Innovative Systems Design and Engineering                                                      www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

   Methods to Determine the Overall Health and Condition of

                               Large Power Transformers

                                               Godswill Ofualagba*
College of Technology, Department of Electrical and Electronics Engineering, Federal University of
Petroleum Resources, P.M.B. 1221, Effurun, Delta State, Nigeria.
    * E-mail of the corresponding author: swillas@ieee.org


Abstract
The unsteady implementation of the conceptual model of deregulation of electric utility industry in many
countries has caused significant consequences in the overall health of the general population of large power
transformers [LPTs]. LPTs are now subject to adverse conditions due to advanced aging, decreases in
routine testing and maintenance activities, reduction of capital for repair and replacement, increased
loading and lack of technical expertise. The method presented in this paper provides a blueprint to
successfully determine the overall health and condition of LPTs.
Keywords: Transformers, gas-in-oil, diagnostics, leakage reactance, maintenance.


1. Introduction
The unsteady implementation of the conceptual model of deregulation of electric utility industry in many
countries has caused significant consequences in the overall health of the general population of large power
transformers [LPTs]. LPTs are now subject to adverse conditions due to advanced aging, decrease in
routine testing and maintenance activities, reduction of capital for repair and replacement, increased
loading and lack of technical expertise. The lack of domestic manufacturing creates a number of related
issues, including long distance travel, shipping, communication difficulties, and a technical expertise
resource drain [1].
The owners of LPT assets are faced with often onerous decisions: replace an aging unit, often from an
offshore manufacturer, or continue using the existing unit with the “hope” that it keeps on cranking out the
megawatts [2]. With new units costing anywhere in a range from several hundred thousand dollars to
multimillion dollars, it is imperative that this critical decision is made with the best data and information
available.
Fortunately today’s asset and risk managers have a varied array of tools at their disposal to help gather
critical information necessary to make informed decisions. The method presented in this paper provides a
blueprint to successfully determine the overall health and condition of LPTs. These methods consist of oil
and electrical diagnostic testing, visual inspections, historical data trending, design review, and operations
/loading/maintenance/repair review.


2. Method to Determine the Overall Health and Conditions of LPTs
2.1 Oil Diagnostics
Perhaps the simplest and least costly method of quickly assessing the general health of a LPT is to take a
sample of the insulating oil. Oil sampling of a transformer is analogous to taking a blood sample from a
human. Many different parameters and conditions can be accessed from an oil sample. To a trained eye, oil
diagnostics provide a solid method to gain an insight into the current state of a health unit [3]. One major
advantage of oil testing is that the sample can easily be taken while the unit is on-line, eliminating the need
for an outage. The most commonly performed oil tests are listed below.

                                                      55
Innovative Systems Design and Engineering                                                     www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012




Sometimes a problem is suspected and additional tests are needed to help pinpoint the issue. There are a
number of additional ASTM tests available for oil diagnostics. Some additional tests are often performed in
such cases as listed below.




2.2 Dissolved Gas-in-Oil Analysis
Dissolved gas-in-oil analysis (DGA) is the most commonly requested oil diagnostic test performed on
transformer oil. All LPTs contain insulating materials that break down due to excessive thermal or electrical
stress, forming gaseous by-products [3]. These by-products are indicative of the type of activity present
within the transformer, such as an incipient-fault condition. The DGA can also shed light on the materials
involved and the severity of the condition. DGA is a powerful tool for detecting incipient-fault conditions
and for investigations after failure has occurred. Additionally, dissolved gases are detectable in low
concentrations, which often allows for early intervention before failure occurs and allows for planned
strategies as opposed to unplanned catastrophes. Typical gases generated from mineral oil/cellulose (paper
and press board) insulated transformers include hydrogen, methane ethane, ethylene, acetylene, carbon
monoxide, and carbon dioxide [3].
The composition of gases generated provides information about the type of incipient-fault condition
present. For example, four general categories of fault conditions have been described and characterized by
Key Gases in Table 3.




                                                     56
Innovative Systems Design and Engineering                                                      www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012




A single sample will provide a snapshot of the transformer at a moment in the unit’s history. However, the
best use of oil diagnostics is to trend the recent data with other test data taken over the life of the
transformer. Trending the data illustrates changes in the transformer that may go undetected in a single test.
An example of an adversely trending condition in a LPT is shown in Table 4. In this example, several key
gas concentrations have increased significantly, a direct result of a serious problem located within the unit.




