MUMBAI METRO RAIL PROJECT
     .




National Institute Of Construction Management And Research
CONTENTS


 Introduction.

 Project Details.

 Study Of Tender Documents.

 Time And Motion Study.

 Construction And Methodology.

 Resource Utilization.


                                          2
Introduction

Present Traffic Scenario:-
1.   Rail- 48% , Bus- 44% & Private Vehicles - 8%.

2.   Inadequate road network.

3.   Suburban rail traffic increased by 6 times while the capacity      increased by
     only 2.3 times.

4.   4500 passengers travel per train against the carrying capacity of 1750 resulting
     an unbearable overcrowding

5.   Vehicular growth Increased from 61,000 to over 1.02 Million in the last four
     decades.

                                                                                        4
NEED



Existing suburban systems under extreme pressure
Existing bus system’s role limited to providing feeder services to
railways.
Bus system alone cannot meet the future demand
Constraints to expand the existing road network capacity
The Road & Rail improvements not adequate for future demand
Many pockets in Island city and suburbs not served by rail based
mass system.
Environmental deterioration due to growth in road traffic
WHY




• it has high-capacity
•...it is fast
•...it is environment-friendly
•...it is financially viable and economical
•...and is attractive to the commuters
ADVANTAGES



Carries same amount of traffic as 6 lane bus or 26 lane
Private cars (Either way).
Reliable, Comfortable and Safe
Reduces time by 50-75% as compared to road
No Air pollution and less noise levels
Energy efficient; Consumes 1/5th Energy per road passenger
km.
Occupies no road space if underground and only about 2m
width of road if elevated
Mumbai Metro Rail Master Plan:-



Phase I (2006 – 2011)
   Versova-Andheri-Ghatkopar - 11.07Km
   Colaba-Bandra-Charkop - 38.24Km
   Bandra-Kurla-Mankhurd - 13.27Km
            Total -     62.68 Km

Phase II (2011 – 2016)
    Charkop-Dahisar - 7.5Km
    Ghatkopat-Mulund - 12.4Km

Phase III(2016 – 2021)
    BKC – Kanjur Marg via Airport - 19.5Km
    Andheri (E)-Dahisar (E) - 18Km
    Hutatma Chowk-Ghatkopar - 21.8Km
    Sewri-Prabhadevi - 3.5Km

          Total Length       -    146.5Km                8
10
SIGNIFICANCE (V-A-G)



Provides East-West rail based connectivity to Central and
Western suburbs.
Facilitates smooth and efficient interchange between
suburban rail system and MRT System at Andheri and
Ghatkopar stations.
Reduces the journey time from 71 minutes to 21 minutes,
between Versova and Ghatkopar .
Provides rail based access to the MIDC, SEEPZ and
commercial developments .
12
13
CAR DEPOT
VERSOVA CAR DEPOT (AREA 13.8 HA)



Stabling
Routine maintenance
Periodic maintenance
Workshop
Offices and storage
TECHNICAL DETAILS

Cab signaling with Automatic Train Protection.
Traction - 25 Kv Ac OHE
Rolling Stock with all advanced features
Train control With Driver
Ticketing system - Automatic Collection
Train Composition – Four/Six Coaches
No. of Classes - Single Class
TECHNICAL DETAILS


Environment - Air Conditioned
Max. Speed - 80 kmph
Average Speed - 33 kmph
Acceleration - 1.0 m/sec2
Deceleration - 1.2 m/sec2.
Frequency (2009)- 4 min ,(2031)- 3 min.
Carrying Capacity/rake -1500 Pax.
System Capacity – 60,000 pphd
Total Journey Time 21 min Approx
TECHNICAL DETAILS


Gauge (Nominal)                1435mm
Route Length (Elevated          31.87 Km
  between dead ends)
Number of stations Elevated    27 Nos.
Rolling Stock
    3.20 m wide & 22mts length modern rolling stock with stainless
steel body
Axle load                       15 t
Seating arrangement             Longitudinal
Capacity of 4 coach unit       1178 Passenger
PASSENGER SECURITY AND INFORMATION SYSTEM




 The passenger security and information system would manage the
MRTS passenger related functions.
 OPERATION CONTROL CENTRE (OCC)
To supervise the passenger areas and trains,
To provide visual information to passengers and at stations.
To provide one way communication from Operation Control Centre to the
passengers at stations through Public Announcement (PA) system.
 CLOSED CIRCUIT TELEVISION (CCTV)
System monitoring the stations and emergency call points on the stations.
 DYNAMIC VISUAL DISPLAYS AND LOUDSPEAKERS.
CCTV cameras, loudspeakers, and information displays will be provided.
Project Details

Type Of Design:-
  1. SUB-STRUCTURE: Pier with pile foundation
  2. SUPER-STRUCTURE: Pre-cast segmental girders

No. Of Piles: 1680 NOS.
  1. DIA. OF PILES: 1000, 1200, 1500 mm
   2. LENGTH: 12 TO 18 M

No. Of Pile Caps: 457 NOS.
  1. LENGTH: 4.5 To 11.5 M
  2. WITDH: 4.5 To 11.5 M
  3. DEPTH: 1.8 To 2.5 M



                                                   20
NO. OF PIER: 457 NOS.
   1. HEIGHT: 10 M
   2. LENGTH – 2 M
   3 WIDTH – 3 M
   4 DIAMETER- 1.75 To 2.25 M



No. Pier Caps: 457 NOS.

