SlideShare a Scribd company logo
1 of 18
TECHNICAL SPECIFICATIONS OF
PREFABRICATED BUILDINGS
TECHNICAL SPECIFICATIONS OF PREFABRICATED BUILDINGS
1-)GENERAL DESCRIPTION OF THE SYSTEM :
MANUFACTURING TECHNOLOGY : DIN EN 10326 standards S320GD+Z,+AZ Erdemir quality no:1332 , S350GD+Z,+AZ Erdemir
quality no:1335 and/or Erdemir quality no: 1322 steel materials are used in load bearing system. Galvanised steel C ve U Profiles made by
Cad-Cam controlled ,fully continue roll-form automatic machines are used in manufacturing.There is no welding in manufacturing.
ASSEMBLY :The assembly of all panels,Trusses(Frame work supporting roof) , Purlins and Frame work between floors are
joined together by bolts and nuts without the need of welding . This enables us to assembly and dissassembly of system many times.
STATISTIC CALCULATIONS :Meets the requirements of Turkish and/or Internatioanal standards stated at item2 ;Sap2000,
CFS, STA4CAD, BRICSCAD, HAYESCAD programs are used to make sismic and static calculations depending on the purpose of the building
and where the building is located.
ENDURANCE :Outer and inner covering are done by CE certified (resistant to fire and water) cemented chipboard
2-) STANDARDS OF SITE BUILDINGS
TS 11372 :Steel Buildings – Made by light and cold formed profiles –Calculation rules
TS 648 :Calculation and building rules of steel buildings
TS 498 :Calculation values for dimensioning of the member of the buildings
TS ENV 1993-1-2 :(Eurocode 3) Design of steel building Section 1-2:General rules- Design criteria against fire
TS 4561 :Calculation rules for Steel buildings according to plastic theory
TS ENV 1090-1 :Steel Building regulations –Part 1:General rules
TS ENV 1090-3 : Steel Building regulations – Part 3: Additional rules for soft steel
TS ENV1998-1 :Eurocode 8:Design of buildings that have high earthquake resistantance -Part 1:General rules,sismic causes and rules
for buildings
TS EN 10326 :Hot dip galvanised steel plates and band -technical drawing rules
TS EN 10327 : Hot dip galvanised and cold formed steel plates and band -technical drawing rules
TS EN 10162 :Steel profiles-Cold rolled- Size and cross sectional tolerances
TS EN 20898 :Mechanical specifications of fastening devices
TS 3611EN 20898-2 : Mechanical specifications of fastening devices – Section 2: load standard screw
3- EXTERIOR WALL (STEEL FRAME)- Height:250
Exterior wall thickness : 100 mm
Exterior wall-Outer board : 8 mm thickness cemented chipboard (CE certificated) OR 0.60mm COIL COATED galvanized sheet
Heat and sound insulation : 80 mm thickness Polystrene (16 dansity) (Fire resistance: DIN 4102 Unflammable
Joining system for wall Panels : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding on any
kind of fastening.
Exterior wall-Inner board : 8 mm thickness cemented chipboard (CE certificated) OR 8mm thickness laminated chipboard
Exterior wall-Inner board paint : Plastic Paint (Two coats)
4- INTERNAL WALL (STEEL FRAME SYSTEM)-Height:250
Internal wall thickness : 100 mm
Inner covering one side : 8 mm thickness cemented chipboard (CE certificated)
Heat and sound insulation : 80 mm thickness Polystrene (16 dansity)
(Fire resistance: DIN 4102 unflammable
Joining system for wall Panels : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding at any
kind of fastening.
Inner covering other side : 8 mm thickness cemented chipboard (CE certificated)
Inner wall-Inner board paint : Water based Plastic Paint (Two coats)
6- ROOF
Roof covering :0,50 painted galvanised sheet
Purlin : Specially shaped galvanised profile
Roof bearing system : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding on
any kind of fastening.
7- DOORS
EXTERIOR DOOR:
Single door : 860mm * 2000mm 0.70 mm thickness Steel door
Double door : 90 mm * 1960 mm Steel door
Door frame : 1,5 mm galvanised sheet (Oil based paint)
Lock / handle : Cylindirical type lock / Grey color metal door handle
INNER DOOR:
Size :840*1960 mm
Door :MDF lam pressed panel (thickness 40 mm )
Door Frame :0,7 mm galvanised sheet (Oil based paint applied)
Lock /handle :Cylindirical type lock / Grey color metal door handle
8-WINDOWS
P2 window :120 x120 cm in dimension,made of Lead Free-PVC
P3 window :160 x 120 cm in dimension,made of Lead Free-PVC
Transom window :60 x40 cm in dimension,made of Lead Free-PVC
9-GLAZING
P2 window :4+8+4mm double glazing
P3 window :4+8+4mm double glazing
Small window :4 mm thickness iced glass
10-PAINT
Outer walls : Water based Acrilic paint ( DYO brand )
Inner walls : Plastic paint,colors will be decided by buyer.
Ceiling : Plastic paint
11-ELECTRICAL INSTALLATION (UNDER THE SURFACE)
Cable 250 V- 50 H
Outlets, Switches VİKO brand
Outlet cables NYM ve NYA 3x2,5 mm2 ( Özgüven – Öznur )
Lighting cables NYM ve NYA 2x1,5 mm2 ( Özgüven – Öznur )
Lighting fixtures Normal rooms 2x40 FLORASANT tubes
WC-bathroom Round Globe – Baklaya
Over Exterior door Outer globe – Baklaya
Fuse, Fuse boxes Federal – Cetsan – Baklaya – Siemens.
Electrical Box Buyer’s responsibilty
Telephone Installation Buyer’s responsibilty
Mains Buyer’s responsibilty
NOT :If any electrical stove, Air Condition, Eelectrical radiator is used this should be shown on plan . For every device
individual fuse line is applied.
13-SANITARY INSTALLATION (OVER THE SURFACE)
Pipes (clean water) PPRC pipe ( Fırat brand )
Pipes(foul water) PVC pipe ( Fırat brand )
Vitrify , taps and shower heads:
Sink counter 28x45cm wall type (DOĞVİT )
Sink tap Fixed to wall. (İNCİ-ECE - SAN)
Toilet Plastic reservoir tank (DOĞVİT )
Shower 80*80 Mermerit
Shower head Mix shower head
Toilet tap Fixed to wall (TSE)
Kitchen installation Hot and cold water installations are made, There will be no cabinets and cupboards.
Main connections Clean and foul water connections are buyer’s responsibilty.
MİMOZA-47 m2
NERGİZ-51 m2
MELİSA-69 m2
SÜMBÜL-86 m2
SARDUNYA-91m2
MANOLYA-103m2
LALE-130m2
LAVANTA-147m2
YASEMİN -150m2
LEYLAK -128m2
KARDELEN -132m2
ERGUVAN -150m2
PETUNYA -169m2

