Our group members:
 Mizanur Rahman khan
Reg:09208025
 Md. Soriful Islam Rasel
Reg:09208008
 Md. Toukir Ahmed
Reg:09208005
 M.K. Masud Hasan
Reg:09208031
Abstract
The main objective of this thesis is to design
of a Power Transformer using computer program.
Six different problems of designing transformer
have been solved which are varied from 600 VA to
5 MVA. These problems have been solved by
developing a computer program by the authors
according to the standard assumed values and
principles of the power transformer design.
Introduction
Transformer is an electrical device which
electric power in one circuit is
transformed into electric power of the
same frequency in another circuit.
It can rise or lower the voltage in a
circuit but with a corresponding
decrease or increase in current
Theory and principles
A transformer works on the
principle of electromagnetic
induction, according to
faradey’s law. Whenever a
closed conductor is placed
into a varying magnetic
field, a potential difference
is developed across the
terminals of the conductor. This phenomenon is
known as electromagnetic induction. This is the basic
principle of working of any transformer.
Open circuit test or no-load test
From this test, we can determine core loss and no-load current (I0) of
the transformer.
The high-voltage side is generally kept open because the current in
high-voltage winding is less compared to that on low-voltage
winding.
In low-voltage side, a voltmeter, an ammeter and a wattmeter are
connected to measure the input voltage, no-load current and the
core loss of the transformer.
W=V1I0cosѳ0
IW=I0cosѳ0
Iµ=I0sinѳ0
Fig : Open Circuit Test
Short circuit or impedance test
 The main purpose of this test is to compute the
following:
 Equivalent impedance of the transformer referred to
primary and secondary.
 Cu loss of the transformer at any desired load.
 Total voltage drop of the transformer referred to primary
and secondary.
Figure : Short Circuit Test
Voltage regulation
• With constant voltage applied in primary, the
secondary terminal voltage will decrease due to voltage
drop across its internal resistance and leakage
reactance.
• Let 0V2 and V2 be the secondary terminal voltages at no
load and on load respectively. The difference 0V2 – V2 is
known as inherent voltage regulation of the
transformer.
•Voltage regulation down:
•Voltage regulation up:
Voltage regulation
The secondary terminal voltage not only depends
on load current but also on the power factor of the
load. The regulation is said to be at full load
provided V2 is determined for full load and at
specified power factor condition. V2 drops more
and more with increasing load current. For lagging
power factor load,
V2<E2, the voltage regulation is positive.
For, leading power factor load,
V2>E2, the voltage regulation is negative.
Core or Iron Loss
From the Nippon Steel Corporation book Core loss for 27-M-4
Grade core. Figure shows core loss vs. flux density.
If we include with handling factor and Total weight of core we
can found Total core or iron loss. That we have been shown our
thesis book
Copper Loss
 The loss of power in the form I2R due to
the resistances of the primary and secondary
windings is known as copper losses. The copper
loss also depends on the magnitude of currents
flowing through the windings. The total Cu loss
is given by
Copper losses are determined on the basis of R01 or
R02 which is determined from short circuit test.
Since the standard operating temperature of
electrical machine is taken as 75 °C, it is then
corrected to 75 °C.
No-load current
Magnetisation Curve
From the Nippon Steel Corporation book
Magnetising curve for 27-M-4 Grade core. Figure
