COPYRIGHT
© Dincel Construction System Pty Ltd
All rights reserved. No part of the information contained in this document may be reproduced
or copied in any form or by any means without written permission from Dincel Construction
System Pty Ltd.
DISCLAIMER
The information contained in this document is intended for the use of suitably qualified and
experienced architects and engineers and other building professionals. This information is not
intended to replace design calculations or analysis normally associated with the design and
specification of buildings and their components. The information contained in this document is
not project specific. Building professionals are required to assess construction site conditions
and provide design/details and appropriate safe work method statements accordingly. Dincel
Construction System Pty Ltd accepts no liability for any circumstances arising from the failure
of a specifier or user of any part of Dincel Construction System to obtain appropriate project
specific professional advice about its use and installation or from failure to adhere to the
requirements of appropriate Standards, Codes of Practice, Worker Health & Safety Act and
relevant Building Codes.
©Copyright Page 2 of 12
IINNTTRROODDUUCCTTIIOONN
The following document must be read in conjunction with download – Dincel Wall
Waterproofing Warranty
Basement walls require protection to prevent water/moisture ingress to avoid steel
reinforcement corrosion, damage to stored goods, mould, mildew development and sick
building syndrome.
Conventional concrete, reinforced concrete masonry walls and shotcrete walls that are in
direct contact with the ground cannot stop water/moisture ingress. They are porous and
will develop cracks even if they incorporate joints.
Water ingress through the walls causes corrosion and eventually may even cause
structural failure. The common prevention method for water/moisture ingress of basement
walls is the application of waterproof membrane systems. However, there is no 100%
guarantee with conventional membrane systems.
The steel reinforcement in basement walls will corrode when in contact with the following
conditions:
1. In air, relative humidity of over 50% provides the necessary amount of water and at
80% or above, the corrosion of bare steel is worse.
2. Water (potable, gray, waste water), salts (e.g. sea water), aggressive soil conditions
(e.g. acid sulphate soils), storage of sewage, acids, oils and chemicals in liquid or
gas form.
3. Stray current corrosion by electrified rail systems or corrosion protection systems
(e.g. cathodic protection). Refer for further information download – Dincel Solution
for Stray Current Corrosion Protection.
To avoid the above the best possible solution is offered by Dincel Walls which is tested by
the CSIRO – Australia as waterproof walls (download – Waterproof walls) without the
need of membranes.
The benefits of Dincel Wall are summarised in the following page.
©Copyright Page 3 of 12
DDIINNCCEELL WWAALLLL BBEENNEEFFIITTSS
BASEMENT WALLS
DINCEL-WALL ELIMINATES:
• Loss of valuable land use
• Waterproofing need for the wall
• Stray Current Corrosion damage
• Excavation behind the wall
• Backfilling the excavation
• Wall joints
• Agricultural lines
• Conventional footings
• Horizontal wall reinforcement
• Scaffolding
• Painting of the internal wall face
• Cleaning costs
• Wastage
• Builder’s Liability for wall
cracking, water damages
DINCEL-WALL ALLOWS:
• Habitable spaces in basements
• Minimum 100 years wall life
• Stronger structural walls in
comparison to reinforced
masonry walls
• Fastest wall construction
©Copyright Page 4 of 12
BBAASSEEMMEENNTT EEXXCCAAVVAATTIIOONNSS
The basement excavation may take place with the following methodologies:
To utilise Dincel-Wall in basement construction the contractor will need to finalise the
basement excavation.
(i) GROUND EXCAVATION BY SHORING (Refer Figure A)
Shoring may take place in the form of discrete concrete or steel piles to stabilise the
basement soil excavation for a temporary period during construction until the
permanent structure incorporating Dincel-Wall is erected. The excavation in sand or
sandy soils or even medium to soft clay soils may require a continuous shoring
system. This may consist of contiguous piles (piles as close as possible to each
other) or secant piles (soft and hard piles overlapping each other which are normally
used for construction below the permanent water table) or alternatively, as shown on
Figure A which is a sheet piling system may be used. The sheet piling normally
engage ground anchors until the placement of the permanent structure. Sheet piling
similar to secant piles are also used when basement construction is subject to high
water table conditions or having granular soil excavation.
The sheet piles in association with are treated as temporary shoring
purposes as they can be either removed or left in place to rust away. The supply of
sheet piling is determined by its thickness and how well the joints of the sheet piling
will retain the water. The sheet piling suppliers in association with do not
need to consider the additional corrosion allowances for sheet thicknesses. Their
sheet thicknesses can be determined by the drivability issue rather than corrosion.
However, drivability issues can be easily overcome by pre-drilling the ground where
required. The joints of the sheet piling can be allowed to leak as long as the leakage
is within the de-watering limits. Today’s sheet piling technology is well advanced
and soft to medium clays can be shored with the assistance of vibrationless
hydraulic rams pushing into the soil, where required ground is pre-drilled to assist the
drivability.
Experience shows that permanent sheet piles incorporating shotcrete
concrete walls often fail to achieve a waterproof basement structure. This
combination cannot be relied on, especially in permanent water conditions due
to the following reasons:
(1) Total waterproofing at the clutches of the sheet piling cannot be achieved
due to many reasons.
(2) Cracking of the shotcrete concrete wall is unavoidable.
(ii) GROUND EXCAVATION BY BATTERING (Refer Figure B)
The ground may be excavated vertically, varying slopes and steps, depending on the
soil conditions.
©Copyright Page 5 of 12
©Copyright Page 6 of 12
©Copyright Page 7 of 12
©Copyright Page 8 of 12
©Copyright Page 9 of 12
©Copyright Page 10 of 12
©Copyright Page 11 of 12
©Copyright Page 12 of 12