More Related Content

What's hot

Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
Lynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsLynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsTrevain Bechan
 
Dts ac6 04-2016_eng
Dts ac6 04-2016_engDts ac6 04-2016_eng
Dts ac6 04-2016_engSathish J
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
 
Product catalogue
Product catalogueProduct catalogue
Product catalogue杉 江紫
 
Actual presentation mercor v3
Actual presentation mercor v3Actual presentation mercor v3
Actual presentation mercor v3MERCOR_HO
 
Static/Dynamic Passbox & Air Curtains
Static/Dynamic Passbox  & Air Curtains Static/Dynamic Passbox  & Air Curtains
Static/Dynamic Passbox & Air Curtains PraneshNanda
 
07 hek en_0703
07 hek en_070307 hek en_0703
07 hek en_0703Adit Group
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 

What's hot (13)

Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
Lynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsLynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - Sections
 
Control Stations - Hazardous Area - Technor EFE
Control Stations - Hazardous Area - Technor EFEControl Stations - Hazardous Area - Technor EFE
Control Stations - Hazardous Area - Technor EFE
 
Dts ac6 04-2016_eng
Dts ac6 04-2016_engDts ac6 04-2016_eng
Dts ac6 04-2016_eng
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
 
Product catalogue
Product catalogueProduct catalogue
Product catalogue
 
Plan Details 1-5
Plan Details 1-5Plan Details 1-5
Plan Details 1-5
 
Actual presentation mercor v3
Actual presentation mercor v3Actual presentation mercor v3
Actual presentation mercor v3
 
Static/Dynamic Passbox & Air Curtains
Static/Dynamic Passbox  & Air Curtains Static/Dynamic Passbox  & Air Curtains
Static/Dynamic Passbox & Air Curtains
 
07 hek en_0703
07 hek en_070307 hek en_0703
07 hek en_0703
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
outdoor cabinets
outdoor cabinetsoutdoor cabinets
outdoor cabinets
 
Pass Box
Pass Box Pass Box
Pass Box
 

Viewers also liked

Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)AISC/NSBA
 
PREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESPREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESRajendran s.
 
