after
contamination with hydrocarbons, heavy metals and aromatic process fluid affecting directly the
sustainability of the surrounding Hammriah and Faw peninsulae,affecting the shadegan natural preserve a
world geologic heritage site , the project involved replacement of the 75 yrs old once through cooling
system with a closed loop making it the Green project of the year
3. BIRJAND MUNICIPALITY WTP
-Plant Design Was Bestowed To Paques Holland Due To Sanctions And Financial Difficulties Msv The Main
Contractor Faced Paques Abandond The Project executing Only The Pilot Plant and Basic Design –Detail
Design Was Not Supplied When Contract With Designer Terminated ,TAWA Engineers Reverse Engineered The
Pilot Plant Data And Completed The Project In Dec 2014, Reducing Chromium Content To Nil And Achieving
85% Recovery Rate Negotiation Underway To Implement TAWA RLD Technology Increasing Ro Recovery To
95%
-1086 MEMBRANE ELEMENTS IN-STORE FOR MORE THAN 7YEARS WERE RECOVERED WITH HELP OF
PASTEUR INSTITUTE AND TAWA ENGINEERS
CAPACITY 57’600 CMD
INLET TH & Cr+6 500PPM&8PPU
OUTLET-TH&
Cr+6
150PPM&NIL
RO COVERY 85% 780 m3/h
TREATMENT SPECS
-FIRST USE OF PELLET REACTORS
-85M/HRS MIRROR VELOCITY ACHIEVED
-FIRST USE BALLASTED SETTLING
-70M/HRS MIRROR VELOCITY ACHIEVED
4. References. Key projects
PROJECT ABADAN REFINARY ,IRAN
CLIENT Tiv Energy-Omrab
CAPACITY 4000 M3/Hrs Clarified Makeup water for cooling towers
1500 M3/Hrs Ultra Filtration Sanitary water
975 M3/Hrs Multistage SWRO
780 M3/Hrs 2nd Pass BWRO
780 M3/Hrs Mixed Bed Ultra-Pure 0,1 μs/cm
SCOPE Engineering-Installation supervision and Startup
YEAR 2015
PROJECT BIRJAND CITY WATER TREATMENT PLANT,IRAN
CLIENT Machine Sazi Vijeh
CAPACITY 2592 M3/Hrs Plant capacity
1800 M3/Hrs Pellet Reactor+Ballasted Settling
594 M3/Hrs Nanofiltration+RO System
Highlights
Membrane Recovery , Planned RLD System +First Use
Pellet reactor Lime Softening Technology
SCOPE PC Subcontract+Operation Supervision
YEAR 2014
5. PROJECT HORMOZGAN 100MLD DESALINATION PLANT,IRAN
CLIENT FARAB-Tana Energy-Machine Sazi Vijeh-Tiv Energy
CAPACITY 4167 M3/Hrs SWRO Plant
11906 M3/Hrs DAF Pretreatment
4167 M3/Hrs Potabilisation Plant
SCOPE 1st contract –Bidding Stage Design and Estimation
Financial Model-Risk Assessment-Due Diligence
2nd contract –Project Kick off -Conceptual Design
YEAR 2013
PROJECT SAKO 1000MLD DESALINATION PLANT,IRAN
CLIENT HENDESEH PARS CONSULTING ENGINEERS
CAPACITY 25’920 M3/Hrs Plant capacity
1ST Contract –Bidding Stage Evaluation
SCOPE
2nd Contract –Training and Supervision of project
personel
YEAR 2015
6. PROJECT SHARJAH MUNICIPALITY,STP UPGRADE ,UAE
CLIENT Global Engineering Systems
CAPACITY 53’000 CMD IFAS –Upgraded STP
Existing 37’500 CMD Activated Sludge STP was upgraded to
53’000 CMD using IFAS technology from Veolia
SCOPE Design-Installation & Startup Supervision
YEAR 2012
PROJECT SAIF ZONE SEWAGE TREATMENT PLANT,UAE
CLIENT GLOBAL ENGINEERING SYSTEMS
CAPACITY 8000 CMD Plant capacity
Highlights Green Field Project –using MBBR Technology by Veolia
SCOPE
Client Training –Design Installation-Operation
Supervision
YEAR 2011
7. PROJECT QURIYAT ,PACKAGED STP,OMAN
CLIENT Global Engineering Systems
CAPACITY 8x300 CMD
Packaged sewage treatment plant –using MBBR
SCOPE Design-construction-Installation-startup
