SlideShare a Scribd company logo
1 of 3
Akeem Olawale BASHIRU (B.Sc, PMP)
13 Abeokuta Street,
Ilaje Bariga Lagos,
Lagos State
Nigeria.
Phone :+2348055114096
:+2348060725703
E-mail: bashir_olawale@yahoo.co.uk
CAREER SUMMARY
I have about 8years mechanical, piping, systems & project engineering/management experience. I possess good problem
solving skills, good verbal communication and writing skills required to work in multi-cultural engineering and management
teams involved in management, planning/execution, design, installation, construction, testing, commissioning of complex
facilities.
I possess multi-talented skills and competencies required for project conception to commissioning and handover of complex
fibre optic links, cement plant and power facilities. I can follow-up with project (scope, budgets and schedules) to achieve
management's objective for assigned project. Software used includes FLARENET, AutoCAD, Solid-Works (3D Models),
Maximo 7.5, Lotus note Microsoft Packages.
I’m Familiar with relevant DNV, ABS, API, ASME, BS, NACE codes such as - BS PD5500, EN13445, DNV E403. DNV
C201, API610, API617, API 616, API614, API613, API560, API676, API 14C, API 650/620, API653, API682, API510, ASME
B31.1, ASME B31.3, ASME B31.4, ASME B31.6. ASME VIII-1&2 and relevant International Oil Company's (IOC) Codes.
PERSONAL INFORMATION
Sex/Marital Status/DoB Male/Married/1ST
April, 1979
EDUCATION
2000 - 2006 University of Ibadan, Ibadan Nigeria (Degree).
1992 - 1998 St Luke‘s, Grammar School, Bariga, Lagos Nigeria (W.A.S.S.C.E).
1986 - 1982 Idowu Primary School, Bariga, Lagos.
SUMMARY OF QUALIFICATIONS
GCE (Senior Secondary School Certificate), Dec., 1999 (5A's and 3C's).
BSC (Mechanical Engineering), University of Ibadan, Ibadan, Feb., 2006{Second Class Honors, (Upper Div.)} 2-1.
Certificate (National Youth Service Corps), Jos Plateau PL/WB/06/353546 Certificate Number: A001094846, Sept. 2007.
Certificate (Modeling Flare System with Aspen FLARENET) – Weam & Company Limited July, 2008
Aspen Technologies Inc. Massachusetts, USA
Certificate (Optical Fiber training and Workshop) – BT Technologies Limited, Lagos Nigeria July, 2009
Certificate (Precision Laser Alignment for rotating mechanical equipment training {SKF WE240}) SKF Sub-Sahara
Africa, Certificate License No: SSA2159 January, 2011
Certificate (Project Management Professional Training) – Piston & Fusion Limited, Lagos Nigeria July, 2012
Certificate (Bearing Specification Installation and Maintenance) – O-Secul Nigeria Limited, Certificate Number: OSNL
NO: WAP1212-02 Dec., 2012.
OTHER CAREER TRAINING
• Scaffolding Training, Harrison Inspection & Training, Port-Harcourt Nigeria (July 2014).
• Safe Operation of Cherry Picker & Tele-handler - National Industrial Safety Council of Nigeria with Tofunpe Venture
(March 2014).
• Level 1 First Aid Course for First Respondent – Wetland Rescue Consult Academy, Certificate Number
WRCA/MR/08/283 (August 2013).
• Mechanical Execution Professionalise Training – Lichtenburg, South Africa (May, 2013).
• Apollo Root Cause Analysis, ARMS reliability (January, 2013).
• 35 hours Training on Project Management for Project Management Professional (PMP), Piston & Fusion Limited,
Lagos Nigeria (July 2012)
• Scaffold (Safety) Inspection Training Workshop, Ogun State National Industrial Safety Council of Nigeria (July, 2012)
• Mechanical Equipment Installation Specialist Training (Bearings, Hydraulic, Pneumatic & Conveyors) -Lichtenburg,
South Africa (February, 2011).
• Practical Operation and Maintenance of Industrial Fans, Blowers and Compressors – IDC Technologies, South Africa
(February, 2011).
• 40 hours Comprehensive Safety training-WAH, Hot Work, Confine Safe, Risk assessment (July, 2010).
• Visible felt Leadership training - E.I du Pont de Nemours and Company Wilmington, DE 19898 (July 2010)
• Precision Shaft Alignment (WE240)-SKF Laser Alignment-Certificate NO: (Sub-Saharan Africa) SSA2160(Jan. 2010)
EMPLOYMENT HISTORY
June 2010 -Date (4 Year, 8months)
Lafarge Cement WAPCO Nigeria PLC (27B, Gerrard Road, Ikoyi, Lagos.)
Position: Mechanical Engineer-(Commissioning/Startup & Head Sectional Engineer Quarry-Raw mill-Kiln-Packing)
Responsibilities Includes (but not limited to):
Commissioning/Startup:
 Installation of mechanical equipment such as pumps, fans, compressor, valves for gas train, filters, gas pipeline.
 Alignment and balancing of rotating equipment such as fans, pump, compressor to correct abnormal vibration.
 Installation of piping systems for gas, compressed air, process and cooling water, drainage, gas valve trains, valves,
strainers,
 Construction support, hydro testing, Purging, inspection, commissioning process and procedures, rotational test. Full
