SlideShare a Scribd company logo
1 of 3
Download to read offline
Page | 1/3 
 
ABDELRAHMAN ELMASRY 
Address: Elite Commercial Center, Tahlia St., P.O Box 13896, Jeddah 21414 ‐ KSA 
Phone: (+966) 566 315 943 | Email: elmasry_abdelrahman@yahoo.com / a.elmasry@inmaem.com
CARRIER OBJECTIVE 
Sr. Electrical & control systems engineer with 10 years hands‐on experience in electrical, automation, 
controls and instrumentation fields gained with various roles across different organizations, has a 
proven track record in previous job roles specifically in Project Engineering, execution and management, 
Worked in many projects that varies in scale and category (Industrial, commercial and residential 
projects). 
 
Seeking a challenging career with progressive organization where I can utilize my strong technical and 
management skills and earn a job which provides me self‐development and help me to achieve personal 
as well as organizational goals.  
EDUCATION 
Bachelor of Electrical Power Engineering                                                                     Sept. 2001 – June 2006 
Faculty of Engineering, Cairo University                                                                                             Cairo‐Egypt  
HIGHLIGHTS 
‐ Project Management, Scheduling & Planning - BMS Testing & Commissioning.
‐ District Cooling Plants/HVAC Control systems engineering. - Substation Automation SCADA
‐ Process SCADA & BMS Engineering - AutoCAD 2D.
‐ Process Instrumentation. - Generator Plants Engineering.
‐ Materials Procurement.
‐ Special control systems (Water/Fuel Leak detection, Hydro disc filtration, chemical treatment)
ACHIEVEMENTS 
 
‐ Handling two mega scale Infrastructure projects for Makkah Holy Haram Expansion and Madinah Holy 
Mosque Expansion (2010‐2015). 
‐ Leading I&C team for CUC‐1 Madinah Project (2015). 
‐ Starting‐up & commissioning for more than 10 BMS projects (2006‐2009). 
‐ Acting as project manager with full responsibility for ordering materials, installation activities, 
test and commissioning, invoicing and closing of the projects (2009). 
 
COURSES 
 Project Management: PMP Preparation Course (2016). 
 IELTS Preparation Course (2016). 
 AutoCad 2D (2009). 
 PLC Programming (2006). 
 
Page | 2/3 
 
EXPERIENCE 
Automation & Control systems Team Leader                                                                             July 2010 – Till Now 
Inma Utilities Contracting Co.                                                                                                                        Jeddah‐KSA 
Job responsibilities: 
 Responsible for all engineering aspects related to control systems of the projects including technical 
review of the design drawings and specifications, submitting the technical proposals, preparing shop 
drawings and technical submittals. 
 Overall responsibility and manage the Project such that the project scope, cost, time are 
either maintained or where possible improved, While ensuring total customer satisfaction. 
 Ordering the installation materials required for the control systems execution considering the 
relevant budget and the delivery time that shall be matching with the project overall time schedule. 
 Preparing control systems tender/bidding packages (Including BMS, SCADA, dedicated control panels 
of special packages). 
 Evaluating the technical offers submitted by the bidders. 
 Coordinating with site team for control systems’ installation activities. 
 Coordinating and providing the technical support for electrical & mechanical teams for the selection 
of electrical and mechanical equipment considering the related controls parts/issues including 
interlocking, protection schemes and interfaces with the control systems. 
 Preparing projects’ schedules for controls scope of work showing expected time frame for the 
materials approvals, delivery, installations and handing over. 
 Preparing control systems’ sequence of operation in line with design concept/outlines, in addition to 
the preparation of engineering drawings of instruments hookup, P&ID, and controls block diagrams. 
Projects: 
 Abraj Kudi Project: The project consists of a large Podium spread on all the site, topped by 12 
Towers accommodating several elements with a total built‐up area of around 1.5 million m2.  
 Makkah (Shamiya) ‐ Central Utility Complex: that accommodate the chilled water and other utilities 
to Haram expansion including the following facilities: 
‐ The world biggest District Cooling Plant (DCP) with total capacity of 160,000 tons refrigerant. 
‐ Emergency Generator Plant, Water treatment Plant, Firefighting Pumps Station and Central 
Waste Collection Plant. 
 Madinah Prophet Mosque Expansion ‐ Central Utility Complex‐1. 
 Holy Haram Expansion – Security building (Preliminary study). 
 King Abdul‐Aziz University‐ Central Utility Plant‐2. 
 
