SlideShare a Scribd company logo
1 of 4
Adam Askwith
Alton Bay,NH
801-637-8363
Mountainrip@hotmail.com
EXPERIENCE:
DemacLenko USA
North American Service Manager
. 4-2014 to present
.Create service department procedures and integration to parts department.
.Consult customers to address their individual needs and find solutions to create confidence with
company support of snowmaking equipment.
.Troubleshooting snowmaking equipment both in the field and over the phone
.Teach annual service schools to educate snowmakers on troubleshooting procedures, proper
operation, utilizing equipment options to optimize production, and end of season maintenance to
ensure equipment is in proper operating condition as well as extending the life of equipment.
.Attend various trade shows and act as a liaison for company to promote products and solidify
customer relationships
.Operate 24 Hr. service hotline, and coordinate with parts department to prioritize part shipments
to customers to reduce down time of equipment.
.Setup of new equipment and onsite training.
.Work with European engineers on new models of snow producers to find solutions for the
different Voltages and Hz and how they affect the operation of the equipment.
Snowlogic USA
Snow Making Technician
6-2013 to 3-2014
.Worked as a service technician with specialized knowledge of snowmaking.
. Educate resort staff on proper operation and troubleshooting of equipment.
.Assist in the production of all models of snow guns.
.Installation of new equipment.
.preform after season service with customers to ensure proper operation of equipment for next
season.
.attend various trade shows and act as a liaison for company to promote products.
.Research and compile automation products and processes to help develop automation for
snowmaking equipment.
TechnoAlpin USA
Snow Making Technician
April 2011 to 5-2013
. Worked as a technician with specialized knowledge of how the TechnoAlpin equipment works.
. Installation of new snowmaking equipment
. Maintaining, and repairing snowmaking equipment
. Assembly of new fanguns, load appropriate programs for individual ski area operating systems
. Set up custom Satel radio communication systems as well as comm. line.
. Set up ATASS+ control systems, configured network gateways with proper IP addressing
. Trouble shoot system faults.
Reason for leaving: company merger lead to reduction of force.
Taylor Electric
Journeyman Electrician
August 2010 to 4-2011
. Installed automated conveyor system Utah department of alcohol distribution center.
. Installed automated fork lift retrieval system for L.D.S. distribution warehouse.
. Worked on install crew for the new expansion for Huntsman Cancer Institute.
. Install Electrical in new research laboratory for Tera Tech.
Reason for leaving: to pursue my passion for the ski industry and further my technical ability’s
University of Utah Hospital
Journeyman Electrician
November 2009 – 6/2010
. Install branch circuits for lighting and medical equipment.
. Install high voltage supply for Symbiot Nuclear Scanner.
. Install new panels with shunt protection.
. Perform general electrical support throughout hospital.
. Install new additions to fire alarm systems.
. Install electrical for new x-ray room.
. Remodel NCC.
. Upgrade x-ray room 3 for new x-ray equipment.
. CT equipment cooling upgrade project.
Reason for leaving: Reduction in labor force
The Canyons, Park City Utah
Lift Maintenance Electricial
2007-11/09
. Meager Motors
. Daily Inspection of tower and safety circuits to assure proper functioning
. Trouble shooting and repair of electrical systems on ski lifts from 24 to 480
volt
. Work with PLC’s, and control circuits.
. Ability to read schematics.
. Rebuild and replace shiv wheels, assembly alignments and terminal work.
Reason for leaving; Eliminated the Electrical Department.
Snowbird Ski Resort
Snow Making Electrician
2003-2007
. Inspect and repair electrical and mechanical systems encompassing entire snow
making system
. Meager Motors
. Trouble shoot and repair snow guns, and pump systems.
. Operate snow cats for grooming, retrieval of snow guns for repair and to transport
explosives for ski patrol.
. Install new 480 for snow making expansion.
. Install new underground raceways from ¾ to 6”.
. Rig and pull wire from 12 to 750 KCM.
. Set and terminate transformers and disconnects.
. Performed installation of fire alarm systems.
Reason for leaving: Reached the top of the wage scale, and better opportunities.
Jayco Electric, South Jordan Utah
Journeyman Electrician
2002 to 2003
. Provided underground pipe and wire installation from 12 to 750 KCM,
. Able to operate heavy equipment
. Install EMT ½ to 4”.
. Install ridged to ¾ to 3”
. Able to read blue prints and oversee job.
. Performed installation of fire alarm systems.
. Job Forman.
Reason for leaving: Left for better opportunities.
JL Electric, Draper Utah
1999-2002
Journeyman Electrician
. Residential remodels, new circuits, service changes, complete rewires.
. Commercial EMT, ridged, ridged, underground, operate heavy equipment, main
power distribution, branch circuits, PLC’s.
. Performed installation of fire alarm systems.
. Job Forman.
Reason for leaving: Company underwent bankruptcy.
Certifications:
Commercial Journeyman Electrician License: 308182-5504
INTERESTS:
Spending time with my family, high performance cars, Snowboarding, Skiing, Camping, Hiking,
Dirt bikes, Arts
REFERENCES: Upon request