Speed No-load/load test, individual test, sequence test, 8/24hours test, vibration measurements.
 Preparation of Standard Operating procedures for mechanical equipments,
 Correction of installation deficiency of installed equipment such as pumps, compressors, heat exchanger, hydraulic
systems, lubrication systems, coolers, drives, gear box.
 Clearing punch-list items to prepare for commissioning work and participation in the commissioning of equipment.
 MTO's, Material Management, fabrication, Construction Supervision, maintenance planning.
 Material control and spares part management.
 Good knowledge of oil and gas production processes and technologies, familiar with maintenance systems.
 Welding inspection and procedure specification, supervision, interpretation of mechanical installation drawings.
Plant maintenance:
 Responsible for the maintenance and well-being of the relevant equipment
 Record some possible anomalies observed on the equipment during maintenance or inspection.
 Monitor the time requirements for each job and the optimal manpower and skills necessary for executing jobs.
 Supervise the trial of equipment after maintenance.
 Ensure that proper safety measures are being adhered to at all times by all personnel.
 Responsible for scheduled inspection of tools and tackles (including safety tools and tackles) and ensuring that these
are in optimal condition of safe use.
 Responsible for recording of daily job activities.
 Manage people working under him.
 Monitor job duration, cost and performance of crew.
 Recommend improvements for cost reductions.
 Respond to emergency repair needs.
 Work with the planning in the development of job planning.
 Ensure productive use of the crew.
 Specify work procedures if required.
 Monitor and controls overtime.
 Ensure safe storage and disposal of replaced spares.
Team Management:
 Defining Tasks and Objectives and annually carry out their Performance Reviews.
 Ensuring good quality of works carried out in the area of coverage without re-work.
 Ensuring good working relationship within the team.
 Motivating the team and ensuring good level of discipline.
 Implement Training Plan for Improving Personnel Skills.
 Contribute to Preparation of the Departmental Budget.
 Facilitate communications.
PROJECT: Lakatabu Expansion Project + 90MegaWatts Wartsila Power Plant
Project cost: >300 Million Euros. -Over 10Million Man-hours of work
(Lafarge S.A France, Wartsila Power Solution, CBMI,).
Nov., 2008 – May, 2010 (1 Year, 6months)
BT Technologies Limited (50/52, Broad Street, Marina, Lagos.)
Position: System Engineer II - (Commissioning, Installation & Maintenance of Optic fiber)
Responsibilities Includes (but not limited to):
 Maintenance of Multilinks-Telkom and Huawei/MTNN FOB network in S/West Nigeria
 Maintain site documentation on Fibre optic links, equipment and network layout.
 Provide project support to implementation on projects execution.
 Supervise civil works (Excavation of trenches, Construction of Manhole and joint box) preparatory to cable
installation.
 Supervise the upgrade and expansion of both OFC and ELP networks.
 Training and support of internal/external personnel on fiber optics technology
PROJECTS:
1. Re-installation of 10km OFC backbone Multilinks – MTN Nigeria Interconnectivity Dugbe Zone
Project Duration: (2 months) May, 2010.
2. Installation of fresh 20km OFC on Ibadan – Ikire segment Multilinks – Telkom Backbone Link
Project Duration: (1 months) Nov., 2009.
3. DWDM interconnectivity: Lagos – Ibadan Multilinks – Telkom EVDO High data Link
Project Duration: (3months) Aug., 2009.
4. Expansion of the FOB along Shagamu – Ibadan Segment Multilinks – Telkom: External Line Plant (ELP) Project
Duration: (6months) Apr., 2009.
5. Installation and testing of OFC inter-shelter at Ibadan switch MTN Nigeria Interconnectivity
Project duration: (2 months) Dec., 2008.
Nov., 2002 – April, 2005 (1 Year)
Automobile Workshop (Bodija Ibadan), Engineering Section (Ministry of Works and Transport Secretariat Ibadan
Oyo State) and Gabimo holding Company (CMD Road Ketu Lagos, Nigeria)
Position: Industrial trainee Engineer
Responsibilities Includes (but not limited to):
 Repair and maintenance of automobile.
 Repair and maintenance of air conditioning.
 Repair and maintenance of generating set.
 Installation and commissioning of heavy duty generating get.
INTERESTS
Teaching, Driving, Traveling, Football, Watching television.
REFERENCES
Dr. T.A.O Salau Senior Lecture Phone number:+234 8028644815
Mechanical Engineering Department Email: tao.salau@mail.ui.edu.ng
University of Ibadan, Ibadan, Nigeria
Dr. O.S Ismail Senior Lecturer Phone number: +234 8023371570
Mechanical Engineering Department Email: osismail@yahoo.com
University of Ibadan, Ibadan, Nigeria