No. Of “U” Girders: 747NOS. (PRECAST SEGMENTAL GIRDERS)

Bearing: Elastomeric Bearing.


                                                          21
Project Tender Documents


Requirement To Contractor:-
  Passengers Per Day – 45000
  Speed – 33Km/hr.
  Time Interval – Less than 120sec.
  Distance Of V-A-G Corridor – 11.4Km.
  No. Of Stations – 12.
            The total cost of the project will
             be around Rs. 4,57,52,00,581.35 /-




                                                  22
Contractors For Work

Package                          Awarded to
Civil Works – Viaduct            Simplex Infrastructure Ltd
Civil Works – Stations           Sew Infrastructure Ltd
Civil Works – Special Bridges    Sew Infrastructure Ltd
Civil Works – Depot Earthworks   Shyam Narayan & Bros
Rolling Stock                    CSR Nanjing, China
Signaling System                 Siemens
Power Supply Traction & SCADA    ABB

Communication System             Thales
Track work                       VNC Rail One
Automatic Fare Collection        Indra
E&M                              ABB
Escalators                       Schindler
Lifts                            OTIS
Depot Machinery & Plant          Awarded to various suppliers
Depot Civil Works                Ahluwalia Contracts (India) Ltd.   23
Funding Arrangement:-

                % Share


                          Reliance Energe Ltd.

     26%


                          Veolia
5%               69%      Transport, SA, France


                          MMRDA




                                                  24
Basic Details:-



 The contract here is executed between MMOPL and SIMPLEX INFRASTRUCTURES
    LTD.

 The contract was issued to SIMPLEX INFRASTRUCTURES LTD on 28/02/2008.

 Estimated value of the project by MMOPL was 457.52Cr. INR.

 Bid security was to be paid off, of amount 21Cr. approximately.

 The project has to be completed within the stipulated time period of 22 calendar months
    or else the contractor has to pay the penalty.

 The total length of Viaduct under this project is 11.343 km.

                                                                                       25
SALIENT FEATURES

Name Of Project              Construction of Viaduct VA & VB
Name Of Employer             Mumbai Metro One Private Limited
Name Of Contractor           Simplex Infrastructure Ltd.
Name Of Consultant           PB – Systra
Name Of Designer             PB – Systra
Tender Value                 Rs.457.52Cr
Project Value                Rs.2356Cr
Type Of Contract             Unit Rate Contract
Project Duration             22 Months.


Route Length -               11.07 km
Elevated Alignment-          100 %
Maximum Gradient-            4.0%
Minimum Curvature -          100 m
Minimum Ground Clearance -   5.5 m
No. Of Stations -            12
Platform Length -            135 m
Car Depot -                  D.N Nagar
Length Of Coach -            22 m.                              26
Width Of Coach -             3.2 m.
LAYOUT OF WADALA CASTING YARD




                                27
WORK BREAKDOWN STRUCTURE




                                          Mumbai Metro Rail Proj.
                                        (Construction of VA & VB in
                                              V-A-G corridore)




         Foundation                             Sub Structure                         Superstructure




  Open                                           Anticrash
               Pile Foundation   Pier                                 Pier Cap   Bearing          U-Girder
Foundation                                        Barrier




                                                                                                             28
PROJECT ORGANIZATION CHART




                                          General Manager
                                           Mr. Ajit Singh




                                                                       Planning &
              Casting Yard   VA-Section                     Erection                 Survey
  QA/QC                                      VB Section                  Billing
               Incharge       Incharge                      Incharge                Incharge
InchargeMr.                                   Incharge                  Incharge
              Mr. Umakant     Mr. Dipak                       Mr. S.                Mr. Karol
   Suman                                     Mr. I. Saha                Ms. Vidya
                  Dube          Tiku                        Adhikari                  Adak
                                                                        Murugan




                                                                                                29
TIME AND MOTION STUDY

   Pile Boring:-
Sr. No.              Work Description              Number of   Number of days          Equipment/
                                                    labour                         Machinery used
  1       Pavement quality concrete breaking          2              1          Diamond cutter


  2       Excavation up to 2.5 m                      8              2          Back      hoe      loader,
                                                                                Dumper
  3       Utility checking                            2              1
  4       If utility found then utility shifting      2              1
  5       Marking pile location                       3             1/2         Auto      level/     Total
                                                                                station
  6       Initial boring with soil auger              2             2 hr        Pile boring rig,
  7       Temporary Pile case/linear insertion        2             1 hr        Pile boring rig,


  8       Soil/Rock auger boring                      2              1          Pile boring rig,
  9       Muck removal                                2              1          Back      hoe      loader,
                                                                                Dumper
                                                                                                             30
Soil Auger




Hydraulic Boring Rig Machine   Rock Cutter   31
Pile Reinforcement Work:-


Sr.       Work Description           Number      Number of    Equipment/
No.                                  of labour     days       Machinery
                                                                 used
1     Reinforcement cutting and         3           2        Bar bending
      bending                                                and Bar
                                                             cutting
                                                             machine
2     Reinforcement          anti-      3           1/2
      corrosive treatment