More Related Content

What's hot

What's hot (20)

Rajesh Patel Resume
Rajesh Patel ResumeRajesh Patel Resume
Rajesh Patel Resume
 
Dhananjay_Kumar_Chaubey_2016
Dhananjay_Kumar_Chaubey_2016Dhananjay_Kumar_Chaubey_2016
Dhananjay_Kumar_Chaubey_2016
 
EDMUND R. ADARLO
EDMUND R. ADARLOEDMUND R. ADARLO
EDMUND R. ADARLO
 
Alhalak Subhi
Alhalak SubhiAlhalak Subhi
Alhalak Subhi
 
tahir
tahirtahir
tahir
 
Bilal.cv
Bilal.cvBilal.cv
Bilal.cv
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
 
cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
shoaib CV
shoaib CVshoaib CV
shoaib CV
 
sanjog navandars
sanjog navandarssanjog navandars
sanjog navandars
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
My resume
My resumeMy resume
My resume
 
Ben CV New
Ben  CV NewBen  CV New
Ben CV New
 
Mani CV - Power Plant Maintenance
Mani CV - Power Plant MaintenanceMani CV - Power Plant Maintenance
Mani CV - Power Plant Maintenance
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
SARAVANA SR.E&I ENGR AUG 2015
SARAVANA SR.E&I ENGR AUG 2015SARAVANA SR.E&I ENGR AUG 2015
SARAVANA SR.E&I ENGR AUG 2015
 
Rajat
RajatRajat
Rajat
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 

Similar to Adam Askwith resume (002) (20)

Ali-Ahmad Resume
Ali-Ahmad ResumeAli-Ahmad Resume
Ali-Ahmad Resume
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
 
Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1
 
Updated Resume' A
Updated Resume' AUpdated Resume' A
Updated Resume' A
 
Samuel C RESUME
Samuel C RESUMESamuel C RESUME
Samuel C RESUME
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
SEKHER
SEKHERSEKHER
SEKHER
 
Resume
ResumeResume
Resume
 
my pagemanager C.V
my pagemanager  C.Vmy pagemanager  C.V
my pagemanager C.V
 
Ally Machemba - CV
Ally Machemba - CVAlly Machemba - CV
Ally Machemba - CV
 
Mohamed Elfadil cv
Mohamed Elfadil cvMohamed Elfadil cv
Mohamed Elfadil cv
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Raju cv
Raju cv Raju cv
Raju cv
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
ramkumar.doc
ramkumar.docramkumar.doc
ramkumar.doc
 
My CV
My CVMy CV
My CV
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 

Adam Askwith resume (002)

