RESPONSIBILITY
ASSIGNMENT MATRIX
AbbasVahedi
(Master Of embedded system for mechatronic)
Fachhochschule Dortmund
R&D project Management
LIST OF CONTENTS
• Motivation
• Definition
• Layout
• Implementation
• An example
• Analyze your chart
• Pros and Cons
• Variation and Alternatives
• Tips
• Recap
• Resources
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 2
MOTIVATION
PM is not
Managing Projects
PM is
People Management
Igor Kokcharov, Ph.D, PMP
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 3
MOTIVATION
• WHO will take responsibility for each tasks
• WHAT needs to be done
• Who knows most hidden aspects of tasks
• HOW MUCH extra money (approximate cash or assets) required
• and who is to be informed of this activity. ….
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 4
DEFINITION
Responsibility Assignment Matrix:
❖ Describes the participation by various roles
in completing tasks for a project.
(Wikipedia)
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 5
• The purpose of the RACI process is to answer the following questions . . .
• What functions, activities, and tasks must be performed
• Who must perform them and what is their level of involvement
• RACI is a highly participative process that ensures ownership of the
responsibilities
RESPONSIBILITY ASSIGNMENT MATRIX (RAM)
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 6
known as RACI matrix or linear responsibility chart (LRC)
RACI MATRIX
R Who is RESPONSIBLE
The person who is assigned to do the
work.
A Who is ACCOUNTABLE
The person who takes the final decision
and has ultimate ownership.
C Who is CONSULTED
The person who must be consulted
before a decision/ action is taken.
I Who is INFORMED
The person who must be informed about the
decision/ action taken.
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 7
LAYOUT
Functional Role:
• A position assigned or assumed to accomplish an activity or sub-activity
Activity:
• An action or decision that is
one of several sequential
steps in the completion of a
business process. It should
always result in a clear
output
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 8
HOW PMS HAVE USED RACI
• List of project tasks (with a good action verb)
• Identify project stakeholders
• Know the responsible and accountable for each task along with its stakeholders
First :R then A and C and I
• At least one stakeholder accountable for every task(Only one accountable
stakeholder)
• Ensure that the stakeholders understands their role.
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 9
EXAMPLE
JohnAdam
Mike
SW
(Y + X)
FEATY FEAT X
Irina 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 10
EXAMPLE (CONT.)
John AdamMike
SW
Y + X
FEATY FEAT X Irina
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 11
Developing
Software
ANALYZE YOUR CHART
1-Vertical Analysis
❖ Lots of R’s
❖ No Empty spaces
❖ Too many A`s
❖ No R`s or A`s
❖ Overall pattern
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 12
ANALYZE YOUR CHART
2- Horizontal Analysis
❖ Lots of R’s
❖ Lots of C`s
❖ Too many I`s
❖ No R’s
❖ No A`s
❖ No C`s or I`s
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 13
PROS AND CONS
+ Clarifies individual/ departmental roles and responsibilities
+ Identifies accountabilities
+ Improve team efficiencies and effectiveness
+ Removes ambiguities with regard to activities and decision
points
+ Assists in defining roles and responsibilities
+ Reduces duplication of efforts or no overlap
+ Assists in task completion before moving to next process
+ Clear demarcation of authority levels
+ Identify problems with the existing process
+ Improve team communication and coordination
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 14
PROS AND CONS (CONT.)
- cause parallelism
- To many forms and alternatives cause complexity
- May reduce the friendship atmosphere (instead of trust to team)
- Can`t define unorganized relations in organization
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 15
TIPS
• Trying to apply RACI charts to everything!!!
• 100% accuracy is not always required
• There must be one, but only one,“A” for each action or decision
• Filling in RACI chart without due diligence
• Double check that the operation can be completed with the new role assignment
• All roles and responsibilities must de documented and communicated
• Less R may useful than more
• the responsible could also be the accountable.
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 16
VARIATION AND ALTERNATIVES
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 17
RECAP
TO Achieve the final goal of project:
PM is not
Project Management
PM is
People Management
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 18
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 19
RESOURCES
• Role & Responsibility Charting (RACI) by Michael L Smith and James Erwin
• https://mgrush.com/blog/2016/12/08/raci/
http://www.projektmanazer.cz
https://www.slideshare.net/anandsubramaniam/raci-matrix
https://workshopbank.com/raci-matrix
https://en.wikipedia.org/wiki/Responsibility_assignment_matrix
27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 20

