SlideShare a Scribd company logo
FEATURED PROJECT PRESENTATION
INTERFAITH MEDICAL CENTER
INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE
3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to
Hospital Operations
BUSINESS TYPE:
HOSPITAL
LOCATION:
BROOKLYN, NY
PROJECT SUMMARY:
Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that
services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room
visits annually. The hospital required a comprehensive lighting upgrade to replace their
outdated system, improve occupant comfort, and increase overall operational efficiency.
Working under crunching time constraints, IoEnergy demonstrated its technical acumen by
designing an upgrade for the entire hospital that was installed in just three weeks. The project,
which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero
interruptions to hospital operations or impact on patient care.
www.ioenergyinc.com | 03
PROJECT SCOPE:
• LED Lighting Upgrade
RESULTS:
• $214,015 Annual Energy
Savings
• $62,606 Annual Maintenance
Savings
• $34,051 HVAC Savings
• 2.85-Year ROI Payback
• 1,258,912 kWh Saved Annually
• 226 kW Demand Savings
INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE
3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to
Hospital Operations
BUSINESS TYPE:
HOSPITAL
LOCATION:
BROOKLYN, NY
PROJECT SUMMARY:
Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that
services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room
visits annually. The hospital required a comprehensive lighting upgrade to replace their
outdated system, improve occupant comfort, and increase overall operational efficiency.
Working under crunching time constraints, IoEnergy demonstrated its technical acumen by
designing an upgrade for the entire hospital that was installed in just three weeks. The project,
which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero
interruptions to hospital operations or impact on patient care.
www.ioenergyinc.com | 03
This was a deadline-driven project that
required a high level of execution and close
attention to detail. We had to overcome the
hurdles of a three-week installation window, a
global pandemic, and the need to get the job
done without any disruption to hospital
operations. Our crews really stepped up and
did an amazing job.”
-Len Pisano,
IoEnergy Director of Strategic Accounts
www.ioenergyinc.com | 04
“
THANK YOU
VIEW MORE OF OUR FEATURED PROJECTS AT
WWW.IOENERGYINC.COM

More Related Content

Similar to Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations

IHEEM 2013 Design Award Entries
IHEEM 2013 Design Award EntriesIHEEM 2013 Design Award Entries
IHEEM 2013 Design Award Entries
Architects for Health
 
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0Karen West
 
Post covid health sector design
Post covid health sector designPost covid health sector design
Post covid health sector design
DipitaGupta
 
Case Study - North Middlesex Hospital
Case Study - North Middlesex HospitalCase Study - North Middlesex Hospital
Case Study - North Middlesex HospitalFlexiDry Global Ltd
 
DOE Case Study - Warwick SRO
DOE Case Study - Warwick SRODOE Case Study - Warwick SRO
DOE Case Study - Warwick SROPhilip Agee
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current ResumeMark Olson
 
Decade of investments
Decade of investmentsDecade of investments
Decade of investments
Erin Kennedy
 
Community Medical Centers: Decade of investments
Community Medical Centers: Decade of investmentsCommunity Medical Centers: Decade of investments
Community Medical Centers: Decade of investments
Kue Lee
 
Cynergin pp57-61 HEJsep16
Cynergin pp57-61 HEJsep16Cynergin pp57-61 HEJsep16
Cynergin pp57-61 HEJsep16Julia Onions
 
Building a new approach to wellness
Building a new approach to wellnessBuilding a new approach to wellness
Building a new approach to wellness
A-dec Australia
 
Schneider_Newsletter_Dec 2014_Final-1
Schneider_Newsletter_Dec 2014_Final-1Schneider_Newsletter_Dec 2014_Final-1
Schneider_Newsletter_Dec 2014_Final-1Nidhi Vats
 
Energy simulation for hospitals
Energy simulation for hospitalsEnergy simulation for hospitals
Doh neda board presentation may 28 final 648 pm
Doh neda board presentation may 28 final 648 pmDoh neda board presentation may 28 final 648 pm
Doh neda board presentation may 28 final 648 pmTed Herbosa
 
Peter Knight
Peter KnightPeter Knight
Peter Knight
Lucia Garcia
 
NyackHospitalFoundation_ED-2014
NyackHospitalFoundation_ED-2014NyackHospitalFoundation_ED-2014
NyackHospitalFoundation_ED-2014Jill Garland
 