Electrical Engineer (Engineering and procurement Dept.)                                             January 2009‐ July 2010 
Kharafi National for Electro‐mechanical Works                                                                                        Giza ‐ Egypt 
Job responsibilities: 
 Handling engineering activities related to Electrical scope of work including shop drawings of cable 
routing, equipment arrangement, installation details in addition to materials submittals. 
 Responsible for electrical materials procurement including materials ordering and commercial 
negotiation. 
 Providing technical support for site team during the project execution. 
Projects: 
 Allegria Residential compound in 6th of October City (Infrastructure). 
 Marrasi Residential compound in North coast (Infrastructure). 
 Accor Hotel (Ethiopia). 
 
Paage | 3/3 
 
 
BMS and I
Advansys 
Job respo
 Re
st
BMS Proje
 Po
 B‐
 RA
 A
 Po
 M
 A
 Re
 Re
BMS Proje
 H
 M
 A
 Ex
 St
 Ex
 W
 E
 A
 E
 N
 D
 Pr
 G
 St
 D
 
 For m
 
Instrumentati
for Trading & 
nsibilities: 
esponsible for
tarting up and
ects (Starting 
ort Ghalib city
‐19 Smart Villa
AYA Holding H
zur Hotel in A
olice printing 
Maadi City Cen
lexandria City
enovation of M
enovation of I
ects (Services 
ilton Green pl
Maadi city Cent
lexandria city 
 
xcellent comm
trong adminis
xperienced in
Work effective
nthusiastic a
Arabic             
nglish           
ationality: Egy
ate of birth: 1
resent residen
ender: Male 
tatus: Married
riving license:
more details, P
ion Engineer  
Contracting (J
r all projects’ e
d commissioni
up & commis
y (2 five stars h
age (Administ
Headquarter (A
lexandria (4 S
establishment
tre extension 
y Centre exten
Mena House O
IGI factory (Da
and Mainten
laza (Alexandr
tre (Carrefour
Centre (Carre
munication a
strative and o
n problem‐sol
ely both as te
and committ
 : Native lan
  : Excellent 
AD
yptian 
17th of March 
nt in Jeddah, S
d. 
: Available (Sa
Please visit my
                        
Johnson's con
engineering a
ng of Building
sioning): 
hotels & inter
tration Buildin
Administratio
tars Hotel). 
t. 
(Carrefour Hy
sion (Carrefou
Oberoi (Hotel)
airy factory).
ance): 
ria). 
r Hyper marke
efour Hyper m
PERSO
nd presentat
organizationa
lving and trou
am member 
ted. 
LAN
nguage 
(Read, writt
DDITIONA
1983 
Saudi Arabia 
udi/Egyptian/
y LinkedIn prof
                        
ntrols System 
spects includi
g Management
national confe
ng). 
on building). 
yper market in
ur Hyper mark
). 
et in Cairo). 
market in Alexa
ONAL SKIL
ion skills. 
al skills 
ubleshooting.
and independ
NGUAGES
ten and spok
AL INFORM
/International
file elmasry_a
                        
Integrator)     
ng Panel Desi
t System. 
erence center
n Cairo). 
ket in Alexand
andria). 
LLS 
. 
dently. 
S  
ken) 
MATION
) 
abdelrahman@
 August 2006
                        
gn, Installatio
r in Marsa Ala
dria). 
@yahoo.com 
6‐January 2009
   Cairo ‐ Egyp
on, programm
m). 
9 
pt  
ing, 

More Related Content

What's hot (19)

cv of renjith chandran
cv of renjith chandrancv of renjith chandran
cv of renjith chandran
 
ZEESHAN)
ZEESHAN)ZEESHAN)
ZEESHAN)
 