More Related Content

What's hot

Enterprise Risk Management as a Core Management Process
Enterprise Risk Management as a Core Management ProcessEnterprise Risk Management as a Core Management Process
Enterprise Risk Management as a Core Management Process
regio12
 

What's hot (20)

Change Management Consulting Case Study
Change Management Consulting   Case StudyChange Management Consulting   Case Study
Change Management Consulting Case Study
 
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
PECB Webinar: Introduction to ISO 22317 – Business Impact Analysis (BIA)
 
Enterprise Risk Management as a Core Management Process
Enterprise Risk Management as a Core Management ProcessEnterprise Risk Management as a Core Management Process
Enterprise Risk Management as a Core Management Process
 
Risk management
Risk managementRisk management
Risk management
 
Agile Principles, Agile People
Agile Principles, Agile PeopleAgile Principles, Agile People
Agile Principles, Agile People
 
Bcm Roadmap
Bcm RoadmapBcm Roadmap
Bcm Roadmap
 
Performance Counselling
Performance CounsellingPerformance Counselling
Performance Counselling
 
Identifying and managing resistance to change
Identifying and managing resistance to change Identifying and managing resistance to change
Identifying and managing resistance to change
 
Succession Planning and Competency Modeling
Succession Planning and Competency ModelingSuccession Planning and Competency Modeling
Succession Planning and Competency Modeling
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity Management
 
RACI
RACI RACI
RACI
 
Crisis Management Strategies When Disaster Strikes
Crisis Management Strategies When Disaster StrikesCrisis Management Strategies When Disaster Strikes
Crisis Management Strategies When Disaster Strikes
 
HR Performance Management Tools for Employee Engagement: RACI
HR Performance Management Tools for Employee Engagement: RACIHR Performance Management Tools for Employee Engagement: RACI
HR Performance Management Tools for Employee Engagement: RACI
 
Risk register
Risk registerRisk register
Risk register
 
Leadership agility
Leadership agilityLeadership agility
Leadership agility
 
Business Continuity Plan Powerpoint Presentation Slides
Business Continuity Plan Powerpoint Presentation SlidesBusiness Continuity Plan Powerpoint Presentation Slides
Business Continuity Plan Powerpoint Presentation Slides
 
The Synergistic Nature of PI Objectives
The Synergistic Nature of PI ObjectivesThe Synergistic Nature of PI Objectives
The Synergistic Nature of PI Objectives
 
Talent wins bookreview
Talent wins bookreviewTalent wins bookreview
Talent wins bookreview
 
The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)
 
Succession Management PowerPoint Presentation Slides
Succession Management PowerPoint Presentation Slides Succession Management PowerPoint Presentation Slides
Succession Management PowerPoint Presentation Slides
 

Similar to Responsibility assignment matrix (RACi Matrix)

CS 414 (IT Project Management)
CS 414 (IT Project Management)CS 414 (IT Project Management)
CS 414 (IT Project Management)
raszky
 
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) ProjecteCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
David Niles
 
Agile Project Management Methods of ERP
Agile Project Management Methods of ERPAgile Project Management Methods of ERP
Agile Project Management Methods of ERP
lisa_yogi
 
Thoughts On Architecting V4 2
Thoughts On Architecting V4 2Thoughts On Architecting V4 2
Thoughts On Architecting V4 2
bmercer
 
operation research notes
operation research notesoperation research notes
operation research notes
Renu Thakur
 

