SlideShare a Scribd company logo
1 of 165
Download to read offline
2015-16
While presenting the Budget Estimates ‘A’ (fund Code - 11, 12, 60, 70),
‘B’ (Fund Code - 21, 22, 23) & ‘G’ (Fund Code - 40) For 2015 - 2016
to the Standing Committe on Wednesday, the 4th February 2015.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 1
Mr. Chairman,
I am presenting to the Standing Committee, the estimates
of receipt and income and expenditure pertaining to the Budgets
„A‟ (Fund code 11, 12, 60, 70), „B‟ (Fund Code 21, 22, 23) and
„G‟ (Fund Code 40) for the financial year 2015-16 in pursuance
of Sections 125 and 126E of the MMC Act, 1888.
Revised Estimates 2014-15 and Budget Estimates 2015-16
The size of the Budget Estimates and the abstracts of the
revenue account and the capital account under „A‟ (Fund code
11, 12, 60, 70), „B‟ (Fund code 21, 22, 23), „E‟ (Fund code 30),
„G‟ (Fund code 40) and „Tree Authority‟ (Fund code 50) are
given below and the details thereof are given in the Annexures I
to IV on pages 134-137.
The total size of Budget Estimates for 2015-2016 is
`33,514.15 crore, which is 27.25% more than Revised Estimates
2014-15.
The Revised Estimates of Capital Expenditure for the
year 2014-15 i.e. `7,348.08 crore as against Budget Estimates
2014-15 is `11,003.69 crore. In the Budget Estimates 2015-16,
the Capital Expenditure is estimated at `11,836.00 crore which
is 7.56% higher than the current year Capital Budget Estimates.
The Estimate of the Revenue Income is `23,509.10 crore
while the Estimate for the Revenue Expenditure is
`21,675.41 crore for 2015-16.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 2
SIZE OF BUDGET ESTIMATES – „A‟ (Fund code 11, 12, 60,
70) „B‟(Fund code 21, 22, 23), „E‟ (Fund code 30), „G‟ (Fund
code 40) and Tree Authority (Fund code 50)
(`in crore)
Details
Budget Estimates
2014-15
Revised Estimates
2014-15
Budget Estimates
2015-16
Income/
Receipts
Expenditure Income /
Receipts
Expenditure Income/
Receipts
Expenditure
Revenue
Income 22,057.05 21,227.08 23,509.10
Revenue
Expenditure 20,170.73 18,966.61 21,675.41
Capital
Receipts 9,121.13 5,109.67 10,005.05
Capital
Expenditure 11,003.69 7,348.08 11,836.00
Total 31,178.18 31,174.42 26,336.75 26,314.69 33,514.15 33,511.41
Excess of
income
over
expenditure
3.76 22.06 2.74
Size of
Budget
Estimates
31,178.18 31,178.18 26,336.75 26,336.75 33,514.15 33,514.15
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 3
REVENUE ACCOUNT –
BUDGET ESTIMATES A, B, E, G &TREE AUTHORITY
(`in crore)
Fund Code Particulars
Budget
Estimates
2015-16
REVENUE INCOME
11 General Budget 18,372.64
12 Health Budget 208.98
21 Improvement Schemes 47.34
22 Slum Clearance 0.92
23 Slum Improvement 23.24
30 Education Budget 566.45
40 Water Supply and Sewerage 4,240.92
50 Tree Authority 48.61
60 Provident Fund ..
70 Pension Fund ..
Net Income 23,509.10
REVENUE EXPENDITURE
11 General Budget 10,741.73
12 Health Budget 2,561.23
21 Improvement Schemes 180.57
22 Slum Clearance 4.60
23 Slum Improvement 156.48
30 Education Budget 1,437.30
40 Water Supply and Sewerage 2,722.40
50 Tree Authority 69.44
60 Provident Fund 7.14
70 Pension Fund 3,794.52
Net Expenditure 21,675.41
Revenue Surplus during the year 1,833.69
Surplus transfer to Capital Account 1,833.01
Surplus 0.68
Net of transfer to other budgets.
Includes withdrawal from accumulated surplus
amounting to `5.12 crore
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 4
CAPITAL ACCOUNT –
BUDGET ESTIMATES A, B, E, G & TREE AUTHORITY
(`in crore)
Fund Code Particulars
Budget
Estimates
2015-16
Capital Receipts
11 General Budget 7,671.27
21 Improvement Schemes 387.15
23 Slum Improvement 28.75
30 Education Budget 357.60
40 Water Supply and Sewerage 1,549.26
50 Tree Authority 11.02
Total 10,005.05
Transfer from Revenue Account 1,833.01
Total fund available for Capital Expenditure 11,838.06
Capital Expenditure
11 General Budget 7,678.12
12 Health Budget 798.54
21 Improvement Schemes 387.05
23 Slum Improvement 61.40
30 Education Budget 357.14
40 Water Supply and Sewerage 2,542.73
50 Tree Authority 11.02
Total 11,836.00
Surplus 2.06
Withdrawal from accumulated surplus.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 5
Financial position of the MCGM
Before elaborating the revenue and capital budget
estimates for the year 2015-16, I feel it necessary to comment
on the present and future financial position of the MCGM,
particularly in the wake of noticeable downfall in the revenue
income from our main source of revenue i.e. Octroi, especially
in Octroi on crude oil since last year and likely abolition of
octroi on introduction of Goods & Service Act (GST) from
01.04.2016
As per the Budget Estimates for 2015-16, out of
estimated revenue income of `19,255.57 crore for Budget „A‟,
„B‟ and „E‟, the revenue from Octroi which is the main source
of revenue, is estimated to `7,900 crore which is about 41.03%.
Thus, Octroi continues to be the prime revenue source of
MCGM.
Octroi is a liquid source of revenue i.e. cash is collected
daily which is used as a working capital to run day-to-day
affairs of the MCGM. The main features of octroi are liquidity
and buoyancy which enables us to maintain our cash flow and
keeps us economically self-dependant. The crucial importance
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 6
of octroi in the finances of the MCGM is reflected in 8% to
10% annual increase and a receipt of more than Rs.15 crore
daily on an average.
Though the Property Tax is also one of the important
revenues of the MCGM, it has its own limitations and therefore
cannot be considered as an alternative to the Octroi.
The Union Government has introduced 122nd
Constitutional Amendments Bill in the Loksabha on
19th
December, 2014 to facilitate the introduction of the Goods
and Services Tax (GST) regime in India.
GST will replace all indirect taxes levied on goods and
services by the Central and State Governments. The above
amendment bill seeks to omit Entry 52 of the State List of the
Constitution of India which empowers the Municipal
Corporation to levy Octroi/LBT. Once this amendment is
enacted, the powers given to Municipal Corporations to levy
octroi will not be in existence.
Due to implementation of the GST, additional tax will be
assigned to States from where the supply of goods originates.
However, there is no clarity yet on the mechanism to offset the
revenue loss experienced by ULBs like Mumbai.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 7
The abolition of octroi, which has remained the major
source of revenue and the crucial factor in budgetary planning
since last several years, will adversely impact our revenues. On
the other hand, seventh pay commission that comes into effect
the same year will increase the salary and pension expenditure.
In the above circumstances, fiscal restructuring of MCGM
has become necessary. MCGM may, therefore, be compelled
to enhance the existing taxes or introduce new taxes in the years
to come. The new taxes like Property Taxes on slums,
Transport Cess, Conservancy Cess and Fire Cess may be some
of the available alternatives for augmenting the municipal
revenue to meet our future revenue and capital expenditure
requirements. We may also request the Govt. that the EGS
Cess collected by us may be retained. Also periodically raising
various fees, rents etc. will also have to be undertaken.
Moreover, we will have to press with the State Govt. to
handover Professional Tax collected in Mumbai to MCGM.
Imposition of penalty on account of unauthorized
construction as per Section 152A of the MMC Act will also be
initiated in 2015-16.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 8
Now, I enumerate provisions under Budget Estimates
„A‟, „B‟ & „E‟. The Budget Estimates for the year 2015-16
alongwith Budget Estimates and Revised Estimates for the
year 2014-15 (Budgets A,B & E) on Revenue Account are
given in the following Table :-
Table-1 Revenue Account Budget A, B, E
(`in crore)
Particulars
Budget
Estimates
Revised
Estimates
Budget
Estimates
2014-15 2014-15 2015-16
Revenue Income 17,958.82 17,569.11 19,255.57
Revenue Expenditure 16,913.15 15,741.48 18,415.89
Surplus during the year
1,045.67
(Surplus)
1,827.63
(Surplus)
839.68
(Surplus)
Transfer to Capital
Account
1,044.50 1,826.00 839.00
Surplus 1.17 1.63 0.68
The above table shows that the Revised Estimates of
revenue income have decreased by `389.71 crore as compared
to the Budget Estimates of 2014-15. In the Budget Estimates
2014-15 income of `4,444.27 crore was estimated from
Development Plan department. In the Revised Estimates for
2014-15 it is revised to `5,074.82 crore showing an increase of
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 9
`630.55 crore as compared to Budget Estimates 2014-15. This
is mainly due to the slightly higher than the anticipated
realization of revenue income from the new source of premium
against fungible FSI. However, the gross income from octroi
estimated at `7,900 crore in the Budget Estimates of 2014-15
has been revised to `7,300 crore. Thus, as compared to the
Budget Estimates 2014-15, the income from octroi is likely to
be decreased by `600 crore and the gross income from the
source of Property Tax estimated at `2,259.66 crore in the B.E.
of 2014-15 has been revised to `2,150.00 crore. Thus, as
compared to the B.E. 2014-15, the income from Property Tax is
likely to be decreased by `109.66 crore.
In the year 2014-15, the Revised Estimate of Revenue
Expenditure is `17,567.48 crore as against Budget Estimates of
`17,957.65 crore showing decrease of `390.17crore. Likewise,
Revised Capital Expenditure is estimated at `5,747.54 crore as
against Budget Estimates of `8,111.43 crore. In the B.E.
2014-15, the total Capital Receipt was estimated to `8,113.61
crore. This included internal loan of `2,000 crore, withdrawal
from Special Fund of `3,556.07 crore and `200 crore from
Central Govt. for BRIMSTOWAD Project, contribution of
`1,044.50 crore from Revenue Account and other receipt of
`1,313.04 crore. As per Revised Estimates 2014-15, the Capital
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 10
Receipts are estimated to `5,767.88 crore in which no amount
of internal loan is proposed. It comprises withdrawal from
Special Funds to the tune of `3,039.80 crore, contribution of
`1,826 crore from Revenue Account and other receipts of
`902.08 crore. Due to revision in Capital Expenditure, there is
no need to raise internal loan of `2,000 crore as envisaged in
the B.E. 2014-15.
The estimated revenue for 2015-16 at `19,255.57 crore
exceeds the estimated revenue expenditure by `839.68 crore.
Hence, funds of `839 crore are proposed to be transferred to the
Capital Account.
The estimated Capital Expenditure for the year 2015-16
is `9,282.25 crore. It is estimated that internal loan of
`2,000 crore will have to be raised to meet this Capital
Expenditure.
For estimation details of various sources of income
vis-a-vis Budget Estimates of revenue income under Revised
Estimates for 2014-15 and the Budget Estimates for 2015-16,
I refer to Table 2 which gives the details of various sources of
income with comparative position of Budget Estimates for
2013-14.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 11
Table-2 - Details of Revenue Income Budget A, B, E
(`in crore)
Octroi, Development Charges and Property tax are the
main sources of revenue for the Municipal Corporation of
Greater Mumbai.
Sr.
No.
Particulars B.E.
2013-14
R.E.
2013-14
B.E.
2014-15
R.E.
2014-15
B.E.
2015-16
1. Octroi (Net) 7,740.00 7,200.00 7,800.00 7,100.00 7,725.00
2. Property Tax 2,259.66 2,258.37 2,259.66 2,150.00 2500.05
3. Receipts from
Development Plan
3,362.41 4,743.95 4,444.27 5,074.82 5,823.74
4. Interest 1,034.74 1,086.95 1,026.05 1,178.50 1,082.40
5. Grant-in-Aid from
Government
322.94 212.60 322.88 248.10 251.38
6. Receipts from
Roads & Bridges
307.17 179.03 664.33 483.16 545.79
7. Supervision Charges 250.00 250.00 350.00 350.00 350.00
8. Solid Waste
Management
109.64 104.91 112.80 103.87 112.10
9. Receipts from
Hospitals &
Medical Colleges
122.33 120.87 130.38 136.45 151.90
10. Receipts from
License Deptt.
149.41 153.91 168.09 149.86 164.46
11. Receipts from
Markets &Deonar
Abattoir
126.45 51.57 92.28 50.53 58.67
12. Other Receipts 667.55 497.23 588.08 543.82 490.08
Total 16,452.30 16,859.39 17,958.82 17,569.11 19,255.57
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 12
GOVERNANCE ISSUES
Implementation of e-tendering procedure
Pursuant to issuance of the new G.R. under No.Meemeve efveCe&³e
ke´À.ceelebmeb/vemleer-2012/He´ke´À 273/39,meeceev³e He´Meemeve efJeYeeie dated
26.11.2014, it has been decided to mandatorily follow
e-tendering system for any tender costing above `3 lakhs.
Detailed guidelines in this regard are already circulated.
Operation of CFCs for 12 hours in a day
including Sundays and Holidays –
Last year pilot project of providing services at CFC for
12 hours in a day (8.00 a.m. to 8.00 p.m.) including all
Saturdays, Sundays (excluding 10 specified holidays) in a year
in G/N, H/E and L Wards has been undertaken.
After successful implementation of this project in these
Wards, it has been replicated in all 24 Wards with effect from
01.04.2014 which has reduced waiting time of citizens at CFCs
and facilitated providing citizens of Mumbai more and efficient
as well as dynamic services. Similarly, CFC has been started in
Municipal Head Office w.e.f. 15.08.2014.
The work of implementation of accepting online Earnest
Money Deposit is in process. Due to this, secrecy of bidders‟
information will be maintained.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 13
Reforms in the Area of Performance Management
The renowned training institutes all over India are being
coordinated with help of Administrative Staff College of India
(ASCI), Hyderabad for imparting capacity building. Efforts are
being taken to make the grant available as against DPR
submitted to MoUD, Government of India.
For imparting capacity building trainings, a budget
provision of `25.26 crore has been proposed in the Budget
Estimates for the financial year 2015-16.
Upgradation of the infrastructure facilities
in MHADA Colonies.
There are 104 MHADA layouts in Mumbai. Due to
enhancement of FSI for MHADA colonies, it is necessary to
upgrade the infrastructure like sewer lines, storm water drains
and road network including streetlights in these colonies.
Upgradation of water supply network is done by MHADA
itself. Draft Policy for recovery of cost of upgradation of
infrastructure in MHADA Colonies is framed and the same is
being submitted for the concurrence of MHADA/GoM and
Standing Committee.
Pending approval to this policy, it is proposed to carry
out upgradation of infrastructure in MHADA colonies on
receipt of payment for carrying out these works from MHADA.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 14
Similar policy will be framed for upgradation of
infrastructure in the MMRDA and Government properties.
ADMINISTRATIVE REFORMS
Implementation of „Bill Tracking System‟
Administration has successfully implemented „Bill
Tracking System‟ in SAP system which can be used by vendors
through MCGM portal to enable them to track the status of their
bill payments. The system of tracker of notification is also
implemented in SAP system.
Implementation of scheme of „Group Insurance‟
for MCGM employees
A policy decision has been taken to implement a
comprehensive Group Health Insurance Scheme for all
municipal employees on the lines of the CGHS Scheme being
implemented for State Government employees in lieu of
different scattered schemes at present in existence. The
proposal for invitation of the “Request for Proposal” for
implementing this scheme from the shortlisted firms/institutions
in public sector providing such health insurance services is
under consideration. This scheme shall be cashless for
municipal employees as well as for their family which will be
implemented on "floater basis". The proposed scheme will
come in force in the ensuing financial year. A provision of
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 15
`75 crore is proposed for the proposed scheme in Revenue
Budget Estimates for 2015-16.
Dues from State Government
Municipal administration is vigorously pursuing
recoveries of outstanding dues from different departments of the
State Govt. Total outstanding dues from the various
departments of the State Govt. amounts to `2,739.88 crore on
account of Grant-in-aid, Property Tax, Water & Sewerage
Charges, MCGM‟s share in various taxes collected by the State
Govt., etc., by the end of November, 2014. This includes an
amount of `1,908.86 crore on account of grant-in-aid from
Education department of the State Govt. On the other hand,
an amount of `355.73 crore is payable to the State Govt. by the
MCGM.
Concerted efforts are being taken to recover the long
outstanding dues in the near future.
Structural audit and structural repairs and
reconstruction of municipal properties
Pursuant to an amendment in MMC Act, 1888
incorporating Section 353B, the structural auditing of
municipal properties has been taken up. Structural audit
reports of 450 buildings have been received. Out of these
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 16
450 buildings, structural repairs of 264 buildings are
required to be carried out. The works of structural repairs
of 48 buildings are in progress while the proposals for
structural repairs of 216 buildings are under process of
finalisation of estimates/ tenders in consultation with the
user departments/structural consultants.
I have proposed a substantial provision of
`531.83 crore under Budget „A‟, „B‟ and „E‟ and
`28.34 crore under Budget „G‟ in B.E. 2015-16 for project
management and consultancy charges for heritage
structures and other municipal properties, their structural
repairs, and for their demolition and reconstruction as per
recommendations in the audit report.
Unified schedule of rates
The Unified Schedule of Rates for the year 2013-14 has
been successfully launched and being implemented by all the
departments with effect from 09.09.2013.
The first revision to be used in the year 2015-16 is
nearing finalization and thereafter the entire mechanism will be
supported on software compatible with SAP with all cross
linkages e.g. specifications, drainage, rate analysis, master
material list, labour list and other supporting parameters.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 17
Thereafter, the next revision will be dealt with by
respective departments such as H.E./Sewerage/Roads/
Ch.Eng.(M.&E.)/S.G./B.M.
This entire new mechanism will facilitate all Engineering
departments having all cross linkages and will also be useful to
Finance department for required auditing. This mechanism
shall also be additive parameter to speedy working out of
projects.
Standard Operating Procedure (SOP) for Systematic
Improvement of Slum Infrastructure
Every year MCGM spends substantial funds on
improvement of Slum Infrastructure. However, due to lack of
systematic approach to development, no constructive
upgradation of Slum Infrastructure is seen despite spending this
amount at Ward level. It is, therefore, proposed to prepare a
wardwise Micro Management Master Plan (MMMP) for the
slum cluster in each ward alongwith its financial implications.
While preparing such MMMP, Macro as well as Micro
Mapping of the Slum Infrastructure will be done after assessing
the existing infrastructure through Architect or Urban Planner.
SOPs will be prepared for each and every activity of the
work to be executed for upgradation of Slum Infrastructure
after carrying out analysis of slum cluster. The funds allocated
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 18
for slum improvement under various G.L. Codes for a ward will
be integrated for implementation of MMMP.
Service Level Bench Marking (SLB)
The appointed consultant has studied the existing data
systems and based on the issue identification and gap analysis,
conceptualized an automated system for calculation of SLB
Indicators. A software developer will be appointed to
implement the MIS system for SLB calculation. It will help the
departments to monitor the service levels automatically with
defined data sources and calculation methodologies.
Creation of a new “Department of Business Development”
As mentioned in my last year‟s budget speech, a new
department of “Business Development” has been created to
target the “Ease of Doing Business” in Mumbai. The
department is now functional with a staff strength of 7 people
already on board and started working towards -
 Ease of Doing Business Target
 Business Process Re-engineering
 Single window clearance for all Permissions.
 Streamlining construction permits, on-line licensing
 Policy Response towards the initiatives by GoI & GoM
 Business Policies for attracting Green field investments
into Mumbai in sun rise sectors
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 19
 CBD infrastructure & connectivity – identifying
infrastructure bottlenecks
 Stake Holders‟ interaction for improving the business
environment by de-bottlenecking business issues
through open dialogue sessions.
 “Branding Mumbai” exercise which will further
consolidate and strengthen the status of Mumbai as an
International Business Hub.
Extension of services to the urban poor
With a view to extending various civic services to the
urban poor and improving the standard of these services, a total
provision of `8,471.03 crore is proposed in B.E. 2015-16 under
the following heads :-
(` in crore)
Gaothans, koliwadas and adivasipadas 27.19
Adhar Kendras 2.59
Upgradation of slums 447.64
Improvement, management and maintenance
of chawls for poorer classes.
683.91
Primary Education(Budget „E‟) 2,500.90
Secondary Education 217.71
Health 3,042.31
Water Subsidies 1,437.32
Others 111.46
Total 8,471.03
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 20
While making allocation for different sectors and
activities therein, I have kept in mind the obligation cast upon
Urban Local Bodies through the XII Schedule referred to by
Article 243W of the Constitution of India and Obligatory
duties under Section 61 of the MMC Act, 1888.
I, now discuss some of the important activities/services
and facilities related to Budget „A‟, „B‟ as well as „E‟.
PROPERTY TAX AND OCTROI
(` in crore)
Revenue Income
B.E.
2014-15
R.E.
2014-15
B.E.
2015-16
1. Octroi (Net) 7,800.00 7,100.00 7,725.00
2. Property Tax 3,956.28 3,810.58 4,513.53
Excluding Govt. revenue
Early Bird Incentive Scheme
In order to induce the tax payers and encourage them for
making early payments, this has been introduced for the first
time in the year 2014-15. As per this scheme, “Early Bird
Incentive” benefit of approximately `6 crore was availed by the
tax payers who paid taxes in advance.
Slum Assessment
There are approximately 15 lakh slum dwellers in
Mumbai. JnNURM makes it mandatory to levy Property Tax
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 21
on every structure in the city. Considering the fact that octroi,
the major source of revenue income of MCGM, will not be
available in 2016-17, we are studying the feasibility of levying
and recovering Property Tax on the hutments in slums.
Survey of properties
The survey of all the properties excluding slums will be
carried out through „360‟ degree Leader Survey by preparing
panoramic images. With the help of this technology, actual
information of properties/structures which remained out of tax
net will be available in the form of images enabling us to bring
all the properties under tax net.
OCTROI
The Union Govt. has introduced 122nd
Constitutional
Amendments Bill in the Lok Sabha to facilitate the introduction
of the Goods & Service Tax (GST) regime in India from
01.04.2016. Thus, the octroi which is the main source of
revenue of MCGM is likely to be abolished from 01.04.2016.
The proposed modernization of Octroi Check Posts has
therefore been stopped and also it has been decided not to
install devices like Vehicle Trackers, CCTVs etc. as they would
be rendered redundant after introduction of GST. However, in
the present circumstances in order to curb the evasion of octroi,
decision has been taken to install CCTV cameras at Octroi
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 22
Check Nakas initially for the period of 1 year and the procedure
for inviting the tender is nearing completion and the cameras
will be installed within short period.
DEVELOPMENT PLAN
Urban Planning including Town Planning
(`in crore)
Revenue Income
B.E.
2014-15
R.E.
2014-15
B.E.
2015-16
Development Plan
department 4,444.32 5,074.84 5,823.82
1. The Regulation 32 has been amended by the State Govt.
in the year 2011 by virtue of which premium is recovered
by MCGM/State Govt. for grant of additional 0.33 F.S.I.
In the year 2014-15, it is proposed to generate `250 crore.
A provision for generating revenue of `350 crore is made
for 2015-16.
2. Similarly, modification to D.C. Regulation has also been
effected in the year 2012 to bring in the concept of
granting of fungible F.S.I. by charging premium. It is
anticipated that amount of `2,080 crore is likely to accrue
in the year 2014-15. In this case, we have already
recovered `1,596.78 crore till 30.01.2015 and S.R.A.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 23
have collected `253.94 crore (approx.) (upto 30.01.2015).
We may achieve this target by the end of March, 2015.
3. The Regulatory provision for construction of public
parking space under Regulation 33(24) is also proposed
wherein substantial amount by way of premium for the
additional F.S.I. allowed under the regulation is likely to
be recovered.
4. So far as the work of revision of the Development Plan
(2014-2034) is concerned, the existing land use survey
has already been completed and existing land use maps
are also prepared. The report on preparatory study which
included existing situation, analysis, growth scenario and
vision for next twenty years (2014-2034) was prepared
and uploaded on MCGM website. Thereafter
20 workshops have been conducted by Development Plan
Department at the key sector level as well as
24 workshops have been conducted at Ward level to
integrate consultative process in planning. The proposed
land use maps are now being prepared after analyzing
existing situation, the future growth scenario upto 2034
and the inputs from workshops. The draft Development
Plan is likely to be prepared by February, 2015 and will
be published for invitation of suggestions/ objections
from public by April, 2015.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 24
5. The work of development of GIS for all 24 Wards has
been successfully completed and D.P. remarks are given
through GIS system. The scanning/digitalization work
has also been completed for 6636 tikka sheets covering
all Wards of City and Suburbs.
6. It is also proposed to simplify approval process and
integrate „NOC‟ required for building approval process
by evolving a combined application form and creating an
on-line platform. The processes are proposed to be
substantially reduced both in terms of time as well as in
terms of procedures. This will greatly help in improving
the MCGM‟s rank in terms of “Ease of doing business”.
INFORMATION TECHNOLOGY
(`in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
119.82 112.36 154.65
Capital
expenditure
105.67 39.92 129.12
Total 225.49 152.28 283.77
In pursuance of „Digital India‟ policy of Govt. of India,
the various initiatives are proposed which are -
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 25
1) Smart City Project
We have actively integrated e-governance initiatives into
our operations. Such initiatives helped us achieve transparency
and become more efficient. We are now in a position to
effectively spread information to residents of Mumbai on issues
that directly or indirectly affect them. A Smart City works
towards ensuring the best for Mumbai's people, regardless of
social status, age, income level, gender, etc. A Detailed
Project Report (DPR) for smart city initiative involving all
departments will be prepared during 2015-16 and
implementation will start.
2) Leveraging Cloud Computing
Implementation of the state-of-the-art cloud based
technology for data center is being planned. This transition will
help to improve flexibility of hardware resources, reduce
procurement, focus on more projects and upgrades. It will also
help in reduction of data center footprint and related expenses
once complete set up is ready. Various existing and new
applications will be deployed on latest hardware and software
platform, to work more efficiently.
3) MCGM 24x7 - M-Governance
The mobile application services are being launched for
payment of water bills, payment of property tax, renewal of
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 26
licenses (Shop & Establishment) and complaints management.
Mobile application technology will be applied to other fields
shortly. This is in sync with the Electronic Delivery of Services
Bill of Govt. of India, 2011.
4) Healthcare Management System
Steps have been taken to implement a comprehensive
Healthcare Management System covering all hospitals, medical
colleges and public health administration related offices to
provide efficient healthcare services to the citizens by
re-engineering the existing manual processes. Presently, bid
management is in progress.
By end of financial year 2015-16, site survey, hardware
deployment for hosting data and software, software
development and User Acceptance Test for (i) public health
system, (ii) hospital management system and (iii) education
management system are planned to be completed.
5) Cloud based Document Management System (DMS)
The DMS will serve as a repository for about 80 crore
images and be accessible to over 20,000 users within MCGM as
well as to citizens. The DMS shall be a major step in promoting
transparency while saving precious time and efforts on the part
of the citizens to source those documents by visiting MCGM
offices in person. Work has started in this respect.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 27
6) Vehicle Tracking System
Vehicle Tracking System has been initiated in two
departments for pilot concept as mentioned below :-
I) SWM (G/South Ward)
(i) Site survey is completed.
(ii) 13 trucks were installed and configured with GPS
trackers and RFID readers.
(iii) G/N, Prabhadevi, D ward and Worli Garage were
installed with RFID readers.
(iv) The RFID reader has been installed and configured
at Mulund dumping and Mahalaxmi transfer
grounds.
(v) 78 bins across G/South were installed with 2 RFID
tags each .
II) SWD
(i) 6 trucks were installed and configured with GPS
trackers.
(ii) Control Room set up is in progress.
7) Disaster Recovery
To ensure smooth and continuous IT operations, Disaster
Recovery Site is being prepared. A project is in progress with
cloud based infrastructure and will be completed by 31st
March,
2015. This will make our IT operations resilient to disasters.
8) GIS (Geographical Information System)
Urban planning, regulating land use, managing roads,
tracking urban forestry and providing parking spaces require
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 28
accurate mapping information. In order to efficiently manage
operations, updated maps must be available to MCGM.
A holistic view of GIS implementation is being taken as
several departments within MCGM will require utility