2.3. Electrical Diagnostics
There are a number of highly effective electrical diagnostic tests available to help determine the existing
health and overall condition of a LPT. A list of the most commonly performed tests is presented below
followed by a brief outline of the purpose of each test.
    •    Winding Power Factor—this test measures the power loss through the insulating system caused by
         insulation deterioration, contamination, and mechanical deformation [7]. Abnormally high or low


                                                     57
Innovative Systems Design and Engineering                                                     www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

        values of power factor, dielectric loss, capacitance, or leakage current indicate a failure of the
        insulation system.
    •   Bushing Power Factor—this test also measures power loss through the insulating system of the
        bushing. Many transformers have been saved from certain failure over the years through the
        detection of imminent bushing failures through use of the power-factor test.
    •   Leakage Reactance—this test is useful in detecting winding movement or core and coil
        displacement in LPTs.
    •   Transformer Turns Ratio—the TTR test is used primarily as an acceptance test, but can also be
        useful after an event to determine if the windings are short circuited [8].
    •   DC Winding Resistance—this test is used to identify a change in dc winding resistance resulting
        from shorted turns, defective joints, or bad contacts.
    •   Core Excitation Current— this measures the current required to excite the transformer core. High
        values of excitation current are generally indicative of shorted turns or core damage in the
        transformer.
    •   Core Ground—this test is used to identify inadvertent core grounds which cause unwanted
        circulating current flow, often leading to overheating situations. This test can only be performed in
        the field if the core ground is accessible.
    •   (Sweep) Frequency Response Analysis (SFRA)—this test is very successful in identifying core and
        coil anomalies such as shipping or short-circuit mechanical damage. This complex test essentially
        injects a signal into the coil and measures the output response at varying frequencies. Numerical
        analysis and fast Fourier transforms (FFTs) are used to transfer the numerical analysis into a
        graphical image for visual analysis. In short, the output response (Signature) of the coil is like a
        fingerprint. If event like a short circuit or bump causes a shift in the core and coil assembly, the
        graphical traces will not line up properly, indicating a problem.




                                       Figure 1. Three phase HV windings
2.4. Additional Tests
Some additional tests that can provide useful information for overall transformer health include power-
factor tip-up testing, partial-discharge analysis, vibration analysis, and thermography.


2.5. Transformer Design-Family Review


                                                    58
Innovative Systems Design and Engineering                                                      www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

All transformers have similar designs, but differences do exist between models and manufacturers. A
typical assessment should include an evaluation of the unit ratings [nameplate], tank design, core/coil
design, load tap-hanger[LTC]/de-energized tap-changer[DETC] design, oil thermal expansion design,
bushing design, arrester design, and known common mode failure mechanisms.

2.6. Visual Inspection
A thorough external visual inspection is recommended as a complement to the diagnostic testing. Items
such as gaskets, pumps, fans, coolers, LTC compartments, control cabinets, piping and conduit, bushings,
arresters, conductor connections, grounding, tank condition, oil containment, gauge observation, pressure
relief valves, and virtually anything else attached, connected to, or mounted on the transformer should be
inspected and addressed.

2.7. Maintenance Record Review
The maintenance history of the unit should be reviewed to help determine its condition [6]. Issues such as
oil leaks, oil processing/degassing, fan repairs/replacement, pump repairs /replacement, LTC work, or any
other maintenance of the unit since it was originally placed in service should be considered in the
assessment.




                                  Figure 2. Three phase HV winding – shorted turns

2.8. Operating Record Review
The operations and loading history should be reviewed to determine if the unit was ever exposed to over
current or over excitation events, short circuits, through faults, harmonic distortions, operational
limitations, grid disturbances, lightning strikes, transient phenomena or any other detrimental conditions.
The loading history can be used to establish benchmark data for a thermal analysis of the unit in an effort to
determine loss of life.


3. Conclusion
Large power transformers are very valuable assets. The life of these assets can be extended for long periods
of time through the use of diagnostics as described in this paper. As a result, the life expectancy of LPTs has
risen significantly over previous assumptions. There are a number of transformers in service in the United
State that are 60, 70 and even 80 years old, and they are still going strong [9].