3     Reinforcement          cage       4           1
      preparation

                                                                           32
Pile Concreting:-



Sr.          Work Description          Number of   Number of    Equipment/
No.                                     labour       days       Machinery
                                                                   used
 1 Reinforcement cage shifting             4         3 hr      Hydraulic
                                                               crane and
                                                               truck
 2 Reinforcement                cage       4         1 hr      Crane
      insertion in bore hole

 3 Pile concreting with tremie             4           1       Tremie pipe,
      pipe                                                     Transit mixer

                                                                               33
Pile Cut-Off Level:-


Sr.            Work Description           Number of   Number of      Equipment/
No.                                        labour       days        Machinery used
1     Extraction of temporary pile            2          1/2      Crane
      casing
2     Temporary backfilling with              3          1/2
      approved material
3     Cutting      off    pile    heads       8          3        Hammer and chisel
      (manually)
4     Disposal       of      excavated        4          1        Back hoe loader,
      material                                                    Dumper
5     P.C.C. up to pile cut off level         4          1        Transit mixer and
                                                                  needle vibrator


                                                                                      34
Pile Cap:-


Sr.          Work Description               Number   Number of     Equipment/
No.                                           of       days        Machinery
                                            labour                     used
1     Reinforcement      cutting      and     4          2       Bar bending &
      bending                                                    cutting machine
2     Reinforcement        anti-corrosive     3         1/2
      treatment
3     Reinforcement cage preparation          6          3
4     Shuttering work for pile cap            4          2
5     Concreting of pile cap                  8          1       Transit      mixer
                                                                 and        needle
                                                                 vibrator
6     Deshuttering of pile cap after 2        4          1
      days
                                                                                      35
7     Curing of pile cap for 7 days           1          7
PILE CAP REINFORCEMENT BINDING




                                 PILE CAP SHUTTERING WORK


                                                            36
Pier Starter:-



    Sr.             Work Description          Number of   Number of     Equipment/
No.                                            labour       days      Machinery used

1         Reinforcement                cage       5           1
          preparation
2         Shuttering      work   for   pier       4          1/2      Hydraulic crane
          starter
3         Concreting of pier starter with         4         3Hrs      Transit   mixer,
          the help concrete pump                                      Needle vibrator,
                                                                      Concrete pump

4         Deshuttering of pier starter            2         2 Hrs     Hydraulic crane
          after 2 days

5         Curing of pier starter for 7            1           7
          days                                                                           37
Shuttering Of Pier Starter




                             38
Pier CONSTRUCTION:-



    Sr.          Work Description           Number of   Number of     Equipment/
No.                                          labour       days      Machinery used

1         Reinforcement              cage       8          1.5
          preparation
2         Shuttering work for pier              6           1       Hydraulic crane

3         Concreting of pier    with the        4           1       Transit   mixer,
          help concrete pump                                        Needle vibrator,
                                                                    Concrete pump


4         Deshuttering of pier after 2          2         2 Hrs     Hydraulic crane
          days
5         Curing of pier starter for 7          1           7
          days                                                                         39
40
Anti-Crash Barrier:-


Sr.          Work Description          Number of   Number of     Equipment/
No.                                     labour       days      Machinery used

1     Reinforcement             cage       3           1
      preparation
2     Shuttering work for Anti –           3         2Hrs      Hydraulic crane
      crash barrier

3     Concreting of Anti – crash           2          1/2      Transit   mixer,
      barrier                                                  Needle vibrator

4     Deshuttering of Anti – crash         2         2 Hrs     Hydraulic crane
      barrier after 2 days

5     Curing of Anti – crash barrier       1           7
      for 7 days
                                                                                  41
42
Pier Cap:-


          Activity Name             No. Of   No. Of Days   Equipment Or Tools
                                    Labour                        Req.
Reinforcement Cutting Bending         11       2 Days       Bar bending & Bar
                                                             cutting machine

Reinforcement Cage Preparation        11       2 Days
Shuttering Soffit Leveling (Base)     5        1 Days
Shutter Alignment                     4        1 Days
Cage Shifting Over The Shutter        3       ½ Hour             Gantry
Shutter Fixing                        4        1 Day
Gangway Preparation On Slab Of        2        ½ Day
Girder For Concreting
Concreting                            6        3 Hours     Transit Mixer, Boom
                                                           Pressure & Vibrator
                                                                                 43
Curing                                1        21 Days
PIER CAP STACKING YARD




REINFORCEMENT CAGEPREPARATION




                                                         44
SHIFTING & FIXING OF PIER CAP ON PIER
                NECK




                                        45
U-Shaped Girder:-

               Activity Name                  No. Of Labour         No. Of Days      Equipment Or
                                                                                       Tools Req.
Reinforcement Cutting Bending                        30               2 Days      Bar bending and Bar
                                                                                    cutting machine

Reinforcement Cage Preparation                       30               3 Days
Shuttering Soffit Leveling (Base)                    12               1 Days
Outer Shutter Alignment                              12               1 Days
Cage Shifting Over The Shutter              4 lab.& 2 gantry opt.    ½ Hour        Gantry and truss to
                                                                                        hold cage
Inner Shutter Fixing                                 10               1 Day
Strand Cutting & Fixing(Threading)                   20               2 Days
Slackness Removal Of Strand                    5 lab. & 1 opt.        1 Hour         Stressing jack
Prestressing Of Strands                        3 lab. & 1 opt.        2 Hours     Stressing jack
Gangway Preparation On Slab Of Girder For            6                ½ Day
Concreting
Concreting                                   16 lab. & 4 meson        6 Hours     Transit Mixer, Boom
                                                                                  Pressure & Vibrator
                                                                                                         46
Curing                                               2                21 Days
LIFTING OF REINFORCEMENT CAGE




