Current Transformers
Current transformers (CT's) provide a simple, inexpensive and yet accurate means of
sensing current flow in power conductors. They are available in 3 basic configurations:
1. Ring Core CT's are available for measuring currents from 50 to 5000
amps, with windows (power conductor opening size) from 1" to 8"
diameter.
2. Split Core CT's are available for measuring currents from 100 to 5000
amps, with windows in varying sizes from 1" by 2" to 13" by 30". Split
core CT's have one end removable so that the load conductor or bus bar
does not have to be disconnected to install the CT.
3. Wound Primary CT's are designed to measure currents from 1 amp to
100 amps. Since the load current passes through primary windings in the
CT, screw terminals are provided for the load and secondary conductors.
Wound primary CT's are available in ratios from 2.5:5 to 100:5 (Models
189 and 190 are examples of wound primary CT's).
CT's used with watt transducers enable the owner to control demand as well as monitor
building and/or tenant power consumption. When CT's are used with Current
Transducers, the result is an excellent method of diagnosing the performance of fans,
pumps, chillers, etc. The Model 4CMA and 4CTV Current Transducers provide
alarms for each motor so the owner is warned immediately of any abnormal operating
condition. Low pump flows will be alarmed if the strainer is dirty or the coupling is
broken. Low fan flows will be alarmed if filters are dirty, belts are slipping, or dampers
(fire, smoke, etc.) are closed. High motor loads will alarm if bearings are dry or worn, or
belts are out of alignment.
CT's are designed to handle motor inrush currents, so no extra precaution is needed to
monitor motors.
Monitoring Multiple Loads With One Watt Transducer
There are two methods of monitoring multiple loads with one watt transducer. All loads
must be fed from the same service and the voltage must be sensed from one source.
1. The first method can be used to monitor up to 5 feeders with wide ranging
loads. The secondaries of the feeder CT's are connected to a Model 190
Summing Transformer. The output of the summing transformer is
connected to the input of a WT Series Watt Transducer. Typically the
CT ratios must be the same, but different ratios can be used with a
specially built summing transformer. Each summing transformer must be
connected to one phase only. It takes three summing transformers and
fifteen feeder CT's to monitor and totalize five three-phase loads.
When using summing transformers, add the primary CT currents to
calculate the kW and kWh outputs. For example, when summing five
1000:5 CT's use a CT ratio of 5000:5 to determine the outputs. When
using low amperage (200A) CT's with a summing transformer, be sure to
check the burden on the CT's as the summing transformer adds burden.
2. The second method is to parallel CT inputs at the transducer.
This method would require:
1. balanced loads,
2. same ratio CT's,
3. paralleling at transducer only,
4. grounding at transducer only,
5. burden capability to be reduced by the number of CT's (e.g., 3
CT's give 1/3 capability),
6. CT's to be oversized so the total secondary current does not
exceed the 5 amp rating, which reduces accuracy. Since this
method requires ideal conditions, it is generally better to use a
summing transformer.
CT Accuracy
A CT is most accurate at rated current with a low burden (load). Accuracy decreases
with increased burden (load) or low line current. In sizing CT's the conductor size and
distance is important. Improper sizing of current transformers or long secondary
conductor runs with undersized cable can result in poor accuracy.
Burden (load) Information On CT's
The external load (e.g., meters, transducers, etc.) applied to the secondary of a CT is
called the burden. The burden can be expressed in volt-amperes:
VA = I2
x Z
Z = Total CT secondary impedance
I = Secondary current
(Generally 1 or 5 amps)
Total burden is the sum of:
1. Device (transducer, meter, etc.) Burden - Furnished by the manufacturer.
2. Burden of Interconnecting Leads - can be calculated by using the above
formula. Use conductor resistance (total to the device and back) for Z (See
Power Equations for chart of impedance of wire sizes).
3. Internal Burden of CT Windings - This is so small that it can generally be
ignored.
Exact burden calculations are usually not necessary unless the CT ratio is below 200:5.
If necessary, see the section on burden calculations
The VA burden that a CT will handle varies with the ratio and physical size of the CT.
The burden capacity for each Model CT is specified on the data sheet. A small 50:5