Mohamed Edrees CV - June16
Mohamed Edrees CV - June16Mohamed Edrees CV - June16
Mohamed Edrees CV - June16
 
Khalil Ahmad AbuCV
Khalil Ahmad AbuCVKhalil Ahmad AbuCV
Khalil Ahmad AbuCV
 
Khalid-Wageh-cv last
Khalid-Wageh-cv lastKhalid-Wageh-cv last
Khalid-Wageh-cv last
 
CV- Mahmood Roostaei- Electrical Engineer
CV- Mahmood Roostaei- Electrical EngineerCV- Mahmood Roostaei- Electrical Engineer
CV- Mahmood Roostaei- Electrical Engineer
 
English lanuange resume
English lanuange resumeEnglish lanuange resume
English lanuange resume
 
Abdelrahman Elsayed CV
Abdelrahman Elsayed CVAbdelrahman Elsayed CV
Abdelrahman Elsayed CV
 
Mansoor raza
Mansoor razaMansoor raza
Mansoor raza
 
mohamed abdallah CV_Old1
mohamed abdallah CV_Old1mohamed abdallah CV_Old1
mohamed abdallah CV_Old1
 
Mohamed rabee cv
Mohamed rabee cvMohamed rabee cv
Mohamed rabee cv
 
ABUBACKER SIDDIQ CV
ABUBACKER SIDDIQ CVABUBACKER SIDDIQ CV
ABUBACKER SIDDIQ CV
 
Khaled's resume
Khaled's resumeKhaled's resume
Khaled's resume
 
Ahmed Cv
Ahmed CvAhmed Cv
Ahmed Cv
 
Hatem Mohammed Rashwan Final
Hatem Mohammed Rashwan FinalHatem Mohammed Rashwan Final
Hatem Mohammed Rashwan Final
 
Atallah Ali Anouz
Atallah Ali AnouzAtallah Ali Anouz
Atallah Ali Anouz
 
Belal Alkhalaileh
Belal AlkhalailehBelal Alkhalaileh
Belal Alkhalaileh
 
AHMED-MOUSTAFA-MOHAMMED-TAWFIEK
AHMED-MOUSTAFA-MOHAMMED-TAWFIEKAHMED-MOUSTAFA-MOHAMMED-TAWFIEK
AHMED-MOUSTAFA-MOHAMMED-TAWFIEK
 
Dina amer cv
Dina amer   cvDina amer   cv
Dina amer cv
 

Viewers also liked

Calendario av 2 e av 3
Calendario  av 2  e  av 3Calendario  av 2  e  av 3
Calendario av 2 e av 3katiagomide
 
MODA VERANO 2015
MODA VERANO 2015MODA VERANO 2015
MODA VERANO 2015fanygp
 
Para medirmos o desenvolvimento de cada país
Para medirmos o desenvolvimento de cada paísPara medirmos o desenvolvimento de cada país
Para medirmos o desenvolvimento de cada paíslakers66
 
Entorno y mis primeros pasos
Entorno y mis primeros pasosEntorno y mis primeros pasos
Entorno y mis primeros pasosMargarita_rs
 
Investigacion
InvestigacionInvestigacion
InvestigacionBrandon C
 
Hipã³nimas e hiperã³nimas
Hipã³nimas e hiperã³nimasHipã³nimas e hiperã³nimas
Hipã³nimas e hiperã³nimasCristina Marques
 
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015mapsgalaxy
 
MARKETDATA_RCI
MARKETDATA_RCIMARKETDATA_RCI
MARKETDATA_RCItguassu
 
Dn 1 out 2015 alimentação escolar
Dn 1 out 2015 alimentação escolarDn 1 out 2015 alimentação escolar
Dn 1 out 2015 alimentação escolarLicínia Simões
 
Histórico Escolar_UFRJ
Histórico Escolar_UFRJHistórico Escolar_UFRJ
Histórico Escolar_UFRJRenan Micha
 
Entorno y primeros pasos
Entorno y primeros pasosEntorno y primeros pasos
Entorno y primeros pasosDanna Valeria
 