  PRE-STRESSING OF
     “U” GIRDER




                                47
CONCRETING OF “U‟ GIRDER                     HEAVING OF CONCRETE




       LIFTONG AND SHIFTING OF „U‟ GIRDER TO STACKING YARD         48
Construction Methodology Of Piling:-




                                       49
Construction Methodology Of
Pile cap




                              50
Construction Methodology Of
Pier




                              51
Construction Methodology Of Pier
              Cap
Reinforcement Cutting &
        Bending

                            Anti corrosive treatment

                              Reinforcement Cage
                                  Preparation

                            Shutter Leveling(Base)


                            Side Shutter Alignment

                            Cage Shifting Over The
                                   Shutter

                             Fixing Pipes for post
                                  tensioning
                          Checking of reinforcement &
                                  shuttering

                                  Concreting

                             Curing on casting bed
                                                                       52
                                                        Deshuttering
Construction Methodology Of
                           U-Shaped Girder
Reinforcement Cutting & Bending      Anti corrosive treatment

                                  Reinforcement Cage Preparation

                                  Shuttering Sofit Leveling(Base)

                                     Outer Shutter Alignment

                                  Cage Shifting Over The Shutter

                                       Fitting Inner Shutter

                                    Strand Cutting & Threading

                                   Slackness removal of Strand

                                           Pre stressing

                                            Concreting

                                           Deshuttering
                                                                                                  53
                                              Curing                Shifting Girder to Stacking Yard
RESOURCE UTILIZATION

         Consumption of Concrete in May-2009
1700
                                                1591.5 Cum
1600
1500
1400
1300
1200
1100                                                                  Grade of Concrete
1000
 900
                                                                         465.25 Cum
 800
 700
                                                                                          561 Cum
 600
 500
 400
 300                               246.25 Cum
 200                   155.5 Cum
        52.5 Cum                                             14 Cum
 100
   0
       Cement Slurry     M15          M25          M35        M40             M45            M55


                                                                                                    54
Consumption of Concrete in June up to 09/06/2009
500
                                 485.25 Cum
450

400

350

300

250
                                                                                Concrete in Cum
200

150

100                                                          93.5 Cum
                                                    71 Cum

 50                   39 Cum
                               23 Cum
         5 Cum                                                          0 Cum
  0
      Cement Slurry    M15      M25           M35    M40       M45      M55




                                                                                                  55
Utilization Of Steel:-

                                   Utilization of Steel in May
80
                                           70.736MT
70
                                                                                  62.914MT
                                                        60.167MT
60

                                                                     47.948MT
50


40
                                                                                               Steel Utilization
                 29.252MT
30                            25.031MT


20


10   5.343MT


 0
     8mm Steel   10mm Steel   12mm Steel   16mm Steel   20mm Steel   25mm Steel   32mm Steel




                                                                                                                   56
Utilization of Manpower


Utilization of Manpower from 07/05/2009 to 06/06/2009
10000
 9000      8685
 8000
 7000                              6707
 6000
 5000                   4676                Manpower Utilization
 4000
 3000
 2000
 1000
    0
        Casting Yard   JB Nagar   Varsova

                                                                   57
Daily Utilization of Manpower


400
350
300
250
200                              Casting Yard
150                              Versova
100
                                 JB Nagar
 50
  0




                                            58
59

More Related Content

What's hot

Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkUnni Krishnan
 
Review of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development planReview of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development planAnoushka Tyagi
 
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITYTRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITYshrikrishna kesharwani
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
Lucknow smart city
Lucknow smart cityLucknow smart city
Lucknow smart citySATISH KUMAR
 
Gandhinagar city case study
Gandhinagar city case studyGandhinagar city case study
Gandhinagar city case studySakshiGadakh
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showkiranightly
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Smart city in respect to kota (project)
Smart city in respect to kota (project)Smart city in respect to kota (project)
Smart city in respect to kota (project)John Paul
 
A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)Manpreet Singh Lotey, MBA
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit systemFagner Glinski
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONYash Shah
 
1.6 Town planning India pre & post independence
1.6  Town planning India pre & post independence1.6  Town planning India pre & post independence
1.6 Town planning India pre & post independenceSachin PatiL
 
India, a design strategy for street vendors in Kanpur, 2nd of April 2011
India, a design strategy for street vendors in Kanpur, 2nd of April 2011India, a design strategy for street vendors in Kanpur, 2nd of April 2011
India, a design strategy for street vendors in Kanpur, 2nd of April 2011Deborah Lambert
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Developmentglogan56
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyAnoushka Tyagi
 

What's hot (20)

Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Review of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development planReview of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development plan
 
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITYTRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Lucknow smart city
Lucknow smart cityLucknow smart city
Lucknow smart city
 
Gandhinagar city case study
Gandhinagar city case studyGandhinagar city case study
Gandhinagar city case study
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 
Surat & Tapi
Surat & Tapi Surat & Tapi
Surat & Tapi
 