Model 2RL will only handle 1 VA of burden capacity. A large 2000:5 Model 170RL
will handle a burden capacity of 100 VA.
As a rule of thumb, use a 1 amp input (WT-1) watt transducer for a 200 amp or less
feeder. The 5 amp (WT-5) transducer can be used for feeders less than 100 amps when
connected to wound primary CT's (Model 189).
Sizing CT's
On new construction, size the CT to handle about 80% of the circuit breaker capacity. If
the building is served by a 2000 amp breaker, use 1600 amp (2000 x 0.8) CT's.
For older buildings, the peak demand can generally be determined from the power
company or from past billings. In this case add 20 to 30% to the peak demand and size
the CT's for this load. If the peak demand was 500 kW, the peak current on a 480/3/60
system would be:
500,000 / (480 x 1.73 x 0.9 pf) = 669 amps
This assumes a 0.9 power factor. (Peak current would be higher with a lower power
factor.) Use CT's about 20% larger. 800:5 CT's would be a good selection.
For older buildings with no demand history, size the CT's the same as for new
construction. Where possible, use multi-tap CT's so that the ratio can be reduced if the
maximum load is much less than 80% of the breaker size.
CT's that are used to monitor motor loads can be sized from the nameplate full load
motor amps.
Selecting CT's
A "Selection Guide" is provided in this catalog to aid in selecting the type of CT for your
application. Non-standard ratios can be obtained by looping the conductor through the
window to add or subtract current flow. (See Example in Figure 2.)
The relationship of the ratio of primary and secondary turns is expressed in the following
formula:
Ka = (Kn ± Nsa) / Np
Ka = Actual transformation ratio
Kn = Nameplate transformation ratio
Transformation ratio = primary current / secondary current
Nsa = Number of secondary turns added or subtracted
(To Add - loop X1 lead through H1. To Subtract -
loop X1 opposite H1)
Np = Number of primary turns
•
3 Primary Loops + 2 Secondary Loops added
Example: An application requires a 20:5 CT ratio, but only a 50:5 CT is
available. Using the above formula it can be determined that by using 3 primary
loops and adding 2 secondary loops that a 20:5 actual ratio will be obtained.
Ka = (Kn ± Nsa) / Np
= (10 + 2) / 3
= 4
Actual CT Ratio = 20:5
Mounting CT's
CT's are generally located in the main breaker panel or in branch distribution panels
where space is always at a premium. Since CT's do not have to be installed 90 degrees to
the conductor run (the conductors can go through the CT at any angle) they are generally
held in place with plastic tie wraps. CT's with mounting feet are available if appearance is
important and there is enough room to accommodate this type of mounting arrangement.
Installing CT's
Window type CT's should be mounted with the H1 side of the
window towards the power source. The X1 secondary
terminal is the polarity terminal (Figure 3).The polarity marks
of a current transformer indicate that when a primary current
enters at the polarity mark (H1) of the primary, a current in
phase with the primary current and proportional to it in
magnitude will leave the polarity terminal of the secondary
(X1).
If a CT test switch is used, the switch must have a "make-before-break" contact pattern to
assure that the CT is not open-circuited during transition.
Normally CT's should not be installed on "Hot" services. The power should be
disconnected when the CT's are installed. Many times this is not possible because of
critical loads such as computers, laboratories, etc. that cannot be shut down. Split core
CT's should not be installed on "Hot" uninsulated bus bars under any conditions.
On existing cable installations where the monitoring point is not close to a cable end,
small ring core CT's can be shunt installed on #8 cable or smaller by using Hot Tap
insulation piercing connectors similar to those made by 3M. A parallel shunt through the
CT is connected to the power cable as shown in (Figure 4). Tape all bare ends.
Check your work before leaving the installation. Make sure all connections are tight and
the installation is neat.
Summary
CT's are inexpensive, accurate devices for monitoring current. If properly sized and
installed, they will give many years of trouble free service with no adjustments to make.
Call Kele for help with your specific applications.
CAUTION: Never open-circuit a CT secondary while the primary is energized.
High crest voltages may occur across the open secondary circuit. To avoid personal
injury or equipment damage, the secondary must always be short-circuited or
connected to a burden. NOTE: A buzzing transformer is an indication of an open
secondary.

