SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
AANNIIRRUUDDDDAAHH VVEERRMMAA
Contact No.:-9977178728,
E-mail Id: -verma.aniruddah1@gmail.com
aniruddahverma@ymail.com
CAREER OBJECTIVE:-
To hold the position of responsibility in a professionally managed organization with creative freedom, scientific
approach and practical challenge. Always prefer challenging jobs for upgrading analytical and logical skills
from time to time.
EDUCATIONAL QUALIFICATION :-
Professional qualification:- B.E.(2005-2009)Mechanical Engineering from Chhattisgarh Swami
Vivekanand Technical University of BHILAI CHHATTISGARH with (CPI 6.57&SPI 7.96)
Academic qualification:-
 High School certificate
D.B.P.N.H.S.School (2002) :- 69%
 Higher Secondary School Certificate
Rastriya H.S.Schoolchhatoud (2005) :- 57%
COMPUTER SKILL:-
AUTOCAD ( National Institute of tech. Raipur)
EXPERIENCE PROFILE:-3
 PRESENT EXPERIENCE:-
 Company: Doosan Power System.
Duration: 2012to till now
Scope: Erection & commissioning of coal mill, coal feeder, and mill rejection system,PA,FD,&ID
fan,WRC Pump
Customer: GMR, Cattishgarh energy
Manufacturer: Doosan power system
Project: 2x685MW Super Critical Thermal Power Plant.
Designation : Mech. Engineer (loesche Coal mill 35.3 D & Equipment Erection & Installation)
Tasks & Duties:
a. Coal mill erection ,operation& maintenance of coal mill, Erection of and ID fan,FD fan, PA
fan, Erection of coal feeder , ,Erection of Boiler Structure. Mill rejection system,water
recalculating pump ,
b. Inspection of all SPBD,and IPBD bus duct
c. Monitoring of APH Erection & Installation works by controlling material, handling,
drawing issue, fabrication, painting and erection, inspection .
d. Handling project activities involving working out various requirements with respect to
utilities, machines, manpower & monitoring overall project operations for ensuring timely
completion.
e. Directing & instructing maintenance technicians, monitoring expenses with optimum
utilization of resources.
f. Monitoring implementation & documentation of quality system
EXPERIENCE PROFILE:-1
 .Organization:- INDU PROJECT LTD(May 2010 to Dec 2012)
1. Bill of material and material indenting
2. Processing of contractor bills
3. Reviving of Engineering Drawings & documents related to Boiler and TG. 4.Coordination with
civil
 Vocational trainee in LAFARGE CEMENT PLANT SONADIH
2. Raw mill and coal mill view in breakdown condition and see how their working processes are
3. ESP,Beg filters pollution controlled device installed in the whole plant, and working processor
4. More knowledge gain of conveyor belt, bucket conveyor, elevators, draught fan,
5. Working processor of preheaters, reclaimers, stackers and ball mill
Tasks & Duties:
 Manpower controlling (shift schedule), to make 24hour generation consumption report, to keep
material stock (bed material,) participate the all shift in charged for any operation trouble and it’s,
record maintain the all .material controlled to yard to by location
 Making bills for contractors and client.
 Material planning & estimation.
PROJECT UNDERTEKEN :-
1. Cement manufacturing process
2. Solar chimney power plant
INDUSTRIAL EXPOSURE:-
1. Undergone training at LAFARGE CEMENT PLANT SONADIH, BALODABAZAR
2.Undergone training at BHILAI STEEL PLANT,BHILAI
PERSONAL DETAIL:-
Date of Birth :- 14/07/1985
Fathers Name :- Mr.Chheduramverma
Mothers Name :- Smt. RukhmaniBaiverma
Status :- Single
Permanent Address: - Mr.Chheduram verma
Dist-Raipur(Chhattisgarh)
Pin-493225
Current CTC :- 3.5 lacs
Notice Period :- 1 month
DECLARATION:-
I hereby declare that the above-mentioned information is true to the best of knowledge belief
Place: - Raipur ANIRUDDAH VERMA
Date:- (B.E.Mechanical)

More Related Content

What's hot (18)

SHASHIKANT - Design Engineer
SHASHIKANT - Design EngineerSHASHIKANT - Design Engineer
SHASHIKANT - Design Engineer
 
Shashikant Resume
Shashikant ResumeShashikant Resume
Shashikant Resume
 
Resume 25-06-2016
Resume 25-06-2016Resume 25-06-2016
Resume 25-06-2016
 
Resume3
Resume3Resume3
Resume3
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
CV OF OMKAR HALDANKAR
CV OF OMKAR HALDANKARCV OF OMKAR HALDANKAR
CV OF OMKAR HALDANKAR
 
Javier Dominguez
Javier DominguezJavier Dominguez
Javier Dominguez
 
RESUME ( Salman Khanzada)
RESUME ( Salman Khanzada)RESUME ( Salman Khanzada)
RESUME ( Salman Khanzada)
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
lakshmikanth702 u
lakshmikanth702 ulakshmikanth702 u
lakshmikanth702 u
 
MY CV2
MY CV2MY CV2
MY CV2
 
Muhannad , CV.DOC
Muhannad , CV.DOCMuhannad , CV.DOC
Muhannad , CV.DOC
 
ANIKET RESUME NEW
ANIKET RESUME NEWANIKET RESUME NEW
ANIKET RESUME NEW
 
Vaibhav Resume
Vaibhav ResumeVaibhav Resume
Vaibhav Resume
 
Yegon current CV
Yegon current CVYegon current CV
Yegon current CV
 
Project engineer Resume_Goolappa (1)
Project engineer Resume_Goolappa (1)Project engineer Resume_Goolappa (1)
Project engineer Resume_Goolappa (1)
 
Engineer tamer kadry resume
Engineer tamer kadry resumeEngineer tamer kadry resume
Engineer tamer kadry resume
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 

Similar to RESUME (20)

SK RESUME
SK RESUMESK RESUME
SK RESUME
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
P-Chandrakant_S_Kawathekar_resume17.
P-Chandrakant_S_Kawathekar_resume17.P-Chandrakant_S_Kawathekar_resume17.
P-Chandrakant_S_Kawathekar_resume17.
 