References


                                                      59
Innovative Systems Design and Engineering                                                     www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

[1] Ladroga R.K. (October 2003.) “Switchyard Transformers Overlooked in Power Quality Equation,”
Power Engineering magazine.
[2] Ladroga R.K., Griffin, P. J. mcGrail, A. J. , Heuston, G. A., Mckenney, P. M. (2005) “Advanced
Diagnostics Support Critical Decisión making,” Proceedings of the Seventy-Second Annual international
Conference of Doble Clients,, transformer Session TX-2.
[3] Griffin P. J. (1998) “Criteria for interpretation of Data for Dissolved Gases in oil from Transformers (A
Review),” Special Technical Publication 998, ASTM, Philadelphia, PA,pp. 89-107.
[4] Clark, F. M. (1962) “Insulating Materials for Design and Engineering Practice,” John Wiley and Sons,
Inc., New York-London.
[5] Griffin P. J. , Lewand, L.R. (1999) “Transformer Case Studies,” Proceedings of the Sixty-Sixth Annual
International Conference of Doble Clients, Sec 5-7
[6] Griffin, P. J., Lewand, L. R., “The Effective Use of Laboratory Analysis Of Insulating Oils As A
Maintenance Tool,” Proceedings of the 2000 International Conference of Doble Clients – Sec 5-8
[7] Homing. M., Kelly, J., Myers, S., Stebbins, R. (2004) “Transformer Maintenance Guide,” Third Edition,
Transformer Maintenance Institute, S.D. Myers.
[8] Heathcote, M. J., J & P (1998) “Transformer Book,” Twelfth Edition, Newnes, Oxford, Woburn.
[9] Ladroga R.K. (2006) “Large Power Transformer Condition Assessment and Life Extension,”
Publication of the International Electrical Testing Association.




                                                    60

More Related Content

What's hot

Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...ijtsrd
 
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...Electrical Reliability Services
 
Short-circuit fault diagnosis of the DC-Link capacitor and its impact on an ...
Short-circuit fault diagnosis of the DC-Link capacitor and  its impact on an ...Short-circuit fault diagnosis of the DC-Link capacitor and  its impact on an ...
Short-circuit fault diagnosis of the DC-Link capacitor and its impact on an ...IJECEIAES
 
Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...Power System Operation
 
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15Ervin I Naranjo Blanchard
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)AHMED MOHAMED HEGAB
 
Optimised and balanced structural of offshore wind turbines
Optimised and balanced structural of offshore wind turbinesOptimised and balanced structural of offshore wind turbines
Optimised and balanced structural of offshore wind turbinesDickdick Maulana
 
PRASA Mission Critical Services
PRASA Mission Critical ServicesPRASA Mission Critical Services
PRASA Mission Critical ServicesJay Burse
 
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...chokrio
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersPower System Operation
 
A real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsA real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsDerya Dinçer
 
Day-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesDay-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesWindpower Engineering & Development
 

What's hot (17)

Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
 
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
 
TESCO Site Verification in a Pre and Post AMI World
TESCO Site Verification in a Pre and Post AMI WorldTESCO Site Verification in a Pre and Post AMI World
TESCO Site Verification in a Pre and Post AMI World
 
Short-circuit fault diagnosis of the DC-Link capacitor and its impact on an ...
Short-circuit fault diagnosis of the DC-Link capacitor and  its impact on an ...Short-circuit fault diagnosis of the DC-Link capacitor and  its impact on an ...
Short-circuit fault diagnosis of the DC-Link capacitor and its impact on an ...
 
Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...
 
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15
Interpreting ieee-std-519-and-meeting-harmonic-limits-vf ds-pcic-2003-15
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
 
Tcom Energyfinal
Tcom EnergyfinalTcom Energyfinal
Tcom Energyfinal
 
Tcom Maint Operate
Tcom Maint OperateTcom Maint Operate
Tcom Maint Operate
 
Ig3415411546
Ig3415411546Ig3415411546
Ig3415411546
 
Optimised and balanced structural of offshore wind turbines
Optimised and balanced structural of offshore wind turbinesOptimised and balanced structural of offshore wind turbines
Optimised and balanced structural of offshore wind turbines
 
New Ideas for Repairing Gearboxes and Generators
New Ideas for Repairing Gearboxes and GeneratorsNew Ideas for Repairing Gearboxes and Generators
New Ideas for Repairing Gearboxes and Generators
 
PRASA Mission Critical Services
PRASA Mission Critical ServicesPRASA Mission Critical Services
PRASA Mission Critical Services
 
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...
Performance Analysis of Faults Detection in Wind Turbine Generator Based on H...
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
 