Similar to Responsibility assignment matrix (RACi Matrix) (20)

System Engineering with Project & Risk Management
System Engineering with Project & Risk ManagementSystem Engineering with Project & Risk Management
System Engineering with Project & Risk Management
 
From Model-based to Model and Simulation-based Systems Architectures
From Model-based to Model and Simulation-based Systems ArchitecturesFrom Model-based to Model and Simulation-based Systems Architectures
From Model-based to Model and Simulation-based Systems Architectures
 
Guide for Post-COVID Process & Service Redesign
Guide for Post-COVID Process & Service RedesignGuide for Post-COVID Process & Service Redesign
Guide for Post-COVID Process & Service Redesign
 
CS 414 (IT Project Management)
CS 414 (IT Project Management)CS 414 (IT Project Management)
CS 414 (IT Project Management)
 
2016-03-02 research seminar
2016-03-02 research seminar2016-03-02 research seminar
2016-03-02 research seminar
 
Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1
 
2014 02 florian-matthes-agile-enterprise-architecture-management
2014 02 florian-matthes-agile-enterprise-architecture-management2014 02 florian-matthes-agile-enterprise-architecture-management
2014 02 florian-matthes-agile-enterprise-architecture-management
 
Optimazation
OptimazationOptimazation
Optimazation
 
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) ProjecteCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
 
Agile Project Management Methods of ERP
Agile Project Management Methods of ERPAgile Project Management Methods of ERP
Agile Project Management Methods of ERP
 
The Inextricable Link Between Value Streams and Resource Capacity Planning
The Inextricable Link Between Value Streams and Resource Capacity PlanningThe Inextricable Link Between Value Streams and Resource Capacity Planning
The Inextricable Link Between Value Streams and Resource Capacity Planning
 
Thoughts On Architecting V4 2
Thoughts On Architecting V4 2Thoughts On Architecting V4 2
Thoughts On Architecting V4 2
 
EDM/PDM Implementation
EDM/PDM ImplementationEDM/PDM Implementation
EDM/PDM Implementation
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems management
 
operation research notes
operation research notesoperation research notes
operation research notes
 
Novel_Value_Stream_Analysis_for_SAFe_-_ver_8.pdf
Novel_Value_Stream_Analysis_for_SAFe_-_ver_8.pdfNovel_Value_Stream_Analysis_for_SAFe_-_ver_8.pdf
Novel_Value_Stream_Analysis_for_SAFe_-_ver_8.pdf
 
Maximo User Group Keynote - "Facilities" is Strategic!
Maximo User Group Keynote - "Facilities" is Strategic!Maximo User Group Keynote - "Facilities" is Strategic!
Maximo User Group Keynote - "Facilities" is Strategic!
 
Print report
Print reportPrint report
Print report
 
10 - Project Management
10 - Project Management10 - Project Management
10 - Project Management
 
Enterprise Architecture for Small and Medium-Sized Enterprises: PhD Overview
Enterprise Architecture for Small and Medium-Sized Enterprises: PhD OverviewEnterprise Architecture for Small and Medium-Sized Enterprises: PhD Overview
Enterprise Architecture for Small and Medium-Sized Enterprises: PhD Overview
 

Recently uploaded

Recently uploaded (12)

digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Internal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika GargInternal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika Garg
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdfNurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out PackagingW.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
 

Responsibility assignment matrix (RACi Matrix)