More Related Content

What's hot

Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
Marlon Maisog
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
Amine Halimi
 
Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16
Rod Ivan Yumol
 
matthew adekunle abioye cv uae
matthew adekunle abioye cv uaematthew adekunle abioye cv uae
matthew adekunle abioye cv uae
Adekunle Abioye
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
jameen rahman
 
Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
Paul Challenor
 
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem
 

What's hot (20)

mpita20_CV_Amec
mpita20_CV_Amecmpita20_CV_Amec
mpita20_CV_Amec
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Raisey-Skeats S April 2015 Personal[2]
Raisey-Skeats S April 2015 Personal[2]Raisey-Skeats S April 2015 Personal[2]
Raisey-Skeats S April 2015 Personal[2]
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
 
Amos dennis cv new
Amos dennis  cv newAmos dennis  cv new
Amos dennis cv new
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 
Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16Rod Ivan Yumol Resume 16
Rod Ivan Yumol Resume 16
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
matthew adekunle abioye cv uae
matthew adekunle abioye cv uaematthew adekunle abioye cv uae
matthew adekunle abioye cv uae
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
MUHAMMAD AMIN CV
MUHAMMAD AMIN CVMUHAMMAD AMIN CV
MUHAMMAD AMIN CV
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
Ejike's CV
Ejike's CVEjike's CV
Ejike's CV
 
SABER CV
SABER CVSABER CV
SABER CV
 
Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
 
resume
resumeresume
resume
 
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
 

Viewers also liked (13)

wps qualification metho
wps qualification methowps qualification metho
wps qualification metho
 
Inspection services
Inspection servicesInspection services
Inspection services
 
Points-to-recall-api653
 Points-to-recall-api653 Points-to-recall-api653
Points-to-recall-api653
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Duplex welding guidelines
Duplex welding guidelinesDuplex welding guidelines
Duplex welding guidelines
 
Asme sec ix
Asme sec ixAsme sec ix
Asme sec ix
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wps
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 
cswip-3-1-new-book
 cswip-3-1-new-book cswip-3-1-new-book
cswip-3-1-new-book
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 

Similar to Bashiru_Akeem CV_2015

EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
Obinna Ezeifedi
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
lenin venugopal
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
vikash kumar
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - Detailed
Vincent Le Cornu
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
Stewart Spence
 
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
Sherif Eissa
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
psmuga9
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
Khubaib Khan
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9
 

Similar to Bashiru_Akeem CV_2015 (20)

EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
 
c v ziouane
c v  ziouanec v  ziouane
c v ziouane
 
B Kiremire Resume R0.4
B Kiremire Resume R0.4B Kiremire Resume R0.4
B Kiremire Resume R0.4
 
CV
CVCV
CV
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
Madon CV shl2
Madon CV shl2Madon CV shl2
Madon CV shl2
 
ANKIT CV
ANKIT CVANKIT CV
ANKIT CV
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 
Hse resume(brief) roy stanley amuegbunem8z
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8z
 
Resume
ResumeResume
Resume
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - Detailed
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
 
Mohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CVMohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CV
 