YEAR 2010
PROJECT FUJAIRAH 1,PILOT PLANT ,UAE
CLIENT FEWA-DOOSAN HEAVY INDUSTRIES
CAPACITY 187 CMD DAF Capacity
Highlights
Evaluation of benefits of using DAF System to control
Algae Bloom
SCOPE Employee of DEGREMONT SA
YEAR 2007
8. PROJECT BURJ KHALIFAI-Lake Water Treatment-UAE
CLIENT Nakheel
CAPACITY 4x28800 CMD
Packaged sewage treatment plant –using MBBR
SCOPE VWS Employee
YEAR 2009
PROJECT FUJAIRAH 2,IWPP ,UAE
CLIENT FEWA-Veolia Water Soloutions
CAPACITY
136’400 CMD Plant capacity
389’800 CMD DAF Capacity
Highlights First Use of DAF System to control Algae Bloom
SCOPE Employee of VWS
YEAR 2009
9. PROJECT DARSAIT STP,OMAN
CLIENT HAYA Water
CAPACITY 50’000 CMD
Municipal sewage treatment plant using MBR –BIOSEP technology
by NORIT & VWS
SCOPE BID manager
YEAR 2009
PROJECT SUR Desalination Plant ,OMAN
CLIENT Sharqiyah Desalination Company
CAPACITY 80’700 CMD
Highlights
Biggest Plant with forced feed beach wells in Persian
Gulf
SCOPE Employee of VWS
YEAR 2008
10. PROJECT CHABAHAR I&II,IRAN
CLIENT NOOR VIJEH
CAPACITY 15’000 CMD
SEA WATER RO DESALINATION PLANT BY AXIOM
SCOPE
DESIGN,CONSTRUCTION,EQUIPMENT
INSTALLATOION,STARTUP
YEAR 2008,2014
PROJECT KANGAN,IRAN
CLIENT NOOR VIJEH
CAPACITY 10’000 CMD
Highlights SEA WATER RO DESALINATION PLANT BY AXIOM
SCOPE DESIGN,CONSTRUCTION,INSTALLATION ONGOING
YEAR 2015
11. PROJECT ASSALUYEH,IRAN
CLIENT NOOR VIJEH
CAPACITY 12’500 CMD
SEA WATER RO DESALINATION PLANT BY LINDE
SCOPE
DESIGN,CONSTRUCTION,EQUIPMENT
INSTALLATOION,STARTUP
YEAR 2004
PROJECT BUSHEHR,IRAN
CLIENT NOOR VIJEH
CAPACITY 10’000 CMD
Highlights SEA WATER RO DESALINATION PLANT BY AXIOM
SCOPE DESIGN,CONSTRUCTION,ongoing
YEAR 2015
12. PROJECT ASSALUYEH,IRAN
CLIENT NOOR VIJEH
CAPACITY 4 MWH
COMPACT TRANSFORMATION STATION
SCOPE
DESIGN,CONSTRUCTION,EQUIPMENT
INSTALLATOION,STARTUP
YEAR 2004
PROJECT ASSALUYEH,IRAN
CLIENT NOOR VIJEH
CAPACITY 10’000 CMD
Highlights
FIRST TANKER FILLING POTABALE WATER
DISTRIBUTION PLANT CONCEPT
SCOPE
CONCEPTUALIZATION,CONTRACTUAL
NEGOTIATION,FEASIBILITY STUDY ,EPC
YEAR 2005
13. PROJECT SUGARCANE WWTP,IRAN
CLIENT MSV
CAPACITY 3X12000
FIRST COMBINED UASB AND CONTINUOUS SBR
APPLICATION,EP DONE BY KEPPEL SEGHERS
SCOPE INSTALLATOION,STARTUP
YEAR 2002
PROJECT SUGASRCANE WTP ,IRAN
CLIENT MSV
CAPACITY 5X10’000CMD
Highlights SURFACE WATER PRETREATMENT 100CMD
SCOPE EPC SUBCONTRACT
YEAR 2002
14. PROJECT CHARMSHAHR WWTP,IRAN
CLIENT BALAGAR
CAPACITY 120’000CMD
SCOPE EPC SUBCONTRACT
YEAR 2004
PROJECT MORVARID STP,BANDAR ABBAS REFINERY,IRAN
CLIENT BALAGAR
CAPACITY 4000 CMD
Highlights SURFACE WATER PRETREATMENT 100CMD
SCOPE EPC SUBCONTRACT
YEAR 2000
15. PROJECT COOLING BLOWDOWN RECOVERY ABBAS ,IRAN
CLIENT NIOPDC
CAPACITY 120’000 CMD
SCOPE CONCEPTUAL/BASIC DESIGN
YEAR 2008
PROJECT 8TH REFINERY FOG REMOVAL ,BANDAR ABBAS ,IRAN
CLIENT PERLIT-SNAM PROJETTI SrL
CAPACITY 16000 CMD
Highlights
FREE OIL AND GREASE API REMOVAL CPpOS, BY
ROSSMARK
SCOPE INSTALLATION ,STARTUP
YEAR 1999
16. PROJECT QOM DESALINATION,IRAN
CLIENT MSV-NOORVIJEH
CAPACITY 6’000 CMD
SCOPE INSTALLIATION,STARTUP,OPERATION FOR 2YRS
YEAR 2002
PROJECT TAFRESH STP ,BANDAR ABBAS ,IRAN
CLIENT MSV
CAPACITY 45000 CMD
SCOPE
DESIGN,FABRICATION SUPERVISION,INSTALLATION
,STARTUP
YEAR 2005
17. Standard packaged plants
item Project Title Capacity
(CMD)
