ASSIGNMENT
PROGRAM BSc IT
SEMESTER SIXTH
SUBJECT CODE & NAME BT0092, Software Project Management
CREDIT 4
BK ID B1363
MAX.MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately
of 400 words. Each questionis followedbyevaluationscheme.
Q.1 Define software cost estimationprocess. Why it is required?
Answer: Software projects are notorius for going past their deadline, going over budget, or both. The
problem lies in the estimation of the amount of effort required for the development of a project. The
cost estimation is usually dependent upon the size estimate of the project, which may use lines of code
or functionpointsasmetrics.
Process:
DefiningCostEstimation: Cost estimationcanbe
Q.2 A project has been defined to contain the following list of activities along with their required
timesfor completion
Activity No Activity Expectedcompletiontime Dependency
1 Requirementscollection 5 -
2 Screendesign 6 1
3 Report design 7 1
4 Database design 2 2,3
5 Userdocumentation 6 4
6 Programming 5 4
7 Testing 3 6
8 Installation 1 5,7
1. Draw the PERT chart for the activities.
2. Calculate the earliestexpectedcompletedtime
3. Show the critical path.
Answer:PERT chart: Usinginformationfromthe table,indicate expectedcompletiontime foreach
activity.
Q. 3 Define risk assessment.Explainthe elementsofrisk assessmentand risk control.
Answer: The aim of the risk assessment process is to remove a hazard or reduce the level of its risk by
adding precautions or control measures, as necessary. By doing so, you have created a safer and
healthier workplace. Assessments should be done by a competent team of individuals who have a good
working knowledge of the workplace. Staff should be involved always include supervisors and workers
whowork withthe processunderreview astheyare the mostfamiliarwiththe operation.
In general,to do an assessment,we should:
 Identifyhazards.
 Evaluate the likelihoodof aninjuryorillnessoccurring
Q. 4 What is conflictmanagement?How do we remove conflictsamong team members?
Answer: Conflict management is the process of limiting the negative aspects of conflict while increasing
the positive aspects of conflict. The aim of conflict management is to enhance learning and group
outcomes, including effectiveness or performance in organizational setting. Properly managed conflict
can improve groupoutcomes.
ResolvingConflictwithTeam Members:
Q. 5 What are the qualities for which an SQE (Software Quality Engineering) evaluation is to be done?
Describe all.
Answer: Software quality measures how well software is designed, and how well the software conforms
to that design although there are several different definitions. It is often described as the 'fitness for
purpose'of a piece of software.
 Be Skeptical:Don’t believe thatthe build
Q. 6 Describe brieflythe activitiesof software reeengineeringwithdiagram.
Answer: Most of the software we depend on today is average 10 to 15 years old. Even when these
programs were created using the best design and coding techniques known at the time(and most were
not), they were created when program size and storage space were principle concerns. They were then
migrated to new platforms. Adjusted for changes in machine and operating system technology.
Enhanced to meet new users. “The result is poorly designed structures, poor coding, poorlogic and poor
documentation”
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601

More Related Content

What's hot (18)

PMP Exam Sample Questions Set 1
PMP Exam Sample Questions Set 1PMP Exam Sample Questions Set 1
PMP Exam Sample Questions Set 1
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
PMP Sample Questions Set 3
PMP Sample Questions Set 3PMP Sample Questions Set 3
PMP Sample Questions Set 3
 
PMP Exam Sample Questions Set 7
PMP Exam Sample Questions Set 7PMP Exam Sample Questions Set 7
PMP Exam Sample Questions Set 7
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
PMP Sample Questions Set 5
PMP Sample Questions Set 5PMP Sample Questions Set 5
PMP Sample Questions Set 5
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
 
Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineering
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Updated
UpdatedUpdated
Updated
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
PMP Exam Sample Questions Set 4
PMP Exam Sample Questions Set 4PMP Exam Sample Questions Set 4
PMP Exam Sample Questions Set 4
 
Mba206 project management
Mba206   project managementMba206   project management
Mba206 project management
 
PMP Sample Questions Set3
PMP Sample Questions Set3PMP Sample Questions Set3
PMP Sample Questions Set3
 

Viewers also liked

Audience research results for music video
Audience research results for music videoAudience research results for music video
Audience research results for music videolora-santini
 
Magazine Analysis
Magazine AnalysisMagazine Analysis
Magazine AnalysisIndiaCaleb
 
EUPATI Launch Meeing: Anders Olauson
EUPATI Launch Meeing: Anders OlausonEUPATI Launch Meeing: Anders Olauson
EUPATI Launch Meeing: Anders Olausonjangeissler
 
How effective is the combination of your ancillary texts and main product?
How effective is the combination of your ancillary texts and main product? How effective is the combination of your ancillary texts and main product?
How effective is the combination of your ancillary texts and main product? nadibadi993
 
Eagles Executive Forum
Eagles Executive ForumEagles Executive Forum
Eagles Executive ForumPixel Zebra
 
