Identifying customer needsIdentifying customer needs
This process involved five main stages
Information gathering (raw data)
Survey, have been conducted, using a questionnaires
developed by the marketing team.
The one-on-one interview involved the SPS staff and the
students of UTM.
The interview last for about an hour, and the result was
interpreted as follows:
Survey, have been conducted, using a questionnaires
developed by the marketing team.
The one-on-one interview involved the SPS staff and the
students of UTM.
The interview last for about an hour, and the result was
interpreted as follows:
Information gathering (raw data)
Number of respondents = 28
Sections of the questionnaires = 3
Section A for SPS staff
Section B for student
Section C general overview about stair case
Total number of questions = 16
Number of respondents = 28
Sections of the questionnaires = 3
Section A for SPS staff
Section B for student
Section C general overview about stair case
Total number of questions = 16
Age
Gender
Respondents
Opinion About SPS Stairs
Place to Install The Lift
Interpretation of raw data to customer needs
Interpretation of raw data to customer needs
Interpretation of raw data to customer needs
Organization of Needs Into Hierarchy
Organization of Needs Into Hierarchy
Organization of Needs Into Hierarchy
Organization of Needs Into Hierarchy
13-The lift has different colors
*The lift is painted
**The lift can be differentiated from
building
***The lift can easily seen
14-The lift is attractive
*The lift has good looking
*The lift is shining
*The lift is decorated
15-The lift is secured
*The lift users can be restricted
*The lift can be used at certain time
*The lift can not be miss-used
**The lift can be lock
*The lift can only be used by some
specific people
16-The lift user can see everyone
outside
*The lift is uncovered
**The lift is transparent
NO Need Importance
1 The lift moves easily 5
2 The lift is easy to operate 4
3 The lift is easy to install 4
4 The lift carry heavy load 3
5 The lift moves freely 4
6 The lift works with little power 3
7 The lift last long time 5
8 The lift is safe 4
Importance of Customer Needs
8 The lift is safe 4
9 The lift is easy to use 5
10 The lift is affordable 3
11 The lift is comfortable 3
12 The lift works in any environment 4
13 The lift has different colors 1
14 The lift is attractive 3
15 The lift is secured 1
16 The lift user can see everyone outside 3
List of
Metrics
Metric
No.
Need Nos. Metric Imp. Units
1 1 Speed 4 m/s
2 2,5,15 Controller 5 Subj.
3 2,9 Control Cabinet Car 5 Subj.
4 3 Time to assemble 2 s
5 4 Load 5 kg
6 4 Persons 4 list
7 5 Machine 4 Subj.
8 5 Drive 5 Subj.
9 6 Current Intensity 4 A
10 6 Current Voltage 4 V10 6 Current Voltage 4 V
11 7 Lift Cycle Failure 5 cycle
12 8 Landing Accuracy 3 mm
13 5,9 Maximum Number of Stops 2 Subj.
14 9 Maximum travel Height 4 m
15 10 Unit Manufacturing Cost 5 MYR
16 11,13,14,16 Car Decoration 1 Subj.
17 12 Car Material 5 List
18 14 Entrance size 2 List
19 12 Resistance of Corrosion 4 mg/cm2
.year
20 12 Resistance of High Temperature 4 ◦
c
Need-Metric Matrix
Competitive
Bench
Marking
Chart
Competitive
Bench
Marking
Chart
Target
Specifications
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering
Product Development, (Customer needs), Marketing, Design, Engineering

More Related Content

Similar to Product Development, (Customer needs), Marketing, Design, Engineering

productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
mahendran mahendran.m
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume Survey
Firoz Ovi
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
Issa Alshaikh
 
SUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumarSUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumar
Deepak kumar
 

Similar to Product Development, (Customer needs), Marketing, Design, Engineering (20)

Traffic volumestudy
Traffic volumestudyTraffic volumestudy
Traffic volumestudy
 
UDI-Nex Concept Brief
UDI-Nex Concept BriefUDI-Nex Concept Brief
UDI-Nex Concept Brief
 
productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
 
autonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptxautonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptx
 
lifts
liftslifts
lifts
 
Customer journey mapping in an industrial context
Customer journey mapping in an industrial contextCustomer journey mapping in an industrial context
Customer journey mapping in an industrial context
 
