The Physiotherapy Hydropool refurbishment project at Milton Keynes University Hospital NHS Foundation Trust was completed in May 2016. The project budget was £230,000 from capital funding. Works included reconfiguring changing rooms, installing new mechanical ventilation, windows, lighting, insulation, and emergency call and door systems. The project updated aging and inefficient facilities to improve accessibility and hygiene for patients.
1. Project Fact Sheet
Project Name: Physiotherapy Hydropool refurbishment –
Budget code OT0006
Location: Physiotherapy Department
Stage: Delivered
Client representative: Ann Dring - Therapy Services Manager & AHP Lead
Core Clinical & Support Services Division
Senior Project Manager (Capital): Alessandro Annunziata
Head of Capital Projects: John Brierley
Director of Estates: Phil Eagles
Project Update:
• Project completed in May 2016
• In Defects until May 2017
Project Brief:
In 2015, Milton Keynes University Hospital NHS Foundation Trust stated its intentions that the
hydrotherapy pool was very dated and the changing rooms were small and not easily disabled
accessible. Radiators & pipe work were rusty, window seals were hanging down, poolside
floor was not up to latest non slip standards, blown plaster due to leaking showers and water
drips into pool from leaking roof.
Construction works to create adequate areas for effective and efficient use of the hydropool
include as follows:
• Alteration of partition walls to
reconfigure the layout of both
changing rooms.
• New mechanical ventilation with
hygienic air grilles and heat recovery
• Hot and cold water services for
clinical sink and showers
• New windows with triple glazed
• New high levels luminaries in LED
• New clear rooflights in triple skins
• New insulation at roof level to reduce
condensation and heating cost
• Presence Detectors (PIR sensors)
designed to switch off lights if an
area is unoccupied
• New wireless emergency call system
• New hygienic Glass Reinforced
Polyester (GRP) doors
• New wall cladding in tiles
• New flooring in antislip ceramic tiles
Construction Project Team:
Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata
Main Contractor Parias Commercial Interiors Ltd
Roofing Contractor Fenland Flat Roofing Ltd
Project Facts & Figures:
Budget: £230,000.00 Funding Source: Capital
Tendering: single stage with priced schedule of works
Contract: JCT Minor works
2nd
Tendering for roofing works only.