➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
The Bower
1.
Aerial view of proposed development
• Refurbishment of 1980’s office
building Stockley Park, near
Heathrow Airport.
• Project value £24m.
• JCT 2011 Design & Build contract
• sq ft office area.
• Principal contractor: ISG
• Architect: ESA.
• Engineer: Reuby & Stagg
• Services: Watkins Payne
• Client: Exton Estates
• Project Manager: Gleeds
Bower
Main Elevation
4 ROUNDWOOD AVENUE // Stockley Park // 75 Wells Street, London W1T 3QH
1.0 TER
1.1 ESA
for
1.2 The
1.3 The
flex
stak
1.4 Foll
env
app
1.5 This
exte
1.6 To a
fully
sus
1.7 The
the
par
1.8 Sec
sub
1.9 Sec
des
1.10 An
sup
• Arc
• Pla
• Lan
• Arb
• Ene
• BRE
• Pha
• Tra
• Aco
1.11 This
app
The Arena (amenity hub) To M4 Heathrow
4 Roundwood
Stockley Park
Main Entrance
Stockley Park
4RW Site Entrance
architecture
design
planning
project management4 Roundwood Avenue Stockley Park
Site & Existing Building Photos
Original building constructed 1986