A real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsA real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnels
 
Day-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesDay-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbines
 

Viewers also liked

Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
Combined use of tap-changing transformer and static VAR compensator for enhan...
Combined use of tap-changing transformer and static VAR compensator for enhan...Combined use of tap-changing transformer and static VAR compensator for enhan...
Combined use of tap-changing transformer and static VAR compensator for enhan...ijsrd.com
 
statcom-svc
statcom-svcstatcom-svc
statcom-svcvahidmon
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introductionjohnwrightsmith
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015johnwrightsmith
 
Control and Analysis of VSC Based High Voltage DC Transmission
Control and Analysis of VSC Based High Voltage DC TransmissionControl and Analysis of VSC Based High Voltage DC Transmission
Control and Analysis of VSC Based High Voltage DC Transmissionijsrd.com
 
Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by AnkitAnkit Sisodiya
 
Project on STATCOM
Project on STATCOMProject on STATCOM
Project on STATCOMSutirtha Das
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...vishalgohel12195
 
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUETRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUEJournal For Research
 
High frequency induction heating
High frequency induction heatingHigh frequency induction heating
High frequency induction heatingsilviusoft
 
OLTC Function Selection, Operation
OLTC Function Selection, OperationOLTC Function Selection, Operation
OLTC Function Selection, OperationMax Philipp
 
Enhancement of power quality in distribution system by using D-STATCOM
Enhancement of power quality in distribution system by using D-STATCOMEnhancement of power quality in distribution system by using D-STATCOM
Enhancement of power quality in distribution system by using D-STATCOMEng Ahmed Salad Osman
 
Reactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomReactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomHussain Ali
 
Analysis and Improved Operation of PEBB Based 5-Level Voltage Source Convert...
Analysis and Improved Operation of PEBB Based 5-Level  Voltage Source Convert...Analysis and Improved Operation of PEBB Based 5-Level  Voltage Source Convert...
Analysis and Improved Operation of PEBB Based 5-Level Voltage Source Convert...IJMER
 

Viewers also liked (20)

Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Combined use of tap-changing transformer and static VAR compensator for enhan...
Combined use of tap-changing transformer and static VAR compensator for enhan...Combined use of tap-changing transformer and static VAR compensator for enhan...
Combined use of tap-changing transformer and static VAR compensator for enhan...
 
statcom-svc
statcom-svcstatcom-svc
statcom-svc
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introduction
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015
 
Control and Analysis of VSC Based High Voltage DC Transmission
Control and Analysis of VSC Based High Voltage DC TransmissionControl and Analysis of VSC Based High Voltage DC Transmission
Control and Analysis of VSC Based High Voltage DC Transmission
 
Testing
TestingTesting
Testing
 
Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by Ankit
 
Project on STATCOM
Project on STATCOMProject on STATCOM
Project on STATCOM
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...
 
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUETRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
 
High frequency induction heating
High frequency induction heatingHigh frequency induction heating
High frequency induction heating
 
OLTC Function Selection, Operation
OLTC Function Selection, OperationOLTC Function Selection, Operation
OLTC Function Selection, Operation
 
Enhancement of power quality in distribution system by using D-STATCOM
Enhancement of power quality in distribution system by using D-STATCOMEnhancement of power quality in distribution system by using D-STATCOM
Enhancement of power quality in distribution system by using D-STATCOM
 
Reactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomReactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcom
 
Dstatcom
DstatcomDstatcom
Dstatcom
 
Reactive power compensation using statcom
Reactive power compensation using statcomReactive power compensation using statcom
Reactive power compensation using statcom
 
statcom
statcomstatcom
statcom
 
Analysis and Improved Operation of PEBB Based 5-Level Voltage Source Convert...
Analysis and Improved Operation of PEBB Based 5-Level  Voltage Source Convert...Analysis and Improved Operation of PEBB Based 5-Level  Voltage Source Convert...
Analysis and Improved Operation of PEBB Based 5-Level Voltage Source Convert...
 