Viewers also liked (14)

Calendario av 2 e av 3
Calendario  av 2  e  av 3Calendario  av 2  e  av 3
Calendario av 2 e av 3
 
MODA VERANO 2015
MODA VERANO 2015MODA VERANO 2015
MODA VERANO 2015
 
Estas navidades
Estas navidadesEstas navidades
Estas navidades
 
Para medirmos o desenvolvimento de cada país
Para medirmos o desenvolvimento de cada paísPara medirmos o desenvolvimento de cada país
Para medirmos o desenvolvimento de cada país
 
Entorno y mis primeros pasos
Entorno y mis primeros pasosEntorno y mis primeros pasos
Entorno y mis primeros pasos
 
Investigacion
InvestigacionInvestigacion
Investigacion
 
Hipã³nimas e hiperã³nimas
Hipã³nimas e hiperã³nimasHipã³nimas e hiperã³nimas
Hipã³nimas e hiperã³nimas
 
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015
Atualização IGO 8.3 2015 - GPS IGO 8.4 Atualizado 2015
 
MARKETDATA_RCI
MARKETDATA_RCIMARKETDATA_RCI
MARKETDATA_RCI
 
Intro
IntroIntro
Intro
 
Dn 1 out 2015 alimentação escolar
Dn 1 out 2015 alimentação escolarDn 1 out 2015 alimentação escolar
Dn 1 out 2015 alimentação escolar
 
Mochiila de emergencia
Mochiila de emergenciaMochiila de emergencia
Mochiila de emergencia
 
Histórico Escolar_UFRJ
Histórico Escolar_UFRJHistórico Escolar_UFRJ
Histórico Escolar_UFRJ
 
Entorno y primeros pasos
Entorno y primeros pasosEntorno y primeros pasos
Entorno y primeros pasos
 

Similar to Eng. abdelrahman Elmasry resume

OMAR AHMED C V.doc
OMAR AHMED C V.docOMAR AHMED C V.doc
OMAR AHMED C V.docOmar Ahmed
 
Eng-Ismail Abassery Updated CV
Eng-Ismail Abassery Updated CVEng-Ismail Abassery Updated CV
Eng-Ismail Abassery Updated CVismail abassery
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohamed ibrahim
 
Dina amer cv
Dina amer   cvDina amer   cv
Dina amer cvDina Amer
 
Avnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey
 
MOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMohamed korashy
 
Muhammad talha resume
Muhammad talha resumeMuhammad talha resume
Muhammad talha resumeTalhaAslam579
 
omar abdel-salam cv
omar abdel-salam cvomar abdel-salam cv
omar abdel-salam cvOmar Salam
 
Girish Resume
Girish ResumeGirish Resume
Girish ResumeGirish R
 
Girish Resume
Girish ResumeGirish Resume
Girish ResumeGirish R
 
MY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMoaiad Mdm
 

Similar to Eng. abdelrahman Elmasry resume (20)

OMAR AHMED C V.doc
OMAR AHMED C V.docOMAR AHMED C V.doc
OMAR AHMED C V.doc
 
Eng-Ismail Abassery Updated CV
Eng-Ismail Abassery Updated CVEng-Ismail Abassery Updated CV
Eng-Ismail Abassery Updated CV
 
hossam electrical power engineer
hossam electrical power engineerhossam electrical power engineer
hossam electrical power engineer
 
hossam electrical power engineer
hossam electrical power engineerhossam electrical power engineer
hossam electrical power engineer
 
Abdulaziz almalki resume
Abdulaziz almalki resume Abdulaziz almalki resume
Abdulaziz almalki resume
 
Mahmoud_Magdy_NEW_CV
Mahmoud_Magdy_NEW_CVMahmoud_Magdy_NEW_CV
Mahmoud_Magdy_NEW_CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)
 
Dina amer cv
Dina amer   cvDina amer   cv
Dina amer cv
 
Ibrahim Gaber -C.V
Ibrahim Gaber -C.VIbrahim Gaber -C.V
Ibrahim Gaber -C.V
 
Avnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey Resume
Avnish Pandey Resume
 
MOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 new
 
Muhammad talha resume
Muhammad talha resumeMuhammad talha resume
Muhammad talha resume
 
omar abdel-salam cv
omar abdel-salam cvomar abdel-salam cv
omar abdel-salam cv
 
Girish Resume
Girish ResumeGirish Resume
Girish Resume
 
Girish Resume
Girish ResumeGirish Resume
Girish Resume
 
MY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMY CV PROJECT ENGINEER
MY CV PROJECT ENGINEER
 
EPE. Mohamed Ashraf
EPE. Mohamed AshrafEPE. Mohamed Ashraf
EPE. Mohamed Ashraf
 
THAIR IBARAR ANJUM
THAIR IBARAR ANJUMTHAIR IBARAR ANJUM
THAIR IBARAR ANJUM
 
my new
my newmy new
my new
 

Recently uploaded

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Eng. abdelrahman Elmasry resume

  • 1. Page | 1/3    ABDELRAHMAN ELMASRY  Address: Elite Commercial Center, Tahlia St., P.O Box 13896, Jeddah 21414 ‐ KSA  Phone: (+966) 566 315 943 | Email: elmasry_abdelrahman@yahoo.com / a.elmasry@inmaem.com CARRIER OBJECTIVE  Sr. Electrical & control systems engineer with 10 years hands‐on experience in electrical, automation,  controls and instrumentation fields gained with various roles across different organizations, has a  proven track record in previous job roles specifically in Project Engineering, execution and management,  Worked in many projects that varies in scale and category (Industrial, commercial and residential  projects).    Seeking a challenging career with progressive organization where I can utilize my strong technical and  management skills and earn a job which provides me self‐development and help me to achieve personal  as well as organizational goals.   EDUCATION  Bachelor of Electrical Power Engineering                                                                     Sept. 2001 – June 2006  Faculty of Engineering, Cairo University                                                                                             Cairo‐Egypt   HIGHLIGHTS  ‐ Project Management, Scheduling & Planning - BMS Testing & Commissioning. ‐ District Cooling Plants/HVAC Control systems engineering. - Substation Automation SCADA ‐ Process SCADA & BMS Engineering - AutoCAD 2D. ‐ Process Instrumentation. - Generator Plants Engineering. ‐ Materials Procurement. ‐ Special control systems (Water/Fuel Leak detection, Hydro disc filtration, chemical treatment) ACHIEVEMENTS    ‐ Handling two mega scale Infrastructure projects for Makkah Holy Haram Expansion and Madinah Holy  Mosque Expansion (2010‐2015).  ‐ Leading I&C team for CUC‐1 Madinah Project (2015).  ‐ Starting‐up & commissioning for more than 10 BMS projects (2006‐2009).  ‐ Acting as project manager with full responsibility for ordering materials, installation activities,  test and commissioning, invoicing and closing of the projects (2009).    COURSES   Project Management: PMP Preparation Course (2016).   IELTS Preparation Course (2016).   AutoCad 2D (2009).   PLC Programming (2006).   
  • 2. Page | 2/3    EXPERIENCE  Automation & Control systems Team Leader                                                                             July 2010 – Till Now  Inma Utilities Contracting Co.                                                                                                                        Jeddah‐KSA  Job responsibilities:   Responsible for all engineering aspects related to control systems of the projects including technical  review of the design drawings and specifications, submitting the technical proposals, preparing shop  drawings and technical submittals.   Overall responsibility and manage the Project such that the project scope, cost, time are  either maintained or where possible improved, While ensuring total customer satisfaction.   Ordering the installation materials required for the control systems execution considering the  relevant budget and the delivery time that shall be matching with the project overall time schedule.   Preparing control systems tender/bidding packages (Including BMS, SCADA, dedicated control panels  of special packages).   Evaluating the technical offers submitted by the bidders.   Coordinating with site team for control systems’ installation activities.   