More Related Content

What's hot

Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsPower System Operation
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7guest8ae54cfb
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relaysRoberto Costa
 
Harmonic comparisons of various PWM techniques for basic MLI
Harmonic comparisons of various PWM techniques for basic MLIHarmonic comparisons of various PWM techniques for basic MLI
Harmonic comparisons of various PWM techniques for basic MLISaquib Maqsood
 
Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection michaeljmack
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBRVijay Raskar
 
Advanced techniques of PULSE WIDTH MODULATION.
Advanced techniques of PULSE WIDTH MODULATION.Advanced techniques of PULSE WIDTH MODULATION.
Advanced techniques of PULSE WIDTH MODULATION.Subashini Puchalapalli
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manojIACM SmartLearn Ltd.
 
Stability test of transformer
Stability test of transformerStability test of transformer
Stability test of transformerSantu Mondal
 
Single phase full bridge inverter
Single phase full bridge inverterSingle phase full bridge inverter
Single phase full bridge inverterNisarg Amin
 
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...IDES Editor
 

What's hot (20)

Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting Calculations
 
Inverter
InverterInverter
Inverter
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7
 
Dead time pwm
Dead time pwmDead time pwm
Dead time pwm
 
pwm inverter
pwm inverterpwm inverter
pwm inverter
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Harmonic comparisons of various PWM techniques for basic MLI
Harmonic comparisons of various PWM techniques for basic MLIHarmonic comparisons of various PWM techniques for basic MLI
Harmonic comparisons of various PWM techniques for basic MLI
 
Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
 
Paper 33-FPGA Triggered Space Vector Modulated Voltage
Paper 33-FPGA Triggered Space Vector Modulated VoltagePaper 33-FPGA Triggered Space Vector Modulated Voltage
Paper 33-FPGA Triggered Space Vector Modulated Voltage
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBR
 
Inverter 2003
Inverter 2003Inverter 2003
Inverter 2003
 
Advanced techniques of PULSE WIDTH MODULATION.
Advanced techniques of PULSE WIDTH MODULATION.Advanced techniques of PULSE WIDTH MODULATION.
Advanced techniques of PULSE WIDTH MODULATION.
 
Pullbox sizing
Pullbox sizingPullbox sizing
Pullbox sizing
 
CSI Manual
CSI ManualCSI Manual
CSI Manual
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manoj
 
Stability test of transformer
Stability test of transformerStability test of transformer
Stability test of transformer
 
Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)
 
Single phase full bridge inverter
Single phase full bridge inverterSingle phase full bridge inverter
Single phase full bridge inverter
 
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...
Space Vector Modulation with DC-Link Voltage Balancing Control for Three-Leve...
 
3 phase current source inverter
3 phase  current  source  inverter3 phase  current  source  inverter
3 phase current source inverter
 

Similar to Measure Currents with CTs: Ring, Split, Wound Models

Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]Md Irshad Ahmad
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)kaushal boghani
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CTParth Patel
 
Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)Jay Ranvir
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Md Abu Jauad Khan Aliv
 
K.kufa meter test - c
K.kufa meter test - cK.kufa meter test - c
K.kufa meter test - cKumbirai Kufa
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functionsMonzer Abdallah Eisa
 
Instrument Transformers
Instrument TransformersInstrument Transformers
Instrument TransformersRidwanul Hoque
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharingVivek Arun
 
Design And Analysis Of Low Power High Performance Single Bit Full Adder
Design And Analysis Of Low Power High Performance Single Bit Full AdderDesign And Analysis Of Low Power High Performance Single Bit Full Adder
Design And Analysis Of Low Power High Performance Single Bit Full AdderIJTET Journal
 

Similar to Measure Currents with CTs: Ring, Split, Wound Models (20)

Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)
 
CT & PT.pptx
CT & PT.pptxCT & PT.pptx
CT & PT.pptx
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Lecture (11.11.22).pptx
Lecture (11.11.22).pptxLecture (11.11.22).pptx
Lecture (11.11.22).pptx
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
K.kufa meter test - c
K.kufa meter test - cK.kufa meter test - c
K.kufa meter test - c
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functions
 
Get 8402
Get 8402Get 8402
Get 8402
 
DC Component of Fault Current
DC Component of Fault CurrentDC Component of Fault Current
DC Component of Fault Current
 
Instrument Transformers
Instrument TransformersInstrument Transformers
Instrument Transformers
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharing
 