Prezentare Matter Wars la MobileMonday
Prezentare Matter Wars la MobileMondayPrezentare Matter Wars la MobileMonday
Prezentare Matter Wars la MobileMondayPopescu Petre
 
General Contractors Glendale has a well rounded approach to home remodelling ...
General Contractors Glendale has a well rounded approach to home remodelling ...General Contractors Glendale has a well rounded approach to home remodelling ...
General Contractors Glendale has a well rounded approach to home remodelling ...Contractors Glendale
 
2010-04-14 EDUCON eMadrid uned mrartacho
2010-04-14 EDUCON eMadrid uned mrartacho2010-04-14 EDUCON eMadrid uned mrartacho
2010-04-14 EDUCON eMadrid uned mrartachoeMadrid network
 
Take on your carbon footprint with PledgeVideo.Org
Take on your carbon footprint with PledgeVideo.OrgTake on your carbon footprint with PledgeVideo.Org
Take on your carbon footprint with PledgeVideo.OrgPaul Richards
 
Drupal for Non-Wimpy Librarians (ILEAD U 2011)
Drupal for Non-Wimpy Librarians (ILEAD U 2011)Drupal for Non-Wimpy Librarians (ILEAD U 2011)
Drupal for Non-Wimpy Librarians (ILEAD U 2011)Mikael Jacobsen
 
Film posters for the genre Sci-Fi
Film posters for the genre Sci-FiFilm posters for the genre Sci-Fi
Film posters for the genre Sci-Fibmillards06
 
BreakDrink.com: Informal Learning & Alternative Professional Development for ...
BreakDrink.com: Informal Learning & Alternative Professional Development for ...BreakDrink.com: Informal Learning & Alternative Professional Development for ...
BreakDrink.com: Informal Learning & Alternative Professional Development for ...Laura Pasquini
 

Viewers also liked (18)

Audience research results for music video
Audience research results for music videoAudience research results for music video
Audience research results for music video
 
Corporate Brand Royalty Rates and Deals
Corporate Brand Royalty Rates and DealsCorporate Brand Royalty Rates and Deals
Corporate Brand Royalty Rates and Deals
 
Arte Con Solo Una Hoja De Papel
Arte Con Solo Una Hoja De PapelArte Con Solo Una Hoja De Papel
Arte Con Solo Una Hoja De Papel
 
Magazine Analysis
Magazine AnalysisMagazine Analysis
Magazine Analysis
 
EUPATI Launch Meeing: Anders Olauson
EUPATI Launch Meeing: Anders OlausonEUPATI Launch Meeing: Anders Olauson
EUPATI Launch Meeing: Anders Olauson
 
Prostate.1
Prostate.1Prostate.1
Prostate.1
 
FMDB - SLC-Cocoaheads
FMDB - SLC-CocoaheadsFMDB - SLC-Cocoaheads
FMDB - SLC-Cocoaheads
 
How effective is the combination of your ancillary texts and main product?
How effective is the combination of your ancillary texts and main product? How effective is the combination of your ancillary texts and main product?
How effective is the combination of your ancillary texts and main product?
 
Eagles Executive Forum
Eagles Executive ForumEagles Executive Forum
Eagles Executive Forum
 
Prezentare Matter Wars la MobileMonday
Prezentare Matter Wars la MobileMondayPrezentare Matter Wars la MobileMonday
Prezentare Matter Wars la MobileMonday
 
General Contractors Glendale has a well rounded approach to home remodelling ...
General Contractors Glendale has a well rounded approach to home remodelling ...General Contractors Glendale has a well rounded approach to home remodelling ...
General Contractors Glendale has a well rounded approach to home remodelling ...
 
Em Me 1
Em Me 1Em Me 1
Em Me 1
 
Internet
InternetInternet
Internet
 
2010-04-14 EDUCON eMadrid uned mrartacho
2010-04-14 EDUCON eMadrid uned mrartacho2010-04-14 EDUCON eMadrid uned mrartacho
2010-04-14 EDUCON eMadrid uned mrartacho
 
Take on your carbon footprint with PledgeVideo.Org
Take on your carbon footprint with PledgeVideo.OrgTake on your carbon footprint with PledgeVideo.Org
Take on your carbon footprint with PledgeVideo.Org
 
Drupal for Non-Wimpy Librarians (ILEAD U 2011)
Drupal for Non-Wimpy Librarians (ILEAD U 2011)Drupal for Non-Wimpy Librarians (ILEAD U 2011)
Drupal for Non-Wimpy Librarians (ILEAD U 2011)
 
Film posters for the genre Sci-Fi
Film posters for the genre Sci-FiFilm posters for the genre Sci-Fi
Film posters for the genre Sci-Fi
 
BreakDrink.com: Informal Learning & Alternative Professional Development for ...
BreakDrink.com: Informal Learning & Alternative Professional Development for ...BreakDrink.com: Informal Learning & Alternative Professional Development for ...
BreakDrink.com: Informal Learning & Alternative Professional Development for ...
 