Smart city in respect to kota (project)
Smart city in respect to kota (project)Smart city in respect to kota (project)
Smart city in respect to kota (project)
 
A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)A study on Affordable Housing projects in India (by Manpreet Singh)
A study on Affordable Housing projects in India (by Manpreet Singh)
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit system
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
 
1.6 Town planning India pre & post independence
1.6  Town planning India pre & post independence1.6  Town planning India pre & post independence
1.6 Town planning India pre & post independence
 
India, a design strategy for street vendors in Kanpur, 2nd of April 2011
India, a design strategy for street vendors in Kanpur, 2nd of April 2011India, a design strategy for street vendors in Kanpur, 2nd of April 2011
India, a design strategy for street vendors in Kanpur, 2nd of April 2011
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Development
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
 

Viewers also liked

Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupSamiir Halady
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro Onekopila
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Reliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementReliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementSwapnil Borkar
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbaiaziz khan
 
Traffic problems & solutions in mumbai
Traffic problems & solutions in mumbaiTraffic problems & solutions in mumbai
Traffic problems & solutions in mumbaiVijaykumar Nishad
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupSamiir Halady
 
Mandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar Mallappanavar
 
Metro Construction
Metro ConstructionMetro Construction
Metro ConstructionMayur Soni
 
Truth behindmetro3yardinaarey
Truth behindmetro3yardinaareyTruth behindmetro3yardinaarey
Truth behindmetro3yardinaareySamiir Halady
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai MetroHansel D'Souza
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail MumbaiSahim Khan
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Paromita Roy
 

Viewers also liked (20)

Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Reliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementReliance Mumbai Metro Project Management
Reliance Mumbai Metro Project Management
 
Metro Station Area Management and Dispersal - Vijaylaxmi, MMRDA
Metro Station Area Management and Dispersal - Vijaylaxmi, MMRDAMetro Station Area Management and Dispersal - Vijaylaxmi, MMRDA
Metro Station Area Management and Dispersal - Vijaylaxmi, MMRDA
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbai
 
Traffic problems & solutions in mumbai
Traffic problems & solutions in mumbaiTraffic problems & solutions in mumbai
Traffic problems & solutions in mumbai
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
 
Metro project
Metro project Metro project
Metro project
 
Mandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts final
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Truth behindmetro3yardinaarey
Truth behindmetro3yardinaareyTruth behindmetro3yardinaarey
Truth behindmetro3yardinaarey
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai Metro
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail Mumbai
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
 

Similar to Mumbai traffic scenario & mumbai metro

Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)Parag Chaubey
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Multan Prajapat
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2R VIJAYAKUMAR
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
Reliance infrastructure
Reliance infrastructureReliance infrastructure
Reliance infrastructuremohandasraman
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
 
Sky bus
Sky busSky bus
Sky busJNTU
 
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEIRJET Journal
 
Group 11 Development Presentation
Group 11 Development PresentationGroup 11 Development Presentation
Group 11 Development PresentationGP Design PS
 
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridgeIRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridgeIRJET Journal
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line RTE
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2Ravi Mehta
 

Similar to Mumbai traffic scenario & mumbai metro (20)

Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...Blastless track construction in tunnel and elavated metro station constructio...
Blastless track construction in tunnel and elavated metro station constructio...
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Reliance infrastructure
Reliance infrastructureReliance infrastructure
Reliance infrastructure
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 
Sky bus
Sky busSky bus
Sky bus
 
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
 
Group 11 Development Presentation
Group 11 Development PresentationGroup 11 Development Presentation
Group 11 Development Presentation
 
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridgeIRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
Hyderabad Metro Rail Project
Hyderabad Metro Rail ProjectHyderabad Metro Rail Project
Hyderabad Metro Rail Project
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
The poster
The posterThe poster
The poster
 
Flexible pavement
Flexible pavement  Flexible pavement
Flexible pavement
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 

Recently uploaded

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 

Recently uploaded (20)

