1. Published Papers
No. Title of The Paper Publishing Publishing Place
Date
1 Meeting The Problems of August/Septemb Building Technology and
Cost Control Systems er Management Journal
1988 .U.K
2 Is The Software Capable Spring 1989 Construction Computing
?of Site Control Journal
.U.K
3 Efficient On-Site Cost Vol. 10, No. 5, The Engineering and
Control System For Iraqi 1991 Technology Journal
Construction Projects Iraq
nd
4 The Role of Re- April 1992 The 2 Scientific
Construction Projects In Conference of Ministry
Improving The of Housing and
Management And , Construction
Following Up Approaches Iraq
of Executing Construction
Projects
5 The Requirement of No. 13, March M.E.C. Journal
Improving The Efficiency 1994 Iraq
of Time Controlling of
Construction Projects in
Iraq
6 Using Computer Aided No. 14, June M.E.C. Journal
Management Systems 1994 Iraq
(CAMS) In Improving
Iraqi Projects
7 The Requirements For December 1995 The 3rd Scientific
Achieving The Accuracy Conference of Ministry
of Cost Accounting For of Housing and
Construction Projects Construction
Iraq
rd
8 The Requirements of December 1995 The 3 Scientific
Improving The Methods of Conference of Ministry
Execution The of Housing and
Construction Contracts in Construction
Iraq Iraq
9 Getting An Efficient Vol. 3, No. 3, Journal of Engineering
Management For Labor 1997 Iraq
Site Cost Problem Control
For Iraqi Projects
10 Getting An Efficient On- Vol. 132, No. 4, The Engineer Journal
Site Material Cost Control December 1997 Iraq
For Construction Projects
2. No. Title of The Paper Publishing Publishing Place
Date
11 Getting An Efficient Site ,Vol. 1, No. 2 The Engineering and
Management System For October 1997 Development Journal
Sub-Contractor Cost Iraq
Problem Control Of Iraqi
Construction Projects
12 Using Computer Aided No. 2, June 1997 The Engineer Journal
Management System Iraq
(CAMS) For Improving
The Management and
Valuation of Iraqi Projects
13 Having An Efficient September 1998 1st Scientific Conference
Management System For of Engineering
Controlling Accident Site Iraq
Cost Problems of Iraqi
Projects
14 Evaluation of The Vol. 134, No. 2, The Engineer Journal
Contractor's Personnel in June 1998 Iraq
Enhancement of The Iraqi
Project Construct ability
15 The Role of An Efficient M.E.C. Journal
Construction Management Iraq
in Improving The
Productivity of Labour For
Construction Sector
16 Using a Computer Model ,Vol. 5, No. 1 The Union of Arab
For Selecting The 1998 Universities Journal
Excavation Method and
Equipment For Irrigation
Projects
17 Developing a Management Vol. 2, No. 2, The Engineering and
System For Identifying June 1998 Development Journal
and Solving The Disputes Iraq
Between The Engineer and
The Contractors in The
Construction Contracts
18 Developing a Management ,Vol. 14, No. 1 Journal of Engineering
Information System (MIS) 1998 Iraq
For Planning and
Controlling The Direct
Execution Activities For
The Oil Projects
19 Using Expert Systems For No. 4, December The Engineer Journal
Selecting Methods and 1999 Iraq
Equipments of Soil
Compaction For Road
3. No. Title of The Paper Publishing Publishing Place
Date
Projects
20 Developing a Management September 1999 The Engineer Journal
Systems For Improving Iraq
The Efficiency of
Controlling Design of
Building Projects
21 A Study of Managing Vol. 144, No. 4, Journal of Engineering
Plant For Iraqi December 1999 Iraq
Construction Firms
22 Developing a Management ,Vol. 6, No. 1 The Union of Arab
System For Identifying 1999 Universities Journal
and Solving The Disputes
In The Competitive
Contracts
23 Need For a Managerial ,Vol. 6, No. 3 The Engineering Journal
Solution For Estimating 2000 Iraq
Construction Costs Of
Highway Projects
24 Potential Slips Leading to ,Vol. 141, No. 1 Journal of Engineering
Poor Management and March 2000 Iraq
Control For On-Site
Construction Material
25 A Study of Evaluation ,Vol. 7, No. 1 The Union of Arab
Systems For Construction 2000 Universities Journal
Projects
26 A Study of Quality Control ,Vol. 6, No. 3 Journal of Engineering
Systems For Construction November 2000 Iraq
Sector
27 Developing a Management ,No. 23 3rd Scientific Conference
System For Evaluating April 2000 .of M.E.C
The Progress Of Iraq
Construction Work Items
28 Deriving an Approximate ,No. 18 M.E.C. Journal
Methods For Estimating April 2000 Iraq
The Execution of Airport
Projects
29 Implementation of TQM ,Vol. 1, No. 1 Iraqi Journal For Civil
System in Construction June 2001 Engineering
Companies
30 A Study of Site ,Vol. 7, No. 1 Journal of Engineering
Relationship Between The March 2001 Iraq
Main Contracts and His
Subcontracts
31 The Role of The Engineer Vol. 5, No. 2, The Engineering and"
in Enhancing The April 2001 "Development
Buildability Journal