More Related Content

What's hot

Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of buildingtoshi gupta
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET) Omar Hamim
 
Earthquake resistance buildings
Earthquake resistance buildingsEarthquake resistance buildings
Earthquake resistance buildingsNishtha Lakdawala
 
modular coordination
modular coordinationmodular coordination
modular coordinationShailja km
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)Prince Pathania
 
National building code
National building codeNational building code
National building codeMayank Rawat
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 
Building Bye laws
Building Bye lawsBuilding Bye laws
Building Bye lawsIdris Saleh
 

What's hot (20)

Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Earthquake resistance buildings
Earthquake resistance buildingsEarthquake resistance buildings
Earthquake resistance buildings
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Highrise structure
Highrise structureHighrise structure
Highrise structure
 
NBC summary part 1 ,2
NBC summary part 1 ,2NBC summary part 1 ,2
NBC summary part 1 ,2
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
National building code
National building codeNational building code
National building code
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Building Bye laws
Building Bye lawsBuilding Bye laws
Building Bye laws
 
Sears tower
Sears towerSears tower
Sears tower
 

Viewers also liked (6)

Trenching shoring
Trenching shoringTrenching shoring
Trenching shoring
 
Shoring
ShoringShoring
Shoring
 
shoring and its techniques
shoring and its techniquesshoring and its techniques
shoring and its techniques
 
Foundations
FoundationsFoundations
Foundations
 
Excavation Techniques
Excavation TechniquesExcavation Techniques
Excavation Techniques
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 

Similar to Basementconstruction

special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concreteErankajKumar
 
Typical Applications for Cementitious Grout
Typical Applications for Cementitious GroutTypical Applications for Cementitious Grout
Typical Applications for Cementitious GroutHess Pumice Products
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methodsKumarS250747
 
Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamrajuRamaprasad Varma
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc buildinghlksd
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concreteErankajKumar
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management ReportArissa Loh
 
Freeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentationFreeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentationKamran Ahmed
 
DPC, lintel and chajja yreuyfgfffff.pptx
DPC, lintel and chajja yreuyfgfffff.pptxDPC, lintel and chajja yreuyfgfffff.pptx
DPC, lintel and chajja yreuyfgfffff.pptxPiyushShahane3
 
Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Matt Jabbari
 
NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414Matt Jabbari
 
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURESCASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURESPrabhu Saran
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketingAditya Sanyal
 

Similar to Basementconstruction (20)

vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
Typical Applications for Cementitious Grout
Typical Applications for Cementitious GroutTypical Applications for Cementitious Grout
Typical Applications for Cementitious Grout
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methods
 
c-4.pdf
c-4.pdfc-4.pdf
c-4.pdf
 
Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamraju
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concrete
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
 
Freeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentationFreeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentation
 
Dpc.pptx
Dpc.pptxDpc.pptx
Dpc.pptx
 
DPC, lintel and chajja yreuyfgfffff.pptx
DPC, lintel and chajja yreuyfgfffff.pptxDPC, lintel and chajja yreuyfgfffff.pptx
DPC, lintel and chajja yreuyfgfffff.pptx
 
Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414
 
NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414
 
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURESCASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
Krystol Magazine 17.1
Krystol Magazine 17.1Krystol Magazine 17.1
Krystol Magazine 17.1
 
Roof Treatment
Roof TreatmentRoof Treatment
Roof Treatment
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