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

Mumbai traffic scenario & mumbai metro

  • 1. MUMBAI METRO RAIL PROJECT . National Institute Of Construction Management And Research
  • 2. CONTENTS  Introduction.  Project Details.  Study Of Tender Documents.  Time And Motion Study.  Construction And Methodology.  Resource Utilization. 2
  • 3.
  • 4. Introduction Present Traffic Scenario:- 1. Rail- 48% , Bus- 44% & Private Vehicles - 8%. 2. Inadequate road network. 3. Suburban rail traffic increased by 6 times while the capacity increased by only 2.3 times. 4. 4500 passengers travel per train against the carrying capacity of 1750 resulting an unbearable overcrowding 5. Vehicular growth Increased from 61,000 to over 1.02 Million in the last four decades. 4
  • 5. NEED Existing suburban systems under extreme pressure Existing bus system’s role limited to providing feeder services to railways. Bus system alone cannot meet the future demand Constraints to expand the existing road network capacity The Road & Rail improvements not adequate for future demand Many pockets in Island city and suburbs not served by rail based mass system. Environmental deterioration due to growth in road traffic
  • 6. WHY • it has high-capacity •...it is fast •...it is environment-friendly •...it is financially viable and economical •...and is attractive to the commuters
  • 7. ADVANTAGES Carries same amount of traffic as 6 lane bus or 26 lane Private cars (Either way). Reliable, Comfortable and Safe Reduces time by 50-75% as compared to road No Air pollution and less noise levels Energy efficient; Consumes 1/5th Energy per road passenger km. Occupies no road space if underground and only about 2m width of road if elevated
  • 8. Mumbai Metro Rail Master Plan:- Phase I (2006 – 2011) Versova-Andheri-Ghatkopar - 11.07Km Colaba-Bandra-Charkop - 38.24Km Bandra-Kurla-Mankhurd - 13.27Km Total - 62.68 Km Phase II (2011 – 2016) Charkop-Dahisar - 7.5Km Ghatkopat-Mulund - 12.4Km Phase III(2016 – 2021) BKC – Kanjur Marg via Airport - 19.5Km Andheri (E)-Dahisar (E) - 18Km Hutatma Chowk-Ghatkopar - 21.8Km Sewri-Prabhadevi - 3.5Km Total Length - 146.5Km 8
  • 9.
  • 10. 10
  • 11. SIGNIFICANCE (V-A-G) Provides East-West rail based connectivity to Central and Western suburbs. Facilitates smooth and efficient interchange between suburban rail system and MRT System at Andheri and Ghatkopar stations. Reduces the journey time from 71 minutes to 21 minutes, between Versova and Ghatkopar . Provides rail based access to the MIDC, SEEPZ and commercial developments .
  • 12. 12
  • 13. 13
  • 15. VERSOVA CAR DEPOT (AREA 13.8 HA) Stabling Routine maintenance Periodic maintenance Workshop Offices and storage
  • 16. TECHNICAL DETAILS Cab signaling with Automatic Train Protection. Traction - 25 Kv Ac OHE Rolling Stock with all advanced features Train control With Driver Ticketing system - Automatic Collection Train Composition – Four/Six Coaches No. of Classes - Single Class
  • 17. TECHNICAL DETAILS Environment - Air Conditioned Max. Speed - 80 kmph Average Speed - 33 kmph Acceleration - 1.0 m/sec2 Deceleration - 1.2 m/sec2. Frequency (2009)- 4 min ,(2031)- 3 min. Carrying Capacity/rake -1500 Pax. System Capacity – 60,000 pphd Total Journey Time 21 min Approx
  • 18. TECHNICAL DETAILS Gauge (Nominal) 1435mm Route Length (Elevated 31.87 Km between dead ends) Number of stations Elevated 27 Nos. Rolling Stock 3.20 m wide & 22mts length modern rolling stock with stainless steel body Axle load 15 t Seating arrangement Longitudinal Capacity of 4 coach unit 1178 Passenger
  • 19. PASSENGER SECURITY AND INFORMATION SYSTEM  The passenger security and information system would manage the MRTS passenger related functions.  OPERATION CONTROL CENTRE (OCC) To supervise the passenger areas and trains, To provide visual information to passengers and at stations. To provide one way communication from Operation Control Centre to the passengers at stations through Public Announcement (PA) system.  CLOSED CIRCUIT TELEVISION (CCTV) System monitoring the stations and emergency call points on the stations.  DYNAMIC VISUAL DISPLAYS AND LOUDSPEAKERS. CCTV cameras, loudspeakers, and information displays will be provided.
  • 20. Project Details Type Of Design:- 1. SUB-STRUCTURE: Pier with pile foundation 2. SUPER-STRUCTURE: Pre-cast segmental girders No. Of Piles: 1680 NOS. 1. DIA. OF PILES: 1000, 1200, 1500 mm 2. LENGTH: 12 TO 18 M No. Of Pile Caps: 457 NOS. 1. LENGTH: 4.5 To 11.5 M 2. WITDH: 4.5 To 11.5 M 3. DEPTH: 1.8 To 2.5 M 20
  • 21. NO. OF PIER: 457 NOS. 1. HEIGHT: 10 M 2. LENGTH – 2 M 3 WIDTH – 3 M 4 DIAMETER- 1.75 To 2.25 M No. Pier Caps: 457 NOS. No. Of “U” Girders: 747NOS. (PRECAST SEGMENTAL GIRDERS) Bearing: Elastomeric Bearing. 21