shows flux density (T) vs exciting power (VA/kg)
Efficiency
Due to the losses in a transformer, its output power is less
than the input power.
Power output = Power input – Total losses
Power input = Power output + Total losses
= Power output + Pi + PCu
The ratio of power output to power input of any device is
called its efficiency (η).
Tank Design
The tank dimensions and profile are decided
in a layout drawing drawn to scale considering
electrical clearances, magnetic
clearances, transport size limits and
manufacturability. The design of stiffeners is a very
important aspect of tank design. An effective
stiffening arrangement can reduce the tank plate
thickness. The stiffeners are designed in such a way
that the tank weight is minimum, and at the same
time it should be able to withstand the specified
loads.
Transformer cooling
Transformer is non-ideal device that is a
practical transformer does not provide 100%
efficiency. Transformer windings are made by
inductive coils, but a little resistive part is also
present in those windings. So, as per the Ohm’s
law, that is V=IR, a decent amount of voltage drop
will take place across those windings. It is known as
the copper loss of the transformer. By the heating
action, this amount of energy is directly converted
into equivalent amount of heat energy. For better
efficiency transformer cooling is required.
Conservator Design
Transformer conservator is considered as one of
the important transformer accessories. As the name
implies, a transformer conservator conserves some
amount of transformer insulating oil. , transformer
conservator is an air tight metallic cylindrical drum
which is fitted above the transformer main oil tank. A
pipeline is provided to create a connection of
transformer main tank and
conservator and this pipeline
usually acts as the circulating
path for the insulating oil.
This conservator tank is
partially filled with insulating oil.
Parallel operation of Transformer
In several power transmission and
distribution sector, parallel operations of
transformers are effectively done. As the name
implies, parallel operation of transformer is
achieved by connecting two or more power
transformers in parallel with each other. So, in
case of parallel operation, the primary windings of
the transformers are connected to a common
voltage source and the secondary windings are
connected to a common load. This is a simple
definition of parallel operation of transformers.
Condition for parallel operation
 Primary windings should be suitable for the
supply system voltage and frequency.
 The transformers should be properly connected
with regard to polarity.
 The voltage ratings of both primaries and
secondaries should be identical.
 The percentage impedence should be equal in
magnetude and have the same X/R ratio in order
to avoid calculating currents and operation at
different power factor.
Design procedure of transformer
 Voltage per turn : Et=k√Q where Q is
the rated KVA
 The Value of ‘K’ for aluminum-wound
transformer may b taken between 0.32
to 0.35
 For our calculation, let us
assume, k=0.33
 Therefore, Et=0.33√100=3.3
Design procedure of transformer
 value of frequency as :
 Et= 4.44 × 50 × Bm × Ag × 0.97 × 10-4
 For determine the core diameter
 Ag=K1πd2/4
 is the rated frequency which is 50 Hz
 Bm=is the maximum flux density in tesla
 Ag=is the gross core area in sq cm
 0.97=is the stacking factor
 The approximate value of K1 may be assume as follows:
 For steps 6:the approximate value of k1=0.92
 For steps 7:the approximate value of k2=0.925
 For steps 8:the approximate value of k3=0.93
 For steps 9:the approximate value of k4=0.935
 For steps 10:the approximate value of k5=0.94
 For steps 11:the approximate value of k6=0.945