information on a common base map. The GIS initiatives will
thus enable various departments to collaborate and use
information provided on maps to make better decisions. So far,
a common base map has been defined for use across
departments and application development for various
departments is under-way. This year, we propose to implement
coordinated GIS and Surveys. We have mapped Sewerage
Operation network and GIS platform successfully.
9) GRC (Governance Risk Management & Compliance)
The applications such as SAP, Water Billing System,
Property Tax system, Octroi have been implemented. At
present, activities such as user registration, user provisioning,
user access management, role assignment are being done
manually. A GRC (Governance Risk Management &
Compliance) for user access management is being planned for
providing a single platform to manage multiple application
access. The benefits include identity management, authorisation
matrix, improved security, enhanced compliance reporting and
improved user satisfaction.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 29
A vendor will soon be selected who will implement GRC
solutions across the organization and provide a common
interface to all applications.
ROADS & TRAFFIC DEPARTMENT
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
638.38 502.68 674.82
Capital
Expenditure
2,309.10 2,315.31 3,200.35
Total 2,947.48 2,817.99 3,875.17
For the first time, a Master Plan for Roads for 3 years has
been prepared and 314 roads have been completed and 574
roads are in progress. More than `1,000 crore has been spent
in this financial year alone.
In B.E. 2015-16, a substantial increase from about
`2,309.10 crore to `3,200.35 crore in allocation of funds is
proposed for improvement of roads in asphalt and cement
concrete.
Improvement & Concretization of Roads
Major roads such as Nesbit Road, Megharaj Sethi Road,
Dadasaheb Phalke Road, Pandurang Budhkar Road, Dinshaw
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 30
Wachchha Road and B.E.S.T Road in City area, Siddharth
Nagar Road No.2 Goregaon (west), Malad Marve Marg, Malad
(West), Aakruli Road, Kandivali (East), Dr.Ambedkar Marg,
Borivali (West), Shiv Vallabh Marg Dahisar (East) and
Kandarpada Dahisar (West) in Western Suburbs and Mother
Dairy Road Kurla, R.C. Marg, V.N.Purav Marg, D.K.Sandu
Marg Chembur, Shankara Colony road Govandi, Veena Nagar
road Mulund in Eastern Suburbs have been concretized in
2014-15.
Major roads like S.V.Road & Link Road (Footpath & Set
Back) Bandra to Dahisar about 20 k.m. each, Free Press Journal
Marg, A.S. D‟Mello Road , G.D. Ambekar Marg, Acharya
Donde Marg, side-strips of S.V. Road in H and K Wards are
proposed to be improved in the year 2015-16.
I have proposed a provision of `1,120.51 crore for
Cement Concrete Roads in B.E. 2015-16.
Improvement of Asphalt/ Mastic Roads
Asphalting of Mogal lane Road, Agashe Road, Bhagat
Lane road, Anandrao Nair road, B.G.Kher Road, M.L
Dahanukar Road etc. in City, Netaram Nathuram Road,
Khandekar Road Andheri (East), Johara Aghadi Road Andheri
(West), Dayabhai Patel Road Malad (East), Daulat Nagar Road
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 31
No.5 Borivali (East), from Link Road to Z Garden Mithagar
Road Dahisar (West) etc. in Western Suburbs and Jogeshwari
Vikhroli link Road Vikhroli, Marva Road and Vijay Fire Road
Kurla(West), Vidhyavihar Station Road etc. in Eastern
Suburbs have been completed during the year 2014-15.
Veer Nariman Road, Potdar Road, Vachha Gandhi Road,
Br. Nath Pai Road are proposed to be taken up in 2015-16.
I have proposed a provision of `1,854.69 crore for
Asphalt Roads in B.E. 2015-16.
Mumbai Coastal Road Project.
The consultancy work for preparation of feasibility
report, DPR preparation, report on environmental studies and
obtaining MOE&F clearance and bid process management for
Mumbai coastal road project is in advance stage of finalisation.
Environmental clearance is being pursued urgently with Govt.
of India and is expected very soon. If all clearances are in
place, we propose to issue tenders and start the work in
2015-16.
I have proposed `200 crore for this project from the
fungible FSI fund, earmarked for the coastal road project.
Parking Policy
MCGM has approved parking policy for the first time to
encourage the public transport and reduce the traffic
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 32
congestion. Roads are public spaces. “Road congesters have to
pay” is the principle adapted in this policy.
Parking is divided as On-street parking and Off-street
parking. On-street parking is divided into A, B & C categories
to manage traffic in Mumbai City. Half the rates of On-street
parking are proposed for Off-street parking, On-street parking
is prohibited on the road in the 500m radius.
Monthly passes will be available at municipal kiosk.
30% & 50% concession shall be given for taxies and buses in
monthly passes respectively. 50% concession shall also be
given for Sunday & holidays. Parking will be free on holidays
for tourist spots at prominent locations to encourage tourism.
Pay & park near school within radius of 100m is prohibited.
Parking at malls and cinema theatres, web based parking,
urban transport fund, formation of new traffic cell and marshals
etc. are some of the other features of the parking policy.
Residential parking permits are being introduced in 'A‟
ward on pilot basis and will be continued in rest of the city
based on 'A' ward experience.
Comprehensive Mobility Plan for the
first time for the Mumbai City.
The work of “Preparation of Comprehensive Mobility
Plan” for the Mumbai city has been undertaken for
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 33
improvement in the traffic management and control at several
places and the same is in progress. Various factors related to
traffic, volumes, speeds etc. are being studied to suggest the
solution for the speedy traffic movement to develop the
network. Besides this, it would be proper to make utilization of
the revenue and the human resources.
With a view to implementing the suggestions made by
the consultants from the traffic point of view, this plan will be
prepared in the financial year 2015-16.
Think Tank
It is essential to give priority to road transport, internal
roads, open spaces for the pedestrian, communication without
transport in less time or stipulated time.
It has, therefore, been decided to form an
inter-disciplinary group of experts from different divisions
namely road engineering, transport planning, signalling and
communication, R.T.O., traffic police as well as experts from
the civil society to take a holistic view and give feedback on
various aspects of traffic issues in Mumbai.
New Trenching guidelines.
New guidelines have been framed for trenching work so
that the trenching work is synchronized with the ongoing road
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 34
works so as to minimize interrupted traffic movement.
Horizontal Drilling Method (HDD) is insisted and encouraged
to minimise the open cut in road. A new technology of micro-
trenching which is less invasive is also introduced.
Depending upon the status of DLP, rates of reinstatement
of trenches have been revised;
For 1st
year of DLP 4 times
For 2nd
year of DLP 3 times
For 3rd
year of DLP 2 times
For 4th
year of DLP Standard rate.
Pedestrian First Policy
For the first time „pedestrian first‟ policy is introduced in
which special attention is given to avoid conflict between
vehicular and pedestrian transportation thereby minimising
accidents and improved ways of travel. Being a part of
roadway, the footpaths shall be kept consistently along the
carriageway which will compel the pedestrian to use it.
Uninterrupted width of footpath will be kept from 1.50m to
3.00m depending upon the width of the road. Also the footpath
surface will be kept even to encourage the pedestrian to use it.
Guard rails and bollards are being provided to improve
pedestrian safety and to avoid parking on footpath thereby
creating maximum utilisation by the pedestrian.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 35
Footpath height is kept 150mm from road level so that the
commuters can easily step up & down.
LED street lighting
In pursuance of the policy of the Govt. of India on
Energy Efficiency, it is proposed to convert all street lights of
Mumbai into LED lights. It is expected to generate huge
savings in the street lights electric bill, a part of which can be
used to incur expenditure on LED conversion. It is proposed to
complete this process by September, 2015.
FLYOVERS & BRIDGES
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
14.00 9.52 13.61
Capital
Expenditure
332.84 212.38 657.18
Total 346.84 221.90 670.79
The Jogeshwari (North) and (South) bridges will be
opened to public in 2015. These bridges will greatly improve
the East-West connectivity between S.V.Road and Western
Express Highway. The extension proposals of both these
bridges are under consideration. Kurla-Kalina bridge on South
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 36
Side is being thrown open to traffic. The resurfacing works of
18 bridges have been completed. The Work Order for
resurfacing of 9 Bridges in Western Suburbs has been given on
31.12.2014 and the work has started.
Construction of flyover bridge at junction of S.V. road
and Veer Savarkar Bridge has started. The work for
construction of F.O.B. at Pravasi Industrial Estate on Goregaon
Mulund Link Road has started. Reconstruction of F.O.B.s
across Mithi River at Jai Bhim Nagar and at Morarji Nagar,
Powai in „S‟ Ward have also started. The work of construction
of culvert over J.K. Chemical Nalla at Wadala Truck Terminal
in F/N Ward is taken in hand. Tenders for widening of bridges
on Deonar Nalla, PMGP Nalla and Children‟s Aid Nalla on
Ghatkopar Mankhurd Link Road in M/E ward have been
invited.
The tender for carrying out the Inventory of the Bridges
and Condition Assessment is invited and the same is proposed
to be opened on 03.03.2015.
The construction of new flyovers at Mith Chowky;
Malad, Bangur Nagar; Goregaon is proposed to be undertaken
in 2015-16.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 37
New Works Proposed
Foot Over Bridges
Demolition and Reconstruction of F.O.B. near Charni
Road, construction of F.O.B. from 161 layout to Juhu Beach,
construction of Skywalk from S.V. Road; Jogeshwari (W) to
Ismail Yusuf College, Jogeshwari (East) are proposed to be
undertaken.
R.O.Bs
The demolition of Hancock and Carnac R.O.Bs. is being
executed by Railway authorities for which funds have been
provided to Railway. New reconstruction issues are being
discussed and pursued with G.M. (Central Railway) office. The
G.A.D. for Vikhroli R.O.B has been approved and work in the
Railway portion is expected to be started shortly. Repairs to
R.O.B. at Priyadarshini Park near Napean Sea Road in
„D‟ Ward have been approved.
Goregaon-Mulund Link Road Project
Goregaon-Mulund link road is proposed for west and east
link which will help to reduce traffic congestions. The length of
the proposed road is 14.66 km. The consultant's Detailed
Project Report (DPR) is in progress. A provision of `300 crore
is proposed in B.E. 2015-16.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 38
STORM WATER DRAINS
(`in crore)
Budget
Estimate
2014-15
Revised
Estimate
2014-15
Budget
Estimate
2015-16
Revenue
Expenditure
337.10 312.13 328.68
Capital
Expenditure
1106.54 899.91 1097.65
Total 1443.64 1212.04 1426.33
1. Development & Conservation of River Systems
Mumbai City has river systems viz., Dahisar, Mithi,
Poiser, Vakola and Oshivara/Walbhat. Out of these, Mithi
river action plan has been mostly implemented leading to
deepening, widening and training which has resulted in
increase in carrying capacity twice and discharge capacity by
three times.
Along the similar lines, it is proposed to take up their
integrated development for rejuvenation of Dahisar and Poiser
river in holistic manner including widening, deepening, training
and beautification along with service roads as well as sewer
lines laying. Remaining river systems will also be taken up in
due course such as Walbhat river system etc.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 39
A DPR will be prepared along with financial structuring
and will be implemented in a phased manner. A provision of
`1.50 crore is proposed in Budget Estimates 2015-16.
2. Storm Water pumping Stations
Under the BRIMSTOWAD Project, Haji Ali and Irla
Pumping Stations are commissioned in May, 2011. Lovegrove
and Cleaveland Pumping Stations will be commissioned by
May, 2015. Britannia Pumping Station is expected to be
commissioned by May, 2016. Gazdharbund Pumping Station is
expected to be commissioned by January, 2017. As regards
Mahul and Mogra Pumping Stations, vigorous follow up is
being taken with the concerned Govt. authorities for allotment/
acquisition of land.
As on date, out of 55 chronic flooding spots existing in
2011 have been reduced to 40.
The provision of `196 crore is proposed in B.E. 2015-16
for all storm water pumping station works.
3. BRIMSTOWAD Project
As the city needs to complete the works under
BRIMSTOWAD Project to protect itself from any future
onslaught of rains similar to that of 26th
July, 2005, we have to
go ahead with the full implementation plan in phasewise
manner. A provision of `376.43 crore has been proposed in the
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 40
financial year 2015-16 for BRIMSTOWAD works. Liability of
BRIMSTOWAD works on MCGM budget will continue up to
the year 2015-16.
Out of total 58 works under BRIMSTOWAD, 26 works
have been completed till date, while 29 works are in progress.
Tenders for the remaining 3 works are to be invited. i.e. works
of Storm Water Pumping Stations at Mahul, Mogra and Dadar
Mahim Diversion work.
Major achievements regarding SWD works
City
a)Most of the underground arch drains in the city area are very
old, hence rehabilitation/strengthening of some of the arch
drains to the tune of 26 kms. has been carried out which has
reduced flooding and rain water accumulation period to
considerable extent.
b)The work of laying 6 nos. of 1800 mm dia. pipe (by Box
pushing method below Mahalaxmi flyover bridge) is in
progress which will be completed by end of March, 2015,
due to which, areas such as Satrasta Circle and
Byculla (West) will get relief from flooding.
c) There is an old existing dhapa drain along Peddar Road. In
the past, some portion of the existing dhapa drain in front of
Cadbury junction and Navroji Gamadia Road junction has
collapsed. The work of about 400 mts. of length (from petrol
pump near Jaslok Hospital up to Cadbury junction, which
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 41
was structurally in a very bad condition) for laying of 1200
dia pipe to replace existing dhapa drain is taken in hand and
about 220 mts. of drain work is completed. The balance
SWD work for a length of 180 mts. is in progress.
Eastern Suburbs
a) The training/improvement work of Laxmibaug nalla, Usha
nagar nalla, Datar colony nalla, Crompton Kanjur nalla
system is in progress under BRIMSTOWAD –Phase II.
b) The training/improvement work of Damodar park nalla, P.L.
Lokhande marg drain and 10 nos. of culverts of LBS Marg is
in progress, due to which, flooding will be considerably
reduced in the surrounding area.
Western Suburbs
The nalla training work of Dhasakwadi nalla, Dharkhadi
nalla, Piramal nagar nalla, Poisar river and P & T nalla have
been recently completed which will reduce flooding in the
respective catchment areas of Dahisar East, Goregaon West,
Kandivali and Khar West.
The balance works of Irla nalla, SNDT nalla have been
proposed during ensuing year.
4. Revision of BRIMSTOWAD Master Plan
As per recommendations of Fact Finding Committee, the
preparation of Revised Master Plan of SWD network for
Greater Mumbai was undertaken and Consultant M/s. MWH (I)
Pvt. Ltd. has submitted the BRIMSTOWAD Draft Master
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 42
Plan-II in the month of February, 2014. To finalize the
BRIMSTOWAD Draft Master Plan-II, a committee of two
retired MCGM (SWD) officers is appointed. After the scrutiny
of the BRIMSTOWAD Draft Master Plan-II by this committee
and submission of report to MCGM, the priority list of works
will be decided and executed as per the availability of funds.
The tender procedure is in progress for the work of
surveying, mapping, analysis and modeling of road side
drains / minor drains.
5. Development of Mithi River
Out of total length of 17.84 k.m. of Mithi River, 11.84
k.m. is in MCGM‟s jurisdiction and 6.0 k.m. is in MMRDA‟s
jurisdiction. Mithi river under MCGM jurisdiction is being
improved, as a result, control over flood water level at
vulnerable locations, increase in carrying capacity by two times
and discharging capacity by three times, reduction in siltation
of river channel will be achieved. Due to construction of
retaining wall, encroachment on the bank of river is prevented.
There are total 12 nos. of bridges out of which 2 are now
in progress and 5 nos. of bridges are proposed through Bridge
Department.
The provision of `35 crore is proposed in B.E. 2015-16
for the work of Mithi River.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 43
6. Catchment Engineer Concept
The concept of Catchment Engineer is being
implemented on experimental basis from last year. Mumbai
city and suburbs have been divided into total 122 catchment
areas for which 80 sub engineers are appointed as Catchment
Engineers. This has yielded good results in the recent monsoon
of 2014.
7. Mechanical desilting of Nalla/Drains
Besides efficient and effective desilting and cleaning of
storm water drain, safety of personnel is also important.
Therefore, mechanized cleaning of drains is being done by
upgrading the machinery. Roadside Open Drain Desilting
(RODD) machine with silt container, Robotic Multi-purpose
excavator machine and Vehicle mounted suction-cum-jetting
Machine with recycling facility are being used.
A provision of `186.14 crore is proposed for cleaning/
desilting and maintenance of Storm Water Drains in Revenue
Budget 2015-16.
During the year 2014-15, total 6,04,551 cu.m. silt has
been removed from Storm Water Drains, Major nallas, Minor
nallas and Mithi river in City and Suburbs before monsoon.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 44
HEALTH AND MEDICAL SERVICES
(`in crore)
Budget
Estimate
2014-15
Revised
Estimate
2014-15
Budget
Estimate
2015-16
Revenue
Expenditure
2,179.35 1,953.90 2,561.24
Capital
Expenditure
733.62 365.89 798.54
Total 2,912.97 2319.79 3,359.78
Mumbai Aarogya Abhiyan
While according due priority to the Health Sector,
substantial funds have been allocated to various important
aspects of the health care under 'cegbyeF& Deejesi³e DeefYe³eeve'. Under this
comprehensive programme to provide health care in primary,
secondary and tertiary sectors, in 2014, we have succeeded in
increasing and enhancing primary health services and maternity
health related services through 12 new dispensaries and 1 new
maternity home.
Malaria & Dengue Control Programme
Through various measures like periodical enumeration of
permanent breeding sources, introduction of Guppy fishes in
permanent breeding sources of mosquitoes, anti larval treatment
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 45
in stagnant water in major and minor nallas, weekly treatment at
stagnant waters in building construction, insecticide treatment in
accumulated water in odd articles, thermal fogging through
fogging machines and creation of public awareness in the
general public, dengue investigation facilities in 50 municipal
dispensaries, we were able to remarkably control and reduce the
prevalence of Malaria and Dengue in Mumbai.
Dispensary upgradation programme
12 new dispensaries have been started in the areas
identified through a gap analysis done by Public Health
Department of MCGM.
Maternity Homes upgradation programme
The Kherwadi Maternity Home and Bail Bazar
Maternity Home have been upgraded and have started
functioning in June/July, 2014. The maternity homes at Marol,
Oshivara, Mother and Child Hospital; Magathane, Chembur
Naka and Bhandup are proposed to be developed as Sentinel
Centers while 6 maternity homes i.e. V.N.Shirodkar, Akurli
Road, Borivali, Deonar, Mulund and Mahim are proposed for
upgradation.
30 new obstetric beds and 20 pediatric beds have been
made available at Bail Bazar Maternity Home, Kurla for giving
quality health care services to mothers and neonatal children.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 46
20 NICU beds will be made available in the Sentinel Centers
proposed to be developed. 60 pediatric beds will be provided in
Mulund, Borivali, Akurli, Marol, Oshiwara and Chembur naka
Maternity homes in the ensuing year .
Branding of MCGM Maternity Homes
It is proposed to carry out branding of all maternity
homes under Public Health Dept. As a pilot project, branding
of squatter‟s colony maternity home will be done in this year.
Implementation Programme for
Diabètes and Hypertension
The Non-Communicable Diseases Cell (NCD Cell) has
been implementing programme for Diabètes and Hypertension
since 2011. Facilities for diagnosis, lifelong treatment and
referral to higher centres have been made available in 55
MCGM dispensaries. This service has been started in 25 new
MCGM dispensaries since November, 2014.
Mumbai Mission for Tuberculoses (TB) control
11 bedded Intensive Respiratory Care Unit (IRCU) is
proposed for TB patients at GTB Hospital. A provision of
`1 crore is proposed in B.E. 2015-16 therefor.
Cleanliness Drive in GTB Hospital
As Tuberculosis is communicable disease, for lowering
its prevalence, hospital premises need be kept clean. Various
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 47
wards, adjacent premises, toilet blocks etc. of Group of TB
Hospitals including Bahadurji Block needs to be cleaned,
regularly monitored and maintained. It is proposed to
outsource these services through NGO for which a budgetary
provision of `13 crore is proposed in B.E. 2015-16.
Facilities for Leprosy patient
It is proposed to give financial assistance of `1,000/- to
every handicapped leprosy patient. It is under consideration to
construct hostel for medical students in hospital campus.
Arogya Bhavan
To provide and co-ordinate various health services
effectively under one roof, it is proposed to construct Arogya
Bhavan of MCGM in the campus of Kasturba Hospital for
which budgetary provision of `50 lakh is proposed in
B.E. 2015-16.
National Urban Health Mission (NUHM).
Recognizing the importance of health in the process of
economic and social development and improving the quality of
life of our citizens, particularly of poorer and vulnerable section
of the population of Urban Area, the Government of India has
resolved to launch the National Urban Health Mission
(NUHM).
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 48
National Urban Health Mission (NUHM) aims to
improve the health status of the urban population, particularly
the slum dwellers and other vulnerable sections by facilitating
equitable access to quality health care with the active
involvement of the Urban Local Bodies (ULBs). Considering
all above, NUHM has been launched in Mumbai since 2013-14.
Birth & Death Record at single premises
Birth & Death record of Public Health Department is
stored at distant premises. Approx. 100 years‟ old record is
available in Public Health Department. For storing this record
permanently at one premises, space is being made available in
the proposed new building in Acworth Leprosy Hospital for
which budgetary provision is proposed.
Dialysis Services
Acknowledging the prime need for more dialysis services
in suburbs, 38 dialysis beds have been commissioned at
5 Peripheral Hospitals i.e. Rajawadi Hospital; Ghatkopar,
M.W. Desai General Hospital; Malad, Dr. Babasaheb
Ambedkar Hospital; Kandivali, Siddharth General Hospital;
Goregaon, Shatabdi Hospital; Govandi through PPP Model.
Letter of Intents (LoIs) have been issued to the
institutes/firms selected through e-tendering under PPP Model
for commissioning another 68 dialysis beds at
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 49
Hinduhridaysamrat Balasaheb Thackeray Trauma Care
Municipal General Hospital; Jogeshwari, V.N. Desai General
Hospital; Santacruz, Cooper Hospital; Vileparle, Bhabha
Hospital; Kurla (West), MAA Hospital; Chembur, M.J. Phule
General Hospital; Vikhroli and MT Agarwal Hospital; Mulund.
Diagnostic Services
3 MRI Centres in suburbs i.e. Rajawadi Hospital;
Ghatkopar in Eastern Suburbs and H.B.T. Trauma Care
General Hospital; Jogeshwari and Cooper Hospital; Vileparle in
Western Suburbs will be commissioned under PPP Model.
Similarly, CT scan centres will also be commissioned at
Bhabha Hospital; Kurla and M.T. Agarwal Hospital; Mulund in
Eastern Suburbs and Siddartha Hospital; Goregaon,
Dr. Babasaheb Ambedkar Hospital; Kandivali and Cooper
Hospital; Vileparle in Western Suburbs under PPP Model.
2 new Anti Retroviral Therapy Centres (ART Centres)
have been started at Rajawadi Hospital, Ghatkopar in Eastern
Suburbs and Bhabha General Hospital, Bandra in Western
Suburbs from December, 2014 by MDACS.
Peripheral Hospitals
 The work of redevelopment of 1000 bedded Harilal
Bhagwati Municipal General Hospital is in progress.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 50
About 86% work for 1st
phase is completed and 2nd
phase
is in planning stage.
 The redevelopment of Bhabha General Hospital; Kurla is
in process.
 It is proposed to construct 150 bedded hospital with all
latest facilities at Kasturba Cross Road Municipal
General Hospital, Borvali and the work is in progress.
 To bridge the gap between the demand for and supply of
secondary level health care in the suburbs, the project of
construction of diagnostic centre at Punjabi Gully;
Borivali, redevelopment of Pt. Madan Mohan Malviya
Municipal General Hospital; Govandi, M.J. Phule
General Hospital; Vikhroli and M.T. Agarwal Hospital;
Mulund are under consideration and plans therefor are
being prepared. Sufficient provisions have been proposed
for these ensuing projects in B.E. 2015-16.
 Maharashtra University of Health Science and Medical
Education & Research Directorate, Maharashtra has
issued permission to start 150 students capacity medical
college affiliated to Dr. R.N. Cooper Hospital. The
Medical Council of India has carried out inspection in
December, 2014 and compliance of observations is in
progress.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 51
 The proposal for construction of Super Specialty
Hospital/Cancer Hospital at „S‟ Ward is underway.
 10 beds are reserved for treatment of chemotherapy at
Dr. Babasaheb Ambedkar Municipal General Hospital,
Kandivali.
 Dilassa Centre is a public hospital based crisis
counseling department for women facing violence. At
present “Dilassa Centres” are available at Bhabha
Hospital, Bandra and Bhabha Hospital, Kurla. Such
centres will be started at 11 peripheral hospitals during
this financial year.
 Modular O.T. facilities will be made available in the
ensuing financial year in 4 peripheral hospitals for which
sufficient provisions are proposed in B.E. 2015-16.
 Intensive Care Units (ICU) – At present, ICU services
are made available in 5 peripheral hospitals through PPP
Model. Similar facility will be made available in another
5 hospitals in the ensuing year through PPP Model.
The following new projects are proposed to be
undertaken in the ensuing year :-
 Blood Bank at Trauma Care Municipal General
Hospital, Jogeshwari.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 52
 Human Milk Bank at Rajawadi Hospital;
Ghatkopar, Dr. Cooper Hospital; Vileparle,
Trauma Hospital; Jogeshwari and Dr. Babasaheb
Ambedkar General Hospital; Kandivali (W).
 Yoga Therapy Centres at Rajawadi Hospital,
Ghatkopar and Dr. Cooper Hospital; Vileparle,
Trauma Care Centre; Jogeshwari.
 Nirbhaya Centre, a centre to enable to control the
problem of violence against women is proposed to
be started at Dr. Babasaheb Ambedkar General
Hospital, Kandivali.
Major Hospitals
At the helm of our three tier health care system, are our
major hospitals handling a daily combined OPD of 13,000
patients and combined bed strength of 4,939.
 The work of restoration and refurbishment of Main
Heritage Building of KEM Hospital is nearing
completion. The fully renovated EMS with modern
medical care and increased capacity is about to be
commissioned for better patient care. The tenders for
external major repairs of 13 storeyed building have
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 53
been invited and the work is likely to be started
during this financial year.
 The purchase process for MRI machine and Bi-plane
DSA Machine, multi slice CT scanner for Radiology
department and Cath lab machines for Cardiology
department for KEM hospital is on.
In the ensuing year, it is proposed to install Digital
Radiology System for Radiology department of KEM Hospital.
It is also proposed to purchase High Intensive Focused Ultra
Sound Machine (HIFU) for Urology department, Real time 3D
and 2D Intra Operative Imaging System for Neurosurgery
department, Dedicated Pet CT Scan Machine for Nuclear
Medicine department for KEM Hospital, for which sufficient
provisions are proposed in B.E. 2015-16.
It is proposed to construct new hostels/quarters at Haji
Ali, Wadala and Koliwada for Doctors of capacity 200, 1200
and 700 for Nair, KEM and Sion Hospitals respectively.
Crematoriums
Beautification and Upgradation of Crematoriums
A phasewise programme for conversion of wood based
crematoriums into PNG based green crematoriums has been
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 54
chalked out. As per phase 1(a)11, phase 1(b) 10, phase 1(c) 23,
crematoriums will be converted into PNG.
In Phase I(a), crematorium at Shivaji Park, Amboli,
Babhai, Charai, Sion, Underai (Malad), Dahanukarwadi, Daulat
Nagar, Oshiwara, Marve Road and Versova Hindu Cemetries
are proposed for conversion. The total station surveys have
been carried out. A Technical Committee has been formed for
technical specifications under the guidance of technical experts
of VJTI, Mumbai. These technical specifications have now
been approved by technical experts. Tenders will be invited by
the end of this financial year. A substantial provision is
proposed for conversion of crematoriums included in Phase II
and III. A sufficient provision is also proposed for development
of Raffique Nagar Muslim Cemetery in Govandi.
Repairs and development works in
Private Cemeteries / Burial Grounds
In the municipal jurisdiction, there are 119 cemeteries /
burial grounds which are owned and managed by the private
trusts. Maintenance and providing basic services at these
cemeteries / burial grounds is the responsibility of these private
trusts. However, due to inadequate financial support, these
cemeteries / burial grounds are not being properly maintained
and basic services are not being provided thereat by these
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 55
private trusts which causes inconvenience to the mourners. The
Corporation, by their Resolution No.1406, dated 03.03.1989,
have accorded approval to undertake repairs and
development works in private cemeteries from municipal
funds under section 63k of the M.M.C. Act subject to
compliance of certain conditions taking into account total no. of