Coordinating and providing the technical support for electrical & mechanical teams for the selection  of electrical and mechanical equipment considering the related controls parts/issues including  interlocking, protection schemes and interfaces with the control systems.   Preparing projects’ schedules for controls scope of work showing expected time frame for the  materials approvals, delivery, installations and handing over.   Preparing control systems’ sequence of operation in line with design concept/outlines, in addition to  the preparation of engineering drawings of instruments hookup, P&ID, and controls block diagrams.  Projects:   Abraj Kudi Project: The project consists of a large Podium spread on all the site, topped by 12  Towers accommodating several elements with a total built‐up area of around 1.5 million m2.    Makkah (Shamiya) ‐ Central Utility Complex: that accommodate the chilled water and other utilities  to Haram expansion including the following facilities:  ‐ The world biggest District Cooling Plant (DCP) with total capacity of 160,000 tons refrigerant.  ‐ Emergency Generator Plant, Water treatment Plant, Firefighting Pumps Station and Central  Waste Collection Plant.   Madinah Prophet Mosque Expansion ‐ Central Utility Complex‐1.   Holy Haram Expansion – Security building (Preliminary study).   King Abdul‐Aziz University‐ Central Utility Plant‐2.    Electrical Engineer (Engineering and procurement Dept.)                                             January 2009‐ July 2010  Kharafi National for Electro‐mechanical Works                                                                                        Giza ‐ Egypt  Job responsibilities:   Handling engineering activities related to Electrical scope of work including shop drawings of cable  routing, equipment arrangement, installation details in addition to materials submittals.   Responsible for electrical materials procurement including materials ordering and commercial  negotiation.   Providing technical support for site team during the project execution.  Projects:   Allegria Residential compound in 6th of October City (Infrastructure).   Marrasi Residential compound in North coast (Infrastructure).   Accor Hotel (Ethiopia).   
  • 3. Paage | 3/3      BMS and I Advansys  Job respo  Re st BMS Proje  Po  B‐  RA  A  Po  M  A  Re  Re BMS Proje  H  M  A  Ex  St  Ex  W  E  A  E  N  D  Pr  G  St  D    For m   Instrumentati for Trading &  nsibilities:  esponsible for tarting up and ects (Starting  ort Ghalib city ‐19 Smart Villa AYA Holding H zur Hotel in A olice printing  Maadi City Cen lexandria City enovation of M enovation of I ects (Services  ilton Green pl Maadi city Cent lexandria city    xcellent comm trong adminis xperienced in Work effective nthusiastic a Arabic              nglish            ationality: Egy ate of birth: 1 resent residen ender: Male  tatus: Married riving license: more details, P ion Engineer   Contracting (J r all projects’ e d commissioni up & commis y (2 five stars h age (Administ Headquarter (A lexandria (4 S establishment tre extension  y Centre exten Mena House O IGI factory (Da and Mainten laza (Alexandr tre (Carrefour Centre (Carre munication a strative and o n problem‐sol ely both as te and committ  : Native lan   : Excellent  AD yptian  17th of March  nt in Jeddah, S d.  : Available (Sa Please visit my                          Johnson's con engineering a ng of Building sioning):  hotels & inter tration Buildin Administratio tars Hotel).  t.  (Carrefour Hy sion (Carrefou Oberoi (Hotel) airy factory). ance):  ria).  r Hyper marke efour Hyper m PERSO nd presentat organizationa lving and trou am member  ted.  LAN nguage  (Read, writt DDITIONA 1983  Saudi Arabia  udi/Egyptian/ y LinkedIn prof                          ntrols System  spects includi g Management national confe ng).  on building).  yper market in ur Hyper mark ).  et in Cairo).  market in Alexa ONAL SKIL ion skills.  al skills  ubleshooting. and independ NGUAGES ten and spok AL INFORM /International file elmasry_a                          Integrator)      ng Panel Desi t System.  erence center n Cairo).  ket in Alexand andria).  LLS  .  dently.  S   ken)  MATION )  abdelrahman@  August 2006                          gn, Installatio r in Marsa Ala dria).  @yahoo.com  6‐January 2009    Cairo ‐ Egyp on, programm m).  9  pt   ing,