12 Revolutionary Prefabricated Homes
12 Revolutionary Prefabricated Homes12 Revolutionary Prefabricated Homes
12 Revolutionary Prefabricated HomesCameron Baker
 
Magazine companies
Magazine companiesMagazine companies
Magazine companiesharveypenson
 
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...Auke Smit
 
Kolam or Rangoli
Kolam or Rangoli Kolam or Rangoli
Kolam or Rangoli nivaca2
 
Dotted kolam designs
Dotted kolam designsDotted kolam designs
Dotted kolam designsSunmadhu
 
KAGER energy efficient prefabricated houses of wood and glass
KAGER energy efficient prefabricated houses of wood and glassKAGER energy efficient prefabricated houses of wood and glass
KAGER energy efficient prefabricated houses of wood and glassDenis Nazvanov
 
Prefabrication
PrefabricationPrefabrication
Prefabricationaaronetan
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panelSAHIL KUMAR
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 

Viewers also liked (17)

Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
 
PREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESPREFABRICATED STRUCTURES
PREFABRICATED STRUCTURES
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Kolam designs
Kolam designsKolam designs
Kolam designs
 
12 Revolutionary Prefabricated Homes
12 Revolutionary Prefabricated Homes12 Revolutionary Prefabricated Homes
12 Revolutionary Prefabricated Homes
 
Magazine companies
Magazine companiesMagazine companies
Magazine companies
 
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...
Auke Smit_The Art of Longing and Belonging Kolam as a Reflection of Women's C...
 
Kolam or Rangoli
Kolam or Rangoli Kolam or Rangoli
Kolam or Rangoli
 
Dotted kolam designs
Dotted kolam designsDotted kolam designs
Dotted kolam designs
 
KAGER energy efficient prefabricated houses of wood and glass
KAGER energy efficient prefabricated houses of wood and glassKAGER energy efficient prefabricated houses of wood and glass
KAGER energy efficient prefabricated houses of wood and glass
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panel
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar to Standard type prefabricated housing (projects and technical spesification)

School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie engHai Pham
 
Fire Protection & Emergency System Junction Boxes & Electrical Enclosures
Fire Protection & Emergency System Junction Boxes & Electrical EnclosuresFire Protection & Emergency System Junction Boxes & Electrical Enclosures
Fire Protection & Emergency System Junction Boxes & Electrical EnclosuresThorne & Derrick UK
 
ICS 5000 UK version
ICS 5000 UK version ICS 5000 UK version
ICS 5000 UK version Schiedel UK
 
02 feam enclosures_eng
02 feam enclosures_eng02 feam enclosures_eng
02 feam enclosures_engHai Pham
 
Nexans Euromold Interface A 200 Series Screened Cable Connectors
Nexans Euromold Interface A 200 Series Screened Cable Connectors Nexans Euromold Interface A 200 Series Screened Cable Connectors
Nexans Euromold Interface A 200 Series Screened Cable Connectors Thorne & Derrick International
 
Nexans Euromold MV Separable Connectors & Bushings - Interface A
Nexans Euromold MV Separable Connectors & Bushings - Interface ANexans Euromold MV Separable Connectors & Bushings - Interface A
Nexans Euromold MV Separable Connectors & Bushings - Interface AThorne & Derrick International
 
Rittal Aksesuvarları
Rittal AksesuvarlarıRittal Aksesuvarları
Rittal Aksesuvarlarıerdinc klima
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio ShortNick Ivill
 
181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-email181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-emaildaniel sandoval
 
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...Thorne & Derrick International
 
Acopladores para armaduras
Acopladores para armadurasAcopladores para armaduras
Acopladores para armadurasCORTARTEC
 