A320108
A320108A320108
A320108
 
Current Transformer.pptx
Current Transformer.pptxCurrent Transformer.pptx
Current Transformer.pptx
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Design And Analysis Of Low Power High Performance Single Bit Full Adder
Design And Analysis Of Low Power High Performance Single Bit Full AdderDesign And Analysis Of Low Power High Performance Single Bit Full Adder
Design And Analysis Of Low Power High Performance Single Bit Full Adder
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

Measure Currents with CTs: Ring, Split, Wound Models

  • 1. Tyco Electronics Corporation Crompton Instruments 1610 Cobb International Parkway, Unit #4 Kennesaw, GA 30152 Tel. 770-425-8903 Fax. 770-423-7194 Current Transformers Current transformers (CT's) provide a simple, inexpensive and yet accurate means of sensing current flow in power conductors. They are available in 3 basic configurations: 1. Ring Core CT's are available for measuring currents from 50 to 5000 amps, with windows (power conductor opening size) from 1" to 8" diameter. 2. Split Core CT's are available for measuring currents from 100 to 5000 amps, with windows in varying sizes from 1" by 2" to 13" by 30". Split core CT's have one end removable so that the load conductor or bus bar does not have to be disconnected to install the CT. 3. Wound Primary CT's are designed to measure currents from 1 amp to 100 amps. Since the load current passes through primary windings in the CT, screw terminals are provided for the load and secondary conductors. Wound primary CT's are available in ratios from 2.5:5 to 100:5 (Models 189 and 190 are examples of wound primary CT's). CT's used with watt transducers enable the owner to control demand as well as monitor building and/or tenant power consumption. When CT's are used with Current Transducers, the result is an excellent method of diagnosing the performance of fans, pumps, chillers, etc. The Model 4CMA and 4CTV Current Transducers provide alarms for each motor so the owner is warned immediately of any abnormal operating condition. Low pump flows will be alarmed if the strainer is dirty or the coupling is broken. Low fan flows will be alarmed if filters are dirty, belts are slipping, or dampers (fire, smoke, etc.) are closed. High motor loads will alarm if bearings are dry or worn, or belts are out of alignment. CT's are designed to handle motor inrush currents, so no extra precaution is needed to monitor motors.
  • 2. Monitoring Multiple Loads With One Watt Transducer There are two methods of monitoring multiple loads with one watt transducer. All loads must be fed from the same service and the voltage must be sensed from one source. 1. The first method can be used to monitor up to 5 feeders with wide ranging loads. The secondaries of the feeder CT's are connected to a Model 190 Summing Transformer. The output of the summing transformer is connected to the input of a WT Series Watt Transducer. Typically the CT ratios must be the same, but different ratios can be used with a specially built summing transformer. Each summing transformer must be connected to one phase only. It takes three summing transformers and fifteen feeder CT's to monitor and totalize five three-phase loads. When using summing transformers, add the primary CT currents to calculate the kW and kWh outputs. For example, when summing five 1000:5 CT's use a CT ratio of 5000:5 to determine the outputs. When using low amperage (200A) CT's with a summing transformer, be sure to check the burden on the CT's as the summing transformer adds burden. 2. The second method is to parallel CT inputs at the transducer. This method would require: 1. balanced loads, 2. same ratio CT's, 3. paralleling at transducer only, 4. grounding at transducer only, 5. burden capability to be reduced by the number of CT's (e.g., 3 CT's give 1/3 capability), 6. CT's to be oversized so the total secondary current does not exceed the 5 amp rating, which reduces accuracy. Since this method requires ideal conditions, it is generally better to use a summing transformer. CT Accuracy A CT is most accurate at rated current with a low burden (load). Accuracy decreases with increased burden (load) or low line current. In sizing CT's the conductor size and distance is important. Improper sizing of current transformers or long secondary conductor runs with undersized cable can result in poor accuracy. Burden (load) Information On CT's