According to the advance engineering
design computer aided design is the most
important part of whole design
Problem- 1. 100 KVA, 11000 / 433 V, 50 Hz, 3
Phase Delta / Star connected, Core Type, ON cooled
Power Transformer.
Output
MATLAB coding
HV Side design values
 Ph-Voltage in HV winding=11000V
 Ph-Current in HV winding=3.03A
 Conductor diameter in LV winding=1.700mm
 Conductor Area in HV winding=2.270mm
 Current density in HV winding=1.335A/sq mm
 For Aluminium wound transformer K=0.33
 EMF/Turn = 3.30
 Turns in HV winding=3344T
 5.00 Percent Turns towards Tapping=167T
 Total Turns in HV winding=3511T
 Assume number of coil per phase=4
 Turns per c oil=878T
 Gap between HV to yoke a top & bottom=25.00mm
 Gap between two tap coil=10.00mm
 Gap between plain coil=7.00mm
 Assume no of layer=17
 Turns per layer=53T
 Axial length of HV coil=103.00mm
 Radial build of HV coil=35.00mm
 Total axial length of 4 coil=412.00mm
 Inside diameter of coil in HV winding=187.00mm
 Outside diameter of coil in HV winding=257.00mm
LV Side design values
 Ph-Voltage in LV winding=250V
 Ph-Current in LV winding=133.34A
 Conductor diameter in LV winding=10.640mm
 Gap between to LV coil to yoke=10.00mm
 Strip size=11.00 X 5.00 X 2 no in parallel A
 Area of strip=108.280mm
 Current density in LV winding=1.231A/sq mm
 Turns in LV winding=76T
 Assume no of layer=02
 Turns per layer=38T
 Radial build of LV coil=23.00mm
 Inside diameter of coil in LV winding=121.00mm
 Outside diameter of coil in LV winding=167.00mmm
 Length of LV coil with packing=470.00mm
Core design values
 Assume 9 step core factor
 Core diameter=115.000(mm)
 Core window height=486.00mm
 Core limb centre=270.000(mm)
 Step width L=110/100/90/80/70/60/50/40/30/mm
 Cores tack
K=33.541/23.248/14.800/11.024/8.628/6.866/5.454/4.2
58/3.199mm
 Total core stack K=111.018(mm)
 Total gross core area=97.832sqcm
 Net core area=94.897sqcm
 Grade ofcore:27M-4
 Weight of Core=197.984(kg)
 Flux density=1.561(Tesla)
Weight of LV Aluminium
 Mean Diameter of coil=144.000mm
 Mean Length of turns=453.000mm
 Total Length of conductor=34428.000mm
 Specific gravity of aluminium=2.760g/cc
 Bare weight of conductor for 1 ph=10.289kgs
 Bare weight of conductor for 3 ph=30.867kgs
 Weight of the covered conductor=33.000kg
 (Considering a coverage of 7 percent for LV strip
 Mean Diameter of coil=222.000mm
 Mean Length of turns=697.434mm
 Total Length of conductor=2448828.748mm
 Specific gravity of aluminium=2.760g/cc
 Bare weight of conductor for 1ph=15.341kgs
 Bare weight of conductor for 3ph=46.023kgs
 Weight of the covered conductor=52.000kg
 (Considering a coverage of 14 percent for HV
strip)
Weight of HV Aluminium
 Resistance of HV site at 75 Deg-C=35.449ohm
 Copper loss at 1 Ph of HV site at 75 Deg-C=325.516W
 Copper loss at 3 Ph of HV site at 75 Deg-C=976.549W
 Resistance of LV site at 75 Deg-C=0.011ohm
 Copper loss at 1Ph of LV site at 75 Deg-C=195.023W
 Copper loss at 3Ph of LV site at 75 Deg-C=585.069W
 Total Copper loss 3Ph at 75 Deg-C=1561.617W
 Approximate stray loss for 100.000 KVA=100.000W
 Load loss as rated load=1662W
 Load loss(maximum)=1762W
Winding Resistance and Load Loss
No Load Loss
 From the figure for 1.561 tesla Flax density
loss=0.911W/kg
 Assume Handeling Factor=25percent
 (ON account of sliting, shearing, knotching,air
gap and human error during assemling)
 Calculated No Load loss=226W
 From the figure for 1.561 tesla Flax Magnetizing
power=1.463VA/kg
 Per phase Magnetizing Current=0.386 A
 Assume ddd towads 200 percent Handeling
Factor
 (for stress developed
duringsliting, shearing, knotching and thikness
variation.)
 Magnetizing Current=1.159A
 Histeresis and eddy Current=0.301A