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67Thorne & Derrick International
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 

Similar to Standard type prefabricated housing (projects and technical spesification) (20)

School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
 
Pre Bid Conference
Pre Bid ConferencePre Bid Conference
Pre Bid Conference
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie eng
 
All drawings
All drawingsAll drawings
All drawings
 
Fire Protection & Emergency System Junction Boxes & Electrical Enclosures
Fire Protection & Emergency System Junction Boxes & Electrical EnclosuresFire Protection & Emergency System Junction Boxes & Electrical Enclosures
Fire Protection & Emergency System Junction Boxes & Electrical Enclosures
 
ICS 5000 UK version
ICS 5000 UK version ICS 5000 UK version
ICS 5000 UK version
 
02 feam enclosures_eng
02 feam enclosures_eng02 feam enclosures_eng
02 feam enclosures_eng
 
Nexans Euromold Interface A 200 Series Screened Cable Connectors
Nexans Euromold Interface A 200 Series Screened Cable Connectors Nexans Euromold Interface A 200 Series Screened Cable Connectors
Nexans Euromold Interface A 200 Series Screened Cable Connectors
 
Nexans Euromold MV Separable Connectors & Bushings - Interface A
Nexans Euromold MV Separable Connectors & Bushings - Interface ANexans Euromold MV Separable Connectors & Bushings - Interface A
Nexans Euromold MV Separable Connectors & Bushings - Interface A
 
Rittal Aksesuvarları
Rittal AksesuvarlarıRittal Aksesuvarları
Rittal Aksesuvarları
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio Short
 
181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-email181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-email
 
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...
Nexans Euromold 158LR Screened Separable Connectors 200 Series up to 250A 24k...
 
Acopladores para armaduras
Acopladores para armadurasAcopladores para armaduras
Acopladores para armaduras
 
Plan Details 1-5
Plan Details 1-5Plan Details 1-5
Plan Details 1-5
 
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67
Hensel DK Cable Junction Boxes - 1.5mm² up to 240 mm² IP 54-67
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 

Recently uploaded

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Standard type prefabricated housing (projects and technical spesification)