  • 22. Project Tender Documents Requirement To Contractor:- Passengers Per Day – 45000 Speed – 33Km/hr. Time Interval – Less than 120sec. Distance Of V-A-G Corridor – 11.4Km. No. Of Stations – 12. The total cost of the project will be around Rs. 4,57,52,00,581.35 /- 22
  • 23. Contractors For Work Package Awarded to Civil Works – Viaduct Simplex Infrastructure Ltd Civil Works – Stations Sew Infrastructure Ltd Civil Works – Special Bridges Sew Infrastructure Ltd Civil Works – Depot Earthworks Shyam Narayan & Bros Rolling Stock CSR Nanjing, China Signaling System Siemens Power Supply Traction & SCADA ABB Communication System Thales Track work VNC Rail One Automatic Fare Collection Indra E&M ABB Escalators Schindler Lifts OTIS Depot Machinery & Plant Awarded to various suppliers Depot Civil Works Ahluwalia Contracts (India) Ltd. 23
  • 24. Funding Arrangement:- % Share Reliance Energe Ltd. 26% Veolia 5% 69% Transport, SA, France MMRDA 24
  • 25. Basic Details:-  The contract here is executed between MMOPL and SIMPLEX INFRASTRUCTURES LTD.  The contract was issued to SIMPLEX INFRASTRUCTURES LTD on 28/02/2008.  Estimated value of the project by MMOPL was 457.52Cr. INR.  Bid security was to be paid off, of amount 21Cr. approximately.  The project has to be completed within the stipulated time period of 22 calendar months or else the contractor has to pay the penalty.  The total length of Viaduct under this project is 11.343 km. 25
  • 26. SALIENT FEATURES Name Of Project Construction of Viaduct VA & VB Name Of Employer Mumbai Metro One Private Limited Name Of Contractor Simplex Infrastructure Ltd. Name Of Consultant PB – Systra Name Of Designer PB – Systra Tender Value Rs.457.52Cr Project Value Rs.2356Cr Type Of Contract Unit Rate Contract Project Duration 22 Months. Route Length - 11.07 km Elevated Alignment- 100 % Maximum Gradient- 4.0% Minimum Curvature - 100 m Minimum Ground Clearance - 5.5 m No. Of Stations - 12 Platform Length - 135 m Car Depot - D.N Nagar Length Of Coach - 22 m. 26 Width Of Coach - 3.2 m.
  • 27. LAYOUT OF WADALA CASTING YARD 27
  • 28. WORK BREAKDOWN STRUCTURE Mumbai Metro Rail Proj. (Construction of VA & VB in V-A-G corridore) Foundation Sub Structure Superstructure Open Anticrash Pile Foundation Pier Pier Cap Bearing U-Girder Foundation Barrier 28
  • 29. PROJECT ORGANIZATION CHART General Manager Mr. Ajit Singh Planning & Casting Yard VA-Section Erection Survey QA/QC VB Section Billing Incharge Incharge Incharge Incharge InchargeMr. Incharge Incharge Mr. Umakant Mr. Dipak Mr. S. Mr. Karol Suman Mr. I. Saha Ms. Vidya Dube Tiku Adhikari Adak Murugan 29
  • 30. TIME AND MOTION STUDY Pile Boring:- Sr. No. Work Description Number of Number of days Equipment/ labour Machinery used 1 Pavement quality concrete breaking 2 1 Diamond cutter 2 Excavation up to 2.5 m 8 2 Back hoe loader, Dumper 3 Utility checking 2 1 4 If utility found then utility shifting 2 1 5 Marking pile location 3 1/2 Auto level/ Total station 6 Initial boring with soil auger 2 2 hr Pile boring rig, 7 Temporary Pile case/linear insertion 2 1 hr Pile boring rig, 8 Soil/Rock auger boring 2 1 Pile boring rig, 9 Muck removal 2 1 Back hoe loader, Dumper 30
  • 31. Soil Auger Hydraulic Boring Rig Machine Rock Cutter 31
  • 32. Pile Reinforcement Work:- Sr. Work Description Number Number of Equipment/ No. of labour days Machinery used 1 Reinforcement cutting and 3 2 Bar bending bending and Bar cutting machine 2 Reinforcement anti- 3 1/2 corrosive treatment 3 Reinforcement cage 4 1 preparation 32
  • 33. Pile Concreting:- Sr. Work Description Number of Number of Equipment/ No. labour days Machinery used 1 Reinforcement cage shifting 4 3 hr Hydraulic crane and truck 2 Reinforcement cage 4 1 hr Crane insertion in bore hole 3 Pile concreting with tremie 4 1 Tremie pipe, pipe Transit mixer 33
  • 34. Pile Cut-Off Level:- Sr. Work Description Number of Number of Equipment/ No. labour days Machinery used 1 Extraction of temporary pile 2 1/2 Crane casing 2 Temporary backfilling with 3 1/2 approved material 3 Cutting off pile heads 8 3 Hammer and chisel (manually) 4 Disposal of excavated 4 1 Back hoe loader, material Dumper 5 P.C.C. up to pile cut off level 4 1 Transit mixer and needle vibrator 34
  • 35. Pile Cap:- Sr. Work Description Number Number of Equipment/ No. of days Machinery labour used 1 Reinforcement cutting and 4 2 Bar bending & bending cutting machine 2 Reinforcement anti-corrosive 3 1/2 treatment 3 Reinforcement cage preparation 6 3 4 Shuttering work for pile cap 4 2 5 Concreting of pile cap 8 1 Transit mixer and needle vibrator 6 Deshuttering of pile cap after 2 4 1 days 35 7 Curing of pile cap for 7 days 1 7