 No load Current=1.197A
 No load Currentat 100 perct. Voltage as a perct. of
Full load current=0.898percent
No Load Current at 100 percent voltage
 From the figure for 1.757 tesla Flax Magnetizing
power=4.289 VA/kg
 Per phase Magnetizing Current=1.006A
 Assume dddtowads200percentHandelingFactor
 (for stress developed during
sliting, shearing, knotching and thikness variation.)
 Magnetizing Current=3.019A
 Hysteresis and eddy Current=0.267A
 No load Current=3.031A
 No load Current at 112.5 perct. Voltage as a perct.
Of Full load current=2.273percent
No Load Current at 112.5 percent voltage
Performance Calculations
 Efficiency at Unity PF and Full Load: 98.15
percent
 Efficiency at 0.8 pf:
At 100 percent Ld: 97.70 percent, 75 percent
Ld:98.10 percent and5 0percent Ld:98.42 percent
 Max Efficiency=98.79 percent occur at Load
=36.84 parcent
 Mean Daimeter of LV & HV coil=183.0000mm,
 Average stack Length of LV & HV
coil=453.0000mm
 Reactance= 4.31 percent, Resistance= 1.66
percent, Impedance= 4.62 percent
 Regulation: at FL and0.8pf=3.94percent, at FL
and UPF=1.75percent
 Tank: Length = 847 mm, Width = 337 mm, Height = 901 mm and
Volume=0.257m^3
 Tank : Surface area for walls side=2.3680 sq.m andTemp-Rise=56is reduced to
40deg-C
 Unit length of each tube=0.5900m, Surface length of elliptical tube =0.1620 m
and No of Tubes =36
 Tank Weight:
 Side sheet ( 3 mm) =52 kg, Bottom sheet ( 5 mm)=11kg, Top sheet( 5
mm)=15kg
 Base Channel=7kg, Tank Flange=7kg, Stiffeners on all 4s ides=10kg
 Conservator and its supports=10kg, LV box=3kg, HV Busing adopter=4kg
 Explosion Vent=4kg, Lifting lugs=2kg, Elliptical tube=39kg
 Radiators Header=20kg, Miscellaneous items=4kg, Total weight of
Tank=187kg
 Volume of Oil in the tank=186.181litres
 Volume of Oil in (Radiator + Header)=( 19.0 + 5.0)=24.0litres
 Volume of Oil in the Conservator (Length= 508.0 mm, Diameter= 235.0
mm)=8.0litres
 Volume of Oil in LV box and HV box=3.0&4.0litres
 Total Volume of Oil in the transformer=226.00litresor193.00kg
 Weight: HV-Wdg( 52.00)+ LV-Wdg( 33.00)+(Core + Yoke)( 197.98 ) Kg
 Weight(Approx.): Insulation= 15.0 kg, Core Fittings=30.0kg, Other
misc.=3.0kg
 Total weight =735.68kg, Kg/KVA = 7.357
TANK Design and Weights
Other 5 Problems
Problem- 2. 600 VA, 240 / 12 V, 50 Hz, 1
Phase, Delta / Star connected, Core Type, ON cooled
Power Transformer.
Problem- 3. 1 KVA, 240 / 12 V, 50 Hz, 1
Phase Delta / Star connected, Core Type, ON cooled
Power Transformer.
Problem- 4. 630 KVA, 11000 / 440 V, 50 Hz, 3
Phase Delta / Star connected, Core Type, ON cooled
Power Transformer:
Problem- 5. 2 MVA, 33000 / 11000 V, 50 Hz, 3
Phase Delta / Star connected, Core Type, ON cooled
Power Transformer:
Problem- 6. 5 MVA, 33000 / 11000 V, 50 Hz, 3
Phase Delta / Star connected, Core Type, ON cooled
Power Transformer.
Discussion and Conclusion
We have designed transformer according to
the proposed specification including primary
coil, number of turns, secondary coil, core
diameter, step width, core stack, core area, flux
density, coil diameter, winding details, loss, no load
current, tank, conservator, oil and weights etc. As
such, the derivation of various equations
involved, explanation for the assumptions made in
employing the approximate formula.
Suggestion for Future work
For batter results about transformer design
need to internship. If anyone did an
internship, they will have the value of
specification and assume value those we
assumed. They will know about how to design a
transformer practically.
We did not create the software as a professional
one rather we have developed it. It is need to
create a software that if give the values of rating
and shown the output values.
Thank you