((Iraq
4. No. Title of The Paper Publishing Publishing Place
Date
32 Developing An Expert 2001 The Engineering and"
System Knowledge Base "Development
For Measuring The Journal
Competitive Strength of ((Iraq
Concrete Cubes By Using
a Non-Destructive Test
33 Suggesting a System to 2001 4th Scientific Conference
Achieve The TQM in The of Ministry of Housing
Construction Projects For and Construction
Iraqi Construction Sector Iraq
th
34 Suggesting a Contracting 2001 4 Scientific Conference
Approach For of Ministry of Housing
Constructing Projects in and Construction
Iraq Iraq
35 The Status of Planning and 2001 4th Scientific Conference
Following up The Usage of Ministry of Housing
of Materials in Iraqi and Construction
Construction Sector Iraq
36 Developing a Planning Vol. 8, No. 2, Journal of Engineering
Relationship Between 2000 Iraq
CPM and Line of Balance
Method
37 Contract Review In Vol. 1, No. 2, Iraqi Journal For Civil
Manufacturing Companies September 2001 Engineering
in Iraq According To ISO Iraq
9000 Standards
38 Controlling of Inspection Vol. 8, No. 2, The Union of Arab"
and Measurement 2001 "Universities
Instrument and Their Journal
Calibration For
Construction Companies in
Iraq According to ISO
9000 Standards
39 Building an Interactive Vol. 1, No. 2, The Iraqi Journal For
Computer System For September 2001 Civil Engineering
Evaluating and Improving Iraq
The Progress of Preparing
Building Project Design
40 Suggesting a Contracting ,Vol. 1, No. 2 The Iraqi Journal For
Approach For Awarding September 2001 Civil Engineering
Construction Work In Iraq Iraq
41 Factors Causing Delays Vol. 5, No. 1, The Engineering and
April 2001 Development Journal
Iraq
5. No. Title of The Paper Publishing Publishing Place
Date
42 Development a ,Vol. 9, No. 1 The Union of Arab"
Management Information 2002 "Universities
System For Controlling Journal
and Following up
Construction Costs of
Irrigation Ministry
Companies Projects
43 Using Value Engineering 2002 The Engineering and"
For Building A "Developing
Management System For Journal
Evaluating The Selecting (Iraq)
And Executing The
Ground Water Tanks
44 A Study of Site September 2002 The Engineering and"
Relationship Between The "Development
Main Contracts and His Journal
Sub-Contractors ((Iraq
45 Design an Engineering ,Vol. 10, No. 1 The Engineering and"
Management Systems For April 2003 "Development
Material Usage on Site Journal
((Iraq
46 Using Value Engineering Vol. 9, No. 3, Journal of Engineering
Technique For Evaluating September 2003 Iraq
Security Function Projects
47 Using Standards For Proceeding of 5th "Engineering"
Evaluating The Scientific Journal
Performance of Project Conference of (Iraq)
Management In Preventing Engineering
Time Delays College
2003
48 Consideration of Quality 2004 The Union of Arab"
Management in Preparing "Universities
The Design For Building Journal
Projects
49 Total Quality Management 2004 The Engineering Journal
Iraq
50 Development of a Value ,Vol. 10, No.1 "Engineering"
Engineering Management March 2004 Journal
System For Construction ((Iraq
Projects in Iraq
51 Issues Connection With International Global Integration of
Devising a Master Conference Graduate Program
Program For Eng. Project proceeding GIGP 2004 Conference))
Management (EPM)” “An (( Jordan
Application on Quality of
Engineering Design
6. No. Title of The Paper Publishing Publishing Place
Date
52 Quality Requirements in International Quality)
Preparing Design For Conference (Conference2005
Construction Projects proceeding (Libya)
53 The Assessing The Quality International Global Integration of
Of Post Graduate Conference Graduate Program (GIGP
Education In The Arab proceeding 2005 Conference )
Universities, Libya As October/ 3-8 ((Russia
Case Study 2005
54 Implementation of Quality Vol, 11, No.3)) The Engineering""
in Preparation The September 2005 Journal
Engineering Design (Iraq)
55 Total Quality Vol. 11, No. 15 Academy of Graduate"
Management; Concepts 2006 Studies" Journal
and Applications (Libya)
56 Quality Implementations Vol. 11, No. 16 Academy of Graduate"
in Preparing Engineering 2006 Studies" Journal
Designs (Libya)
57 Developing a Planning 21- 18 The proceeding of
Relationship between the September 2007 “Eleventh International
Network analysis and Line Conference of Civil,
of Balance Methods Structural and
Environmental
Engineering Computing
(CSEEC/2007), Malta
58 How the NANO August 2009 a paper presented as a
Technology Could speech in “The
Improve The Efficiency of NANOTECH India 2009
The Engineering Project Conference, 14th _ 16th
Management (India)
59 Creating a Planning Vol. 1/ Eng. Gulf University” ”
Relationship between the Division/No. 1/ /Journal
CPM and Line of Balance August 2009 Bahrain
Method