1. FOCUSED ASSESSMENT REPORT
Page 1 of 2
Item
No.
Item Assessed Reference Compliance Finding Root
Cause
Corrective
Action
Corrective Action
compliance
remarks
Yes No N/A
1
Approved For Construction (AFC)
Drawings has to check before start
the inspection of item
AFC
DRAWINGS
2
Materials specification and grades
has to cross check with the AFC
and marking of MRV in the each
separate item as per AFC
SAES-W-
013,AFC
DRAWINGS
3
Joint Details, Bevel Angle, Root
Gap, Mismatch and joint details
are to be ensure as per the WPS
and AFC
SAES-W-
013,AFC
DRAWINGS
4
Approved WPS and PQR has to
available at the time of inspection
to ensure the requirements
SAES-W-013
5
Make Sure the welder going to
engage in the job has qualified as
per the required WPS
SAES-W-013
6
Make sure the Joints are free from
dust, Contaminations within 25mm
from the joint
SAES-W-013
DISCIPLINE BI/JO PROJECTTITLE CONTRACTOR LOCATION DATE OF
ASSESSMENT
ASSESSMENT NUMBER
FOCUSSED ASSESSMENT
AREA
PURPOSE OF THIS FOCUSED ASSESSMENT IS TO MAKE SURE THAT FIT UP REQUIREMENTS ARE COMPLYINGWITH SAUDI ARAMCOENGINEERINGSTANDARDS AND PROJECT
SPECIFICATION REQUIREMENTS.
REFERENCE STANDARDS/PROCEDURES SAES-W-013,AFC DRAWINGS
2. FOCUSED ASSESSMENT REPORT
Page 2 of 2
7
Weldable primer has to apply to
joints to avoid the moisture
absorption which results in rust SAES-W-013
Signature
Agreed Completion Date: N/A
Name Positive comments/opportunity for improvement
General Comments:
Date