More Related Content

What's hot

Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformerSudarshan Pandey
 
Three level inverter
Three level inverterThree level inverter
Three level inverterVinay Singh
 
Voltage and Frequency Control of the Grid
Voltage and Frequency Control of the GridVoltage and Frequency Control of the Grid
Voltage and Frequency Control of the GridLeonardo ENERGY
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector groupShyamkant Vasekar
 
Simplified analysis of graetz circuit copy - copy
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copyVert Wheeler
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substationEmran Ali
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Deviceskhemraj298
 
Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating StationVasanthan Ravichandran
 
Three phase-controlled-rectifiers
Three phase-controlled-rectifiersThree phase-controlled-rectifiers
Three phase-controlled-rectifiersTejas Deshpande
 
Voltage stability using Series FACTS devices
Voltage stability using Series FACTS devicesVoltage stability using Series FACTS devices
Voltage stability using Series FACTS devicesSAI SREE
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 

What's hot (20)

Motor Protection
Motor ProtectionMotor Protection
Motor Protection
 
EXCITATION SYSTEMS
EXCITATION SYSTEMSEXCITATION SYSTEMS
EXCITATION SYSTEMS
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Flyback converter
Flyback converterFlyback converter
Flyback converter
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformer
 
Soft starters
Soft startersSoft starters
Soft starters
 
Three level inverter
Three level inverterThree level inverter
Three level inverter
 
Voltage and Frequency Control of the Grid
Voltage and Frequency Control of the GridVoltage and Frequency Control of the Grid
Voltage and Frequency Control of the Grid
 
COGGING & CRAWLING IN INDUCTION MOTOR
COGGING & CRAWLING IN INDUCTION MOTORCOGGING & CRAWLING IN INDUCTION MOTOR
COGGING & CRAWLING IN INDUCTION MOTOR
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
 
Simplified analysis of graetz circuit copy - copy
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copy
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating Station
 
Three phase-controlled-rectifiers
Three phase-controlled-rectifiersThree phase-controlled-rectifiers
Three phase-controlled-rectifiers
 
Voltage stability using Series FACTS devices
Voltage stability using Series FACTS devicesVoltage stability using Series FACTS devices
Voltage stability using Series FACTS devices
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Transformer Design
Transformer DesignTransformer Design
Transformer Design
 

Viewers also liked

Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Dheeraj Upadhyay
 
Transformer design
Transformer designTransformer design
Transformer designsulaim_qais
 
Transformer design by s u khaparkar
Transformer design by s u khaparkarTransformer design by s u khaparkar
Transformer design by s u khaparkarexhod
 
Transformer Designing
Transformer Designing Transformer Designing
Transformer Designing Praveen Sharma
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionStudent
 
ANN based fault diagnostic scheme for power transformer
ANN based fault diagnostic scheme for power transformerANN based fault diagnostic scheme for power transformer
ANN based fault diagnostic scheme for power transformerMohammad Sohaib
 
Criminalistica y criminologia
Criminalistica y criminologiaCriminalistica y criminologia
Criminalistica y criminologiaOskar Treejjoo
 
Pembangunan MRT
 Pembangunan MRT Pembangunan MRT
Pembangunan MRTHafizhanani
 
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...Audrey Chemouli
 

Viewers also liked (18)

Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )
 
Transformer design
Transformer designTransformer design
Transformer design
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
Transformer design by s u khaparkar
Transformer design by s u khaparkarTransformer design by s u khaparkar
Transformer design by s u khaparkar
 
Power transformer
Power transformerPower transformer
Power transformer
 
Transformer Designing
Transformer Designing Transformer Designing
Transformer Designing
 
Transformer Design
Transformer DesignTransformer Design
Transformer Design
 
Powertransformer
Powertransformer Powertransformer
Powertransformer
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer Construction
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
ANN based fault diagnostic scheme for power transformer
ANN based fault diagnostic scheme for power transformerANN based fault diagnostic scheme for power transformer
ANN based fault diagnostic scheme for power transformer
 
Criminalistica y criminologia
Criminalistica y criminologiaCriminalistica y criminologia
Criminalistica y criminologia
 
Ppt
PptPpt
Ppt
 
Sjh5 pt (1)
Sjh5 pt (1)Sjh5 pt (1)
Sjh5 pt (1)
 
Sound Signature
Sound SignatureSound Signature
Sound Signature
 
Hello
HelloHello
Hello
 
Pembangunan MRT
 Pembangunan MRT Pembangunan MRT
Pembangunan MRT
 
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...
Etat des lieux de l'interprofessionnalité suite à l'ordonnance du 31 mars 201...
 