year Client Location Scope
1 Water Desalination 2×1700 2009 Arpa Noosh Co. Gilan province EPC
2 Water Desalination 3600 2009 Oujan Iranian Co.
(Rani)
Saveh Industrial
zone
EPC
3 Waste Water
Treatment via RO
700 2010 Kavir Kashan Steel
Complex
Esfahan province EPC
4 Exclusion of Lead
from potable water
(Resin based)
300 2013 Golestan province's
W&WW Co.
Golestan province EPC
5 Exclusion of Arsenic
from potable water
(Resin based)
300 2013 East Azerbaijan
province's W&WW
Co.
East Azerbaijan
province
EPC
6 Water treatment
plant
2000 2013 Golestan province's
W&WW Co.
Golestan province EPC
7 Exclusion of
Chromium from
potable water (Resin
based)
360 2013 South Khorasan
province's W&WW
Co.
South Khorasan
province
EPC
8 Water treatment
plant using
NanoFiltration
1700 2012 West Azerbaijan
province's W&WW
Co.
West Azerbaijan
province
EPC
9 Water treatment
plant using
NanoFiltration
300 2012 West Azerbaijan
province's W&WW
Co.
West Azerbaijan
province
EPC
10 Installation &
commissioning of Sea
water desalination
plant
17000 2007-
2008
Sistan province's
W&WW Co.
Sistan province EPC
11 Water treatment
plant
200 NF +
160 RO
2013 Bajestan W&WW Co. Soukh Khorasan
province
EPC
12 Exclusion of Iron &
Manganese from
potable water
600 2012 Gilan province's
W&WW Co.
Gilan province EPC
Sea Water
Desalination
4X250CMD 2001 Hormozgan RW&WW
Co.
Hormozgan EPC
18. Group Collective Experience
item Project Title Capacity
(m3/day)
year Client Location Scope
13 Structure design for
WWTP
600CMD 2003 NIOC Kharg Island Design
14 Water tanks 4000 & 14000 2004 W&WWEC Gorgan city Design
14 7th Tehran WWTP (ILF
Co. proved)
430’000CMD 2011 Tehran W&WWCo. Tehran Design
15 Fashafouyeh WWTP 20’000 ppl 2008 Tehran prison Tehran EC
16 Packaged WWTP for
residential camps 15 &
16
4x800CMD 2009 Hydro-Machine Asalouyeh-
Boushehr
province
EC
17 Birjand WTP 52’800 2008 MSV Birjand, South
Khorasan
province
E-PM-C-
I&C
18 Design and
supervision of WTP (JV
with Axiom Co)
15’000 2008 NVCO Chabahar port,
Sistan province
E-PM-C-
I&C
19 Design and
supervision of WTP (JV
with Axiom Co)
15’000 2009 KHERAD Bandar Lengeh,
Boushehr
province
E-C-I&C
20 6 sand filters;
Aquazure project (JV
with Axiom Co)
45’000 2009 NVCO Chabahar port,
Sistan province
E-C-I&C
19. item Project Title Capacity
(CMD)
year Client Location Scope
21 15Km water
transfere line
pumping station and
tanks
30’000 2010 PSEEZ Asalouyeh-
Boushehr province
EPC-
subcont
ract
22 Storm waterCanal
and power
transformer station
N/A 2006 PSEEZ Asalouyeh-
Boushehr province
EPC-
subcont
ract
23 RO plant 1500 2005 NVCO Hormozgan
province
EC,I&C-
subcont
ract
24 12 Beach wells 45’000 2009 KHERAD Bandar Lengeh,
Boushehr province
EPC
25 RO plant 17500 2013 Chabahar Chabahar port,
Hormozgan
province)
EC-
Subcont
ract
26 Gas power station-
TANIR Co
N/A 2011 Parand-
NasirAbad
Tehran province EPC
27 RO plant- Sharif Nad
Co
15000 2011 KHERAD Bandar Lengeh,
Boushehr province
E-I&C
28 RO plant phase 2 15000 2012 Konarak-
Chabahar
Chabahar port,
Hormozgan
province
EPC-
subcont
ract Civil
29 Coastal barrier 250m N/A 2006 NVCO Asalouyeh-
Boushehr province
EPC-
Subcont
ract
30 Ground filter 45000 2007 NVCO Hormozgan
province
EPC-
subcont
ract
31 RO plant 6000 2007 Hendijan Khouzestan
province
EC-I&C-
Subcont
ract
32 Sand filter- Aquazure
design
45000 2013 Chabahar Hormozgan
province
EPC-
Subcont
ract