Basementconstruction

  • 1. ©Copyright Page 1 of 12 BBAASSEEMMEENNTT CCOONNSSTTRRUUCCTTIIOONN Dincel Construction System Pty Ltd 101 Quarry Road ERSKINE PARK NSW 2759 PO Box 104, ST CLAIR NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: construction@dincel.com.au COPYRIGHT © Dincel Construction System Pty Ltd All rights reserved. No part of the information contained in this document may be reproduced or copied in any form or by any means without written permission from Dincel Construction System Pty Ltd. DISCLAIMER The information contained in this document is intended for the use of suitably qualified and experienced architects and engineers and other building professionals. This information is not intended to replace design calculations or analysis normally associated with the design and specification of buildings and their components. The information contained in this document is not project specific. Building professionals are required to assess construction site conditions and provide design/details and appropriate safe work method statements accordingly. Dincel Construction System Pty Ltd accepts no liability for any circumstances arising from the failure of a specifier or user of any part of Dincel Construction System to obtain appropriate project specific professional advice about its use and installation or from failure to adhere to the requirements of appropriate Standards, Codes of Practice, Worker Health & Safety Act and relevant Building Codes.
  • 2. ©Copyright Page 2 of 12 IINNTTRROODDUUCCTTIIOONN The following document must be read in conjunction with download – Dincel Wall Waterproofing Warranty Basement walls require protection to prevent water/moisture ingress to avoid steel reinforcement corrosion, damage to stored goods, mould, mildew development and sick building syndrome. Conventional concrete, reinforced concrete masonry walls and shotcrete walls that are in direct contact with the ground cannot stop water/moisture ingress. They are porous and will develop cracks even if they incorporate joints. Water ingress through the walls causes corrosion and eventually may even cause structural failure. The common prevention method for water/moisture ingress of basement walls is the application of waterproof membrane systems. However, there is no 100% guarantee with conventional membrane systems. The steel reinforcement in basement walls will corrode when in contact with the following conditions: 1. In air, relative humidity of over 50% provides the necessary amount of water and at 80% or above, the corrosion of bare steel is worse. 2. Water (potable, gray, waste water), salts (e.g. sea water), aggressive soil conditions (e.g. acid sulphate soils), storage of sewage, acids, oils and chemicals in liquid or gas form. 3. Stray current corrosion by electrified rail systems or corrosion protection systems (e.g. cathodic protection). Refer for further information download – Dincel Solution for Stray Current Corrosion Protection. To avoid the above the best possible solution is offered by Dincel Walls which is tested by the CSIRO – Australia as waterproof walls (download – Waterproof walls) without the need of membranes. The benefits of Dincel Wall are summarised in the following page.
  • 3. ©Copyright Page 3 of 12 DDIINNCCEELL WWAALLLL BBEENNEEFFIITTSS BASEMENT WALLS DINCEL-WALL ELIMINATES: • Loss of valuable land use • Waterproofing need for the wall • Stray Current Corrosion damage • Excavation behind the wall • Backfilling the excavation • Wall joints • Agricultural lines • Conventional footings • Horizontal wall reinforcement • Scaffolding • Painting of the internal wall face • Cleaning costs • Wastage • Builder’s Liability for wall cracking, water damages DINCEL-WALL ALLOWS: • Habitable spaces in basements • Minimum 100 years wall life • Stronger structural walls in comparison to reinforced masonry walls • Fastest wall construction
  • 4. ©Copyright Page 4 of 12 BBAASSEEMMEENNTT EEXXCCAAVVAATTIIOONNSS The basement excavation may take place with the following methodologies: To utilise Dincel-Wall in basement construction the contractor will need to finalise the basement excavation. (i) GROUND EXCAVATION BY SHORING (Refer Figure A) Shoring may take place in the form of discrete concrete or steel piles to stabilise the basement soil excavation for a temporary period during construction until the permanent structure incorporating Dincel-Wall is erected. The excavation in sand or sandy soils or even medium to soft clay soils may require a continuous shoring system. This may consist of contiguous piles (piles as close as possible to each other) or secant piles (soft and hard piles overlapping each other which are normally used for construction below the permanent water table) or alternatively, as shown on Figure A which is a sheet piling system may be used. The sheet piling normally engage ground anchors until the placement of the permanent structure. Sheet piling similar to secant piles are also used when basement construction is subject to high water table conditions or having granular soil excavation. The sheet piles in association with are treated as temporary shoring purposes as they can be either removed or left in place to rust away. The supply of sheet piling is determined by its thickness and how well the joints of the sheet piling will retain the water. The sheet piling suppliers in association with do not need to consider the additional corrosion allowances for sheet thicknesses. Their sheet thicknesses can be determined by the drivability issue rather than corrosion. However, drivability issues can be easily overcome by pre-drilling the ground where required. The joints of the sheet piling can be allowed to leak as long as the leakage is within the de-watering limits. Today’s sheet piling technology is well advanced and soft to medium clays can be shored with the assistance of vibrationless hydraulic rams pushing into the soil, where required ground is pre-drilled to assist the drivability. Experience shows that permanent sheet piles incorporating shotcrete concrete walls often fail to achieve a waterproof basement structure. This combination cannot be relied on, especially in permanent water conditions due to the following reasons: (1) Total waterproofing at the clutches of the sheet piling cannot be achieved due to many reasons. (2) Cracking of the shotcrete concrete wall is unavoidable. (ii) GROUND EXCAVATION BY BATTERING (Refer Figure B) The ground may be excavated vertically, varying slopes and steps, depending on the soil conditions.