Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
1. Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
ASSIGNMENT
PROGRAM BSc IT
SEMESTER SIXTH
SUBJECT CODE & NAME BT0092, Software Project Management
CREDIT 4
BK ID B1363
MAX.MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately
of 400 words. Each questionis followedbyevaluationscheme.
Q.1 Define software cost estimationprocess. Why it is required?
Answer: Software projects are notorius for going past their deadline, going over budget, or both. The
problem lies in the estimation of the amount of effort required for the development of a project. The
cost estimation is usually dependent upon the size estimate of the project, which may use lines of code
or functionpointsasmetrics.
Process:
DefiningCostEstimation: Cost estimationcanbe
Q.2 A project has been defined to contain the following list of activities along with their required
timesfor completion
Activity No Activity Expectedcompletiontime Dependency
2. 1 Requirementscollection 5 -
2 Screendesign 6 1
3 Report design 7 1
4 Database design 2 2,3
5 Userdocumentation 6 4
6 Programming 5 4
7 Testing 3 6
8 Installation 1 5,7
1. Draw the PERT chart for the activities.
2. Calculate the earliestexpectedcompletedtime
3. Show the critical path.
Answer:PERT chart: Usinginformationfromthe table,indicate expectedcompletiontime foreach
activity.
Q. 3 Define risk assessment.Explainthe elementsofrisk assessmentand risk control.
Answer: The aim of the risk assessment process is to remove a hazard or reduce the level of its risk by
adding precautions or control measures, as necessary. By doing so, you have created a safer and
healthier workplace. Assessments should be done by a competent team of individuals who have a good
working knowledge of the workplace. Staff should be involved always include supervisors and workers
whowork withthe processunderreview astheyare the mostfamiliarwiththe operation.
In general,to do an assessment,we should:
Identifyhazards.
Evaluate the likelihoodof aninjuryorillnessoccurring
Q. 4 What is conflictmanagement?How do we remove conflictsamong team members?
Answer: Conflict management is the process of limiting the negative aspects of conflict while increasing
the positive aspects of conflict. The aim of conflict management is to enhance learning and group
outcomes, including effectiveness or performance in organizational setting. Properly managed conflict
can improve groupoutcomes.
ResolvingConflictwithTeam Members:
3. Q. 5 What are the qualities for which an SQE (Software Quality Engineering) evaluation is to be done?
Describe all.
Answer: Software quality measures how well software is designed, and how well the software conforms
to that design although there are several different definitions. It is often described as the 'fitness for
purpose'of a piece of software.
Be Skeptical:Don’t believe thatthe build
Q. 6 Describe brieflythe activitiesof software reeengineeringwithdiagram.
Answer: Most of the software we depend on today is average 10 to 15 years old. Even when these
programs were created using the best design and coding techniques known at the time(and most were
not), they were created when program size and storage space were principle concerns. They were then
migrated to new platforms. Adjusted for changes in machine and operating system technology.
Enhanced to meet new users. “The result is poorly designed structures, poor coding, poorlogic and poor
documentation”
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601