dead bodies brought for final rites, availability of MCGM
facilities in the vicinity and reservation of cemetery in the
Development Plan.
Accordingly, a provision of `6 crore is proposed in B.E.
2015-16 for station survey, repairs and development works and
provision of red earth in private cemeteries / burial grounds.
The highlights of the provisions made in B.E. 2015-16
for improvement of Health Sector are as under:-
(` in crore)
Sr.
No.
Details Provision
1 Providing PNG furnace at various municipal
cemeteries
4.00
2 Provision for repairs of existing Health Post,
construction/ addition/ alteration of premises
for new Health Posts and purchase of furniture,
instruments etc. under IPP-V in Brihanmumbai.
2.00
3 Upgradation of Public Health institutions,
Dispensaries and Construction of regional
health Centre.
2.00
4 Upgradation of Maternity Homes (Civil) 2.63
Upgradation of Maternity Homes (Equipment) 3.25
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 56
5 Provision for conversion of Kasturba Maternity
Home into Municipal General Hospital in
R/Central Ward
15.00
6 Modernisation & repairs to 159 dispensaries
under Public Health Department (Branding)
5.00
7 Structural repairs to various peripheral
hospitals/ Special Hospitals/Major Hospitals/
Medical Colleges/Health Department Structure
51.00
8 Construction of Gas Crematorium and proposed
reconstruction of Staff Quarters at Underai
Hindu Cemetery, Malad East at P/North Ward
3.42
K.E.M. Hospital
1 Purchase of Plant & Machinery, Digital
Radiography Equipment & PET- C.T.Scan
Machine for K.E.M. Hospital
53.25
2 Upgradation of Plasma Centre in K.E.M. Hosp. 21.50
3 Works related to the Comprehensive repairs/
Restoration of the K.E.M.Hospital Main
Building. (Heritage)
10.00
L.T.M.G. Hospital
1 Purchase of Plant & Machinery alongwith
LCMS, Cath Lab, PACS machines for
L.T.M.G. Hospital
32.75
B.Y.L.Nair Hospital
1 Purchase of Plant & Machinery and equipments
for B.Y.L.Nair Hospital
51.45
Peripheral Hospitals
1 Provision for construction of new Medical
College building at Dr. R.N. Cooper Municipal
General Hospital
2.00
2 Purchase of Plant & Machinery, C.T.Scan
Machine, Ventilators for Hinduhridaysamrat
Balasaheb Thakre Trauma Care Hospital,
Jogeshwari.
14.82
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 57
EDUCATION
Primary Education
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
2,312.96 2,021.13 2,143.75
Capital
Expenditure
347.38 156.53 357.14
Total 2,660.34 2,177.66 2,500.89
 In ensuing academic year, it is decided to establish
200 new computer labs in various municipal schools.
Budget provision 2015-16 .. `17 crore
 It is our endeavour that henceforth, no student of
municipal school shall sit on the floor. With this objective
and considering the present shortages of benches and
desks in primary schools, a tender procedure for
eco-friendly 14,791 desks and benches is in progress.
Budget provision .. `7.25 crore
 It is decided to provide „Tab‟ for the students of Std.VIII
of MCGM Primary as well as Secondary Schools from
the academic year 2015-16.
Budget provision (Primary) .. `29.22 crore
Budget provision(Secondary) .. `5.18 crore
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 58
 It is decided to create suitable website of Education
Department in the ensuing academic year.
Budget provision .. `10 lakhs
 Virtual Classroom – It is now decided to start with new
202 Virtual classrooms (100 primary and 102 secondary)
in the Phase – III Project in academic year 2015-16.
Budget provision .. `8.86 crore (Primary)
`8.81 crore (Secondary)
SOLID WASTE MANAGEMENT
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
1,789.83 1,428.53 1,855.94
Capital
Expenditure
421.24 97.06 376.01
Total 2,211.07 1,525.59 2,231.95
Swaccha Bharat-Swaccha Mumbai Abhiyan
In response to the appeal made by Hon‟ble
Prime Minister for implementing the Clean India Mission
(Swaccha Bharat Abhiyan), MCGM, being the prime agency
responsible for maintaining cleanliness in the city, “Swaccha
Bharat-Swaccha Mumbai Abhiyan” has been implemented
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 59
from 02nd
October, 2014. Under this drive, various programs
have been undertaken/proposed to be undertaken.
It is expected that grants in the form of VGF (Viability
Gap Funding) will become available from the Central Govt.
under Swaccha Bharat Mission (SBM) and Corporation will
have to contribute some portion of the expenditure on
implementation of mission components work. Drafting a City
Sanitation Plan and submission of DPR to the Central Govt.is
the necessary condition for getting such assistance. It is
therefore, decided to start the work of preparation of City
Sanitation Plan and DPR for further submission to Govt. of
India.
Public Awareness
To increase the awareness among the citizens regarding
the waste management and to streamline the roll of several
NGOs engaged in the activity of cleanliness by training their
volunteers and to coordinate their functioning and generally to
improve the civic sense, the MCGM has called an “Expression
of Interest” from the experts in the field to devise and organise
awareness campaign. A provision of `15 crore has been
proposed in the B.E. 2015-16.
Cleanliness at High Refuse Generation spots
To enhance the participation of Shopkeepers in the
cleanliness campaign and maintain cleanliness outside the
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 60
shops and nearby premises, Saaf Aangan scheme is being
encouraged. Special attention is being provided at high refuse
generation points to ensure that they remain litter free at all
times.
Cleanliness in MMRDA Housing Colonies
MCGM has accepted responsibility of maintaining
cleanliness in the MMRDA Housing Colonies constructed by
MMRDA for rehabilitation of PAPs.
Budget provision 2015-16 .. `2.90 crore
Cleaning of House Gullies
Total 1,148 volunteers are deployed for the purpose of
cleaning house gullies and house-to-house collection of refuse.
Budget provision 2015-16 .. `20 crore
Swachha Mumbai Prabodhan Abhiyan
(Vasti Swacchata Yojana)
Under “Clean India Mission”, special efforts are being
taken to ensure that high refuse generation points in 24 wards of
the city like tourist spots, sea beaches and high footfall areas
remain litter free all 24 hours. Slum dwellers residing near
railway tracks throw garbage on railway land. As such house to
house collection has been started in these slum colonies. This
has helped to reduce such 142 spots to 60 spots.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 61
A provision of `35 crore has been proposed in
B.E. 2015-16 under the head “manning-mopping”.
MCGM has started a scheme under “Swachha Mumbai
Prabhodan Abhiyan” (Vasti Swachhata Yojna) for maintaining
cleanliness in slums.
A provision of `75 crore has been proposed in
B.E. 2015-16 for “Swachha Mumbai Prabhodan Abhiyan”.
“Debris-on-Call”
Debris generated due to construction activities is
unauthorisedly dumped on the roads/footpaths. To abate this,
“Debris-on-call service” for collection of debris generated
from household repairs and construction activity has been
started in March, 2014. Under this scheme, 7670 MT of debris
has been lifted till November, 2014 and a revenue of
`19.23 lakhs has been generated. Under Swaccha Bharat
Abhiyan, special efforts are being made to control the debris
being indiscriminately dumped at such spots. For this, Junior
Overseers have been made aware and empowered.
Segregation of Waste
The work of segregation of waste is awarded to “Mahila
Bachat Gats” formed by the rag pickers at Dry Waste
Segregation Centres set up in all 24 wards. The vehicles
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 62
provided at each ward for collection of segregated dry waste
from house to house are being augmented to accommodate the
increasing capacity of dry waste, for which a provision of
`13 crore has been proposed in B.E. 2015-16. For setting up
additional Dry Waste Segregation Centre in various wards, a
provision of `3 crore is proposed in B.E. 2015-16.
Small Capacity Waste Processing Projects
The projects awarded for scientific processing of MSW
are stalled due to continuous litigations. As an alternative, small
capacity processing plants for converting waste into energy has
been planned. The EoIs for setting up 3 such plants each of
about 1000 MT per day, total about 2500 MT per day have been
issued. For this purpose, a provision of `3 crore has been
proposed in B.E. 2015-16.
Similarly, decentralized waste processing facilities of 3,
5 and 10 MT capacity are being set up at ward level, for which
a provision of `2 crore has been proposed in B.E. 2015-16.
Future Planning of Waste Management
In view of the increasing population in Mumbai and
consequent increase in solid waste, it is proposed to acquire
126 hectare of land outside Mumbai at Taloja from Govt. of
Maharashtra. A continuous pursual in this regard is made by
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 63
MCGM. If the GoM allots the land, it will help in reducing
burden of waste management within Mumbai at Deonar,
Kanjurmarg and Mulund. Sufficient provision has been
proposed in the B.E. 2015-16 for acquisition of land in D.P.
department‟s budget. Also a provision of `1 crore for protecting
the land after acquisition is proposed in B.E. 2015-16.
 Stationery Compactors (Hyva) of 15 MT capacity are
proposed to be installed at 20 new locations to improve
hygienic conditions around large collection centres, for
which budget provision of `7 crore is proposed in
B.E. 2015-16.
 27 large compactors and 41 mini compactors are
proposed to be purchased in 2015-16. For this
purpose, a provision of `20 crore is proposed in
B.E. 2015-16.
New Refuse Transfer Stations
For preparing DPR for developing and building transfer
station at suitable sites, the appointment of PMC will be made.
A provision of `6 crore has, therefore, been proposed in B.E.
2015-16
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 64
Elimination of Open Defecation Spots:-
In the guidelines provided by the Central Govt. under the
Swaccha Bharat Abhiyan, emphasis has been given on
elimination of open defecation spots by providing private
toilets, public toilets and Pay and Use toilets for floating
population, etc. SWM department is planning to construct new
pay and use toilets in the City to increase the existing number
of Pay and Use Toilets at new places, especially under flyovers
and public roads which do not obstruct traffic. If permanent
toilets cannot be built in crowded places, then it is proposed to
provide portable toilets at such places. All these schemes are
covered under “Pay and Use” scheme for NGOs; hence no
budgetary provision is made for these works. To maintain
public toilets provided in slums, it is proposed to delegate this
work to NGO Sansthas under Vasti Swacchata Yojana; initially
on trial basis in 7 wards.
Public toilet for ladies (Right to „Pee‟)
With a view to providing public toilet facilities for ladies
in crowded areas in the Mumbai City, a notice was issued in the
public newspapers inviting suggestions from citizens and NGOs
regarding suitable places for such toilets in Mumbai.
Accordingly, Assistant Commissioners of Wards are being
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 65
directed to suggest suitable places. Considering the suggestions,
wardwise locations will be finalised and toilets on „Pay & Use‟
basis will be constructed. A provision of `5.25 crore is
proposed for this purpose in B.E. 2015-16.
Environment Protection: -
As per the XII amendment of the Indian Constitution,
Local Self Governments are given responsibility of “Protection
of Urban Forestry, Environment Protection and Atmospheric
elements”. In Mumbai, monitoring of air, water and noise
pollution is done by Environment Section of SWM department
and Environment Status Report is published every year. It is
proposed to make Environment Status Report more useful by
increasing the scope of statistics and other information
published in the report. In the year 2015-16, the programs/
schemes proposed to increase the effectiveness of the section
are -
SAFAR Project - Stationary Air Quality Monitoring Centre is
currently monitoring the air quality at 7 places and at 3 traffic
junctions and dumping grounds through Mobile Air Quality
Monitoring Van which measures the elements responsible for
polluting the environment. Additionally, it is proposed to install
7 more modern Air Quality Monitoring Centers in collaboration
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 66
with IITM of Indian Meteorological Department under the
“SAFAR” project. For this, a budgetary provision of `5 crore
has been proposed in the B.E. 2015-16.
Noise Mapping - To measure the noise levels at 1200 places in
all wards of Greater Mumbai and to undertake appropriate
remedial measures alongwith budgetary estimates at places
where the levels exceed the limits by appointing Project
Consultant, a budgetary provision has been proposed in the
budget. Accordingly, e-tender has been called for awarding the
work.
Ashray Yojna
Under the project of Ashray Yojna, it is proposed to
redevelop the existing plots by utilizing 4 FSI. A proposal is
submitted for approval of State Govt. to permit 4 FSI. To begin
with, temporary transit camps are being constructed at
16 locations. Out of these, 2 in City, 1 each in E.S. & W.S. are
in progress. A budget provision of `197.62 crore is proposed in
B.E. 2015-16 for construction of transit camps, major repairs
and redevelopment of SWM staff quarters.
For reconstruction and renovation of mustering
chowkies, a provision of `6 crore is proposed in B.E. 2015-16.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 67
“Mission Garima”
With a view to reducing human intervention with
sewage, it is planned to have a systematic approach for
reduction in breakdown maintenance with increase in
preventive maintenance by effective use of machinery/
mechanization/ automation of system.
With this objective, “Mission Garima” has been launched
jointly with Tata Trust. It is aimed for health, hygiene and
welfare of workers working in Sewerage, SWD and SWM
departments. It is planned to procure various machineries
which will help maintenance of sewerage conveyance system
mechanically and reduction of human intervention.
Welfare Activities for Conservancy Staff
To reduce the mortality rate of Municipal conservancy
staff while on duty; primarily due to unhygienic working
conditions and illiteracy making them prone to addiction,
comprehensive plans have been made. Measures like safety
gears, de-addiction programmes, counselling, financial
planning, training, medical check-up are conducted every year
for the workers and families.
Training Programme for Labour
For Class IV employees, 3 Day residential training
programmes are conducted at C.T.I. & R.C. The Labour
department also conducts 2 days „Quality of Life Training
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 68
Programme‟ for the benefit of employees and their spouses
wherein emphasis on family budget and quality of life,
de-addiction, (alcoholism, gutkha, tobacco, smoking etc.) health
of women and children, effects of unauthorised absenteeism,
etc. is given. This programme has benefited in improving their
daily life style in a positive way.
Earmarking 25% provision for SWM and Sewage Water
Projects out of total provision for Capital Works.
The Member Secretary, Maharashtra Pollution Control
Board (MPCB) has informed that it is mandatory to earmark
25% of the total provision made for Capital Works for the
projects under Solid Waste Management and Sewage Water as
per the provisions of Section 41(2)A Water (Pollution
Prevention and Control) Act, 1974 and Section 15 Environment
(Protection) Act, 1986 as well as Municipal Solid Waste
(Management & Handling) Rules, 2000.
Keeping these directives in view, in the B.E. 2015-16, a
provision of `2,962.21 crore out of total provision of
`11,824.98 crore i.e. 25.05% of the total capital provision has
been earmarked for the projects as given below :-
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 69
Activity Provision
(` in Crore)
Solid Waste Management 376.01
Storm Water Drain 1,097.65
Roads (25% provision for SWD) 793.88
Goregaon-Mulund Link Road (7%) 21.00
Sewage Water 148.09
Sewerage Projects 173.18
Municipal Seweage Disposal Project 352.40
Total 2,962.21
Total Capital Provision
Budget A, B & E 9,282.25
Budget G 2,542.73
Total Capital Provision 11,824.98
% of capital provision for the project S.W.M.,
S.W.D., S.P. etc. over total capital
25.05%
LICENCE
Action against unauthorized hoardings
In pursuance of Hon‟ble High Court‟s orders dated
30.07.2012, efforts have been made to remove the hoardings
which are violating the new policy guidelines. Henceforth,
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 70
permission for display of hoardings on terrace of more than
30 years old building will not be granted.
Pursuant to the Bombay High Court orders on Writ
Petition No.PIL/37 of 2010 and No.PIL/155 of 2011 display of
Banners, Boards etc., I would like to mention here that we have
taken utmost efforts to minimize this nuisance. Sr. Inspectors
(Lic.) of the ward have now been appointed as „Nodal Officer‟
and Toll free Nos. (1292 & 1293) have been provided and
activated to the citizens for lodging the complaints in respect of
display of unauthorised banners / posters etc.
Street Vendors Regulation
As per Hon‟ble Supreme Court‟s orders dated
09.09.2013, 1,28,443 Registration forms were distributed to the
streets vendors in July, 2014 and accordingly 99,435 duly filled
in registration forms were received at respective ward offices.
In order to ascertain the eligibility, a software is being
developed by MCGM.
As per the plan and scheme under the provisions of
“The Street Vendors (Protection of Livelihood & Regulation of
Street Vending) Act 2014”, vending, non-vending and restricted
vending zones are to be created. It is proposed to create Geo-
fencing of these zones and also issue identity cards to the
registered Street Vendors with QRT Codes / other technology
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 71
as well as provide instrument to concern Lorry Inspectors
which could read the Identity Card and also penalty or warning
that is imposed can be registered on the spot. It is also proposed
to develop a software to tag the position of individual street
vendor with respect to time and place allotted for his business
as well as to create database of individual street vendor for
regular inspection and history of individual street vendor. A
provision of `3 crore is made for the same.
GARDENS
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
149.08 132.17 144.28
Capital
Expenditure
268.89 143.33 294.91
Total 417.97 275.50 439.19
Garden Cell
Improvement of various RG/PG/lakes/Sports complexes
Phasewise improvement of various RG/PG/Lakes and
Sports Complexes in Mumbai jurisdiction is taken up by
Garden cell through a new concept of „Design Built Basis‟
where bidders are to submit designs. Architects/Consultants are
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 72
to be engaged for enabling the latest concepts in urban
development/Garden design.
Phase –I
29 plots were identified and same are under improvement
in holistic approach as individual theme gardens on „Design
Build Basis‟. Total Area under development as
Garden/playground is 3,24,000.00 sq.mt. Few of the gardens
with individual theme are -
Sr.
No.
Name of Garden(Ward) Theme Area
1 BombayDyeing Plot (F/S) Multi Theme 9 Acre
2 Priyadarshani Garden (L) Fortresses of
Maharashtra
6 Acre
3 Hegadewar Udyan (N) Phases of Moon 3 Acre
4 Nakshtra Udyan (K/W) Nakshtra (Zodiac
Signs)
3 acre
5 S.K. Patil Udyan (C) Butter Fly Garden 1 Acre
6 Upper Govind Nagar (P/S) Rose Garden 1 Acre
7 R.G. Plot at Model Town,
Andheri (K/W)
Musical Theme
Garden
1.8 Acre
Phase-II
Holistic improvement of 33 plots will commence shortly.
Total area to be developed shortly as Garden /Play ground is
2,23,600.00 sq.mt. Shilp-Gram at Jogeshwari of area 12 acres
will be developed as “Shilpgram” and the preliminary work is
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 73
started. The Gardens at CTIRC, Borivali, Praksh Cotton Mill,
Wadala, Sion Circle, Sion, Vasant Prabhu Garden, Dadar are
proposed to be developed.
Phase-III
Borivali Sports Complex at Chikuwadi in about 12 acre
area will be developed for which clearances are being pursued.
The compound wall construction is nearly completed. Repairs
to Andheri Sports Complex will commence shortly.
Garden Department
Durgadevi Udyan (Grant Road), Sant Gadage Maharaj
Udyan; E Ward, Bhatia Baugh in A ward, Sardar Vallabhabhai
Patel Udyan; Andheri (W), Meenatai Thakare Maidan, one
reserved plot in P/N ward, Jari Mari Udyan and Sane Guruji
Udyan in R/N ward are proposed to be developed in financial
year 2015-16. The development work of Chittaranjan Udyan,
Vidyavihar (E) is completed. All development works of the
these gardens are being executed by E.E.( Garden Cell) under
Design Build Concept.
Wet Lands/lakes
The beautification works of four wet lands is proposed in
the year 2014-15. Among them, the beautification work of
Charai Lake is nearing completion. The work of removal of
encroachment and leveling of the plot of Kalina tank is in
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 74
progress. The contractual agency for beautification of
Bandra Talao is appointed and the work is started. NOC of the
Heritage Department has also been obtained.
Development of Shivaji Talao has been undertaken. This
includes desilting, road development, development of gardens.
I also propose to develop Banganga lake and also maintaining
this lake in South Mumbai in Malbar Hill. Financial modalities
will be worked out.
Spaces below Flyovers – Spaces below Matunga, Hindmata,
Bharatmata, Lalbaug flyovers are being developed. Tenders
have been floated and some works have already started.
GPS based Tree Census – Till today, the GPS based tree
census of more than 11 lakh trees has been completed
successfully.
Development of Gardens/ RG/PG plots – Out of total
179 major Gardens/ RG/ PG plots, 10 plots in City area,
11 plots in Eastern Suburbs and 40 plots in Western Suburbs
are proposed to be developed in the year 2015-16.
Rain Tree Conservation
Garden Department is also undertaking steps for
protection of Rain Tree Conservation infected by Mealy bugs.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 75
Outside experts are involved in this work and we have achieved
reasonable success in this aspect.
Theatres & Swimming Pools - Development/ improvement of
Kalidas Natyagriha, Birla Krida Kendra, Kandivali Swimming
Pool and Chembur Swimming Pool will be done shortly.
It has been decided to carry out structural repairs and to
reconstruct General Arunkumar Vaidya Swimming Pool in
Olympic shape with modern amenities such as separate
swimming pool for children, audience gallery, administrative
building, diving board, etc.
Mumbai Cultural Festival
Cultural vibrancy of city is as important as economic
prosperity. It is, therefore, proposed to hold Mumbai Cultural
Festival every year during December / January to make the City
culturally vibrant involving persons of national and
international eminence. It is proposed to make a provision of
`25 lakh for the same and Maharashtra Tourism will anchor this
programme.
Modernization of Veermata Jijabai Bhosale Udyan & Zoo
Veermata Jijabai Bhosale Udyan & Zoo (53 acres) is
declared as “Heritage Grade II (B)” site & “Medium Zoo”
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 76
and accorded recognition up to 31.12.2015 by Central Zoo
Authority, New Delhi. The Master (Layout) Plan has been
approved on 05-12-2012. The zoo development works are
proposed to be completed by December, 2016 and the entire
project cost will be around `325 crore.
The proposed Humboldt Penguin facility is at the Ground
floor of the Interpretation Center building and an agency viz.
M/s Goa Trade Farming Co. Ltd., Thailand has been appointed
for the procurement of 6 (3M + 3F) Humboldt Penguins. These
Humboldt Penguins will be brought by December, 2015. The
other facilities at the Interpretation Centre will include Marine
Fish exhibits, Children‟s Play area & Library, 3D Theatre at
Ground floor, Zoo Exploration Centre at 1st floor and
administrative office at 2nd floor.
The Memorandum of Understanding (MOU) between the
State Forest Department and MCGM is prepared and sent for
the approval to the State Govt. for the establishment of
international zoo at Aarey Milk Colony, Goregaon (125 acres).
Bird Park of international standards will be developed at
Dr. Babasaheb Ambedkar Udyan; Powai (25 acres), for which a
PMC consultant viz. Universal Organics, Mumbai is already
selected.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 77
For the year 2015-16, a budget provision of `49 crore has
been proposed for the various zoo development works.
ESTATE
 Estate department has been entrusted with the
responsibility to look after the estates owned or managed
on behalf of Government of Maharashtra („W‟ properties)
by Corporation.
 Estate department is also taking over lot of PAP tenements
for allotment to families affected under various
development schemes.
 Since 1991, Estate Department received total 20,122 PAPs
of 180 sq.ft., 225 sq.ft. and 269 sq.ft. area from Chief
Engineer (D.P.), S.R.A. & MMRDA. out of which 6,795
PAPs are allotted to respective project affected persons
and remaining 13,327 PAPs are vacant
 Out of total allotted 6,795 PAPs 3,091 PAPs are allotted to
residents/Municipal Employees of dilapidated buildings,
1,567 PAPs are allotted to project affected persons nearby
Tansa pipeline project in Mumbai and 2,137 PAPs are
allotted to various road widening project affected persons.
 Pursuant to an amendment in MMC Act, 1888
incorporating Section 353B, the Estate department has
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 78
already taken up the structural auditing of 751
municipal properties.
MUMBAI FIRE BRIGADE
(` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
167.12 148.99 224.02
Capital
Expenditure
190.53 99.28 262.27
Total 357.65 248.27 486.29
 A programme was undertaken to strengthen the Disaster
Management capability of the Fire Brigade, under which
it was decided to construct and equip 6 Regional
Command Centers. The Command Center at Wadala is
already commissioned and the Command Centers at
Vikhroli, Byculla, Mankhurd, Borivali are ready and will
be commissioned shortly.
 With a view to strengthening the Fire Brigade and
reducing the response time as well as increasing the
efficiency and efficacy of the search and rescue
operations of Mumbai Fire Brigade, a substantial
provision of `262.27 crore has been proposed in the
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 79
B.E. 2015-16 . The major items and provision proposed
therefor are as stated below : -
(` in crore)
R.E.
2014-15
B.E.
2015-16
1 90 mtrs. Hydraulic platform,
(1 Nos)
20.00 6.00
2 81 mtrs. Hydraulic platform,
(3 Nos)
20.00 26.00
3 3 Hazmat Vehicles 0.01 15.00
4 Special ultra high pressure water
mist system (6 Nos.)
0.01 3.00
5 Mini Quick Response
Multipurpose Vehicles (10 Nos.)
0.76 8.04
6 Portable pumps (22 Nos.) 3.95 3.96
7 Replacement of old fire engines
(24 Nos.)
14.30 27.75
8 Purchase of Fire Engines (6
Nos.)
0.70 6.25
9 Replacement of Water Tankers
(11 Nos.)
0.01 18.00
 Mumbai Fire Brigade has carried out a gap analysis and
accordingly prepared a perspective plan for setting of
26 new fire stations in the next five years. The work of
construction of Fire Stations at Kanjurmarg (W) is
being executed by MCGM and is expected to be
completed in the ensuing financial year.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 80
The other Fire Stations at the plots at Amboli Village,
Andheri (W), Kandarpada at Dahisar and Ramabai
Ambedkar Colony Ghatkopar (E) are being developed
through developers/land owners. A substantial provision
of `2.00 crore has been proposed for construction of new
fire stations in B.E. 2015-16.
 Mini Fire Stations - The proposal of constructing the
mini fire stations with temporary shed in municipal
properties is under consideration. These fire stations will
be equipped with mini fire tender and sufficient
manpower. It has been decided to link these fire stations
with their parent fire stations. Mini fire stations will
have early and easy access to the scene of incident
including hutments/slums.
3 locations each in City, W.S. area and 4 in E.S. have
been identified for constructing such mini fire stations.
 With a view to modernizing the Control Room of
Mumbai Fire Brigade, it is proposed to install “Integrated
Command & Control System & Vehicles tracking system
based on GPS & GIS System”. This will improve the
efficiency of the Control room and also reduce the
response time.
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 81
MUNICIPAL MARKETS
( ` in crore)
Budget
Estimates
2014-15
Revised
Estimates
2014-15
Budget
Estimates
2015-16
Revenue
Expenditure
64.20 50.28 67.46
Capital
Expenditure
49.31 21.24 37.20
Total 113.51 71.52 104.66
 As per Corporation Resolution no.1779 dated
28.03.2013, it has been decided to redevelop the existing
92 markets and 6 open plots as follows.
Category - I Markets to be developed as per
existing policy Part – II and Part –
III approved by U.D. in the year
2004 – 2005.
= 18 nos.
Category - II Markets to be developed as per
revised policy which is submitted
for the approval of U.D. department.
= 25 nos.
Category III
& IV
Markets to be developed as per
DCR 33(21)
= 49 nos.
Category - V Open plots in MCGM possession to
be developed as per Part – I of
policy and guidelines approved by
U.D. in the year 2004 - 2005
= 06 nos
Category - I Letter of Intent has been issued for 18 markets.
Out of these 18 markets, redevelopment work
of Vakola Market, Sant Jalaram Bappa
Market, Pant Nagar Markets are completed
B U D G E T E S T I M A T E S A , B & G 2015-16
MUNICIPAL CORPORATION OF GREATER MUMBAI 82
and the redevelopment work of B.R. Gawde
Market is nearing completion. Besides this, the
redevelopment work of 4 markets is in
progress and for 2 markets, IOD has been
issued. The time period of Letter of Intent is
extended for the remaining 8 markets.
Category - II Improvements Committee/Corporation have
approved the revised redevelopment policy to
maintain the profit sharing ratio of
developers/association same for all municipal
markets by increasing profit of Corporation.
This policy has been challenged by some of
the Market Associations in High Court and as
per High Court directions, redevelopment of
25 markets as per existing policy is under
consideration.
Category III &
IV
The 49 markets falling in this category will be
developed as per DCR 33(21).
Category - V The 6 open plots which are in M.C.G.M.
possession will be developed as per Part - I of
policy guidelines approved by U.D. in the
year 2004 – 2005. The open plots are located
at Chandivali village – Kurla, Borladevi
Mandir – Govandi, Godrej plot – Vikhroli
(West), Kannamwar Nagar – Vikhroli (East),
Eksar village – Borivali. The plans of
Chandivali village, Godrej plot, Kannamwar
Nagar are ready.
 A ground + 9 floor modern market (Majas Market) is
constructed at Poonam Nagar, Jogeshwari, K/E Ward at
a total cost of `69.67 crore. At present, the
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET
BMC  BUDGET