Statcom
StatcomStatcom
Statcom
 

Similar to Methods to determine the overall health and condition of large power transformers

Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_finalSnehangshu Ghosh
 
Transfguide transformer protection application guide
Transfguide transformer protection application guideTransfguide transformer protection application guide
Transfguide transformer protection application guidePrasad RVS
 
2003 cigre mexico_tenbohlen
2003 cigre mexico_tenbohlen2003 cigre mexico_tenbohlen
2003 cigre mexico_tenbohlenSujit Adhya
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143sanjeet kumar
 
Iaetsd significance of stator winding insulation systems of low-voltage induc...
Iaetsd significance of stator winding insulation systems of low-voltage induc...Iaetsd significance of stator winding insulation systems of low-voltage induc...
Iaetsd significance of stator winding insulation systems of low-voltage induc...Iaetsd Iaetsd
 
System Operational Challenges from the Energy Transition
System Operational Challenges from the Energy TransitionSystem Operational Challenges from the Energy Transition
System Operational Challenges from the Energy TransitionPower System Operation
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Vecoin
 
Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...eSAT Publishing House
 
A Review On Power Quality Issues and Standards
A Review On Power Quality Issues and StandardsA Review On Power Quality Issues and Standards
A Review On Power Quality Issues and StandardsIRJET Journal
 
Proposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorProposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorIOSR Journals
 
01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.pptvikram desai
 
Power System Operational Challenges from the Energy Transition
Power System Operational Challenges from the Energy TransitionPower System Operational Challenges from the Energy Transition
Power System Operational Challenges from the Energy TransitionPower System Operation
 
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Power System Operation
 
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Power System Operation
 
Qualitrol | Vault Monitoring
Qualitrol | Vault MonitoringQualitrol | Vault Monitoring
Qualitrol | Vault MonitoringSean Wallace
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 

Similar to Methods to determine the overall health and condition of large power transformers (20)

Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_final
 
Transformer guide
Transformer guideTransformer guide
Transformer guide
 
Transfguide transformer protection application guide
Transfguide transformer protection application guideTransfguide transformer protection application guide
Transfguide transformer protection application guide
 
2003 cigre mexico_tenbohlen
2003 cigre mexico_tenbohlen2003 cigre mexico_tenbohlen
2003 cigre mexico_tenbohlen
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143
 
H010514852
H010514852H010514852
H010514852
 
Iaetsd significance of stator winding insulation systems of low-voltage induc...
Iaetsd significance of stator winding insulation systems of low-voltage induc...Iaetsd significance of stator winding insulation systems of low-voltage induc...
Iaetsd significance of stator winding insulation systems of low-voltage induc...
 
System Operational Challenges from the Energy Transition
System Operational Challenges from the Energy TransitionSystem Operational Challenges from the Energy Transition
System Operational Challenges from the Energy Transition
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
 
Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...
 
A Review On Power Quality Issues and Standards
A Review On Power Quality Issues and StandardsA Review On Power Quality Issues and Standards
A Review On Power Quality Issues and Standards
 
PQ_surveys_FFF.pdf
PQ_surveys_FFF.pdfPQ_surveys_FFF.pdf
PQ_surveys_FFF.pdf
 
Proposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorProposal Technique for an Static Var Compensator
Proposal Technique for an Static Var Compensator
 
01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt
 
Power System Operational Challenges from the Energy Transition
Power System Operational Challenges from the Energy TransitionPower System Operational Challenges from the Energy Transition
Power System Operational Challenges from the Energy Transition
 
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
 
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
Energy Storage Systems as a Reliable Alternative to Diesel Generators for Cri...
 
Qualitrol | Vault Monitoring
Qualitrol | Vault MonitoringQualitrol | Vault Monitoring
Qualitrol | Vault Monitoring
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 

More from Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

More from Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Recently uploaded

Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 

Recently uploaded (20)

Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 

Methods to determine the overall health and condition of large power transformers