  • 3. The external load (e.g., meters, transducers, etc.) applied to the secondary of a CT is called the burden. The burden can be expressed in volt-amperes: VA = I2 x Z Z = Total CT secondary impedance I = Secondary current (Generally 1 or 5 amps) Total burden is the sum of: 1. Device (transducer, meter, etc.) Burden - Furnished by the manufacturer. 2. Burden of Interconnecting Leads - can be calculated by using the above formula. Use conductor resistance (total to the device and back) for Z (See Power Equations for chart of impedance of wire sizes). 3. Internal Burden of CT Windings - This is so small that it can generally be ignored. Exact burden calculations are usually not necessary unless the CT ratio is below 200:5. If necessary, see the section on burden calculations The VA burden that a CT will handle varies with the ratio and physical size of the CT. The burden capacity for each Model CT is specified on the data sheet. A small 50:5 Model 2RL will only handle 1 VA of burden capacity. A large 2000:5 Model 170RL will handle a burden capacity of 100 VA. As a rule of thumb, use a 1 amp input (WT-1) watt transducer for a 200 amp or less feeder. The 5 amp (WT-5) transducer can be used for feeders less than 100 amps when connected to wound primary CT's (Model 189). Sizing CT's On new construction, size the CT to handle about 80% of the circuit breaker capacity. If the building is served by a 2000 amp breaker, use 1600 amp (2000 x 0.8) CT's. For older buildings, the peak demand can generally be determined from the power company or from past billings. In this case add 20 to 30% to the peak demand and size the CT's for this load. If the peak demand was 500 kW, the peak current on a 480/3/60 system would be: 500,000 / (480 x 1.73 x 0.9 pf) = 669 amps This assumes a 0.9 power factor. (Peak current would be higher with a lower power factor.) Use CT's about 20% larger. 800:5 CT's would be a good selection.
  • 4. For older buildings with no demand history, size the CT's the same as for new construction. Where possible, use multi-tap CT's so that the ratio can be reduced if the maximum load is much less than 80% of the breaker size. CT's that are used to monitor motor loads can be sized from the nameplate full load motor amps. Selecting CT's A "Selection Guide" is provided in this catalog to aid in selecting the type of CT for your application. Non-standard ratios can be obtained by looping the conductor through the window to add or subtract current flow. (See Example in Figure 2.) The relationship of the ratio of primary and secondary turns is expressed in the following formula: Ka = (Kn ± Nsa) / Np Ka = Actual transformation ratio Kn = Nameplate transformation ratio Transformation ratio = primary current / secondary current Nsa = Number of secondary turns added or subtracted (To Add - loop X1 lead through H1. To Subtract - loop X1 opposite H1) Np = Number of primary turns • 3 Primary Loops + 2 Secondary Loops added Example: An application requires a 20:5 CT ratio, but only a 50:5 CT is available. Using the above formula it can be determined that by using 3 primary loops and adding 2 secondary loops that a 20:5 actual ratio will be obtained. Ka = (Kn ± Nsa) / Np = (10 + 2) / 3 = 4
  • 5. Actual CT Ratio = 20:5 Mounting CT's CT's are generally located in the main breaker panel or in branch distribution panels where space is always at a premium. Since CT's do not have to be installed 90 degrees to the conductor run (the conductors can go through the CT at any angle) they are generally held in place with plastic tie wraps. CT's with mounting feet are available if appearance is important and there is enough room to accommodate this type of mounting arrangement. Installing CT's Window type CT's should be mounted with the H1 side of the window towards the power source. The X1 secondary terminal is the polarity terminal (Figure 3).The polarity marks of a current transformer indicate that when a primary current enters at the polarity mark (H1) of the primary, a current in phase with the primary current and proportional to it in magnitude will leave the polarity terminal of the secondary (X1). If a CT test switch is used, the switch must have a "make-before-break" contact pattern to assure that the CT is not open-circuited during transition. Normally CT's should not be installed on "Hot" services. The power should be disconnected when the CT's are installed. Many times this is not possible because of critical loads such as computers, laboratories, etc. that cannot be shut down. Split core CT's should not be installed on "Hot" uninsulated bus bars under any conditions. On existing cable installations where the monitoring point is not close to a cable end, small ring core CT's can be shunt installed on #8 cable or smaller by using Hot Tap insulation piercing connectors similar to those made by 3M. A parallel shunt through the CT is connected to the power cable as shown in (Figure 4). Tape all bare ends. Check your work before leaving the installation. Make sure all connections are tight and the installation is neat.
  • 6. Summary CT's are inexpensive, accurate devices for monitoring current. If properly sized and installed, they will give many years of trouble free service with no adjustments to make. Call Kele for help with your specific applications. CAUTION: Never open-circuit a CT secondary while the primary is energized. High crest voltages may occur across the open secondary circuit. To avoid personal injury or equipment damage, the secondary must always be short-circuited or connected to a burden. NOTE: A buzzing transformer is an indication of an open secondary.