More Related Content

What's hot

INDUSTRIAL CORRIDOR - MAKE IN INDIA
INDUSTRIAL CORRIDOR - MAKE IN INDIAINDUSTRIAL CORRIDOR - MAKE IN INDIA
INDUSTRIAL CORRIDOR - MAKE IN INDIANetsourcing .in
 
AN OVERVIEW ON THE SOBHA LIMITED
AN OVERVIEW ON THE SOBHA LIMITEDAN OVERVIEW ON THE SOBHA LIMITED
AN OVERVIEW ON THE SOBHA LIMITEDVARUN KESAVAN
 
Pradhan mantri awas yojana (pmay)
Pradhan mantri awas yojana (pmay)Pradhan mantri awas yojana (pmay)
Pradhan mantri awas yojana (pmay)SakshiGadakh
 
Trip rate calculations
Trip rate calculationsTrip rate calculations
Trip rate calculationsayishairshad
 
Approaching Inclusive Housing in India
Approaching Inclusive Housing in IndiaApproaching Inclusive Housing in India
Approaching Inclusive Housing in IndiaJIT KUMAR GUPTA
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Urban Public Finance / Local Public Finance
Urban Public Finance / Local Public FinanceUrban Public Finance / Local Public Finance
Urban Public Finance / Local Public FinanceRavikant Joshi
 
Smart City Mission
Smart City MissionSmart City Mission
Smart City MissionNaman Markan
 
Housing finance
Housing financeHousing finance
Housing financeArchDuty
 
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Ravikant Joshi
 

What's hot (20)

Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 
INDUSTRIAL CORRIDOR - MAKE IN INDIA
INDUSTRIAL CORRIDOR - MAKE IN INDIAINDUSTRIAL CORRIDOR - MAKE IN INDIA
INDUSTRIAL CORRIDOR - MAKE IN INDIA
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
Railway project
Railway projectRailway project
Railway project
 
Pradhan mantri awas yojana – housing for all by 2022
Pradhan mantri awas yojana – housing for all by 2022Pradhan mantri awas yojana – housing for all by 2022
Pradhan mantri awas yojana – housing for all by 2022
 
AN OVERVIEW ON THE SOBHA LIMITED
AN OVERVIEW ON THE SOBHA LIMITEDAN OVERVIEW ON THE SOBHA LIMITED
AN OVERVIEW ON THE SOBHA LIMITED
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Pradhan mantri awas yojana (pmay)
Pradhan mantri awas yojana (pmay)Pradhan mantri awas yojana (pmay)
Pradhan mantri awas yojana (pmay)
 
India Smart Cities and Urban Transport
India Smart Cities and Urban TransportIndia Smart Cities and Urban Transport
India Smart Cities and Urban Transport
 
Special purpose vehicle (SPV)
Special purpose vehicle (SPV)Special purpose vehicle (SPV)
Special purpose vehicle (SPV)
 
Trip rate calculations
Trip rate calculationsTrip rate calculations
Trip rate calculations
 
Urban infrastructure in india
Urban infrastructure in indiaUrban infrastructure in india
Urban infrastructure in india
 
Approaching Inclusive Housing in India
Approaching Inclusive Housing in IndiaApproaching Inclusive Housing in India
Approaching Inclusive Housing in India
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Urban Public Finance / Local Public Finance
Urban Public Finance / Local Public FinanceUrban Public Finance / Local Public Finance
Urban Public Finance / Local Public Finance
 
Housing finance in India
Housing finance in IndiaHousing finance in India
Housing finance in India
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 
Smart City Mission
Smart City MissionSmart City Mission
Smart City Mission
 
Housing finance
Housing financeHousing finance
Housing finance
 
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
 

Similar to BMC BUDGET

ICRA Comments Union Budget 2015-16
ICRA Comments Union Budget 2015-16ICRA Comments Union Budget 2015-16
ICRA Comments Union Budget 2015-16Pranav Awasthi, CFA
 
Income Tax Analysis of Previous Three Years
Income Tax Analysis of Previous Three YearsIncome Tax Analysis of Previous Three Years
Income Tax Analysis of Previous Three YearsMamoona Shahzad
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020E'ville Eye
 
Budget 2016-17: Reform, fiscal commitment and more.
Budget 2016-17: Reform, fiscal commitment and more.Budget 2016-17: Reform, fiscal commitment and more.
Budget 2016-17: Reform, fiscal commitment and more.NIPFP Publications
 
Dpnc budget-2014-15-highlights
Dpnc budget-2014-15-highlightsDpnc budget-2014-15-highlights
Dpnc budget-2014-15-highlightsSandeep Gupta
 
RBSA-Budget-Finance Bill 2023-Key Proposals.pdf
RBSA-Budget-Finance Bill 2023-Key Proposals.pdfRBSA-Budget-Finance Bill 2023-Key Proposals.pdf
RBSA-Budget-Finance Bill 2023-Key Proposals.pdfRBSA Advisors
 
Budget in brief_2016_17
Budget in brief_2016_17Budget in brief_2016_17
Budget in brief_2016_17osama khan
 
Union Budget 2023-24
Union Budget 2023-24Union Budget 2023-24
Union Budget 2023-24iciciprumf
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Government of Ekiti State, Nigeria
 
Wealth Vistas - Budget Special Issue
Wealth Vistas - Budget Special IssueWealth Vistas - Budget Special Issue
Wealth Vistas - Budget Special IssueTushar Agarwal
 
050221-Analysis of union budget 2021-22.pptx
050221-Analysis of union budget 2021-22.pptx050221-Analysis of union budget 2021-22.pptx
050221-Analysis of union budget 2021-22.pptxcollegemate
 
A Glimpse of Union Budget 2015
A Glimpse of Union Budget 2015A Glimpse of Union Budget 2015
A Glimpse of Union Budget 2015RSPCPavan
 
Analysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportAnalysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportDVSResearchFoundatio
 

Similar to BMC BUDGET (20)

ICRA Comments Union Budget 2015-16
ICRA Comments Union Budget 2015-16ICRA Comments Union Budget 2015-16
ICRA Comments Union Budget 2015-16
 
Budget analysis FY -2020-21
Budget analysis FY -2020-21 Budget analysis FY -2020-21
Budget analysis FY -2020-21
 
Income Tax Analysis of Previous Three Years
Income Tax Analysis of Previous Three YearsIncome Tax Analysis of Previous Three Years
Income Tax Analysis of Previous Three Years
 
Budget circular 2013 14
Budget circular 2013 14Budget circular 2013 14
Budget circular 2013 14
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
UNION BUDGET 2022
UNION BUDGET 2022UNION BUDGET 2022
UNION BUDGET 2022
 
MTBiz July 2014
MTBiz July 2014MTBiz July 2014
MTBiz July 2014
 
ICRA GoI Budget 2014-15
ICRA GoI Budget 2014-15ICRA GoI Budget 2014-15
ICRA GoI Budget 2014-15
 
Budget 2016-17: Reform, fiscal commitment and more.
Budget 2016-17: Reform, fiscal commitment and more.Budget 2016-17: Reform, fiscal commitment and more.
Budget 2016-17: Reform, fiscal commitment and more.
 