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 

Bashiru_Akeem CV_2015

  • 1. Akeem Olawale BASHIRU (B.Sc, PMP) 13 Abeokuta Street, Ilaje Bariga Lagos, Lagos State Nigeria. Phone :+2348055114096 :+2348060725703 E-mail: bashir_olawale@yahoo.co.uk CAREER SUMMARY I have about 8years mechanical, piping, systems & project engineering/management experience. I possess good problem solving skills, good verbal communication and writing skills required to work in multi-cultural engineering and management teams involved in management, planning/execution, design, installation, construction, testing, commissioning of complex facilities. I possess multi-talented skills and competencies required for project conception to commissioning and handover of complex fibre optic links, cement plant and power facilities. I can follow-up with project (scope, budgets and schedules) to achieve management's objective for assigned project. Software used includes FLARENET, AutoCAD, Solid-Works (3D Models), Maximo 7.5, Lotus note Microsoft Packages. I’m Familiar with relevant DNV, ABS, API, ASME, BS, NACE codes such as - BS PD5500, EN13445, DNV E403. DNV C201, API610, API617, API 616, API614, API613, API560, API676, API 14C, API 650/620, API653, API682, API510, ASME B31.1, ASME B31.3, ASME B31.4, ASME B31.6. ASME VIII-1&2 and relevant International Oil Company's (IOC) Codes. PERSONAL INFORMATION Sex/Marital Status/DoB Male/Married/1ST April, 1979 EDUCATION 2000 - 2006 University of Ibadan, Ibadan Nigeria (Degree). 1992 - 1998 St Luke‘s, Grammar School, Bariga, Lagos Nigeria (W.A.S.S.C.E). 1986 - 1982 Idowu Primary School, Bariga, Lagos. SUMMARY OF QUALIFICATIONS GCE (Senior Secondary School Certificate), Dec., 1999 (5A's and 3C's). BSC (Mechanical Engineering), University of Ibadan, Ibadan, Feb., 2006{Second Class Honors, (Upper Div.)} 2-1. Certificate (National Youth Service Corps), Jos Plateau PL/WB/06/353546 Certificate Number: A001094846, Sept. 2007. Certificate (Modeling Flare System with Aspen FLARENET) – Weam & Company Limited July, 2008 Aspen Technologies Inc. Massachusetts, USA Certificate (Optical Fiber training and Workshop) – BT Technologies Limited, Lagos Nigeria July, 2009 Certificate (Precision Laser Alignment for rotating mechanical equipment training {SKF WE240}) SKF Sub-Sahara Africa, Certificate License No: SSA2159 January, 2011 Certificate (Project Management Professional Training) – Piston & Fusion Limited, Lagos Nigeria July, 2012 Certificate (Bearing Specification Installation and Maintenance) – O-Secul Nigeria Limited, Certificate Number: OSNL NO: WAP1212-02 Dec., 2012. OTHER CAREER TRAINING • Scaffolding Training, Harrison Inspection & Training, Port-Harcourt Nigeria (July 2014). • Safe Operation of Cherry Picker & Tele-handler - National Industrial Safety Council of Nigeria with Tofunpe Venture (March 2014). • Level 1 First Aid Course for First Respondent – Wetland Rescue Consult Academy, Certificate Number WRCA/MR/08/283 (August 2013). • Mechanical Execution Professionalise Training – Lichtenburg, South Africa (May, 2013). • Apollo Root Cause Analysis, ARMS reliability (January, 2013).
  • 2. • 35 hours Training on Project Management for Project Management Professional (PMP), Piston & Fusion Limited, Lagos Nigeria (July 2012) • Scaffold (Safety) Inspection Training Workshop, Ogun State National Industrial Safety Council of Nigeria (July, 2012) • Mechanical Equipment Installation Specialist Training (Bearings, Hydraulic, Pneumatic & Conveyors) -Lichtenburg, South Africa (February, 2011). • Practical Operation and Maintenance of Industrial Fans, Blowers and Compressors – IDC Technologies, South Africa (February, 2011). • 40 hours Comprehensive Safety training-WAH, Hot Work, Confine Safe, Risk assessment (July, 2010). • Visible felt Leadership training - E.I du Pont de Nemours and Company Wilmington, DE 19898 (July 2010) • Precision Shaft Alignment (WE240)-SKF Laser Alignment-Certificate NO: (Sub-Saharan Africa) SSA2160(Jan. 2010) EMPLOYMENT HISTORY June 2010 -Date (4 Year, 8months) Lafarge Cement WAPCO Nigeria PLC (27B, Gerrard Road, Ikoyi, Lagos.) Position: Mechanical Engineer-(Commissioning/Startup & Head Sectional Engineer Quarry-Raw mill-Kiln-Packing) Responsibilities Includes (but not limited to): Commissioning/Startup:  Installation of mechanical equipment such as pumps, fans, compressor, valves for gas train, filters, gas pipeline.  Alignment and balancing of rotating equipment such as fans, pump, compressor to correct abnormal vibration.  Installation of piping systems for gas, compressed air, process and cooling water, drainage, gas valve trains, valves, strainers,  Construction support, hydro testing, Purging, inspection, commissioning process and procedures, rotational test. Full Speed No-load/load test, individual test, sequence test, 8/24hours test, vibration measurements.  