Asbestos Removal of Insulation Board Ceiling
1. Case Study:
Removal of Asbestos Insulation Board
Ceiling throughout a Domestic Flat
London
2. Amiante STR Limited
Our Services
Our company provides the highest standard of professionalism and workmanship. We
understand customers are often wary and concerned at the potential hazards of asbestos
and asbestos containing materials or ACM’s.
We provide the full range of asbestos services, from asbestos surveying, asbestos
encapsulation or if necessary asbestos removal and disposal. Our aim is to provide
quality workmanship at a price that ensures the health, safety and welfare of our clients and
our staff. We also provide asbestos consultancy services as well as asbestos training.
Our philosophy is to ensure that all of our customers are able to make informed decisions
about asbestos management issues.
3. Removal of Asbestos Insulation Board Ceiling throughout a
Domestic Flat
Site: London
4. Removal of Asbestos Insulation Board Ceiling throughout a
Domestic Flat
Site: London
PROJECT
Amiante STR LTD were instructed by the domestic client to remove approximately 100m² of
asbestos insulation board to the ceiling of his flat. Due to the fibrous nature of insulation board
this work falls under Licensed Removal category – meaning it was to be carried out in fully
controlled conditions & required a 14 Day Notification to be submitted to the HSE.
5. Removal of Asbestos Insulation Board Ceiling throughout a
Domestic Flat
Site: London
Health & Safety
The Control of Asbestos Regulations 2012
Legislation 10 says asbestos awareness training
should be given to workers in the refurbishment and
maintenance & allied trades, where it is foreseeable
that asbestos containing material may become
exposed during their work. This includes (but is not
limited to):Demolition workers, construction
workers, general maintenance staff, electricians,
plumbers, gas fitters, painters and decorators,
joiners, shop fitters, plasterers, roofers, heating and
ventilation engineers, telecommunication engineers,
computer and data installers, fire and burglar alarm
installers, architects & building surveyors.
6. P E T E
People, Environment, Tools and Exposure
PETE represents a process encompassing Health & Safety, risk assessment and project management.
PETE assists in ensuring that all aspects of a project are managed safely.
Below are a few of the PETE considerations taken into account on this project.
[This PETE is where those planning a project ask about the impact of People, Environment, Tools and Exposure to the
project. Includes Client discussions, site surveying, estimating or consultancy].
-The works had to be notified to the Health & Safety Executive 14 days prior to start date. Risk assessment &
method statement had to be prepared.
-The waste transit route had to be taken into consideration as the property was in a block of flats.
-Works had to be carried out in fully controlled conditions with the use of polythene enclosures, negative pressure
units & airlocks.
[This PETE is all of the people involved above who must have asbestos awareness training to ensure they are legally
compliant for controlling the risks to People, Environment, Tools and Exposure].
-The insulation board was badly damaged and broken up with debris over the floor from where previous refurb
contractors had been in and carelessly knocked through it without consideration of the potential risks.
-Contractors should all be aware of the risk of asbestos & where asbestos is found to avoid situations like this
occurring.
-This is why asbestos awareness training is crucial for Contractors who are likely to work around asbestos.
[This PETE represents the safe removal of asbestos materials in compliance with current legislation and is also our reminder
to assess all of the risks to our own staff of People, Environment, Tools and Exposure and not just the asbestos risk].
-Working within occupied premises, our operatives had to take into consideration the property was located around
other occupied flats in which other residents were living in both above and below the flat we were working in.
7. Our Vision
Working together to create a safer environment by building an international consultancy providing asbestos
solutions worldwide.
Our Values
To act openly and respect everyone
To work safely to prevent, accidents, incidents or
near misses
To be honest and trustworthy in all of our actions
To remember the customer pays for the service
they receive
Our Mission
To reduce the spread and exposure of asbestos at
all times
To create a safer environment for everyone
To provide a reliable solution for anyone with an
asbestos problem
To provide an income for our staff and shareholders
Amiante STR Limited
8. Providing asbestos solutions to create a safer environment
www.amiantestr.co.uk
enq@amiante.co.uk
Hampshire: 023 9223 0700
London: 020 8531 4969
Head Office: Unit 5, Falcon Court, Parklands Business Park, Forest Road, Denmead, Hampshire, PO7 6BZ
People, Environment, Tools and Exposure
P E T E