Dpnc budget-2014-15-highlights
Dpnc budget-2014-15-highlightsDpnc budget-2014-15-highlights
Dpnc budget-2014-15-highlights
 
14-15_3Qtr_Reports
14-15_3Qtr_Reports14-15_3Qtr_Reports
14-15_3Qtr_Reports
 
RBSA-Budget-Finance Bill 2023-Key Proposals.pdf
RBSA-Budget-Finance Bill 2023-Key Proposals.pdfRBSA-Budget-Finance Bill 2023-Key Proposals.pdf
RBSA-Budget-Finance Bill 2023-Key Proposals.pdf
 
Budget in brief_2016_17
Budget in brief_2016_17Budget in brief_2016_17
Budget in brief_2016_17
 
Union Budget 2023-24
Union Budget 2023-24Union Budget 2023-24
Union Budget 2023-24
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
 
Wealth Vistas - Budget Special Issue
Wealth Vistas - Budget Special IssueWealth Vistas - Budget Special Issue
Wealth Vistas - Budget Special Issue
 
050221-Analysis of union budget 2021-22.pptx
050221-Analysis of union budget 2021-22.pptx050221-Analysis of union budget 2021-22.pptx
050221-Analysis of union budget 2021-22.pptx
 
A Glimpse of Union Budget 2015
A Glimpse of Union Budget 2015A Glimpse of Union Budget 2015
A Glimpse of Union Budget 2015
 
Analysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportAnalysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First Report
 
Union Budget 2016
Union Budget 2016Union Budget 2016
Union Budget 2016
 

More from PESHWA ACHARYA

RELIANCE DIGITAL - Party of FOUNDING TEAM
RELIANCE DIGITAL  -  Party  of FOUNDING TEAM RELIANCE DIGITAL  -  Party  of FOUNDING TEAM
RELIANCE DIGITAL - Party of FOUNDING TEAM PESHWA ACHARYA
 
Sterling Resort touchpoints
Sterling Resort  touchpointsSterling Resort  touchpoints
Sterling Resort touchpointsPESHWA ACHARYA
 
Consumer loyalty program
Consumer loyalty programConsumer loyalty program
Consumer loyalty programPESHWA ACHARYA
 
Think asconsumercredmay2019.pptx
Think asconsumercredmay2019.pptxThink asconsumercredmay2019.pptx
Think asconsumercredmay2019.pptxPESHWA ACHARYA
 
Indian management journal article nov - 2018 by peshwa acharya
Indian management journal   article   nov - 2018  by peshwa acharyaIndian management journal   article   nov - 2018  by peshwa acharya
Indian management journal article nov - 2018 by peshwa acharyaPESHWA ACHARYA
 
Sterling Instagram stories.pptx
Sterling  Instagram stories.pptxSterling  Instagram stories.pptx
Sterling Instagram stories.pptxPESHWA ACHARYA
 
Best practises in loyalty marketing
Best practises in loyalty marketingBest practises in loyalty marketing
Best practises in loyalty marketingPESHWA ACHARYA
 
STERLING RESORTS BROCHURE
STERLING  RESORTS  BROCHURE STERLING  RESORTS  BROCHURE
STERLING RESORTS BROCHURE PESHWA ACHARYA
 
Amadeus traveller-tribes-2030-airline-it
Amadeus traveller-tribes-2030-airline-itAmadeus traveller-tribes-2030-airline-it
Amadeus traveller-tribes-2030-airline-itPESHWA ACHARYA
 
AIR ASIA MEDIA STRATEGY
AIR  ASIA   MEDIA  STRATEGY AIR  ASIA   MEDIA  STRATEGY
AIR ASIA MEDIA STRATEGY PESHWA ACHARYA
 
Rocket perks an introduction
Rocket perks   an introductionRocket perks   an introduction
Rocket perks an introductionPESHWA ACHARYA
 
BLOG POSTS / CONTENT MAREKTING
BLOG POSTS  / CONTENT MAREKTING BLOG POSTS  / CONTENT MAREKTING
BLOG POSTS / CONTENT MAREKTING PESHWA ACHARYA
 
Customer touchpoints workshop
Customer touchpoints workshopCustomer touchpoints workshop
Customer touchpoints workshopPESHWA ACHARYA
 
Sterling master class digital
Sterling master class  digitalSterling master class  digital
Sterling master class digitalPESHWA ACHARYA
 
MARKETING WHITEBOOK 2017
MARKETING WHITEBOOK  2017MARKETING WHITEBOOK  2017
MARKETING WHITEBOOK 2017PESHWA ACHARYA
 
Building Brands - Consumer Marketing
Building Brands -  Consumer Marketing Building Brands -  Consumer Marketing
Building Brands - Consumer Marketing PESHWA ACHARYA
 

More from PESHWA ACHARYA (20)

RELIANCE DIGITAL - Party of FOUNDING TEAM
RELIANCE DIGITAL  -  Party  of FOUNDING TEAM RELIANCE DIGITAL  -  Party  of FOUNDING TEAM
RELIANCE DIGITAL - Party of FOUNDING TEAM
 
Sterling Resort touchpoints
Sterling Resort  touchpointsSterling Resort  touchpoints
Sterling Resort touchpoints
 
Consumer loyalty program
Consumer loyalty programConsumer loyalty program
Consumer loyalty program
 
Think asconsumercredmay2019.pptx
Think asconsumercredmay2019.pptxThink asconsumercredmay2019.pptx
Think asconsumercredmay2019.pptx
 
Ppt thal1
Ppt thal1Ppt thal1
Ppt thal1
 
Indian management journal article nov - 2018 by peshwa acharya
Indian management journal   article   nov - 2018  by peshwa acharyaIndian management journal   article   nov - 2018  by peshwa acharya
Indian management journal article nov - 2018 by peshwa acharya
 
Sterling Instagram stories.pptx
Sterling  Instagram stories.pptxSterling  Instagram stories.pptx
Sterling Instagram stories.pptx
 
Best practises in loyalty marketing
Best practises in loyalty marketingBest practises in loyalty marketing
Best practises in loyalty marketing
 
STERLING RESORTS BROCHURE
STERLING  RESORTS  BROCHURE STERLING  RESORTS  BROCHURE
STERLING RESORTS BROCHURE
 
Amadeus traveller-tribes-2030-airline-it
Amadeus traveller-tribes-2030-airline-itAmadeus traveller-tribes-2030-airline-it
Amadeus traveller-tribes-2030-airline-it
 
UMH - STERLING
UMH -  STERLING UMH -  STERLING
UMH - STERLING
 
AIR ASIA MEDIA STRATEGY
AIR  ASIA   MEDIA  STRATEGY AIR  ASIA   MEDIA  STRATEGY
AIR ASIA MEDIA STRATEGY
 
Rocket perks an introduction
Rocket perks   an introductionRocket perks   an introduction
Rocket perks an introduction
 
BLOG POSTS / CONTENT MAREKTING
BLOG POSTS  / CONTENT MAREKTING BLOG POSTS  / CONTENT MAREKTING
BLOG POSTS / CONTENT MAREKTING
 
Brand archetypecards
Brand archetypecardsBrand archetypecards
Brand archetypecards
 
Customer touchpoints workshop
Customer touchpoints workshopCustomer touchpoints workshop
Customer touchpoints workshop
 
Sterling master class digital
Sterling master class  digitalSterling master class  digital
Sterling master class digital
 
MARKETING WHITEBOOK 2017
MARKETING WHITEBOOK  2017MARKETING WHITEBOOK  2017
MARKETING WHITEBOOK 2017
 
Building Brands - Consumer Marketing
Building Brands -  Consumer Marketing Building Brands -  Consumer Marketing
Building Brands - Consumer Marketing
 
Competition audit
Competition auditCompetition audit
Competition audit
 

Recently uploaded

Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptxpiyushsinghrajput913
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...kajalverma014
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgergMadhuKothuru
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Menggugurkan Kandungan 087776558899
 
2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom PrizeChristina Parmionova
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetkumargunjan9515
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...kumargunjan9515
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfSocial Samosa
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
 

Recently uploaded (20)

Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 

BMC BUDGET

  • 1. 2015-16 While presenting the Budget Estimates ‘A’ (fund Code - 11, 12, 60, 70), ‘B’ (Fund Code - 21, 22, 23) & ‘G’ (Fund Code - 40) For 2015 - 2016 to the Standing Committe on Wednesday, the 4th February 2015.
  • 2. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 1 Mr. Chairman, I am presenting to the Standing Committee, the estimates of receipt and income and expenditure pertaining to the Budgets „A‟ (Fund code 11, 12, 60, 70), „B‟ (Fund Code 21, 22, 23) and „G‟ (Fund Code 40) for the financial year 2015-16 in pursuance of Sections 125 and 126E of the MMC Act, 1888. Revised Estimates 2014-15 and Budget Estimates 2015-16 The size of the Budget Estimates and the abstracts of the revenue account and the capital account under „A‟ (Fund code 11, 12, 60, 70), „B‟ (Fund code 21, 22, 23), „E‟ (Fund code 30), „G‟ (Fund code 40) and „Tree Authority‟ (Fund code 50) are given below and the details thereof are given in the Annexures I to IV on pages 134-137. The total size of Budget Estimates for 2015-2016 is `33,514.15 crore, which is 27.25% more than Revised Estimates 2014-15. The Revised Estimates of Capital Expenditure for the year 2014-15 i.e. `7,348.08 crore as against Budget Estimates 2014-15 is `11,003.69 crore. In the Budget Estimates 2015-16, the Capital Expenditure is estimated at `11,836.00 crore which is 7.56% higher than the current year Capital Budget Estimates. The Estimate of the Revenue Income is `23,509.10 crore while the Estimate for the Revenue Expenditure is `21,675.41 crore for 2015-16.
  • 3. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 2 SIZE OF BUDGET ESTIMATES – „A‟ (Fund code 11, 12, 60, 70) „B‟(Fund code 21, 22, 23), „E‟ (Fund code 30), „G‟ (Fund code 40) and Tree Authority (Fund code 50) (`in crore) Details Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Income/ Receipts Expenditure Income / Receipts Expenditure Income/ Receipts Expenditure Revenue Income 22,057.05 21,227.08 23,509.10 Revenue Expenditure 20,170.73 18,966.61 21,675.41 Capital Receipts 9,121.13 5,109.67 10,005.05 Capital Expenditure 11,003.69 7,348.08 11,836.00 Total 31,178.18 31,174.42 26,336.75 26,314.69 33,514.15 33,511.41 Excess of income over expenditure 3.76 22.06 2.74 Size of Budget Estimates 31,178.18 31,178.18 26,336.75 26,336.75 33,514.15 33,514.15
  • 4. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 3 REVENUE ACCOUNT – BUDGET ESTIMATES A, B, E, G &TREE AUTHORITY (`in crore) Fund Code Particulars Budget Estimates 2015-16 REVENUE INCOME 11 General Budget 18,372.64 12 Health Budget 208.98 21 Improvement Schemes 47.34 22 Slum Clearance 0.92 23 Slum Improvement 23.24 30 Education Budget 566.45 40 Water Supply and Sewerage 4,240.92 50 Tree Authority 48.61 60 Provident Fund .. 70 Pension Fund .. Net Income 23,509.10 REVENUE EXPENDITURE 11 General Budget 10,741.73 12 Health Budget 2,561.23 21 Improvement Schemes 180.57 22 Slum Clearance 4.60 23 Slum Improvement 156.48 30 Education Budget 1,437.30 40 Water Supply and Sewerage 2,722.40 50 Tree Authority 69.44 60 Provident Fund 7.14 70 Pension Fund 3,794.52 Net Expenditure 21,675.41 Revenue Surplus during the year 1,833.69 Surplus transfer to Capital Account 1,833.01 Surplus 0.68 Net of transfer to other budgets. Includes withdrawal from accumulated surplus amounting to `5.12 crore
  • 5. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 4 CAPITAL ACCOUNT – BUDGET ESTIMATES A, B, E, G & TREE AUTHORITY (`in crore) Fund Code Particulars Budget Estimates 2015-16 Capital Receipts 11 General Budget 7,671.27 21 Improvement Schemes 387.15 23 Slum Improvement 28.75 30 Education Budget 357.60 40 Water Supply and Sewerage 1,549.26 50 Tree Authority 11.02 Total 10,005.05 Transfer from Revenue Account 1,833.01 Total fund available for Capital Expenditure 11,838.06 Capital Expenditure 11 General Budget 7,678.12 12 Health Budget 798.54 21 Improvement Schemes 387.05 23 Slum Improvement 61.40 30 Education Budget 357.14 40 Water Supply and Sewerage 2,542.73 50 Tree Authority 11.02 Total 11,836.00 Surplus 2.06 Withdrawal from accumulated surplus.
  • 6. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 5 Financial position of the MCGM Before elaborating the revenue and capital budget estimates for the year 2015-16, I feel it necessary to comment on the present and future financial position of the MCGM, particularly in the wake of noticeable downfall in the revenue income from our main source of revenue i.e. Octroi, especially in Octroi on crude oil since last year and likely abolition of octroi on introduction of Goods & Service Act (GST) from 01.04.2016 As per the Budget Estimates for 2015-16, out of estimated revenue income of `19,255.57 crore for Budget „A‟, „B‟ and „E‟, the revenue from Octroi which is the main source of revenue, is estimated to `7,900 crore which is about 41.03%. Thus, Octroi continues to be the prime revenue source of MCGM. Octroi is a liquid source of revenue i.e. cash is collected daily which is used as a working capital to run day-to-day affairs of the MCGM. The main features of octroi are liquidity and buoyancy which enables us to maintain our cash flow and keeps us economically self-dependant. The crucial importance
  • 7. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 6 of octroi in the finances of the MCGM is reflected in 8% to 10% annual increase and a receipt of more than Rs.15 crore daily on an average. Though the Property Tax is also one of the important revenues of the MCGM, it has its own limitations and therefore cannot be considered as an alternative to the Octroi. The Union Government has introduced 122nd Constitutional Amendments Bill in the Loksabha on 19th December, 2014 to facilitate the introduction of the Goods and Services Tax (GST) regime in India. GST will replace all indirect taxes levied on goods and services by the Central and State Governments. The above amendment bill seeks to omit Entry 52 of the State List of the Constitution of India which empowers the Municipal Corporation to levy Octroi/LBT. Once this amendment is enacted, the powers given to Municipal Corporations to levy octroi will not be in existence. Due to implementation of the GST, additional tax will be assigned to States from where the supply of goods originates. However, there is no clarity yet on the mechanism to offset the revenue loss experienced by ULBs like Mumbai.
  • 8. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 7 The abolition of octroi, which has remained the major source of revenue and the crucial factor in budgetary planning since last several years, will adversely impact our revenues. On the other hand, seventh pay commission that comes into effect the same year will increase the salary and pension expenditure. In the above circumstances, fiscal restructuring of MCGM has become necessary. MCGM may, therefore, be compelled to enhance the existing taxes or introduce new taxes in the years to come. The new taxes like Property Taxes on slums, Transport Cess, Conservancy Cess and Fire Cess may be some of the available alternatives for augmenting the municipal revenue to meet our future revenue and capital expenditure requirements. We may also request the Govt. that the EGS Cess collected by us may be retained. Also periodically raising various fees, rents etc. will also have to be undertaken. Moreover, we will have to press with the State Govt. to handover Professional Tax collected in Mumbai to MCGM. Imposition of penalty on account of unauthorized construction as per Section 152A of the MMC Act will also be initiated in 2015-16.
  • 9. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 8 Now, I enumerate provisions under Budget Estimates „A‟, „B‟ & „E‟. The Budget Estimates for the year 2015-16 alongwith Budget Estimates and Revised Estimates for the year 2014-15 (Budgets A,B & E) on Revenue Account are given in the following Table :- Table-1 Revenue Account Budget A, B, E (`in crore) Particulars Budget Estimates Revised Estimates Budget Estimates 2014-15 2014-15 2015-16 Revenue Income 17,958.82 17,569.11 19,255.57 Revenue Expenditure 16,913.15 15,741.48 18,415.89 Surplus during the year 1,045.67 (Surplus) 1,827.63 (Surplus) 839.68 (Surplus) Transfer to Capital Account 1,044.50 1,826.00 839.00 Surplus 1.17 1.63 0.68 The above table shows that the Revised Estimates of revenue income have decreased by `389.71 crore as compared to the Budget Estimates of 2014-15. In the Budget Estimates 2014-15 income of `4,444.27 crore was estimated from Development Plan department. In the Revised Estimates for 2014-15 it is revised to `5,074.82 crore showing an increase of
  • 10. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 9 `630.55 crore as compared to Budget Estimates 2014-15. This is mainly due to the slightly higher than the anticipated realization of revenue income from the new source of premium against fungible FSI. However, the gross income from octroi estimated at `7,900 crore in the Budget Estimates of 2014-15 has been revised to `7,300 crore. Thus, as compared to the Budget Estimates 2014-15, the income from octroi is likely to be decreased by `600 crore and the gross income from the source of Property Tax estimated at `2,259.66 crore in the B.E. of 2014-15 has been revised to `2,150.00 crore. Thus, as compared to the B.E. 2014-15, the income from Property Tax is likely to be decreased by `109.66 crore. In the year 2014-15, the Revised Estimate of Revenue Expenditure is `17,567.48 crore as against Budget Estimates of `17,957.65 crore showing decrease of `390.17crore. Likewise, Revised Capital Expenditure is estimated at `5,747.54 crore as against Budget Estimates of `8,111.43 crore. In the B.E. 2014-15, the total Capital Receipt was estimated to `8,113.61 crore. This included internal loan of `2,000 crore, withdrawal from Special Fund of `3,556.07 crore and `200 crore from Central Govt. for BRIMSTOWAD Project, contribution of `1,044.50 crore from Revenue Account and other receipt of `1,313.04 crore. As per Revised Estimates 2014-15, the Capital
  • 11. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 10 Receipts are estimated to `5,767.88 crore in which no amount of internal loan is proposed. It comprises withdrawal from Special Funds to the tune of `3,039.80 crore, contribution of `1,826 crore from Revenue Account and other receipts of `902.08 crore. Due to revision in Capital Expenditure, there is no need to raise internal loan of `2,000 crore as envisaged in the B.E. 2014-15. The estimated revenue for 2015-16 at `19,255.57 crore exceeds the estimated revenue expenditure by `839.68 crore. Hence, funds of `839 crore are proposed to be transferred to the Capital Account. The estimated Capital Expenditure for the year 2015-16 is `9,282.25 crore. It is estimated that internal loan of `2,000 crore will have to be raised to meet this Capital Expenditure. For estimation details of various sources of income vis-a-vis Budget Estimates of revenue income under Revised Estimates for 2014-15 and the Budget Estimates for 2015-16, I refer to Table 2 which gives the details of various sources of income with comparative position of Budget Estimates for 2013-14.
  • 12. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 11 Table-2 - Details of Revenue Income Budget A, B, E (`in crore) Octroi, Development Charges and Property tax are the main sources of revenue for the Municipal Corporation of Greater Mumbai. Sr. No. Particulars B.E. 2013-14 R.E. 2013-14 B.E. 2014-15 R.E. 2014-15 B.E. 2015-16 1. Octroi (Net) 7,740.00 7,200.00 7,800.00 7,100.00 7,725.00 2. Property Tax 2,259.66 2,258.37 2,259.66 2,150.00 2500.05 3. Receipts from Development Plan 3,362.41 4,743.95 4,444.27 5,074.82 5,823.74 4. Interest 1,034.74 1,086.95 1,026.05 1,178.50 1,082.40 5. Grant-in-Aid from Government 322.94 212.60 322.88 248.10 251.38 6. Receipts from Roads & Bridges 307.17 179.03 664.33 483.16 545.79 7. Supervision Charges 250.00 250.00 350.00 350.00 350.00 8. Solid Waste Management 109.64 104.91 112.80 103.87 112.10 9. Receipts from Hospitals & Medical Colleges 122.33 120.87 130.38 136.45 151.90 10. Receipts from License Deptt. 149.41 153.91 168.09 149.86 164.46 11. Receipts from Markets &Deonar Abattoir 126.45 51.57 92.28 50.53 58.67 12. Other Receipts 667.55 497.23 588.08 543.82 490.08 Total 16,452.30 16,859.39 17,958.82 17,569.11 19,255.57
  • 13. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 12 GOVERNANCE ISSUES Implementation of e-tendering procedure Pursuant to issuance of the new G.R. under No.Meemeve efveCe&³e ke´À.ceelebmeb/vemleer-2012/He´ke´À 273/39,meeceev³e He´Meemeve efJeYeeie dated 26.11.2014, it has been decided to mandatorily follow e-tendering system for any tender costing above `3 lakhs. Detailed guidelines in this regard are already circulated. Operation of CFCs for 12 hours in a day including Sundays and Holidays – Last year pilot project of providing services at CFC for 12 hours in a day (8.00 a.m. to 8.00 p.m.) including all Saturdays, Sundays (excluding 10 specified holidays) in a year in G/N, H/E and L Wards has been undertaken. After successful implementation of this project in these Wards, it has been replicated in all 24 Wards with effect from 01.04.2014 which has reduced waiting time of citizens at CFCs and facilitated providing citizens of Mumbai more and efficient as well as dynamic services. Similarly, CFC has been started in Municipal Head Office w.e.f. 15.08.2014. The work of implementation of accepting online Earnest Money Deposit is in process. Due to this, secrecy of bidders‟ information will be maintained.
  • 14. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 13 Reforms in the Area of Performance Management The renowned training institutes all over India are being coordinated with help of Administrative Staff College of India (ASCI), Hyderabad for imparting capacity building. Efforts are being taken to make the grant available as against DPR submitted to MoUD, Government of India. For imparting capacity building trainings, a budget provision of `25.26 crore has been proposed in the Budget Estimates for the financial year 2015-16. Upgradation of the infrastructure facilities in MHADA Colonies. There are 104 MHADA layouts in Mumbai. Due to enhancement of FSI for MHADA colonies, it is necessary to upgrade the infrastructure like sewer lines, storm water drains and road network including streetlights in these colonies. Upgradation of water supply network is done by MHADA itself. Draft Policy for recovery of cost of upgradation of infrastructure in MHADA Colonies is framed and the same is being submitted for the concurrence of MHADA/GoM and Standing Committee. Pending approval to this policy, it is proposed to carry out upgradation of infrastructure in MHADA colonies on receipt of payment for carrying out these works from MHADA.
  • 15. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 14 Similar policy will be framed for upgradation of infrastructure in the MMRDA and Government properties. ADMINISTRATIVE REFORMS Implementation of „Bill Tracking System‟ Administration has successfully implemented „Bill Tracking System‟ in SAP system which can be used by vendors through MCGM portal to enable them to track the status of their bill payments. The system of tracker of notification is also implemented in SAP system. Implementation of scheme of „Group Insurance‟ for MCGM employees A policy decision has been taken to implement a comprehensive Group Health Insurance Scheme for all municipal employees on the lines of the CGHS Scheme being implemented for State Government employees in lieu of different scattered schemes at present in existence. The proposal for invitation of the “Request for Proposal” for implementing this scheme from the shortlisted firms/institutions in public sector providing such health insurance services is under consideration. This scheme shall be cashless for municipal employees as well as for their family which will be implemented on "floater basis". The proposed scheme will come in force in the ensuing financial year. A provision of
  • 16. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 15 `75 crore is proposed for the proposed scheme in Revenue Budget Estimates for 2015-16. Dues from State Government Municipal administration is vigorously pursuing recoveries of outstanding dues from different departments of the State Govt. Total outstanding dues from the various departments of the State Govt. amounts to `2,739.88 crore on account of Grant-in-aid, Property Tax, Water & Sewerage Charges, MCGM‟s share in various taxes collected by the State Govt., etc., by the end of November, 2014. This includes an amount of `1,908.86 crore on account of grant-in-aid from Education department of the State Govt. On the other hand, an amount of `355.73 crore is payable to the State Govt. by the MCGM. Concerted efforts are being taken to recover the long outstanding dues in the near future. Structural audit and structural repairs and reconstruction of municipal properties Pursuant to an amendment in MMC Act, 1888 incorporating Section 353B, the structural auditing of municipal properties has been taken up. Structural audit reports of 450 buildings have been received. Out of these
  • 17. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 16 450 buildings, structural repairs of 264 buildings are required to be carried out. The works of structural repairs of 48 buildings are in progress while the proposals for structural repairs of 216 buildings are under process of finalisation of estimates/ tenders in consultation with the user departments/structural consultants. I have proposed a substantial provision of `531.83 crore under Budget „A‟, „B‟ and „E‟ and `28.34 crore under Budget „G‟ in B.E. 2015-16 for project management and consultancy charges for heritage structures and other municipal properties, their structural repairs, and for their demolition and reconstruction as per recommendations in the audit report. Unified schedule of rates The Unified Schedule of Rates for the year 2013-14 has been successfully launched and being implemented by all the departments with effect from 09.09.2013. The first revision to be used in the year 2015-16 is nearing finalization and thereafter the entire mechanism will be supported on software compatible with SAP with all cross linkages e.g. specifications, drainage, rate analysis, master material list, labour list and other supporting parameters.
  • 18. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 17 Thereafter, the next revision will be dealt with by respective departments such as H.E./Sewerage/Roads/ Ch.Eng.(M.&E.)/S.G./B.M. This entire new mechanism will facilitate all Engineering departments having all cross linkages and will also be useful to Finance department for required auditing. This mechanism shall also be additive parameter to speedy working out of projects. Standard Operating Procedure (SOP) for Systematic Improvement of Slum Infrastructure Every year MCGM spends substantial funds on improvement of Slum Infrastructure. However, due to lack of systematic approach to development, no constructive upgradation of Slum Infrastructure is seen despite spending this amount at Ward level. It is, therefore, proposed to prepare a wardwise Micro Management Master Plan (MMMP) for the slum cluster in each ward alongwith its financial implications. While preparing such MMMP, Macro as well as Micro Mapping of the Slum Infrastructure will be done after assessing the existing infrastructure through Architect or Urban Planner. SOPs will be prepared for each and every activity of the work to be executed for upgradation of Slum Infrastructure after carrying out analysis of slum cluster. The funds allocated
  • 19. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 18 for slum improvement under various G.L. Codes for a ward will be integrated for implementation of MMMP. Service Level Bench Marking (SLB) The appointed consultant has studied the existing data systems and based on the issue identification and gap analysis, conceptualized an automated system for calculation of SLB Indicators. A software developer will be appointed to implement the MIS system for SLB calculation. It will help the departments to monitor the service levels automatically with defined data sources and calculation methodologies. Creation of a new “Department of Business Development” As mentioned in my last year‟s budget speech, a new department of “Business Development” has been created to target the “Ease of Doing Business” in Mumbai. The department is now functional with a staff strength of 7 people already on board and started working towards -  Ease of Doing Business Target  Business Process Re-engineering  Single window clearance for all Permissions.  Streamlining construction permits, on-line licensing  Policy Response towards the initiatives by GoI & GoM  Business Policies for attracting Green field investments into Mumbai in sun rise sectors
  • 20. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 19  CBD infrastructure & connectivity – identifying infrastructure bottlenecks  Stake Holders‟ interaction for improving the business environment by de-bottlenecking business issues through open dialogue sessions.  “Branding Mumbai” exercise which will further consolidate and strengthen the status of Mumbai as an International Business Hub. Extension of services to the urban poor With a view to extending various civic services to the urban poor and improving the standard of these services, a total provision of `8,471.03 crore is proposed in B.E. 2015-16 under the following heads :- (` in crore) Gaothans, koliwadas and adivasipadas 27.19 Adhar Kendras 2.59 Upgradation of slums 447.64 Improvement, management and maintenance of chawls for poorer classes. 683.91 Primary Education(Budget „E‟) 2,500.90 Secondary Education 217.71 Health 3,042.31 Water Subsidies 1,437.32 Others 111.46 Total 8,471.03
  • 21. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 20 While making allocation for different sectors and activities therein, I have kept in mind the obligation cast upon Urban Local Bodies through the XII Schedule referred to by Article 243W of the Constitution of India and Obligatory duties under Section 61 of the MMC Act, 1888. I, now discuss some of the important activities/services and facilities related to Budget „A‟, „B‟ as well as „E‟. PROPERTY TAX AND OCTROI (` in crore) Revenue Income B.E. 2014-15 R.E. 2014-15 B.E. 2015-16 1. Octroi (Net) 7,800.00 7,100.00 7,725.00 2. Property Tax 3,956.28 3,810.58 4,513.53 Excluding Govt. revenue Early Bird Incentive Scheme In order to induce the tax payers and encourage them for making early payments, this has been introduced for the first time in the year 2014-15. As per this scheme, “Early Bird Incentive” benefit of approximately `6 crore was availed by the tax payers who paid taxes in advance. Slum Assessment There are approximately 15 lakh slum dwellers in Mumbai. JnNURM makes it mandatory to levy Property Tax
  • 22. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 21 on every structure in the city. Considering the fact that octroi, the major source of revenue income of MCGM, will not be available in 2016-17, we are studying the feasibility of levying and recovering Property Tax on the hutments in slums. Survey of properties The survey of all the properties excluding slums will be carried out through „360‟ degree Leader Survey by preparing panoramic images. With the help of this technology, actual information of properties/structures which remained out of tax net will be available in the form of images enabling us to bring all the properties under tax net. OCTROI The Union Govt. has introduced 122nd Constitutional Amendments Bill in the Lok Sabha to facilitate the introduction of the Goods & Service Tax (GST) regime in India from 01.04.2016. Thus, the octroi which is the main source of revenue of MCGM is likely to be abolished from 01.04.2016. The proposed modernization of Octroi Check Posts has therefore been stopped and also it has been decided not to install devices like Vehicle Trackers, CCTVs etc. as they would be rendered redundant after introduction of GST. However, in the present circumstances in order to curb the evasion of octroi, decision has been taken to install CCTV cameras at Octroi
  • 23. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 22 Check Nakas initially for the period of 1 year and the procedure for inviting the tender is nearing completion and the cameras will be installed within short period. DEVELOPMENT PLAN Urban Planning including Town Planning (`in crore) Revenue Income B.E. 2014-15 R.E. 2014-15 B.E. 2015-16 Development Plan department 4,444.32 5,074.84 5,823.82 1. The Regulation 32 has been amended by the State Govt. in the year 2011 by virtue of which premium is recovered by MCGM/State Govt. for grant of additional 0.33 F.S.I. In the year 2014-15, it is proposed to generate `250 crore. A provision for generating revenue of `350 crore is made for 2015-16. 2. Similarly, modification to D.C. Regulation has also been effected in the year 2012 to bring in the concept of granting of fungible F.S.I. by charging premium. It is anticipated that amount of `2,080 crore is likely to accrue in the year 2014-15. In this case, we have already recovered `1,596.78 crore till 30.01.2015 and S.R.A.
  • 24. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 23 have collected `253.94 crore (approx.) (upto 30.01.2015). We may achieve this target by the end of March, 2015. 3. The Regulatory provision for construction of public parking space under Regulation 33(24) is also proposed wherein substantial amount by way of premium for the additional F.S.I. allowed under the regulation is likely to be recovered. 4. So far as the work of revision of the Development Plan (2014-2034) is concerned, the existing land use survey has already been completed and existing land use maps are also prepared. The report on preparatory study which included existing situation, analysis, growth scenario and vision for next twenty years (2014-2034) was prepared and uploaded on MCGM website. Thereafter 20 workshops have been conducted by Development Plan Department at the key sector level as well as 24 workshops have been conducted at Ward level to integrate consultative process in planning. The proposed land use maps are now being prepared after analyzing existing situation, the future growth scenario upto 2034 and the inputs from workshops. The draft Development Plan is likely to be prepared by February, 2015 and will be published for invitation of suggestions/ objections from public by April, 2015.
  • 25. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 24 5. The work of development of GIS for all 24 Wards has been successfully completed and D.P. remarks are given through GIS system. The scanning/digitalization work has also been completed for 6636 tikka sheets covering all Wards of City and Suburbs. 6. It is also proposed to simplify approval process and integrate „NOC‟ required for building approval process by evolving a combined application form and creating an on-line platform. The processes are proposed to be substantially reduced both in terms of time as well as in terms of procedures. This will greatly help in improving the MCGM‟s rank in terms of “Ease of doing business”. INFORMATION TECHNOLOGY (`in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 119.82 112.36 154.65 Capital expenditure 105.67 39.92 129.12 Total 225.49 152.28 283.77 In pursuance of „Digital India‟ policy of Govt. of India, the various initiatives are proposed which are -
  • 26. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 25 1) Smart City Project We have actively integrated e-governance initiatives into our operations. Such initiatives helped us achieve transparency and become more efficient. We are now in a position to effectively spread information to residents of Mumbai on issues that directly or indirectly affect them. A Smart City works towards ensuring the best for Mumbai's people, regardless of social status, age, income level, gender, etc. A Detailed Project Report (DPR) for smart city initiative involving all departments will be prepared during 2015-16 and implementation will start. 2) Leveraging Cloud Computing Implementation of the state-of-the-art cloud based technology for data center is being planned. This transition will help to improve flexibility of hardware resources, reduce procurement, focus on more projects and upgrades. It will also help in reduction of data center footprint and related expenses once complete set up is ready. Various existing and new applications will be deployed on latest hardware and software platform, to work more efficiently. 3) MCGM 24x7 - M-Governance The mobile application services are being launched for payment of water bills, payment of property tax, renewal of
  • 27. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 26 licenses (Shop & Establishment) and complaints management. Mobile application technology will be applied to other fields shortly. This is in sync with the Electronic Delivery of Services Bill of Govt. of India, 2011. 4) Healthcare Management System Steps have been taken to implement a comprehensive Healthcare Management System covering all hospitals, medical colleges and public health administration related offices to provide efficient healthcare services to the citizens by re-engineering the existing manual processes. Presently, bid management is in progress. By end of financial year 2015-16, site survey, hardware deployment for hosting data and software, software development and User Acceptance Test for (i) public health system, (ii) hospital management system and (iii) education management system are planned to be completed. 5) Cloud based Document Management System (DMS) The DMS will serve as a repository for about 80 crore images and be accessible to over 20,000 users within MCGM as well as to citizens. The DMS shall be a major step in promoting transparency while saving precious time and efforts on the part of the citizens to source those documents by visiting MCGM offices in person. Work has started in this respect.
  • 28. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 27 6) Vehicle Tracking System Vehicle Tracking System has been initiated in two departments for pilot concept as mentioned below :- I) SWM (G/South Ward) (i) Site survey is completed. (ii) 13 trucks were installed and configured with GPS trackers and RFID readers. (iii) G/N, Prabhadevi, D ward and Worli Garage were installed with RFID readers. (iv) The RFID reader has been installed and configured at Mulund dumping and Mahalaxmi transfer grounds. (v) 78 bins across G/South were installed with 2 RFID tags each . II) SWD (i) 6 trucks were installed and configured with GPS trackers. (ii) Control Room set up is in progress. 7) Disaster Recovery To ensure smooth and continuous IT operations, Disaster Recovery Site is being prepared. A project is in progress with cloud based infrastructure and will be completed by 31st March, 2015. This will make our IT operations resilient to disasters. 8) GIS (Geographical Information System) Urban planning, regulating land use, managing roads, tracking urban forestry and providing parking spaces require
