2. Amiante STR Limited
Our Services
Our company provides the highest standard of professionalism and workmanship. We
understand customers are often wary and concerned at the potential hazards of asbestos
and asbestos containing materials or ACM’s.
We provide the full range of asbestos services, from asbestos surveying, asbestos
encapsulation or if necessary asbestos removal and disposal. Our aim is to provide
quality workmanship at a price that ensures the health, safety and welfare of our clients and
our staff. We also provide asbestos consultancy services as well as asbestos training.
Our philosophy is to ensure that all of our customers are able to make informed decisions
about asbestos management issues.
4. Asbestos Insulation Board Removal
Site: Central London
PROJECT
Amiante STR Ltd carried out the refurbishment and demolition survey of
the property, and were then instructed to remove the identified asbestos
insulation board panelling to staircase service risers over all floors, as well
as fireplace closure panels & cladding to lift motor room ceiling and walls.
5. Asbestos Insulation Board Removal
Site: Central London
The works took around two
weeks to complete and all
works were carried out under
“Fully controlled conditions”.
Health & Safety
6. P E T E
People, Environment, Tools and Exposure
PETE represents a process encompassing Health & Safety, risk assessment and project management.
PETE assists in ensuring that all aspects of a project are managed safely.
Below are a few of the PETE considerations taken into account on this project.
[This PETE is where those planning a project ask about the impact of People, Environment, Tools and Exposure to the project. Includes
Client discussions, site surveying, estimating or consultancy].
-Initial desktop audit of survey documents, followed by site visits during costing stage.
-Full risk assessment and method statement prepared so the removal team and the client were aware of potential risks, but also that
they were comfortable with the way the works were going to progress.
-14 Day Notification submitted to the Health & Safety Executive to inform them when the works were scheduled to start and what
works would be carried out.
-Site visit prior to start date, by the Contracts Manager with the site Supervisor to talk through the scope and stages of works. The
visit was also used to reassess RAMS (Risk Assessment and Method Statement as it is classed as a “live” document). This ensured
no amendments were necessary to the planning of the project as the site conditions hadn't changed since the original planning
phase.
-All works completed in accordance with Control of Asbestos Regulations 2012 and the relevant paperwork issued to the client for
their retention.
[This PETE is all of the people involved above who must have asbestos awareness training to ensure they are legally compliant for controlling
the risks to People, Environment, Tools and Exposure].
-Due to extensive refurbishment works the client knew that the current Asbestos Management Survey was not sufficient for the
works planned and that there was a possibility of hidden ACMs. Subsequently the client instructed Amiante STR Ltd to carry out the
R&D Survey which identified some areas of concern, which due to access restriction were not identified during the Asbestos
Management Survey carried out by another surveying company.
-This is why it is important that contractors make sure the client provides the correct type of asbestos survey prior to carrying out
extensive refurbishment or demolition works.
[This PETE represents the safe removal of asbestos materials in compliance with current legislation and is also our reminder to assess all of
the risks to our own staff of People, Environment, Tools and Exposure and not just the asbestos risk].
-For licensable/notifiable asbestos works such as this job, where there is a higher risk of fibre release, safety measures are put in
place to minimise potential fibre release and to ensure the works did not exceed the control limit.
-In addition to heavy duty polythene enclosures, our operatives wore disposable overalls and were equipped with full face
respirators to ensure filtered airflow whilst working with asbestos.
-Air monitoring was carried out by UKAS Accredited laboratory to ensure that there were no airborne fibres present and that the area
is safe for re-occupation.
7. Our Vision
Working together to create a safer environment by building an international consultancy providing asbestos
solutions worldwide.
Our Values
To act openly and respect everyone
To work safely to prevent, accidents, incidents or
near misses
To be honest and trustworthy in all of our actions
To remember the customer pays for the service
they receive
Our Mission
To reduce the spread and exposure of asbestos at
all times
To create a safer environment for everyone
To provide a reliable solution for anyone with an
asbestos problem
To provide an income for our staff and shareholders
Amiante STR Limited
8. Providing asbestos solutions to create a safer environment
www.amiantestr.co.uk
enq@amiante.co.uk
Hampshire: 023 9223 0700
London: 020 8531 4969
Head Office: Unit 5, Falcon Court, Parklands Business Park, Forest Road, Denmead, Hampshire, PO7 6BZ
People, Environment, Tools and Exposure
P E T E