Similar to Presentation Design of Computer aided design of power transformer

Design & Implementation of Zero Voltage Switching Buck Converter
Design & Implementation of Zero Voltage Switching Buck ConverterDesign & Implementation of Zero Voltage Switching Buck Converter
Design & Implementation of Zero Voltage Switching Buck ConverterIJERA Editor
 
Pocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsPocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsSuresh Kumar
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
Design of a Non-Ideal Buck Converter
Design of a Non-Ideal Buck ConverterDesign of a Non-Ideal Buck Converter
Design of a Non-Ideal Buck ConverterIRJET Journal
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Stationneeraj prasad
 
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...IRJET Journal
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdfNerupaSharma
 
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.ppt
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.pptOPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.ppt
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.pptMadavanR1
 
ECE 505 Power electronics final paper
ECE 505 Power electronics final paperECE 505 Power electronics final paper
ECE 505 Power electronics final paperRob Garrone
 
presentation_transformers_1489551826_236516.ppt
presentation_transformers_1489551826_236516.pptpresentation_transformers_1489551826_236516.ppt
presentation_transformers_1489551826_236516.pptKrishnaBhalerao2
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharingVivek Arun
 
Transformers.ppt
Transformers.pptTransformers.ppt
Transformers.pptaditya40570
 
high temp superconducting transformer for railway application.ppt
high temp superconducting transformer for railway application.ppthigh temp superconducting transformer for railway application.ppt
high temp superconducting transformer for railway application.pptvaibhavn55
 
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)Md Abu Jauad Khan Aliv
 

Similar to Presentation Design of Computer aided design of power transformer (20)

Design & Implementation of Zero Voltage Switching Buck Converter
Design & Implementation of Zero Voltage Switching Buck ConverterDesign & Implementation of Zero Voltage Switching Buck Converter
Design & Implementation of Zero Voltage Switching Buck Converter
 
Pocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsPocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systems
 
Transformers.pptx
Transformers.pptxTransformers.pptx
Transformers.pptx
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Design of a Non-Ideal Buck Converter
Design of a Non-Ideal Buck ConverterDesign of a Non-Ideal Buck Converter
Design of a Non-Ideal Buck Converter
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
 
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...IRJET-  	  Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
IRJET- Design and Fabrication of a Single-Phase 1KVA Transformer with Aut...
 
A03540109
A03540109A03540109
A03540109
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdf
 
Transformer
TransformerTransformer
Transformer
 
Sub station training
Sub station trainingSub station training
Sub station training
 
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.ppt
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.pptOPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.ppt
OPERATING PRINCIPLES OF TRANSFORMER AND CONSTRUCTION.ppt
 
ECE 505 Power electronics final paper
ECE 505 Power electronics final paperECE 505 Power electronics final paper
ECE 505 Power electronics final paper
 
Transformer.pptx
Transformer.pptxTransformer.pptx
Transformer.pptx
 
presentation_transformers_1489551826_236516.ppt
presentation_transformers_1489551826_236516.pptpresentation_transformers_1489551826_236516.ppt
presentation_transformers_1489551826_236516.ppt
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharing
 
Transformers.ppt
Transformers.pptTransformers.ppt
Transformers.ppt
 
high temp superconducting transformer for railway application.ppt
high temp superconducting transformer for railway application.ppthigh temp superconducting transformer for railway application.ppt
high temp superconducting transformer for railway application.ppt
 
TRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptxTRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptx
 