  • 1. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Methods to Determine the Overall Health and Condition of Large Power Transformers Godswill Ofualagba* College of Technology, Department of Electrical and Electronics Engineering, Federal University of Petroleum Resources, P.M.B. 1221, Effurun, Delta State, Nigeria. * E-mail of the corresponding author: swillas@ieee.org Abstract The unsteady implementation of the conceptual model of deregulation of electric utility industry in many countries has caused significant consequences in the overall health of the general population of large power transformers [LPTs]. LPTs are now subject to adverse conditions due to advanced aging, decreases in routine testing and maintenance activities, reduction of capital for repair and replacement, increased loading and lack of technical expertise. The method presented in this paper provides a blueprint to successfully determine the overall health and condition of LPTs. Keywords: Transformers, gas-in-oil, diagnostics, leakage reactance, maintenance. 1. Introduction The unsteady implementation of the conceptual model of deregulation of electric utility industry in many countries has caused significant consequences in the overall health of the general population of large power transformers [LPTs]. LPTs are now subject to adverse conditions due to advanced aging, decrease in routine testing and maintenance activities, reduction of capital for repair and replacement, increased loading and lack of technical expertise. The lack of domestic manufacturing creates a number of related issues, including long distance travel, shipping, communication difficulties, and a technical expertise resource drain [1]. The owners of LPT assets are faced with often onerous decisions: replace an aging unit, often from an offshore manufacturer, or continue using the existing unit with the “hope” that it keeps on cranking out the megawatts [2]. With new units costing anywhere in a range from several hundred thousand dollars to multimillion dollars, it is imperative that this critical decision is made with the best data and information available. Fortunately today’s asset and risk managers have a varied array of tools at their disposal to help gather critical information necessary to make informed decisions. The method presented in this paper provides a blueprint to successfully determine the overall health and condition of LPTs. These methods consist of oil and electrical diagnostic testing, visual inspections, historical data trending, design review, and operations /loading/maintenance/repair review. 2. Method to Determine the Overall Health and Conditions of LPTs 2.1 Oil Diagnostics Perhaps the simplest and least costly method of quickly assessing the general health of a LPT is to take a sample of the insulating oil. Oil sampling of a transformer is analogous to taking a blood sample from a human. Many different parameters and conditions can be accessed from an oil sample. To a trained eye, oil diagnostics provide a solid method to gain an insight into the current state of a health unit [3]. One major advantage of oil testing is that the sample can easily be taken while the unit is on-line, eliminating the need for an outage. The most commonly performed oil tests are listed below. 55
  • 2. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Sometimes a problem is suspected and additional tests are needed to help pinpoint the issue. There are a number of additional ASTM tests available for oil diagnostics. Some additional tests are often performed in such cases as listed below. 2.2 Dissolved Gas-in-Oil Analysis Dissolved gas-in-oil analysis (DGA) is the most commonly requested oil diagnostic test performed on transformer oil. All LPTs contain insulating materials that break down due to excessive thermal or electrical stress, forming gaseous by-products [3]. These by-products are indicative of the type of activity present within the transformer, such as an incipient-fault condition. The DGA can also shed light on the materials involved and the severity of the condition. DGA is a powerful tool for detecting incipient-fault conditions and for investigations after failure has occurred. Additionally, dissolved gases are detectable in low concentrations, which often allows for early intervention before failure occurs and allows for planned strategies as opposed to unplanned catastrophes. Typical gases generated from mineral oil/cellulose (paper and press board) insulated transformers include hydrogen, methane ethane, ethylene, acetylene, carbon monoxide, and carbon dioxide [3]. The composition of gases generated provides information about the type of incipient-fault condition present. For example, four general categories of fault conditions have been described and characterized by Key Gases in Table 3. 56
  • 3. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 A single sample will provide a snapshot of the transformer at a moment in the unit’s history. However, the best use of oil diagnostics is to trend the recent data with other test data taken over the life of the transformer. Trending the data illustrates changes in the transformer that may go undetected in a single test. An example of an adversely trending condition in a LPT is shown in Table 4. In this example, several key gas concentrations have increased significantly, a direct result of a serious problem located within the unit. 2.3. Electrical Diagnostics There are a number of highly effective electrical diagnostic tests available to help determine the existing health and overall condition of a LPT. A list of the most commonly performed tests is presented below followed by a brief outline of the purpose of each test. • Winding Power Factor—this test measures the power loss through the insulating system caused by insulation deterioration, contamination, and mechanical deformation [7]. Abnormally high or low 57