Marketing planning and forecasting of airtel company ltd
Marketing planning and forecasting of airtel company ltdMarketing planning and forecasting of airtel company ltd
Marketing planning and forecasting of airtel company ltd
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
I Style Myself - Usability Evaluation
I Style Myself - Usability EvaluationI Style Myself - Usability Evaluation
I Style Myself - Usability Evaluation
 
Advanced parking lot
Advanced parking lotAdvanced parking lot
Advanced parking lot
 
Usability Report
Usability ReportUsability Report
Usability Report
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume Survey
 
Chapter 04
Chapter 04Chapter 04
Chapter 04
 
ADO-A Chapter 04
ADO-A Chapter 04ADO-A Chapter 04
ADO-A Chapter 04
 
Lean project plan
Lean project plan Lean project plan
Lean project plan
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
SUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumarSUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumar
 
Mypath 200625
Mypath 200625Mypath 200625
Mypath 200625
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
Tools and techniques
Tools and techniquesTools and techniques
Tools and techniques
 

Recently uploaded

21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 

Recently uploaded (20)

litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s Handbook
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 

Product Development, (Customer needs), Marketing, Design, Engineering

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Identifying customer needsIdentifying customer needs This process involved five main stages
  • 12.
  • 13. Information gathering (raw data) Survey, have been conducted, using a questionnaires developed by the marketing team. The one-on-one interview involved the SPS staff and the students of UTM. The interview last for about an hour, and the result was interpreted as follows: Survey, have been conducted, using a questionnaires developed by the marketing team. The one-on-one interview involved the SPS staff and the students of UTM. The interview last for about an hour, and the result was interpreted as follows:
  • 14.
  • 15. Information gathering (raw data) Number of respondents = 28 Sections of the questionnaires = 3 Section A for SPS staff Section B for student Section C general overview about stair case Total number of questions = 16 Number of respondents = 28 Sections of the questionnaires = 3 Section A for SPS staff Section B for student Section C general overview about stair case Total number of questions = 16
  • 16. Age
  • 18.
  • 20.
  • 22. Place to Install The Lift
  • 23. Interpretation of raw data to customer needs
  • 24. Interpretation of raw data to customer needs
  • 25. Interpretation of raw data to customer needs
  • 26. Organization of Needs Into Hierarchy
  • 27. Organization of Needs Into Hierarchy
  • 28. Organization of Needs Into Hierarchy
  • 29. Organization of Needs Into Hierarchy 13-The lift has different colors *The lift is painted **The lift can be differentiated from building ***The lift can easily seen 14-The lift is attractive *The lift has good looking *The lift is shining *The lift is decorated 15-The lift is secured *The lift users can be restricted *The lift can be used at certain time *The lift can not be miss-used **The lift can be lock *The lift can only be used by some specific people 16-The lift user can see everyone outside *The lift is uncovered **The lift is transparent
  • 30.
  • 31.
  • 32. NO Need Importance 1 The lift moves easily 5 2 The lift is easy to operate 4 3 The lift is easy to install 4 4 The lift carry heavy load 3 5 The lift moves freely 4 6 The lift works with little power 3 7 The lift last long time 5 8 The lift is safe 4 Importance of Customer Needs 8 The lift is safe 4 9 The lift is easy to use 5 10 The lift is affordable 3 11 The lift is comfortable 3 12 The lift works in any environment 4 13 The lift has different colors 1 14 The lift is attractive 3 15 The lift is secured 1 16 The lift user can see everyone outside 3
  • 33. List of Metrics Metric No. Need Nos. Metric Imp. Units 1 1 Speed 4 m/s 2 2,5,15 Controller 5 Subj. 3 2,9 Control Cabinet Car 5 Subj. 4 3 Time to assemble 2 s 5 4 Load 5 kg 6 4 Persons 4 list 7 5 Machine 4 Subj. 8 5 Drive 5 Subj. 9 6 Current Intensity 4 A 10 6 Current Voltage 4 V10 6 Current Voltage 4 V 11 7 Lift Cycle Failure 5 cycle 12 8 Landing Accuracy 3 mm 13 5,9 Maximum Number of Stops 2 Subj. 14 9 Maximum travel Height 4 m 15 10 Unit Manufacturing Cost 5 MYR 16 11,13,14,16 Car Decoration 1 Subj. 17 12 Car Material 5 List 18 14 Entrance size 2 List 19 12 Resistance of Corrosion 4 mg/cm2 .year 20 12 Resistance of High Temperature 4 ◦ c