  • 2. TECHNICAL SPECIFICATIONS OF PREFABRICATED BUILDINGS 1-)GENERAL DESCRIPTION OF THE SYSTEM : MANUFACTURING TECHNOLOGY : DIN EN 10326 standards S320GD+Z,+AZ Erdemir quality no:1332 , S350GD+Z,+AZ Erdemir quality no:1335 and/or Erdemir quality no: 1322 steel materials are used in load bearing system. Galvanised steel C ve U Profiles made by Cad-Cam controlled ,fully continue roll-form automatic machines are used in manufacturing.There is no welding in manufacturing. ASSEMBLY :The assembly of all panels,Trusses(Frame work supporting roof) , Purlins and Frame work between floors are joined together by bolts and nuts without the need of welding . This enables us to assembly and dissassembly of system many times. STATISTIC CALCULATIONS :Meets the requirements of Turkish and/or Internatioanal standards stated at item2 ;Sap2000, CFS, STA4CAD, BRICSCAD, HAYESCAD programs are used to make sismic and static calculations depending on the purpose of the building and where the building is located. ENDURANCE :Outer and inner covering are done by CE certified (resistant to fire and water) cemented chipboard 2-) STANDARDS OF SITE BUILDINGS TS 11372 :Steel Buildings – Made by light and cold formed profiles –Calculation rules TS 648 :Calculation and building rules of steel buildings TS 498 :Calculation values for dimensioning of the member of the buildings TS ENV 1993-1-2 :(Eurocode 3) Design of steel building Section 1-2:General rules- Design criteria against fire TS 4561 :Calculation rules for Steel buildings according to plastic theory TS ENV 1090-1 :Steel Building regulations –Part 1:General rules TS ENV 1090-3 : Steel Building regulations – Part 3: Additional rules for soft steel TS ENV1998-1 :Eurocode 8:Design of buildings that have high earthquake resistantance -Part 1:General rules,sismic causes and rules for buildings TS EN 10326 :Hot dip galvanised steel plates and band -technical drawing rules
  • 3. TS EN 10327 : Hot dip galvanised and cold formed steel plates and band -technical drawing rules TS EN 10162 :Steel profiles-Cold rolled- Size and cross sectional tolerances TS EN 20898 :Mechanical specifications of fastening devices TS 3611EN 20898-2 : Mechanical specifications of fastening devices – Section 2: load standard screw 3- EXTERIOR WALL (STEEL FRAME)- Height:250 Exterior wall thickness : 100 mm Exterior wall-Outer board : 8 mm thickness cemented chipboard (CE certificated) OR 0.60mm COIL COATED galvanized sheet Heat and sound insulation : 80 mm thickness Polystrene (16 dansity) (Fire resistance: DIN 4102 Unflammable Joining system for wall Panels : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding on any kind of fastening. Exterior wall-Inner board : 8 mm thickness cemented chipboard (CE certificated) OR 8mm thickness laminated chipboard Exterior wall-Inner board paint : Plastic Paint (Two coats) 4- INTERNAL WALL (STEEL FRAME SYSTEM)-Height:250 Internal wall thickness : 100 mm Inner covering one side : 8 mm thickness cemented chipboard (CE certificated) Heat and sound insulation : 80 mm thickness Polystrene (16 dansity) (Fire resistance: DIN 4102 unflammable Joining system for wall Panels : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding at any kind of fastening. Inner covering other side : 8 mm thickness cemented chipboard (CE certificated) Inner wall-Inner board paint : Water based Plastic Paint (Two coats) 6- ROOF Roof covering :0,50 painted galvanised sheet Purlin : Specially shaped galvanised profile Roof bearing system : Specially designed galvanised profile .Fastenings are made by bolts and nuts.There is no welding on any kind of fastening.
  • 4. 7- DOORS EXTERIOR DOOR: Single door : 860mm * 2000mm 0.70 mm thickness Steel door Double door : 90 mm * 1960 mm Steel door Door frame : 1,5 mm galvanised sheet (Oil based paint) Lock / handle : Cylindirical type lock / Grey color metal door handle INNER DOOR: Size :840*1960 mm Door :MDF lam pressed panel (thickness 40 mm ) Door Frame :0,7 mm galvanised sheet (Oil based paint applied) Lock /handle :Cylindirical type lock / Grey color metal door handle 8-WINDOWS P2 window :120 x120 cm in dimension,made of Lead Free-PVC P3 window :160 x 120 cm in dimension,made of Lead Free-PVC Transom window :60 x40 cm in dimension,made of Lead Free-PVC 9-GLAZING P2 window :4+8+4mm double glazing P3 window :4+8+4mm double glazing Small window :4 mm thickness iced glass 10-PAINT Outer walls : Water based Acrilic paint ( DYO brand ) Inner walls : Plastic paint,colors will be decided by buyer. Ceiling : Plastic paint 11-ELECTRICAL INSTALLATION (UNDER THE SURFACE) Cable 250 V- 50 H Outlets, Switches VİKO brand
  • 5. Outlet cables NYM ve NYA 3x2,5 mm2 ( Özgüven – Öznur ) Lighting cables NYM ve NYA 2x1,5 mm2 ( Özgüven – Öznur ) Lighting fixtures Normal rooms 2x40 FLORASANT tubes WC-bathroom Round Globe – Baklaya Over Exterior door Outer globe – Baklaya Fuse, Fuse boxes Federal – Cetsan – Baklaya – Siemens. Electrical Box Buyer’s responsibilty Telephone Installation Buyer’s responsibilty Mains Buyer’s responsibilty NOT :If any electrical stove, Air Condition, Eelectrical radiator is used this should be shown on plan . For every device individual fuse line is applied. 13-SANITARY INSTALLATION (OVER THE SURFACE) Pipes (clean water) PPRC pipe ( Fırat brand ) Pipes(foul water) PVC pipe ( Fırat brand ) Vitrify , taps and shower heads: Sink counter 28x45cm wall type (DOĞVİT ) Sink tap Fixed to wall. (İNCİ-ECE - SAN) Toilet Plastic reservoir tank (DOĞVİT ) Shower 80*80 Mermerit Shower head Mix shower head Toilet tap Fixed to wall (TSE) Kitchen installation Hot and cold water installations are made, There will be no cabinets and cupboards. Main connections Clean and foul water connections are buyer’s responsibilty.