  • 29. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 28 accurate mapping information. In order to efficiently manage operations, updated maps must be available to MCGM. A holistic view of GIS implementation is being taken as several departments within MCGM will require utility information on a common base map. The GIS initiatives will thus enable various departments to collaborate and use information provided on maps to make better decisions. So far, a common base map has been defined for use across departments and application development for various departments is under-way. This year, we propose to implement coordinated GIS and Surveys. We have mapped Sewerage Operation network and GIS platform successfully. 9) GRC (Governance Risk Management & Compliance) The applications such as SAP, Water Billing System, Property Tax system, Octroi have been implemented. At present, activities such as user registration, user provisioning, user access management, role assignment are being done manually. A GRC (Governance Risk Management & Compliance) for user access management is being planned for providing a single platform to manage multiple application access. The benefits include identity management, authorisation matrix, improved security, enhanced compliance reporting and improved user satisfaction.
  • 30. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 29 A vendor will soon be selected who will implement GRC solutions across the organization and provide a common interface to all applications. ROADS & TRAFFIC DEPARTMENT (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 638.38 502.68 674.82 Capital Expenditure 2,309.10 2,315.31 3,200.35 Total 2,947.48 2,817.99 3,875.17 For the first time, a Master Plan for Roads for 3 years has been prepared and 314 roads have been completed and 574 roads are in progress. More than `1,000 crore has been spent in this financial year alone. In B.E. 2015-16, a substantial increase from about `2,309.10 crore to `3,200.35 crore in allocation of funds is proposed for improvement of roads in asphalt and cement concrete. Improvement & Concretization of Roads Major roads such as Nesbit Road, Megharaj Sethi Road, Dadasaheb Phalke Road, Pandurang Budhkar Road, Dinshaw
  • 31. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 30 Wachchha Road and B.E.S.T Road in City area, Siddharth Nagar Road No.2 Goregaon (west), Malad Marve Marg, Malad (West), Aakruli Road, Kandivali (East), Dr.Ambedkar Marg, Borivali (West), Shiv Vallabh Marg Dahisar (East) and Kandarpada Dahisar (West) in Western Suburbs and Mother Dairy Road Kurla, R.C. Marg, V.N.Purav Marg, D.K.Sandu Marg Chembur, Shankara Colony road Govandi, Veena Nagar road Mulund in Eastern Suburbs have been concretized in 2014-15. Major roads like S.V.Road & Link Road (Footpath & Set Back) Bandra to Dahisar about 20 k.m. each, Free Press Journal Marg, A.S. D‟Mello Road , G.D. Ambekar Marg, Acharya Donde Marg, side-strips of S.V. Road in H and K Wards are proposed to be improved in the year 2015-16. I have proposed a provision of `1,120.51 crore for Cement Concrete Roads in B.E. 2015-16. Improvement of Asphalt/ Mastic Roads Asphalting of Mogal lane Road, Agashe Road, Bhagat Lane road, Anandrao Nair road, B.G.Kher Road, M.L Dahanukar Road etc. in City, Netaram Nathuram Road, Khandekar Road Andheri (East), Johara Aghadi Road Andheri (West), Dayabhai Patel Road Malad (East), Daulat Nagar Road
  • 32. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 31 No.5 Borivali (East), from Link Road to Z Garden Mithagar Road Dahisar (West) etc. in Western Suburbs and Jogeshwari Vikhroli link Road Vikhroli, Marva Road and Vijay Fire Road Kurla(West), Vidhyavihar Station Road etc. in Eastern Suburbs have been completed during the year 2014-15. Veer Nariman Road, Potdar Road, Vachha Gandhi Road, Br. Nath Pai Road are proposed to be taken up in 2015-16. I have proposed a provision of `1,854.69 crore for Asphalt Roads in B.E. 2015-16. Mumbai Coastal Road Project. The consultancy work for preparation of feasibility report, DPR preparation, report on environmental studies and obtaining MOE&F clearance and bid process management for Mumbai coastal road project is in advance stage of finalisation. Environmental clearance is being pursued urgently with Govt. of India and is expected very soon. If all clearances are in place, we propose to issue tenders and start the work in 2015-16. I have proposed `200 crore for this project from the fungible FSI fund, earmarked for the coastal road project. Parking Policy MCGM has approved parking policy for the first time to encourage the public transport and reduce the traffic
  • 33. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 32 congestion. Roads are public spaces. “Road congesters have to pay” is the principle adapted in this policy. Parking is divided as On-street parking and Off-street parking. On-street parking is divided into A, B & C categories to manage traffic in Mumbai City. Half the rates of On-street parking are proposed for Off-street parking, On-street parking is prohibited on the road in the 500m radius. Monthly passes will be available at municipal kiosk. 30% & 50% concession shall be given for taxies and buses in monthly passes respectively. 50% concession shall also be given for Sunday & holidays. Parking will be free on holidays for tourist spots at prominent locations to encourage tourism. Pay & park near school within radius of 100m is prohibited. Parking at malls and cinema theatres, web based parking, urban transport fund, formation of new traffic cell and marshals etc. are some of the other features of the parking policy. Residential parking permits are being introduced in 'A‟ ward on pilot basis and will be continued in rest of the city based on 'A' ward experience. Comprehensive Mobility Plan for the first time for the Mumbai City. The work of “Preparation of Comprehensive Mobility Plan” for the Mumbai city has been undertaken for
  • 34. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 33 improvement in the traffic management and control at several places and the same is in progress. Various factors related to traffic, volumes, speeds etc. are being studied to suggest the solution for the speedy traffic movement to develop the network. Besides this, it would be proper to make utilization of the revenue and the human resources. With a view to implementing the suggestions made by the consultants from the traffic point of view, this plan will be prepared in the financial year 2015-16. Think Tank It is essential to give priority to road transport, internal roads, open spaces for the pedestrian, communication without transport in less time or stipulated time. It has, therefore, been decided to form an inter-disciplinary group of experts from different divisions namely road engineering, transport planning, signalling and communication, R.T.O., traffic police as well as experts from the civil society to take a holistic view and give feedback on various aspects of traffic issues in Mumbai. New Trenching guidelines. New guidelines have been framed for trenching work so that the trenching work is synchronized with the ongoing road
  • 35. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 34 works so as to minimize interrupted traffic movement. Horizontal Drilling Method (HDD) is insisted and encouraged to minimise the open cut in road. A new technology of micro- trenching which is less invasive is also introduced. Depending upon the status of DLP, rates of reinstatement of trenches have been revised; For 1st year of DLP 4 times For 2nd year of DLP 3 times For 3rd year of DLP 2 times For 4th year of DLP Standard rate. Pedestrian First Policy For the first time „pedestrian first‟ policy is introduced in which special attention is given to avoid conflict between vehicular and pedestrian transportation thereby minimising accidents and improved ways of travel. Being a part of roadway, the footpaths shall be kept consistently along the carriageway which will compel the pedestrian to use it. Uninterrupted width of footpath will be kept from 1.50m to 3.00m depending upon the width of the road. Also the footpath surface will be kept even to encourage the pedestrian to use it. Guard rails and bollards are being provided to improve pedestrian safety and to avoid parking on footpath thereby creating maximum utilisation by the pedestrian.
  • 36. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 35 Footpath height is kept 150mm from road level so that the commuters can easily step up & down. LED street lighting In pursuance of the policy of the Govt. of India on Energy Efficiency, it is proposed to convert all street lights of Mumbai into LED lights. It is expected to generate huge savings in the street lights electric bill, a part of which can be used to incur expenditure on LED conversion. It is proposed to complete this process by September, 2015. FLYOVERS & BRIDGES (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 14.00 9.52 13.61 Capital Expenditure 332.84 212.38 657.18 Total 346.84 221.90 670.79 The Jogeshwari (North) and (South) bridges will be opened to public in 2015. These bridges will greatly improve the East-West connectivity between S.V.Road and Western Express Highway. The extension proposals of both these bridges are under consideration. Kurla-Kalina bridge on South
  • 37. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 36 Side is being thrown open to traffic. The resurfacing works of 18 bridges have been completed. The Work Order for resurfacing of 9 Bridges in Western Suburbs has been given on 31.12.2014 and the work has started. Construction of flyover bridge at junction of S.V. road and Veer Savarkar Bridge has started. The work for construction of F.O.B. at Pravasi Industrial Estate on Goregaon Mulund Link Road has started. Reconstruction of F.O.B.s across Mithi River at Jai Bhim Nagar and at Morarji Nagar, Powai in „S‟ Ward have also started. The work of construction of culvert over J.K. Chemical Nalla at Wadala Truck Terminal in F/N Ward is taken in hand. Tenders for widening of bridges on Deonar Nalla, PMGP Nalla and Children‟s Aid Nalla on Ghatkopar Mankhurd Link Road in M/E ward have been invited. The tender for carrying out the Inventory of the Bridges and Condition Assessment is invited and the same is proposed to be opened on 03.03.2015. The construction of new flyovers at Mith Chowky; Malad, Bangur Nagar; Goregaon is proposed to be undertaken in 2015-16.
  • 38. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 37 New Works Proposed Foot Over Bridges Demolition and Reconstruction of F.O.B. near Charni Road, construction of F.O.B. from 161 layout to Juhu Beach, construction of Skywalk from S.V. Road; Jogeshwari (W) to Ismail Yusuf College, Jogeshwari (East) are proposed to be undertaken. R.O.Bs The demolition of Hancock and Carnac R.O.Bs. is being executed by Railway authorities for which funds have been provided to Railway. New reconstruction issues are being discussed and pursued with G.M. (Central Railway) office. The G.A.D. for Vikhroli R.O.B has been approved and work in the Railway portion is expected to be started shortly. Repairs to R.O.B. at Priyadarshini Park near Napean Sea Road in „D‟ Ward have been approved. Goregaon-Mulund Link Road Project Goregaon-Mulund link road is proposed for west and east link which will help to reduce traffic congestions. The length of the proposed road is 14.66 km. The consultant's Detailed Project Report (DPR) is in progress. A provision of `300 crore is proposed in B.E. 2015-16.
  • 39. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 38 STORM WATER DRAINS (`in crore) Budget Estimate 2014-15 Revised Estimate 2014-15 Budget Estimate 2015-16 Revenue Expenditure 337.10 312.13 328.68 Capital Expenditure 1106.54 899.91 1097.65 Total 1443.64 1212.04 1426.33 1. Development & Conservation of River Systems Mumbai City has river systems viz., Dahisar, Mithi, Poiser, Vakola and Oshivara/Walbhat. Out of these, Mithi river action plan has been mostly implemented leading to deepening, widening and training which has resulted in increase in carrying capacity twice and discharge capacity by three times. Along the similar lines, it is proposed to take up their integrated development for rejuvenation of Dahisar and Poiser river in holistic manner including widening, deepening, training and beautification along with service roads as well as sewer lines laying. Remaining river systems will also be taken up in due course such as Walbhat river system etc.
  • 40. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 39 A DPR will be prepared along with financial structuring and will be implemented in a phased manner. A provision of `1.50 crore is proposed in Budget Estimates 2015-16. 2. Storm Water pumping Stations Under the BRIMSTOWAD Project, Haji Ali and Irla Pumping Stations are commissioned in May, 2011. Lovegrove and Cleaveland Pumping Stations will be commissioned by May, 2015. Britannia Pumping Station is expected to be commissioned by May, 2016. Gazdharbund Pumping Station is expected to be commissioned by January, 2017. As regards Mahul and Mogra Pumping Stations, vigorous follow up is being taken with the concerned Govt. authorities for allotment/ acquisition of land. As on date, out of 55 chronic flooding spots existing in 2011 have been reduced to 40. The provision of `196 crore is proposed in B.E. 2015-16 for all storm water pumping station works. 3. BRIMSTOWAD Project As the city needs to complete the works under BRIMSTOWAD Project to protect itself from any future onslaught of rains similar to that of 26th July, 2005, we have to go ahead with the full implementation plan in phasewise manner. A provision of `376.43 crore has been proposed in the
  • 41. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 40 financial year 2015-16 for BRIMSTOWAD works. Liability of BRIMSTOWAD works on MCGM budget will continue up to the year 2015-16. Out of total 58 works under BRIMSTOWAD, 26 works have been completed till date, while 29 works are in progress. Tenders for the remaining 3 works are to be invited. i.e. works of Storm Water Pumping Stations at Mahul, Mogra and Dadar Mahim Diversion work. Major achievements regarding SWD works City a)Most of the underground arch drains in the city area are very old, hence rehabilitation/strengthening of some of the arch drains to the tune of 26 kms. has been carried out which has reduced flooding and rain water accumulation period to considerable extent. b)The work of laying 6 nos. of 1800 mm dia. pipe (by Box pushing method below Mahalaxmi flyover bridge) is in progress which will be completed by end of March, 2015, due to which, areas such as Satrasta Circle and Byculla (West) will get relief from flooding. c) There is an old existing dhapa drain along Peddar Road. In the past, some portion of the existing dhapa drain in front of Cadbury junction and Navroji Gamadia Road junction has collapsed. The work of about 400 mts. of length (from petrol pump near Jaslok Hospital up to Cadbury junction, which
  • 42. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 41 was structurally in a very bad condition) for laying of 1200 dia pipe to replace existing dhapa drain is taken in hand and about 220 mts. of drain work is completed. The balance SWD work for a length of 180 mts. is in progress. Eastern Suburbs a) The training/improvement work of Laxmibaug nalla, Usha nagar nalla, Datar colony nalla, Crompton Kanjur nalla system is in progress under BRIMSTOWAD –Phase II. b) The training/improvement work of Damodar park nalla, P.L. Lokhande marg drain and 10 nos. of culverts of LBS Marg is in progress, due to which, flooding will be considerably reduced in the surrounding area. Western Suburbs The nalla training work of Dhasakwadi nalla, Dharkhadi nalla, Piramal nagar nalla, Poisar river and P & T nalla have been recently completed which will reduce flooding in the respective catchment areas of Dahisar East, Goregaon West, Kandivali and Khar West. The balance works of Irla nalla, SNDT nalla have been proposed during ensuing year. 4. Revision of BRIMSTOWAD Master Plan As per recommendations of Fact Finding Committee, the preparation of Revised Master Plan of SWD network for Greater Mumbai was undertaken and Consultant M/s. MWH (I) Pvt. Ltd. has submitted the BRIMSTOWAD Draft Master
  • 43. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 42 Plan-II in the month of February, 2014. To finalize the BRIMSTOWAD Draft Master Plan-II, a committee of two retired MCGM (SWD) officers is appointed. After the scrutiny of the BRIMSTOWAD Draft Master Plan-II by this committee and submission of report to MCGM, the priority list of works will be decided and executed as per the availability of funds. The tender procedure is in progress for the work of surveying, mapping, analysis and modeling of road side drains / minor drains. 5. Development of Mithi River Out of total length of 17.84 k.m. of Mithi River, 11.84 k.m. is in MCGM‟s jurisdiction and 6.0 k.m. is in MMRDA‟s jurisdiction. Mithi river under MCGM jurisdiction is being improved, as a result, control over flood water level at vulnerable locations, increase in carrying capacity by two times and discharging capacity by three times, reduction in siltation of river channel will be achieved. Due to construction of retaining wall, encroachment on the bank of river is prevented. There are total 12 nos. of bridges out of which 2 are now in progress and 5 nos. of bridges are proposed through Bridge Department. The provision of `35 crore is proposed in B.E. 2015-16 for the work of Mithi River.
  • 44. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 43 6. Catchment Engineer Concept The concept of Catchment Engineer is being implemented on experimental basis from last year. Mumbai city and suburbs have been divided into total 122 catchment areas for which 80 sub engineers are appointed as Catchment Engineers. This has yielded good results in the recent monsoon of 2014. 7. Mechanical desilting of Nalla/Drains Besides efficient and effective desilting and cleaning of storm water drain, safety of personnel is also important. Therefore, mechanized cleaning of drains is being done by upgrading the machinery. Roadside Open Drain Desilting (RODD) machine with silt container, Robotic Multi-purpose excavator machine and Vehicle mounted suction-cum-jetting Machine with recycling facility are being used. A provision of `186.14 crore is proposed for cleaning/ desilting and maintenance of Storm Water Drains in Revenue Budget 2015-16. During the year 2014-15, total 6,04,551 cu.m. silt has been removed from Storm Water Drains, Major nallas, Minor nallas and Mithi river in City and Suburbs before monsoon.
  • 45. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 44 HEALTH AND MEDICAL SERVICES (`in crore) Budget Estimate 2014-15 Revised Estimate 2014-15 Budget Estimate 2015-16 Revenue Expenditure 2,179.35 1,953.90 2,561.24 Capital Expenditure 733.62 365.89 798.54 Total 2,912.97 2319.79 3,359.78 Mumbai Aarogya Abhiyan While according due priority to the Health Sector, substantial funds have been allocated to various important aspects of the health care under 'cegbyeF& Deejesi³e DeefYe³eeve'. Under this comprehensive programme to provide health care in primary, secondary and tertiary sectors, in 2014, we have succeeded in increasing and enhancing primary health services and maternity health related services through 12 new dispensaries and 1 new maternity home. Malaria & Dengue Control Programme Through various measures like periodical enumeration of permanent breeding sources, introduction of Guppy fishes in permanent breeding sources of mosquitoes, anti larval treatment
  • 46. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 45 in stagnant water in major and minor nallas, weekly treatment at stagnant waters in building construction, insecticide treatment in accumulated water in odd articles, thermal fogging through fogging machines and creation of public awareness in the general public, dengue investigation facilities in 50 municipal dispensaries, we were able to remarkably control and reduce the prevalence of Malaria and Dengue in Mumbai. Dispensary upgradation programme 12 new dispensaries have been started in the areas identified through a gap analysis done by Public Health Department of MCGM. Maternity Homes upgradation programme The Kherwadi Maternity Home and Bail Bazar Maternity Home have been upgraded and have started functioning in June/July, 2014. The maternity homes at Marol, Oshivara, Mother and Child Hospital; Magathane, Chembur Naka and Bhandup are proposed to be developed as Sentinel Centers while 6 maternity homes i.e. V.N.Shirodkar, Akurli Road, Borivali, Deonar, Mulund and Mahim are proposed for upgradation. 30 new obstetric beds and 20 pediatric beds have been made available at Bail Bazar Maternity Home, Kurla for giving quality health care services to mothers and neonatal children.
  • 47. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 46 20 NICU beds will be made available in the Sentinel Centers proposed to be developed. 60 pediatric beds will be provided in Mulund, Borivali, Akurli, Marol, Oshiwara and Chembur naka Maternity homes in the ensuing year . Branding of MCGM Maternity Homes It is proposed to carry out branding of all maternity homes under Public Health Dept. As a pilot project, branding of squatter‟s colony maternity home will be done in this year. Implementation Programme for Diabètes and Hypertension The Non-Communicable Diseases Cell (NCD Cell) has been implementing programme for Diabètes and Hypertension since 2011. Facilities for diagnosis, lifelong treatment and referral to higher centres have been made available in 55 MCGM dispensaries. This service has been started in 25 new MCGM dispensaries since November, 2014. Mumbai Mission for Tuberculoses (TB) control 11 bedded Intensive Respiratory Care Unit (IRCU) is proposed for TB patients at GTB Hospital. A provision of `1 crore is proposed in B.E. 2015-16 therefor. Cleanliness Drive in GTB Hospital As Tuberculosis is communicable disease, for lowering its prevalence, hospital premises need be kept clean. Various
  • 48. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 47 wards, adjacent premises, toilet blocks etc. of Group of TB Hospitals including Bahadurji Block needs to be cleaned, regularly monitored and maintained. It is proposed to outsource these services through NGO for which a budgetary provision of `13 crore is proposed in B.E. 2015-16. Facilities for Leprosy patient It is proposed to give financial assistance of `1,000/- to every handicapped leprosy patient. It is under consideration to construct hostel for medical students in hospital campus. Arogya Bhavan To provide and co-ordinate various health services effectively under one roof, it is proposed to construct Arogya Bhavan of MCGM in the campus of Kasturba Hospital for which budgetary provision of `50 lakh is proposed in B.E. 2015-16. National Urban Health Mission (NUHM). Recognizing the importance of health in the process of economic and social development and improving the quality of life of our citizens, particularly of poorer and vulnerable section of the population of Urban Area, the Government of India has resolved to launch the National Urban Health Mission (NUHM).
  • 49. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 48 National Urban Health Mission (NUHM) aims to improve the health status of the urban population, particularly the slum dwellers and other vulnerable sections by facilitating equitable access to quality health care with the active involvement of the Urban Local Bodies (ULBs). Considering all above, NUHM has been launched in Mumbai since 2013-14. Birth & Death Record at single premises Birth & Death record of Public Health Department is stored at distant premises. Approx. 100 years‟ old record is available in Public Health Department. For storing this record permanently at one premises, space is being made available in the proposed new building in Acworth Leprosy Hospital for which budgetary provision is proposed. Dialysis Services Acknowledging the prime need for more dialysis services in suburbs, 38 dialysis beds have been commissioned at 5 Peripheral Hospitals i.e. Rajawadi Hospital; Ghatkopar, M.W. Desai General Hospital; Malad, Dr. Babasaheb Ambedkar Hospital; Kandivali, Siddharth General Hospital; Goregaon, Shatabdi Hospital; Govandi through PPP Model. Letter of Intents (LoIs) have been issued to the institutes/firms selected through e-tendering under PPP Model for commissioning another 68 dialysis beds at
  • 50. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 49 Hinduhridaysamrat Balasaheb Thackeray Trauma Care Municipal General Hospital; Jogeshwari, V.N. Desai General Hospital; Santacruz, Cooper Hospital; Vileparle, Bhabha Hospital; Kurla (West), MAA Hospital; Chembur, M.J. Phule General Hospital; Vikhroli and MT Agarwal Hospital; Mulund. Diagnostic Services 3 MRI Centres in suburbs i.e. Rajawadi Hospital; Ghatkopar in Eastern Suburbs and H.B.T. Trauma Care General Hospital; Jogeshwari and Cooper Hospital; Vileparle in Western Suburbs will be commissioned under PPP Model. Similarly, CT scan centres will also be commissioned at Bhabha Hospital; Kurla and M.T. Agarwal Hospital; Mulund in Eastern Suburbs and Siddartha Hospital; Goregaon, Dr. Babasaheb Ambedkar Hospital; Kandivali and Cooper Hospital; Vileparle in Western Suburbs under PPP Model. 2 new Anti Retroviral Therapy Centres (ART Centres) have been started at Rajawadi Hospital, Ghatkopar in Eastern Suburbs and Bhabha General Hospital, Bandra in Western Suburbs from December, 2014 by MDACS. Peripheral Hospitals  The work of redevelopment of 1000 bedded Harilal Bhagwati Municipal General Hospital is in progress.
  • 51. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 50 About 86% work for 1st phase is completed and 2nd phase is in planning stage.  The redevelopment of Bhabha General Hospital; Kurla is in process.  It is proposed to construct 150 bedded hospital with all latest facilities at Kasturba Cross Road Municipal General Hospital, Borvali and the work is in progress.  To bridge the gap between the demand for and supply of secondary level health care in the suburbs, the project of construction of diagnostic centre at Punjabi Gully; Borivali, redevelopment of Pt. Madan Mohan Malviya Municipal General Hospital; Govandi, M.J. Phule General Hospital; Vikhroli and M.T. Agarwal Hospital; Mulund are under consideration and plans therefor are being prepared. Sufficient provisions have been proposed for these ensuing projects in B.E. 2015-16.  Maharashtra University of Health Science and Medical Education & Research Directorate, Maharashtra has issued permission to start 150 students capacity medical college affiliated to Dr. R.N. Cooper Hospital. The Medical Council of India has carried out inspection in December, 2014 and compliance of observations is in progress.
  • 52. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 51  The proposal for construction of Super Specialty Hospital/Cancer Hospital at „S‟ Ward is underway.  10 beds are reserved for treatment of chemotherapy at Dr. Babasaheb Ambedkar Municipal General Hospital, Kandivali.  Dilassa Centre is a public hospital based crisis counseling department for women facing violence. At present “Dilassa Centres” are available at Bhabha Hospital, Bandra and Bhabha Hospital, Kurla. Such centres will be started at 11 peripheral hospitals during this financial year.  Modular O.T. facilities will be made available in the ensuing financial year in 4 peripheral hospitals for which sufficient provisions are proposed in B.E. 2015-16.  Intensive Care Units (ICU) – At present, ICU services are made available in 5 peripheral hospitals through PPP Model. Similar facility will be made available in another 5 hospitals in the ensuing year through PPP Model. The following new projects are proposed to be undertaken in the ensuing year :-  Blood Bank at Trauma Care Municipal General Hospital, Jogeshwari.
  • 53. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 52  Human Milk Bank at Rajawadi Hospital; Ghatkopar, Dr. Cooper Hospital; Vileparle, Trauma Hospital; Jogeshwari and Dr. Babasaheb Ambedkar General Hospital; Kandivali (W).  Yoga Therapy Centres at Rajawadi Hospital, Ghatkopar and Dr. Cooper Hospital; Vileparle, Trauma Care Centre; Jogeshwari.  Nirbhaya Centre, a centre to enable to control the problem of violence against women is proposed to be started at Dr. Babasaheb Ambedkar General Hospital, Kandivali. Major Hospitals At the helm of our three tier health care system, are our major hospitals handling a daily combined OPD of 13,000 patients and combined bed strength of 4,939.  The work of restoration and refurbishment of Main Heritage Building of KEM Hospital is nearing completion. The fully renovated EMS with modern medical care and increased capacity is about to be commissioned for better patient care. The tenders for external major repairs of 13 storeyed building have
  • 54. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 53 been invited and the work is likely to be started during this financial year.  The purchase process for MRI machine and Bi-plane DSA Machine, multi slice CT scanner for Radiology department and Cath lab machines for Cardiology department for KEM hospital is on. In the ensuing year, it is proposed to install Digital Radiology System for Radiology department of KEM Hospital. It is also proposed to purchase High Intensive Focused Ultra Sound Machine (HIFU) for Urology department, Real time 3D and 2D Intra Operative Imaging System for Neurosurgery department, Dedicated Pet CT Scan Machine for Nuclear Medicine department for KEM Hospital, for which sufficient provisions are proposed in B.E. 2015-16. It is proposed to construct new hostels/quarters at Haji Ali, Wadala and Koliwada for Doctors of capacity 200, 1200 and 700 for Nair, KEM and Sion Hospitals respectively. Crematoriums Beautification and Upgradation of Crematoriums A phasewise programme for conversion of wood based crematoriums into PNG based green crematoriums has been
  • 55. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 54 chalked out. As per phase 1(a)11, phase 1(b) 10, phase 1(c) 23, crematoriums will be converted into PNG. In Phase I(a), crematorium at Shivaji Park, Amboli, Babhai, Charai, Sion, Underai (Malad), Dahanukarwadi, Daulat Nagar, Oshiwara, Marve Road and Versova Hindu Cemetries are proposed for conversion. The total station surveys have been carried out. A Technical Committee has been formed for technical specifications under the guidance of technical experts of VJTI, Mumbai. These technical specifications have now been approved by technical experts. Tenders will be invited by the end of this financial year. A substantial provision is proposed for conversion of crematoriums included in Phase II and III. A sufficient provision is also proposed for development of Raffique Nagar Muslim Cemetery in Govandi. Repairs and development works in Private Cemeteries / Burial Grounds In the municipal jurisdiction, there are 119 cemeteries / burial grounds which are owned and managed by the private trusts. Maintenance and providing basic services at these cemeteries / burial grounds is the responsibility of these private trusts. However, due to inadequate financial support, these cemeteries / burial grounds are not being properly maintained and basic services are not being provided thereat by these