  • 4. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 values of power factor, dielectric loss, capacitance, or leakage current indicate a failure of the insulation system. • Bushing Power Factor—this test also measures power loss through the insulating system of the bushing. Many transformers have been saved from certain failure over the years through the detection of imminent bushing failures through use of the power-factor test. • Leakage Reactance—this test is useful in detecting winding movement or core and coil displacement in LPTs. • Transformer Turns Ratio—the TTR test is used primarily as an acceptance test, but can also be useful after an event to determine if the windings are short circuited [8]. • DC Winding Resistance—this test is used to identify a change in dc winding resistance resulting from shorted turns, defective joints, or bad contacts. • Core Excitation Current— this measures the current required to excite the transformer core. High values of excitation current are generally indicative of shorted turns or core damage in the transformer. • Core Ground—this test is used to identify inadvertent core grounds which cause unwanted circulating current flow, often leading to overheating situations. This test can only be performed in the field if the core ground is accessible. • (Sweep) Frequency Response Analysis (SFRA)—this test is very successful in identifying core and coil anomalies such as shipping or short-circuit mechanical damage. This complex test essentially injects a signal into the coil and measures the output response at varying frequencies. Numerical analysis and fast Fourier transforms (FFTs) are used to transfer the numerical analysis into a graphical image for visual analysis. In short, the output response (Signature) of the coil is like a fingerprint. If event like a short circuit or bump causes a shift in the core and coil assembly, the graphical traces will not line up properly, indicating a problem. Figure 1. Three phase HV windings 2.4. Additional Tests Some additional tests that can provide useful information for overall transformer health include power- factor tip-up testing, partial-discharge analysis, vibration analysis, and thermography. 2.5. Transformer Design-Family Review 58
  • 5. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 All transformers have similar designs, but differences do exist between models and manufacturers. A typical assessment should include an evaluation of the unit ratings [nameplate], tank design, core/coil design, load tap-hanger[LTC]/de-energized tap-changer[DETC] design, oil thermal expansion design, bushing design, arrester design, and known common mode failure mechanisms. 2.6. Visual Inspection A thorough external visual inspection is recommended as a complement to the diagnostic testing. Items such as gaskets, pumps, fans, coolers, LTC compartments, control cabinets, piping and conduit, bushings, arresters, conductor connections, grounding, tank condition, oil containment, gauge observation, pressure relief valves, and virtually anything else attached, connected to, or mounted on the transformer should be inspected and addressed. 2.7. Maintenance Record Review The maintenance history of the unit should be reviewed to help determine its condition [6]. Issues such as oil leaks, oil processing/degassing, fan repairs/replacement, pump repairs /replacement, LTC work, or any other maintenance of the unit since it was originally placed in service should be considered in the assessment. Figure 2. Three phase HV winding – shorted turns 2.8. Operating Record Review The operations and loading history should be reviewed to determine if the unit was ever exposed to over current or over excitation events, short circuits, through faults, harmonic distortions, operational limitations, grid disturbances, lightning strikes, transient phenomena or any other detrimental conditions. The loading history can be used to establish benchmark data for a thermal analysis of the unit in an effort to determine loss of life. 3. Conclusion Large power transformers are very valuable assets. The life of these assets can be extended for long periods of time through the use of diagnostics as described in this paper. As a result, the life expectancy of LPTs has risen significantly over previous assumptions. There are a number of transformers in service in the United State that are 60, 70 and even 80 years old, and they are still going strong [9]. References 59
  • 6. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 [1] Ladroga R.K. (October 2003.) “Switchyard Transformers Overlooked in Power Quality Equation,” Power Engineering magazine. [2] Ladroga R.K., Griffin, P. J. mcGrail, A. J. , Heuston, G. A., Mckenney, P. M. (2005) “Advanced Diagnostics Support Critical Decisión making,” Proceedings of the Seventy-Second Annual international Conference of Doble Clients,, transformer Session TX-2. [3] Griffin P. J. (1998) “Criteria for interpretation of Data for Dissolved Gases in oil from Transformers (A Review),” Special Technical Publication 998, ASTM, Philadelphia, PA,pp. 89-107. [4] Clark, F. M. (1962) “Insulating Materials for Design and Engineering Practice,” John Wiley and Sons, Inc., New York-London. [5] Griffin P. J. , Lewand, L.R. (1999) “Transformer Case Studies,” Proceedings of the Sixty-Sixth Annual International Conference of Doble Clients, Sec 5-7 [6] Griffin, P. J., Lewand, L. R., “The Effective Use of Laboratory Analysis Of Insulating Oils As A Maintenance Tool,” Proceedings of the 2000 International Conference of Doble Clients – Sec 5-8 [7] Homing. M., Kelly, J., Myers, S., Stebbins, R. (2004) “Transformer Maintenance Guide,” Third Edition, Transformer Maintenance Institute, S.D. Myers. [8] Heathcote, M. J., J & P (1998) “Transformer Book,” Twelfth Edition, Newnes, Oxford, Woburn. [9] Ladroga R.K. (2006) “Large Power Transformer Condition Assessment and Life Extension,” Publication of the International Electrical Testing Association. 60