  • 1. Adam Askwith Alton Bay,NH 801-637-8363 Mountainrip@hotmail.com EXPERIENCE: DemacLenko USA North American Service Manager . 4-2014 to present .Create service department procedures and integration to parts department. .Consult customers to address their individual needs and find solutions to create confidence with company support of snowmaking equipment. .Troubleshooting snowmaking equipment both in the field and over the phone .Teach annual service schools to educate snowmakers on troubleshooting procedures, proper operation, utilizing equipment options to optimize production, and end of season maintenance to ensure equipment is in proper operating condition as well as extending the life of equipment. .Attend various trade shows and act as a liaison for company to promote products and solidify customer relationships .Operate 24 Hr. service hotline, and coordinate with parts department to prioritize part shipments to customers to reduce down time of equipment. .Setup of new equipment and onsite training. .Work with European engineers on new models of snow producers to find solutions for the different Voltages and Hz and how they affect the operation of the equipment. Snowlogic USA Snow Making Technician 6-2013 to 3-2014 .Worked as a service technician with specialized knowledge of snowmaking. . Educate resort staff on proper operation and troubleshooting of equipment. .Assist in the production of all models of snow guns. .Installation of new equipment.
  • 2. .preform after season service with customers to ensure proper operation of equipment for next season. .attend various trade shows and act as a liaison for company to promote products. .Research and compile automation products and processes to help develop automation for snowmaking equipment. TechnoAlpin USA Snow Making Technician April 2011 to 5-2013 . Worked as a technician with specialized knowledge of how the TechnoAlpin equipment works. . Installation of new snowmaking equipment . Maintaining, and repairing snowmaking equipment . Assembly of new fanguns, load appropriate programs for individual ski area operating systems . Set up custom Satel radio communication systems as well as comm. line. . Set up ATASS+ control systems, configured network gateways with proper IP addressing . Trouble shoot system faults. Reason for leaving: company merger lead to reduction of force. Taylor Electric Journeyman Electrician August 2010 to 4-2011 . Installed automated conveyor system Utah department of alcohol distribution center. . Installed automated fork lift retrieval system for L.D.S. distribution warehouse. . Worked on install crew for the new expansion for Huntsman Cancer Institute. . Install Electrical in new research laboratory for Tera Tech. Reason for leaving: to pursue my passion for the ski industry and further my technical ability’s University of Utah Hospital Journeyman Electrician November 2009 – 6/2010 . Install branch circuits for lighting and medical equipment. . Install high voltage supply for Symbiot Nuclear Scanner. . Install new panels with shunt protection. . Perform general electrical support throughout hospital. . Install new additions to fire alarm systems. . Install electrical for new x-ray room. . Remodel NCC. . Upgrade x-ray room 3 for new x-ray equipment. . CT equipment cooling upgrade project. Reason for leaving: Reduction in labor force
  • 3. The Canyons, Park City Utah Lift Maintenance Electricial 2007-11/09 . Meager Motors . Daily Inspection of tower and safety circuits to assure proper functioning . Trouble shooting and repair of electrical systems on ski lifts from 24 to 480 volt . Work with PLC’s, and control circuits. . Ability to read schematics. . Rebuild and replace shiv wheels, assembly alignments and terminal work. Reason for leaving; Eliminated the Electrical Department. Snowbird Ski Resort Snow Making Electrician 2003-2007 . Inspect and repair electrical and mechanical systems encompassing entire snow making system . Meager Motors . Trouble shoot and repair snow guns, and pump systems. . Operate snow cats for grooming, retrieval of snow guns for repair and to transport explosives for ski patrol. . Install new 480 for snow making expansion. . Install new underground raceways from ¾ to 6”. . Rig and pull wire from 12 to 750 KCM. . Set and terminate transformers and disconnects. . Performed installation of fire alarm systems. Reason for leaving: Reached the top of the wage scale, and better opportunities. Jayco Electric, South Jordan Utah Journeyman Electrician 2002 to 2003 . Provided underground pipe and wire installation from 12 to 750 KCM, . Able to operate heavy equipment . Install EMT ½ to 4”. . Install ridged to ¾ to 3” . Able to read blue prints and oversee job.
  • 4. . Performed installation of fire alarm systems. . Job Forman. Reason for leaving: Left for better opportunities. JL Electric, Draper Utah 1999-2002 Journeyman Electrician . Residential remodels, new circuits, service changes, complete rewires. . Commercial EMT, ridged, ridged, underground, operate heavy equipment, main power distribution, branch circuits, PLC’s. . Performed installation of fire alarm systems. . Job Forman. Reason for leaving: Company underwent bankruptcy. Certifications: Commercial Journeyman Electrician License: 308182-5504 INTERESTS: Spending time with my family, high performance cars, Snowboarding, Skiing, Camping, Hiking, Dirt bikes, Arts REFERENCES: Upon request