Preparation of Standard Operating procedures for mechanical equipments,  Correction of installation deficiency of installed equipment such as pumps, compressors, heat exchanger, hydraulic systems, lubrication systems, coolers, drives, gear box.  Clearing punch-list items to prepare for commissioning work and participation in the commissioning of equipment.  MTO's, Material Management, fabrication, Construction Supervision, maintenance planning.  Material control and spares part management.  Good knowledge of oil and gas production processes and technologies, familiar with maintenance systems.  Welding inspection and procedure specification, supervision, interpretation of mechanical installation drawings. Plant maintenance:  Responsible for the maintenance and well-being of the relevant equipment  Record some possible anomalies observed on the equipment during maintenance or inspection.  Monitor the time requirements for each job and the optimal manpower and skills necessary for executing jobs.  Supervise the trial of equipment after maintenance.  Ensure that proper safety measures are being adhered to at all times by all personnel.  Responsible for scheduled inspection of tools and tackles (including safety tools and tackles) and ensuring that these are in optimal condition of safe use.  Responsible for recording of daily job activities.  Manage people working under him.  Monitor job duration, cost and performance of crew.  Recommend improvements for cost reductions.  Respond to emergency repair needs.  Work with the planning in the development of job planning.  Ensure productive use of the crew.  Specify work procedures if required.  Monitor and controls overtime.  Ensure safe storage and disposal of replaced spares. Team Management:  Defining Tasks and Objectives and annually carry out their Performance Reviews.  Ensuring good quality of works carried out in the area of coverage without re-work.  Ensuring good working relationship within the team.  Motivating the team and ensuring good level of discipline.  Implement Training Plan for Improving Personnel Skills.
  • 3.  Contribute to Preparation of the Departmental Budget.  Facilitate communications. PROJECT: Lakatabu Expansion Project + 90MegaWatts Wartsila Power Plant Project cost: >300 Million Euros. -Over 10Million Man-hours of work (Lafarge S.A France, Wartsila Power Solution, CBMI,). Nov., 2008 – May, 2010 (1 Year, 6months) BT Technologies Limited (50/52, Broad Street, Marina, Lagos.) Position: System Engineer II - (Commissioning, Installation & Maintenance of Optic fiber) Responsibilities Includes (but not limited to):  Maintenance of Multilinks-Telkom and Huawei/MTNN FOB network in S/West Nigeria  Maintain site documentation on Fibre optic links, equipment and network layout.  Provide project support to implementation on projects execution.  Supervise civil works (Excavation of trenches, Construction of Manhole and joint box) preparatory to cable installation.  Supervise the upgrade and expansion of both OFC and ELP networks.  Training and support of internal/external personnel on fiber optics technology PROJECTS: 1. Re-installation of 10km OFC backbone Multilinks – MTN Nigeria Interconnectivity Dugbe Zone Project Duration: (2 months) May, 2010. 2. Installation of fresh 20km OFC on Ibadan – Ikire segment Multilinks – Telkom Backbone Link Project Duration: (1 months) Nov., 2009. 3. DWDM interconnectivity: Lagos – Ibadan Multilinks – Telkom EVDO High data Link Project Duration: (3months) Aug., 2009. 4. Expansion of the FOB along Shagamu – Ibadan Segment Multilinks – Telkom: External Line Plant (ELP) Project Duration: (6months) Apr., 2009. 5. Installation and testing of OFC inter-shelter at Ibadan switch MTN Nigeria Interconnectivity Project duration: (2 months) Dec., 2008. Nov., 2002 – April, 2005 (1 Year) Automobile Workshop (Bodija Ibadan), Engineering Section (Ministry of Works and Transport Secretariat Ibadan Oyo State) and Gabimo holding Company (CMD Road Ketu Lagos, Nigeria) Position: Industrial trainee Engineer Responsibilities Includes (but not limited to):  Repair and maintenance of automobile.  Repair and maintenance of air conditioning.  Repair and maintenance of generating set.  Installation and commissioning of heavy duty generating get. INTERESTS Teaching, Driving, Traveling, Football, Watching television. REFERENCES Dr. T.A.O Salau Senior Lecture Phone number:+234 8028644815 Mechanical Engineering Department Email: tao.salau@mail.ui.edu.ng University of Ibadan, Ibadan, Nigeria Dr. O.S Ismail Senior Lecturer Phone number: +234 8023371570 Mechanical Engineering Department Email: osismail@yahoo.com University of Ibadan, Ibadan, Nigeria