Similar to Bt0092, software project management

Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineeringsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
Bt0081 software engineering
Bt0081   software engineeringBt0081   software engineering
Bt0081 software engineeringsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance managementsmumbahelp
 
Bc0054 – software project management & quality assurance
Bc0054 – software project management & quality assuranceBc0054 – software project management & quality assurance
Bc0054 – software project management & quality assurancesmumbahelp
 
Mi0033 – software engineering
Mi0033 – software engineeringMi0033 – software engineering
Mi0033 – software engineeringsmumbahelp
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mit301– object oriented analysis and design
Mit301– object oriented analysis and designMit301– object oriented analysis and design
Mit301– object oriented analysis and designsmumbahelp
 
Mca5020 advanced software engineering-de
Mca5020   advanced software engineering-deMca5020   advanced software engineering-de
Mca5020 advanced software engineering-desmumbahelp
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignmentssmumbahelp
 
Mi0033 – software engineering
Mi0033 – software engineeringMi0033 – software engineering
Mi0033 – software engineeringsmumbahelp
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....smumbahelp
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementsmumbahelp
 

Similar to Bt0092, software project management (20)

Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineering
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
Bt0081 software engineering
Bt0081   software engineeringBt0081   software engineering
Bt0081 software engineering
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance management
 
Bc0054 – software project management & quality assurance
Bc0054 – software project management & quality assuranceBc0054 – software project management & quality assurance
Bc0054 – software project management & quality assurance
 
Mi0033 – software engineering
Mi0033 – software engineeringMi0033 – software engineering
Mi0033 – software engineering
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project management
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mit301– object oriented analysis and design
Mit301– object oriented analysis and designMit301– object oriented analysis and design
Mit301– object oriented analysis and design
 
Mca5020 advanced software engineering-de
Mca5020   advanced software engineering-deMca5020   advanced software engineering-de
Mca5020 advanced software engineering-de
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
 
Mi0033 – software engineering
Mi0033 – software engineeringMi0033 – software engineering
Mi0033 – software engineering
 
Mb0049 project management....
Mb0049   project management....Mb0049   project management....
Mb0049 project management....
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 

Bt0092, software project management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601 ASSIGNMENT PROGRAM BSc IT SEMESTER SIXTH SUBJECT CODE & NAME BT0092, Software Project Management CREDIT 4 BK ID B1363 MAX.MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each questionis followedbyevaluationscheme. Q.1 Define software cost estimationprocess. Why it is required? Answer: Software projects are notorius for going past their deadline, going over budget, or both. The problem lies in the estimation of the amount of effort required for the development of a project. The cost estimation is usually dependent upon the size estimate of the project, which may use lines of code or functionpointsasmetrics. Process: DefiningCostEstimation: Cost estimationcanbe Q.2 A project has been defined to contain the following list of activities along with their required timesfor completion Activity No Activity Expectedcompletiontime Dependency
  • 2. 1 Requirementscollection 5 - 2 Screendesign 6 1 3 Report design 7 1 4 Database design 2 2,3 5 Userdocumentation 6 4 6 Programming 5 4 7 Testing 3 6 8 Installation 1 5,7 1. Draw the PERT chart for the activities. 2. Calculate the earliestexpectedcompletedtime 3. Show the critical path. Answer:PERT chart: Usinginformationfromthe table,indicate expectedcompletiontime foreach activity. Q. 3 Define risk assessment.Explainthe elementsofrisk assessmentand risk control. Answer: The aim of the risk assessment process is to remove a hazard or reduce the level of its risk by adding precautions or control measures, as necessary. By doing so, you have created a safer and healthier workplace. Assessments should be done by a competent team of individuals who have a good working knowledge of the workplace. Staff should be involved always include supervisors and workers whowork withthe processunderreview astheyare the mostfamiliarwiththe operation. In general,to do an assessment,we should:  Identifyhazards.  Evaluate the likelihoodof aninjuryorillnessoccurring Q. 4 What is conflictmanagement?How do we remove conflictsamong team members? Answer: Conflict management is the process of limiting the negative aspects of conflict while increasing the positive aspects of conflict. The aim of conflict management is to enhance learning and group outcomes, including effectiveness or performance in organizational setting. Properly managed conflict can improve groupoutcomes. ResolvingConflictwithTeam Members:
  • 3. Q. 5 What are the qualities for which an SQE (Software Quality Engineering) evaluation is to be done? Describe all. Answer: Software quality measures how well software is designed, and how well the software conforms to that design although there are several different definitions. It is often described as the 'fitness for purpose'of a piece of software.  Be Skeptical:Don’t believe thatthe build Q. 6 Describe brieflythe activitiesof software reeengineeringwithdiagram. Answer: Most of the software we depend on today is average 10 to 15 years old. Even when these programs were created using the best design and coding techniques known at the time(and most were not), they were created when program size and storage space were principle concerns. They were then migrated to new platforms. Adjusted for changes in machine and operating system technology. Enhanced to meet new users. “The result is poorly designed structures, poor coding, poorlogic and poor documentation” Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601