SHAKEEL AHMAD
SHAKEEL AHMADSHAKEEL AHMAD
SHAKEEL AHMAD
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 
yogesh Resume
yogesh Resumeyogesh Resume
yogesh Resume
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_Resume
 
Resume.
Resume.Resume.
Resume.
 
Resume_suman
Resume_sumanResume_suman
Resume_suman
 
Khaled Mahfouz
Khaled MahfouzKhaled Mahfouz
Khaled Mahfouz
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
SHAJIN NDT
SHAJIN NDTSHAJIN NDT
SHAJIN NDT
 
Bhimasen Yadawad-3
Bhimasen Yadawad-3Bhimasen Yadawad-3
Bhimasen Yadawad-3
 
vijay cv
vijay cvvijay cv
vijay cv
 
CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
 
Updated CV
Updated CVUpdated CV
Updated CV
 
DILKASH(resume)
DILKASH(resume)DILKASH(resume)
DILKASH(resume)
 
kusum_1_gs
kusum_1_gskusum_1_gs
kusum_1_gs
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
sameer CV (22-1-2016)
sameer CV (22-1-2016)sameer CV (22-1-2016)
sameer CV (22-1-2016)
 

RESUME

  • 1. CURRICULUM VITAE AANNIIRRUUDDDDAAHH VVEERRMMAA Contact No.:-9977178728, E-mail Id: -verma.aniruddah1@gmail.com aniruddahverma@ymail.com CAREER OBJECTIVE:- To hold the position of responsibility in a professionally managed organization with creative freedom, scientific approach and practical challenge. Always prefer challenging jobs for upgrading analytical and logical skills from time to time. EDUCATIONAL QUALIFICATION :- Professional qualification:- B.E.(2005-2009)Mechanical Engineering from Chhattisgarh Swami Vivekanand Technical University of BHILAI CHHATTISGARH with (CPI 6.57&SPI 7.96) Academic qualification:-  High School certificate D.B.P.N.H.S.School (2002) :- 69%  Higher Secondary School Certificate Rastriya H.S.Schoolchhatoud (2005) :- 57% COMPUTER SKILL:- AUTOCAD ( National Institute of tech. Raipur) EXPERIENCE PROFILE:-3  PRESENT EXPERIENCE:-  Company: Doosan Power System. Duration: 2012to till now Scope: Erection & commissioning of coal mill, coal feeder, and mill rejection system,PA,FD,&ID fan,WRC Pump Customer: GMR, Cattishgarh energy Manufacturer: Doosan power system Project: 2x685MW Super Critical Thermal Power Plant. Designation : Mech. Engineer (loesche Coal mill 35.3 D & Equipment Erection & Installation)
  • 2. Tasks & Duties: a. Coal mill erection ,operation& maintenance of coal mill, Erection of and ID fan,FD fan, PA fan, Erection of coal feeder , ,Erection of Boiler Structure. Mill rejection system,water recalculating pump , b. Inspection of all SPBD,and IPBD bus duct c. Monitoring of APH Erection & Installation works by controlling material, handling, drawing issue, fabrication, painting and erection, inspection . d. Handling project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion. e. Directing & instructing maintenance technicians, monitoring expenses with optimum utilization of resources. f. Monitoring implementation & documentation of quality system EXPERIENCE PROFILE:-1  .Organization:- INDU PROJECT LTD(May 2010 to Dec 2012) 1. Bill of material and material indenting 2. Processing of contractor bills 3. Reviving of Engineering Drawings & documents related to Boiler and TG. 4.Coordination with civil  Vocational trainee in LAFARGE CEMENT PLANT SONADIH 2. Raw mill and coal mill view in breakdown condition and see how their working processes are 3. ESP,Beg filters pollution controlled device installed in the whole plant, and working processor 4. More knowledge gain of conveyor belt, bucket conveyor, elevators, draught fan, 5. Working processor of preheaters, reclaimers, stackers and ball mill Tasks & Duties:  Manpower controlling (shift schedule), to make 24hour generation consumption report, to keep material stock (bed material,) participate the all shift in charged for any operation trouble and it’s, record maintain the all .material controlled to yard to by location  Making bills for contractors and client.  Material planning & estimation. PROJECT UNDERTEKEN :- 1. Cement manufacturing process 2. Solar chimney power plant INDUSTRIAL EXPOSURE:-
  • 3. 1. Undergone training at LAFARGE CEMENT PLANT SONADIH, BALODABAZAR 2.Undergone training at BHILAI STEEL PLANT,BHILAI PERSONAL DETAIL:- Date of Birth :- 14/07/1985 Fathers Name :- Mr.Chheduramverma Mothers Name :- Smt. RukhmaniBaiverma Status :- Single Permanent Address: - Mr.Chheduram verma Dist-Raipur(Chhattisgarh) Pin-493225 Current CTC :- 3.5 lacs Notice Period :- 1 month DECLARATION:- I hereby declare that the above-mentioned information is true to the best of knowledge belief Place: - Raipur ANIRUDDAH VERMA Date:- (B.E.Mechanical)