Similar to Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations (20)

IHEEM 2013 Design Award Entries
IHEEM 2013 Design Award EntriesIHEEM 2013 Design Award Entries
IHEEM 2013 Design Award Entries
 
WBD-WFA_2009
WBD-WFA_2009WBD-WFA_2009
WBD-WFA_2009
 
Murray Ward - PM report
Murray Ward - PM reportMurray Ward - PM report
Murray Ward - PM report
 
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
 
Post covid health sector design
Post covid health sector designPost covid health sector design
Post covid health sector design
 
Case Study - North Middlesex Hospital
Case Study - North Middlesex HospitalCase Study - North Middlesex Hospital
Case Study - North Middlesex Hospital
 
PPPs in health
PPPs in  health   PPPs in  health
PPPs in health
 
DOE Case Study - Warwick SRO
DOE Case Study - Warwick SRODOE Case Study - Warwick SRO
DOE Case Study - Warwick SRO
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current Resume
 
Decade of investments
Decade of investmentsDecade of investments
Decade of investments
 
resumemjs02122015
resumemjs02122015resumemjs02122015
resumemjs02122015
 
Community Medical Centers: Decade of investments
Community Medical Centers: Decade of investmentsCommunity Medical Centers: Decade of investments
Community Medical Centers: Decade of investments
 
Cynergin pp57-61 HEJsep16
Cynergin pp57-61 HEJsep16Cynergin pp57-61 HEJsep16
Cynergin pp57-61 HEJsep16
 
Building a new approach to wellness
Building a new approach to wellnessBuilding a new approach to wellness
Building a new approach to wellness
 
Schneider_Newsletter_Dec 2014_Final-1
Schneider_Newsletter_Dec 2014_Final-1Schneider_Newsletter_Dec 2014_Final-1
Schneider_Newsletter_Dec 2014_Final-1
 
Energy simulation for hospitals
Energy simulation for hospitalsEnergy simulation for hospitals
Energy simulation for hospitals
 
Doh neda board presentation may 28 final 648 pm
Doh neda board presentation may 28 final 648 pmDoh neda board presentation may 28 final 648 pm
Doh neda board presentation may 28 final 648 pm
 
65_Barts_v001
65_Barts_v00165_Barts_v001
65_Barts_v001
 
Peter Knight
Peter KnightPeter Knight
Peter Knight
 
NyackHospitalFoundation_ED-2014
NyackHospitalFoundation_ED-2014NyackHospitalFoundation_ED-2014
NyackHospitalFoundation_ED-2014
 

Recently uploaded

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations

  • 2. INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations BUSINESS TYPE: HOSPITAL LOCATION: BROOKLYN, NY PROJECT SUMMARY: Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room visits annually. The hospital required a comprehensive lighting upgrade to replace their outdated system, improve occupant comfort, and increase overall operational efficiency. Working under crunching time constraints, IoEnergy demonstrated its technical acumen by designing an upgrade for the entire hospital that was installed in just three weeks. The project, which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero interruptions to hospital operations or impact on patient care. www.ioenergyinc.com | 03
  • 3. PROJECT SCOPE: • LED Lighting Upgrade RESULTS: • $214,015 Annual Energy Savings • $62,606 Annual Maintenance Savings • $34,051 HVAC Savings • 2.85-Year ROI Payback • 1,258,912 kWh Saved Annually • 226 kW Demand Savings INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations BUSINESS TYPE: HOSPITAL LOCATION: BROOKLYN, NY PROJECT SUMMARY: Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room visits annually. The hospital required a comprehensive lighting upgrade to replace their outdated system, improve occupant comfort, and increase overall operational efficiency. Working under crunching time constraints, IoEnergy demonstrated its technical acumen by designing an upgrade for the entire hospital that was installed in just three weeks. The project, which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero interruptions to hospital operations or impact on patient care. www.ioenergyinc.com | 03
  • 4. This was a deadline-driven project that required a high level of execution and close attention to detail. We had to overcome the hurdles of a three-week installation window, a global pandemic, and the need to get the job done without any disruption to hospital operations. Our crews really stepped up and did an amazing job.” -Len Pisano, IoEnergy Director of Strategic Accounts www.ioenergyinc.com | 04 “
  • 5. THANK YOU VIEW MORE OF OUR FEATURED PROJECTS AT WWW.IOENERGYINC.COM