  • 56. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 55 private trusts which causes inconvenience to the mourners. The Corporation, by their Resolution No.1406, dated 03.03.1989, have accorded approval to undertake repairs and development works in private cemeteries from municipal funds under section 63k of the M.M.C. Act subject to compliance of certain conditions taking into account total no. of dead bodies brought for final rites, availability of MCGM facilities in the vicinity and reservation of cemetery in the Development Plan. Accordingly, a provision of `6 crore is proposed in B.E. 2015-16 for station survey, repairs and development works and provision of red earth in private cemeteries / burial grounds. The highlights of the provisions made in B.E. 2015-16 for improvement of Health Sector are as under:- (` in crore) Sr. No. Details Provision 1 Providing PNG furnace at various municipal cemeteries 4.00 2 Provision for repairs of existing Health Post, construction/ addition/ alteration of premises for new Health Posts and purchase of furniture, instruments etc. under IPP-V in Brihanmumbai. 2.00 3 Upgradation of Public Health institutions, Dispensaries and Construction of regional health Centre. 2.00 4 Upgradation of Maternity Homes (Civil) 2.63 Upgradation of Maternity Homes (Equipment) 3.25
  • 57. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 56 5 Provision for conversion of Kasturba Maternity Home into Municipal General Hospital in R/Central Ward 15.00 6 Modernisation & repairs to 159 dispensaries under Public Health Department (Branding) 5.00 7 Structural repairs to various peripheral hospitals/ Special Hospitals/Major Hospitals/ Medical Colleges/Health Department Structure 51.00 8 Construction of Gas Crematorium and proposed reconstruction of Staff Quarters at Underai Hindu Cemetery, Malad East at P/North Ward 3.42 K.E.M. Hospital 1 Purchase of Plant & Machinery, Digital Radiography Equipment & PET- C.T.Scan Machine for K.E.M. Hospital 53.25 2 Upgradation of Plasma Centre in K.E.M. Hosp. 21.50 3 Works related to the Comprehensive repairs/ Restoration of the K.E.M.Hospital Main Building. (Heritage) 10.00 L.T.M.G. Hospital 1 Purchase of Plant & Machinery alongwith LCMS, Cath Lab, PACS machines for L.T.M.G. Hospital 32.75 B.Y.L.Nair Hospital 1 Purchase of Plant & Machinery and equipments for B.Y.L.Nair Hospital 51.45 Peripheral Hospitals 1 Provision for construction of new Medical College building at Dr. R.N. Cooper Municipal General Hospital 2.00 2 Purchase of Plant & Machinery, C.T.Scan Machine, Ventilators for Hinduhridaysamrat Balasaheb Thakre Trauma Care Hospital, Jogeshwari. 14.82
  • 58. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 57 EDUCATION Primary Education (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 2,312.96 2,021.13 2,143.75 Capital Expenditure 347.38 156.53 357.14 Total 2,660.34 2,177.66 2,500.89  In ensuing academic year, it is decided to establish 200 new computer labs in various municipal schools. Budget provision 2015-16 .. `17 crore  It is our endeavour that henceforth, no student of municipal school shall sit on the floor. With this objective and considering the present shortages of benches and desks in primary schools, a tender procedure for eco-friendly 14,791 desks and benches is in progress. Budget provision .. `7.25 crore  It is decided to provide „Tab‟ for the students of Std.VIII of MCGM Primary as well as Secondary Schools from the academic year 2015-16. Budget provision (Primary) .. `29.22 crore Budget provision(Secondary) .. `5.18 crore
  • 59. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 58  It is decided to create suitable website of Education Department in the ensuing academic year. Budget provision .. `10 lakhs  Virtual Classroom – It is now decided to start with new 202 Virtual classrooms (100 primary and 102 secondary) in the Phase – III Project in academic year 2015-16. Budget provision .. `8.86 crore (Primary) `8.81 crore (Secondary) SOLID WASTE MANAGEMENT (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 1,789.83 1,428.53 1,855.94 Capital Expenditure 421.24 97.06 376.01 Total 2,211.07 1,525.59 2,231.95 Swaccha Bharat-Swaccha Mumbai Abhiyan In response to the appeal made by Hon‟ble Prime Minister for implementing the Clean India Mission (Swaccha Bharat Abhiyan), MCGM, being the prime agency responsible for maintaining cleanliness in the city, “Swaccha Bharat-Swaccha Mumbai Abhiyan” has been implemented
  • 60. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 59 from 02nd October, 2014. Under this drive, various programs have been undertaken/proposed to be undertaken. It is expected that grants in the form of VGF (Viability Gap Funding) will become available from the Central Govt. under Swaccha Bharat Mission (SBM) and Corporation will have to contribute some portion of the expenditure on implementation of mission components work. Drafting a City Sanitation Plan and submission of DPR to the Central Govt.is the necessary condition for getting such assistance. It is therefore, decided to start the work of preparation of City Sanitation Plan and DPR for further submission to Govt. of India. Public Awareness To increase the awareness among the citizens regarding the waste management and to streamline the roll of several NGOs engaged in the activity of cleanliness by training their volunteers and to coordinate their functioning and generally to improve the civic sense, the MCGM has called an “Expression of Interest” from the experts in the field to devise and organise awareness campaign. A provision of `15 crore has been proposed in the B.E. 2015-16. Cleanliness at High Refuse Generation spots To enhance the participation of Shopkeepers in the cleanliness campaign and maintain cleanliness outside the
  • 61. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 60 shops and nearby premises, Saaf Aangan scheme is being encouraged. Special attention is being provided at high refuse generation points to ensure that they remain litter free at all times. Cleanliness in MMRDA Housing Colonies MCGM has accepted responsibility of maintaining cleanliness in the MMRDA Housing Colonies constructed by MMRDA for rehabilitation of PAPs. Budget provision 2015-16 .. `2.90 crore Cleaning of House Gullies Total 1,148 volunteers are deployed for the purpose of cleaning house gullies and house-to-house collection of refuse. Budget provision 2015-16 .. `20 crore Swachha Mumbai Prabodhan Abhiyan (Vasti Swacchata Yojana) Under “Clean India Mission”, special efforts are being taken to ensure that high refuse generation points in 24 wards of the city like tourist spots, sea beaches and high footfall areas remain litter free all 24 hours. Slum dwellers residing near railway tracks throw garbage on railway land. As such house to house collection has been started in these slum colonies. This has helped to reduce such 142 spots to 60 spots.
  • 62. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 61 A provision of `35 crore has been proposed in B.E. 2015-16 under the head “manning-mopping”. MCGM has started a scheme under “Swachha Mumbai Prabhodan Abhiyan” (Vasti Swachhata Yojna) for maintaining cleanliness in slums. A provision of `75 crore has been proposed in B.E. 2015-16 for “Swachha Mumbai Prabhodan Abhiyan”. “Debris-on-Call” Debris generated due to construction activities is unauthorisedly dumped on the roads/footpaths. To abate this, “Debris-on-call service” for collection of debris generated from household repairs and construction activity has been started in March, 2014. Under this scheme, 7670 MT of debris has been lifted till November, 2014 and a revenue of `19.23 lakhs has been generated. Under Swaccha Bharat Abhiyan, special efforts are being made to control the debris being indiscriminately dumped at such spots. For this, Junior Overseers have been made aware and empowered. Segregation of Waste The work of segregation of waste is awarded to “Mahila Bachat Gats” formed by the rag pickers at Dry Waste Segregation Centres set up in all 24 wards. The vehicles
  • 63. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 62 provided at each ward for collection of segregated dry waste from house to house are being augmented to accommodate the increasing capacity of dry waste, for which a provision of `13 crore has been proposed in B.E. 2015-16. For setting up additional Dry Waste Segregation Centre in various wards, a provision of `3 crore is proposed in B.E. 2015-16. Small Capacity Waste Processing Projects The projects awarded for scientific processing of MSW are stalled due to continuous litigations. As an alternative, small capacity processing plants for converting waste into energy has been planned. The EoIs for setting up 3 such plants each of about 1000 MT per day, total about 2500 MT per day have been issued. For this purpose, a provision of `3 crore has been proposed in B.E. 2015-16. Similarly, decentralized waste processing facilities of 3, 5 and 10 MT capacity are being set up at ward level, for which a provision of `2 crore has been proposed in B.E. 2015-16. Future Planning of Waste Management In view of the increasing population in Mumbai and consequent increase in solid waste, it is proposed to acquire 126 hectare of land outside Mumbai at Taloja from Govt. of Maharashtra. A continuous pursual in this regard is made by
  • 64. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 63 MCGM. If the GoM allots the land, it will help in reducing burden of waste management within Mumbai at Deonar, Kanjurmarg and Mulund. Sufficient provision has been proposed in the B.E. 2015-16 for acquisition of land in D.P. department‟s budget. Also a provision of `1 crore for protecting the land after acquisition is proposed in B.E. 2015-16.  Stationery Compactors (Hyva) of 15 MT capacity are proposed to be installed at 20 new locations to improve hygienic conditions around large collection centres, for which budget provision of `7 crore is proposed in B.E. 2015-16.  27 large compactors and 41 mini compactors are proposed to be purchased in 2015-16. For this purpose, a provision of `20 crore is proposed in B.E. 2015-16. New Refuse Transfer Stations For preparing DPR for developing and building transfer station at suitable sites, the appointment of PMC will be made. A provision of `6 crore has, therefore, been proposed in B.E. 2015-16
  • 65. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 64 Elimination of Open Defecation Spots:- In the guidelines provided by the Central Govt. under the Swaccha Bharat Abhiyan, emphasis has been given on elimination of open defecation spots by providing private toilets, public toilets and Pay and Use toilets for floating population, etc. SWM department is planning to construct new pay and use toilets in the City to increase the existing number of Pay and Use Toilets at new places, especially under flyovers and public roads which do not obstruct traffic. If permanent toilets cannot be built in crowded places, then it is proposed to provide portable toilets at such places. All these schemes are covered under “Pay and Use” scheme for NGOs; hence no budgetary provision is made for these works. To maintain public toilets provided in slums, it is proposed to delegate this work to NGO Sansthas under Vasti Swacchata Yojana; initially on trial basis in 7 wards. Public toilet for ladies (Right to „Pee‟) With a view to providing public toilet facilities for ladies in crowded areas in the Mumbai City, a notice was issued in the public newspapers inviting suggestions from citizens and NGOs regarding suitable places for such toilets in Mumbai. Accordingly, Assistant Commissioners of Wards are being
  • 66. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 65 directed to suggest suitable places. Considering the suggestions, wardwise locations will be finalised and toilets on „Pay & Use‟ basis will be constructed. A provision of `5.25 crore is proposed for this purpose in B.E. 2015-16. Environment Protection: - As per the XII amendment of the Indian Constitution, Local Self Governments are given responsibility of “Protection of Urban Forestry, Environment Protection and Atmospheric elements”. In Mumbai, monitoring of air, water and noise pollution is done by Environment Section of SWM department and Environment Status Report is published every year. It is proposed to make Environment Status Report more useful by increasing the scope of statistics and other information published in the report. In the year 2015-16, the programs/ schemes proposed to increase the effectiveness of the section are - SAFAR Project - Stationary Air Quality Monitoring Centre is currently monitoring the air quality at 7 places and at 3 traffic junctions and dumping grounds through Mobile Air Quality Monitoring Van which measures the elements responsible for polluting the environment. Additionally, it is proposed to install 7 more modern Air Quality Monitoring Centers in collaboration
  • 67. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 66 with IITM of Indian Meteorological Department under the “SAFAR” project. For this, a budgetary provision of `5 crore has been proposed in the B.E. 2015-16. Noise Mapping - To measure the noise levels at 1200 places in all wards of Greater Mumbai and to undertake appropriate remedial measures alongwith budgetary estimates at places where the levels exceed the limits by appointing Project Consultant, a budgetary provision has been proposed in the budget. Accordingly, e-tender has been called for awarding the work. Ashray Yojna Under the project of Ashray Yojna, it is proposed to redevelop the existing plots by utilizing 4 FSI. A proposal is submitted for approval of State Govt. to permit 4 FSI. To begin with, temporary transit camps are being constructed at 16 locations. Out of these, 2 in City, 1 each in E.S. & W.S. are in progress. A budget provision of `197.62 crore is proposed in B.E. 2015-16 for construction of transit camps, major repairs and redevelopment of SWM staff quarters. For reconstruction and renovation of mustering chowkies, a provision of `6 crore is proposed in B.E. 2015-16.
  • 68. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 67 “Mission Garima” With a view to reducing human intervention with sewage, it is planned to have a systematic approach for reduction in breakdown maintenance with increase in preventive maintenance by effective use of machinery/ mechanization/ automation of system. With this objective, “Mission Garima” has been launched jointly with Tata Trust. It is aimed for health, hygiene and welfare of workers working in Sewerage, SWD and SWM departments. It is planned to procure various machineries which will help maintenance of sewerage conveyance system mechanically and reduction of human intervention. Welfare Activities for Conservancy Staff To reduce the mortality rate of Municipal conservancy staff while on duty; primarily due to unhygienic working conditions and illiteracy making them prone to addiction, comprehensive plans have been made. Measures like safety gears, de-addiction programmes, counselling, financial planning, training, medical check-up are conducted every year for the workers and families. Training Programme for Labour For Class IV employees, 3 Day residential training programmes are conducted at C.T.I. & R.C. The Labour department also conducts 2 days „Quality of Life Training
  • 69. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 68 Programme‟ for the benefit of employees and their spouses wherein emphasis on family budget and quality of life, de-addiction, (alcoholism, gutkha, tobacco, smoking etc.) health of women and children, effects of unauthorised absenteeism, etc. is given. This programme has benefited in improving their daily life style in a positive way. Earmarking 25% provision for SWM and Sewage Water Projects out of total provision for Capital Works. The Member Secretary, Maharashtra Pollution Control Board (MPCB) has informed that it is mandatory to earmark 25% of the total provision made for Capital Works for the projects under Solid Waste Management and Sewage Water as per the provisions of Section 41(2)A Water (Pollution Prevention and Control) Act, 1974 and Section 15 Environment (Protection) Act, 1986 as well as Municipal Solid Waste (Management & Handling) Rules, 2000. Keeping these directives in view, in the B.E. 2015-16, a provision of `2,962.21 crore out of total provision of `11,824.98 crore i.e. 25.05% of the total capital provision has been earmarked for the projects as given below :-
  • 70. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 69 Activity Provision (` in Crore) Solid Waste Management 376.01 Storm Water Drain 1,097.65 Roads (25% provision for SWD) 793.88 Goregaon-Mulund Link Road (7%) 21.00 Sewage Water 148.09 Sewerage Projects 173.18 Municipal Seweage Disposal Project 352.40 Total 2,962.21 Total Capital Provision Budget A, B & E 9,282.25 Budget G 2,542.73 Total Capital Provision 11,824.98 % of capital provision for the project S.W.M., S.W.D., S.P. etc. over total capital 25.05% LICENCE Action against unauthorized hoardings In pursuance of Hon‟ble High Court‟s orders dated 30.07.2012, efforts have been made to remove the hoardings which are violating the new policy guidelines. Henceforth,
  • 71. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 70 permission for display of hoardings on terrace of more than 30 years old building will not be granted. Pursuant to the Bombay High Court orders on Writ Petition No.PIL/37 of 2010 and No.PIL/155 of 2011 display of Banners, Boards etc., I would like to mention here that we have taken utmost efforts to minimize this nuisance. Sr. Inspectors (Lic.) of the ward have now been appointed as „Nodal Officer‟ and Toll free Nos. (1292 & 1293) have been provided and activated to the citizens for lodging the complaints in respect of display of unauthorised banners / posters etc. Street Vendors Regulation As per Hon‟ble Supreme Court‟s orders dated 09.09.2013, 1,28,443 Registration forms were distributed to the streets vendors in July, 2014 and accordingly 99,435 duly filled in registration forms were received at respective ward offices. In order to ascertain the eligibility, a software is being developed by MCGM. As per the plan and scheme under the provisions of “The Street Vendors (Protection of Livelihood & Regulation of Street Vending) Act 2014”, vending, non-vending and restricted vending zones are to be created. It is proposed to create Geo- fencing of these zones and also issue identity cards to the registered Street Vendors with QRT Codes / other technology
  • 72. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 71 as well as provide instrument to concern Lorry Inspectors which could read the Identity Card and also penalty or warning that is imposed can be registered on the spot. It is also proposed to develop a software to tag the position of individual street vendor with respect to time and place allotted for his business as well as to create database of individual street vendor for regular inspection and history of individual street vendor. A provision of `3 crore is made for the same. GARDENS (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 149.08 132.17 144.28 Capital Expenditure 268.89 143.33 294.91 Total 417.97 275.50 439.19 Garden Cell Improvement of various RG/PG/lakes/Sports complexes Phasewise improvement of various RG/PG/Lakes and Sports Complexes in Mumbai jurisdiction is taken up by Garden cell through a new concept of „Design Built Basis‟ where bidders are to submit designs. Architects/Consultants are
  • 73. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 72 to be engaged for enabling the latest concepts in urban development/Garden design. Phase –I 29 plots were identified and same are under improvement in holistic approach as individual theme gardens on „Design Build Basis‟. Total Area under development as Garden/playground is 3,24,000.00 sq.mt. Few of the gardens with individual theme are - Sr. No. Name of Garden(Ward) Theme Area 1 BombayDyeing Plot (F/S) Multi Theme 9 Acre 2 Priyadarshani Garden (L) Fortresses of Maharashtra 6 Acre 3 Hegadewar Udyan (N) Phases of Moon 3 Acre 4 Nakshtra Udyan (K/W) Nakshtra (Zodiac Signs) 3 acre 5 S.K. Patil Udyan (C) Butter Fly Garden 1 Acre 6 Upper Govind Nagar (P/S) Rose Garden 1 Acre 7 R.G. Plot at Model Town, Andheri (K/W) Musical Theme Garden 1.8 Acre Phase-II Holistic improvement of 33 plots will commence shortly. Total area to be developed shortly as Garden /Play ground is 2,23,600.00 sq.mt. Shilp-Gram at Jogeshwari of area 12 acres will be developed as “Shilpgram” and the preliminary work is
  • 74. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 73 started. The Gardens at CTIRC, Borivali, Praksh Cotton Mill, Wadala, Sion Circle, Sion, Vasant Prabhu Garden, Dadar are proposed to be developed. Phase-III Borivali Sports Complex at Chikuwadi in about 12 acre area will be developed for which clearances are being pursued. The compound wall construction is nearly completed. Repairs to Andheri Sports Complex will commence shortly. Garden Department Durgadevi Udyan (Grant Road), Sant Gadage Maharaj Udyan; E Ward, Bhatia Baugh in A ward, Sardar Vallabhabhai Patel Udyan; Andheri (W), Meenatai Thakare Maidan, one reserved plot in P/N ward, Jari Mari Udyan and Sane Guruji Udyan in R/N ward are proposed to be developed in financial year 2015-16. The development work of Chittaranjan Udyan, Vidyavihar (E) is completed. All development works of the these gardens are being executed by E.E.( Garden Cell) under Design Build Concept. Wet Lands/lakes The beautification works of four wet lands is proposed in the year 2014-15. Among them, the beautification work of Charai Lake is nearing completion. The work of removal of encroachment and leveling of the plot of Kalina tank is in
  • 75. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 74 progress. The contractual agency for beautification of Bandra Talao is appointed and the work is started. NOC of the Heritage Department has also been obtained. Development of Shivaji Talao has been undertaken. This includes desilting, road development, development of gardens. I also propose to develop Banganga lake and also maintaining this lake in South Mumbai in Malbar Hill. Financial modalities will be worked out. Spaces below Flyovers – Spaces below Matunga, Hindmata, Bharatmata, Lalbaug flyovers are being developed. Tenders have been floated and some works have already started. GPS based Tree Census – Till today, the GPS based tree census of more than 11 lakh trees has been completed successfully. Development of Gardens/ RG/PG plots – Out of total 179 major Gardens/ RG/ PG plots, 10 plots in City area, 11 plots in Eastern Suburbs and 40 plots in Western Suburbs are proposed to be developed in the year 2015-16. Rain Tree Conservation Garden Department is also undertaking steps for protection of Rain Tree Conservation infected by Mealy bugs.
  • 76. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 75 Outside experts are involved in this work and we have achieved reasonable success in this aspect. Theatres & Swimming Pools - Development/ improvement of Kalidas Natyagriha, Birla Krida Kendra, Kandivali Swimming Pool and Chembur Swimming Pool will be done shortly. It has been decided to carry out structural repairs and to reconstruct General Arunkumar Vaidya Swimming Pool in Olympic shape with modern amenities such as separate swimming pool for children, audience gallery, administrative building, diving board, etc. Mumbai Cultural Festival Cultural vibrancy of city is as important as economic prosperity. It is, therefore, proposed to hold Mumbai Cultural Festival every year during December / January to make the City culturally vibrant involving persons of national and international eminence. It is proposed to make a provision of `25 lakh for the same and Maharashtra Tourism will anchor this programme. Modernization of Veermata Jijabai Bhosale Udyan & Zoo Veermata Jijabai Bhosale Udyan & Zoo (53 acres) is declared as “Heritage Grade II (B)” site & “Medium Zoo”
  • 77. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 76 and accorded recognition up to 31.12.2015 by Central Zoo Authority, New Delhi. The Master (Layout) Plan has been approved on 05-12-2012. The zoo development works are proposed to be completed by December, 2016 and the entire project cost will be around `325 crore. The proposed Humboldt Penguin facility is at the Ground floor of the Interpretation Center building and an agency viz. M/s Goa Trade Farming Co. Ltd., Thailand has been appointed for the procurement of 6 (3M + 3F) Humboldt Penguins. These Humboldt Penguins will be brought by December, 2015. The other facilities at the Interpretation Centre will include Marine Fish exhibits, Children‟s Play area & Library, 3D Theatre at Ground floor, Zoo Exploration Centre at 1st floor and administrative office at 2nd floor. The Memorandum of Understanding (MOU) between the State Forest Department and MCGM is prepared and sent for the approval to the State Govt. for the establishment of international zoo at Aarey Milk Colony, Goregaon (125 acres). Bird Park of international standards will be developed at Dr. Babasaheb Ambedkar Udyan; Powai (25 acres), for which a PMC consultant viz. Universal Organics, Mumbai is already selected.
  • 78. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 77 For the year 2015-16, a budget provision of `49 crore has been proposed for the various zoo development works. ESTATE  Estate department has been entrusted with the responsibility to look after the estates owned or managed on behalf of Government of Maharashtra („W‟ properties) by Corporation.  Estate department is also taking over lot of PAP tenements for allotment to families affected under various development schemes.  Since 1991, Estate Department received total 20,122 PAPs of 180 sq.ft., 225 sq.ft. and 269 sq.ft. area from Chief Engineer (D.P.), S.R.A. & MMRDA. out of which 6,795 PAPs are allotted to respective project affected persons and remaining 13,327 PAPs are vacant  Out of total allotted 6,795 PAPs 3,091 PAPs are allotted to residents/Municipal Employees of dilapidated buildings, 1,567 PAPs are allotted to project affected persons nearby Tansa pipeline project in Mumbai and 2,137 PAPs are allotted to various road widening project affected persons.  Pursuant to an amendment in MMC Act, 1888 incorporating Section 353B, the Estate department has
  • 79. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 78 already taken up the structural auditing of 751 municipal properties. MUMBAI FIRE BRIGADE (` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 167.12 148.99 224.02 Capital Expenditure 190.53 99.28 262.27 Total 357.65 248.27 486.29  A programme was undertaken to strengthen the Disaster Management capability of the Fire Brigade, under which it was decided to construct and equip 6 Regional Command Centers. The Command Center at Wadala is already commissioned and the Command Centers at Vikhroli, Byculla, Mankhurd, Borivali are ready and will be commissioned shortly.  With a view to strengthening the Fire Brigade and reducing the response time as well as increasing the efficiency and efficacy of the search and rescue operations of Mumbai Fire Brigade, a substantial provision of `262.27 crore has been proposed in the
  • 80. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 79 B.E. 2015-16 . The major items and provision proposed therefor are as stated below : - (` in crore) R.E. 2014-15 B.E. 2015-16 1 90 mtrs. Hydraulic platform, (1 Nos) 20.00 6.00 2 81 mtrs. Hydraulic platform, (3 Nos) 20.00 26.00 3 3 Hazmat Vehicles 0.01 15.00 4 Special ultra high pressure water mist system (6 Nos.) 0.01 3.00 5 Mini Quick Response Multipurpose Vehicles (10 Nos.) 0.76 8.04 6 Portable pumps (22 Nos.) 3.95 3.96 7 Replacement of old fire engines (24 Nos.) 14.30 27.75 8 Purchase of Fire Engines (6 Nos.) 0.70 6.25 9 Replacement of Water Tankers (11 Nos.) 0.01 18.00  Mumbai Fire Brigade has carried out a gap analysis and accordingly prepared a perspective plan for setting of 26 new fire stations in the next five years. The work of construction of Fire Stations at Kanjurmarg (W) is being executed by MCGM and is expected to be completed in the ensuing financial year.
  • 81. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 80 The other Fire Stations at the plots at Amboli Village, Andheri (W), Kandarpada at Dahisar and Ramabai Ambedkar Colony Ghatkopar (E) are being developed through developers/land owners. A substantial provision of `2.00 crore has been proposed for construction of new fire stations in B.E. 2015-16.  Mini Fire Stations - The proposal of constructing the mini fire stations with temporary shed in municipal properties is under consideration. These fire stations will be equipped with mini fire tender and sufficient manpower. It has been decided to link these fire stations with their parent fire stations. Mini fire stations will have early and easy access to the scene of incident including hutments/slums. 3 locations each in City, W.S. area and 4 in E.S. have been identified for constructing such mini fire stations.  With a view to modernizing the Control Room of Mumbai Fire Brigade, it is proposed to install “Integrated Command & Control System & Vehicles tracking system based on GPS & GIS System”. This will improve the efficiency of the Control room and also reduce the response time.
  • 82. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 81 MUNICIPAL MARKETS ( ` in crore) Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 Revenue Expenditure 64.20 50.28 67.46 Capital Expenditure 49.31 21.24 37.20 Total 113.51 71.52 104.66  As per Corporation Resolution no.1779 dated 28.03.2013, it has been decided to redevelop the existing 92 markets and 6 open plots as follows. Category - I Markets to be developed as per existing policy Part – II and Part – III approved by U.D. in the year 2004 – 2005. = 18 nos. Category - II Markets to be developed as per revised policy which is submitted for the approval of U.D. department. = 25 nos. Category III & IV Markets to be developed as per DCR 33(21) = 49 nos. Category - V Open plots in MCGM possession to be developed as per Part – I of policy and guidelines approved by U.D. in the year 2004 - 2005 = 06 nos Category - I Letter of Intent has been issued for 18 markets. Out of these 18 markets, redevelopment work of Vakola Market, Sant Jalaram Bappa Market, Pant Nagar Markets are completed
  • 83. B U D G E T E S T I M A T E S A , B & G 2015-16 MUNICIPAL CORPORATION OF GREATER MUMBAI 82 and the redevelopment work of B.R. Gawde Market is nearing completion. Besides this, the redevelopment work of 4 markets is in progress and for 2 markets, IOD has been issued. The time period of Letter of Intent is extended for the remaining 8 markets. Category - II Improvements Committee/Corporation have approved the revised redevelopment policy to maintain the profit sharing ratio of developers/association same for all municipal markets by increasing profit of Corporation. This policy has been challenged by some of the Market Associations in High Court and as per High Court directions, redevelopment of 25 markets as per existing policy is under consideration. Category III & IV The 49 markets falling in this category will be developed as per DCR 33(21). Category - V The 6 open plots which are in M.C.G.M. possession will be developed as per Part - I of policy guidelines approved by U.D. in the year 2004 – 2005. The open plots are located at Chandivali village – Kurla, Borladevi Mandir – Govandi, Godrej plot – Vikhroli (West), Kannamwar Nagar – Vikhroli (East), Eksar village – Borivali. The plans of Chandivali village, Godrej plot, Kannamwar Nagar are ready.  A ground + 9 floor modern market (Majas Market) is constructed at Poonam Nagar, Jogeshwari, K/E Ward at a total cost of `69.67 crore. At present, the