  • 1. RESPONSIBILITY ASSIGNMENT MATRIX AbbasVahedi (Master Of embedded system for mechatronic) Fachhochschule Dortmund R&D project Management
  • 2. LIST OF CONTENTS • Motivation • Definition • Layout • Implementation • An example • Analyze your chart • Pros and Cons • Variation and Alternatives • Tips • Recap • Resources 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 2
  • 3. MOTIVATION PM is not Managing Projects PM is People Management Igor Kokcharov, Ph.D, PMP 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 3
  • 4. MOTIVATION • WHO will take responsibility for each tasks • WHAT needs to be done • Who knows most hidden aspects of tasks • HOW MUCH extra money (approximate cash or assets) required • and who is to be informed of this activity. …. 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 4
  • 5. DEFINITION Responsibility Assignment Matrix: ❖ Describes the participation by various roles in completing tasks for a project. (Wikipedia) 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 5
  • 6. • The purpose of the RACI process is to answer the following questions . . . • What functions, activities, and tasks must be performed • Who must perform them and what is their level of involvement • RACI is a highly participative process that ensures ownership of the responsibilities RESPONSIBILITY ASSIGNMENT MATRIX (RAM) 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 6 known as RACI matrix or linear responsibility chart (LRC)
  • 7. RACI MATRIX R Who is RESPONSIBLE The person who is assigned to do the work. A Who is ACCOUNTABLE The person who takes the final decision and has ultimate ownership. C Who is CONSULTED The person who must be consulted before a decision/ action is taken. I Who is INFORMED The person who must be informed about the decision/ action taken. 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 7
  • 8. LAYOUT Functional Role: • A position assigned or assumed to accomplish an activity or sub-activity Activity: • An action or decision that is one of several sequential steps in the completion of a business process. It should always result in a clear output 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 8
  • 9. HOW PMS HAVE USED RACI • List of project tasks (with a good action verb) • Identify project stakeholders • Know the responsible and accountable for each task along with its stakeholders First :R then A and C and I • At least one stakeholder accountable for every task(Only one accountable stakeholder) • Ensure that the stakeholders understands their role. 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 9
  • 10. EXAMPLE JohnAdam Mike SW (Y + X) FEATY FEAT X Irina 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 10
  • 11. EXAMPLE (CONT.) John AdamMike SW Y + X FEATY FEAT X Irina 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 11 Developing Software
  • 12. ANALYZE YOUR CHART 1-Vertical Analysis ❖ Lots of R’s ❖ No Empty spaces ❖ Too many A`s ❖ No R`s or A`s ❖ Overall pattern 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 12
  • 13. ANALYZE YOUR CHART 2- Horizontal Analysis ❖ Lots of R’s ❖ Lots of C`s ❖ Too many I`s ❖ No R’s ❖ No A`s ❖ No C`s or I`s 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 13
  • 14. PROS AND CONS + Clarifies individual/ departmental roles and responsibilities + Identifies accountabilities + Improve team efficiencies and effectiveness + Removes ambiguities with regard to activities and decision points + Assists in defining roles and responsibilities + Reduces duplication of efforts or no overlap + Assists in task completion before moving to next process + Clear demarcation of authority levels + Identify problems with the existing process + Improve team communication and coordination 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 14
  • 15. PROS AND CONS (CONT.) - cause parallelism - To many forms and alternatives cause complexity - May reduce the friendship atmosphere (instead of trust to team) - Can`t define unorganized relations in organization 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 15
  • 16. TIPS • Trying to apply RACI charts to everything!!! • 100% accuracy is not always required • There must be one, but only one,“A” for each action or decision • Filling in RACI chart without due diligence • Double check that the operation can be completed with the new role assignment • All roles and responsibilities must de documented and communicated • Less R may useful than more • the responsible could also be the accountable. 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 16
  • 17. VARIATION AND ALTERNATIVES 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 17
  • 18. RECAP TO Achieve the final goal of project: PM is not Project Management PM is People Management 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 18
  • 19. 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 19
  • 20. RESOURCES • Role & Responsibility Charting (RACI) by Michael L Smith and James Erwin • https://mgrush.com/blog/2016/12/08/raci/ http://www.projektmanazer.cz https://www.slideshare.net/anandsubramaniam/raci-matrix https://workshopbank.com/raci-matrix https://en.wikipedia.org/wiki/Responsibility_assignment_matrix 27.05.2018Embedded System For Mechatronics(ESM)- R&D Management 20