  • 36. PILE CAP REINFORCEMENT BINDING PILE CAP SHUTTERING WORK 36
  • 37. Pier Starter:- Sr. Work Description Number of Number of Equipment/ No. labour days Machinery used 1 Reinforcement cage 5 1 preparation 2 Shuttering work for pier 4 1/2 Hydraulic crane starter 3 Concreting of pier starter with 4 3Hrs Transit mixer, the help concrete pump Needle vibrator, Concrete pump 4 Deshuttering of pier starter 2 2 Hrs Hydraulic crane after 2 days 5 Curing of pier starter for 7 1 7 days 37
  • 38. Shuttering Of Pier Starter 38
  • 39. Pier CONSTRUCTION:- Sr. Work Description Number of Number of Equipment/ No. labour days Machinery used 1 Reinforcement cage 8 1.5 preparation 2 Shuttering work for pier 6 1 Hydraulic crane 3 Concreting of pier with the 4 1 Transit mixer, help concrete pump Needle vibrator, Concrete pump 4 Deshuttering of pier after 2 2 2 Hrs Hydraulic crane days 5 Curing of pier starter for 7 1 7 days 39
  • 40. 40
  • 41. Anti-Crash Barrier:- Sr. Work Description Number of Number of Equipment/ No. labour days Machinery used 1 Reinforcement cage 3 1 preparation 2 Shuttering work for Anti – 3 2Hrs Hydraulic crane crash barrier 3 Concreting of Anti – crash 2 1/2 Transit mixer, barrier Needle vibrator 4 Deshuttering of Anti – crash 2 2 Hrs Hydraulic crane barrier after 2 days 5 Curing of Anti – crash barrier 1 7 for 7 days 41
  • 42. 42
  • 43. Pier Cap:- Activity Name No. Of No. Of Days Equipment Or Tools Labour Req. Reinforcement Cutting Bending 11 2 Days Bar bending & Bar cutting machine Reinforcement Cage Preparation 11 2 Days Shuttering Soffit Leveling (Base) 5 1 Days Shutter Alignment 4 1 Days Cage Shifting Over The Shutter 3 ½ Hour Gantry Shutter Fixing 4 1 Day Gangway Preparation On Slab Of 2 ½ Day Girder For Concreting Concreting 6 3 Hours Transit Mixer, Boom Pressure & Vibrator 43 Curing 1 21 Days
  • 44. PIER CAP STACKING YARD REINFORCEMENT CAGEPREPARATION 44
  • 45. SHIFTING & FIXING OF PIER CAP ON PIER NECK 45
  • 46. U-Shaped Girder:- Activity Name No. Of Labour No. Of Days Equipment Or Tools Req. Reinforcement Cutting Bending 30 2 Days Bar bending and Bar cutting machine Reinforcement Cage Preparation 30 3 Days Shuttering Soffit Leveling (Base) 12 1 Days Outer Shutter Alignment 12 1 Days Cage Shifting Over The Shutter 4 lab.& 2 gantry opt. ½ Hour Gantry and truss to hold cage Inner Shutter Fixing 10 1 Day Strand Cutting & Fixing(Threading) 20 2 Days Slackness Removal Of Strand 5 lab. & 1 opt. 1 Hour Stressing jack Prestressing Of Strands 3 lab. & 1 opt. 2 Hours Stressing jack Gangway Preparation On Slab Of Girder For 6 ½ Day Concreting Concreting 16 lab. & 4 meson 6 Hours Transit Mixer, Boom Pressure & Vibrator 46 Curing 2 21 Days
  • 47. LIFTING OF REINFORCEMENT CAGE PRE-STRESSING OF “U” GIRDER 47
  • 48. CONCRETING OF “U‟ GIRDER HEAVING OF CONCRETE LIFTONG AND SHIFTING OF „U‟ GIRDER TO STACKING YARD 48
  • 52. Construction Methodology Of Pier Cap Reinforcement Cutting & Bending Anti corrosive treatment Reinforcement Cage Preparation Shutter Leveling(Base) Side Shutter Alignment Cage Shifting Over The Shutter Fixing Pipes for post tensioning Checking of reinforcement & shuttering Concreting Curing on casting bed 52 Deshuttering
  • 53. Construction Methodology Of U-Shaped Girder Reinforcement Cutting & Bending Anti corrosive treatment Reinforcement Cage Preparation Shuttering Sofit Leveling(Base) Outer Shutter Alignment Cage Shifting Over The Shutter Fitting Inner Shutter Strand Cutting & Threading Slackness removal of Strand Pre stressing Concreting Deshuttering 53 Curing Shifting Girder to Stacking Yard
  • 54. RESOURCE UTILIZATION Consumption of Concrete in May-2009 1700 1591.5 Cum 1600 1500 1400 1300 1200 1100 Grade of Concrete 1000 900 465.25 Cum 800 700 561 Cum 600 500 400 300 246.25 Cum 200 155.5 Cum 52.5 Cum 14 Cum 100 0 Cement Slurry M15 M25 M35 M40 M45 M55 54
  • 55. Consumption of Concrete in June up to 09/06/2009 500 485.25 Cum 450 400 350 300 250 Concrete in Cum 200 150 100 93.5 Cum 71 Cum 50 39 Cum 23 Cum 5 Cum 0 Cum 0 Cement Slurry M15 M25 M35 M40 M45 M55 55
  • 56. Utilization Of Steel:- Utilization of Steel in May 80 70.736MT 70 62.914MT 60.167MT 60 47.948MT 50 40 Steel Utilization 29.252MT 30 25.031MT 20 10 5.343MT 0 8mm Steel 10mm Steel 12mm Steel 16mm Steel 20mm Steel 25mm Steel 32mm Steel 56
  • 57. Utilization of Manpower Utilization of Manpower from 07/05/2009 to 06/06/2009 10000 9000 8685 8000 7000 6707 6000 5000 4676 Manpower Utilization 4000 3000 2000 1000 0 Casting Yard JB Nagar Varsova 57
  • 58. Daily Utilization of Manpower 400 350 300 250 200 Casting Yard 150 Versova 100 JB Nagar 50 0 58
  • 59. 59