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 

Recently uploaded (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

Presentation Design of Computer aided design of power transformer

  • 1.
  • 2.
  • 3. Our group members:  Mizanur Rahman khan Reg:09208025  Md. Soriful Islam Rasel Reg:09208008  Md. Toukir Ahmed Reg:09208005  M.K. Masud Hasan Reg:09208031
  • 4. Abstract The main objective of this thesis is to design of a Power Transformer using computer program. Six different problems of designing transformer have been solved which are varied from 600 VA to 5 MVA. These problems have been solved by developing a computer program by the authors according to the standard assumed values and principles of the power transformer design.
  • 5. Introduction Transformer is an electrical device which electric power in one circuit is transformed into electric power of the same frequency in another circuit. It can rise or lower the voltage in a circuit but with a corresponding decrease or increase in current
  • 6. Theory and principles A transformer works on the principle of electromagnetic induction, according to faradey’s law. Whenever a closed conductor is placed into a varying magnetic field, a potential difference is developed across the terminals of the conductor. This phenomenon is known as electromagnetic induction. This is the basic principle of working of any transformer.
  • 7. Open circuit test or no-load test From this test, we can determine core loss and no-load current (I0) of the transformer. The high-voltage side is generally kept open because the current in high-voltage winding is less compared to that on low-voltage winding. In low-voltage side, a voltmeter, an ammeter and a wattmeter are connected to measure the input voltage, no-load current and the core loss of the transformer. W=V1I0cosѳ0 IW=I0cosѳ0 Iµ=I0sinѳ0 Fig : Open Circuit Test
  • 8. Short circuit or impedance test  The main purpose of this test is to compute the following:  Equivalent impedance of the transformer referred to primary and secondary.  Cu loss of the transformer at any desired load.  Total voltage drop of the transformer referred to primary and secondary. Figure : Short Circuit Test
  • 9. Voltage regulation • With constant voltage applied in primary, the secondary terminal voltage will decrease due to voltage drop across its internal resistance and leakage reactance. • Let 0V2 and V2 be the secondary terminal voltages at no load and on load respectively. The difference 0V2 – V2 is known as inherent voltage regulation of the transformer. •Voltage regulation down: •Voltage regulation up:
  • 10. Voltage regulation The secondary terminal voltage not only depends on load current but also on the power factor of the load. The regulation is said to be at full load provided V2 is determined for full load and at specified power factor condition. V2 drops more and more with increasing load current. For lagging power factor load, V2<E2, the voltage regulation is positive. For, leading power factor load, V2>E2, the voltage regulation is negative.
  • 11. Core or Iron Loss From the Nippon Steel Corporation book Core loss for 27-M-4 Grade core. Figure shows core loss vs. flux density. If we include with handling factor and Total weight of core we can found Total core or iron loss. That we have been shown our thesis book
  • 12. Copper Loss  The loss of power in the form I2R due to the resistances of the primary and secondary windings is known as copper losses. The copper loss also depends on the magnitude of currents flowing through the windings. The total Cu loss is given by Copper losses are determined on the basis of R01 or R02 which is determined from short circuit test. Since the standard operating temperature of electrical machine is taken as 75 °C, it is then corrected to 75 °C.
  • 14. Magnetisation Curve From the Nippon Steel Corporation book Magnetising curve for 27-M-4 Grade core. Figure shows flux density (T) vs exciting power (VA/kg)
  • 15. Efficiency Due to the losses in a transformer, its output power is less than the input power. Power output = Power input – Total losses Power input = Power output + Total losses = Power output + Pi + PCu The ratio of power output to power input of any device is called its efficiency (η).
  • 16. Tank Design The tank dimensions and profile are decided in a layout drawing drawn to scale considering electrical clearances, magnetic clearances, transport size limits and manufacturability. The design of stiffeners is a very important aspect of tank design. An effective stiffening arrangement can reduce the tank plate thickness. The stiffeners are designed in such a way that the tank weight is minimum, and at the same time it should be able to withstand the specified loads.
  • 17. Transformer cooling Transformer is non-ideal device that is a practical transformer does not provide 100% efficiency. Transformer windings are made by inductive coils, but a little resistive part is also present in those windings. So, as per the Ohm’s law, that is V=IR, a decent amount of voltage drop will take place across those windings. It is known as the copper loss of the transformer. By the heating action, this amount of energy is directly converted into equivalent amount of heat energy. For better efficiency transformer cooling is required.
  • 18. Conservator Design Transformer conservator is considered as one of the important transformer accessories. As the name implies, a transformer conservator conserves some amount of transformer insulating oil. , transformer conservator is an air tight metallic cylindrical drum which is fitted above the transformer main oil tank. A pipeline is provided to create a connection of transformer main tank and conservator and this pipeline usually acts as the circulating path for the insulating oil. This conservator tank is partially filled with insulating oil.
  • 19. Parallel operation of Transformer In several power transmission and distribution sector, parallel operations of transformers are effectively done. As the name implies, parallel operation of transformer is achieved by connecting two or more power transformers in parallel with each other. So, in case of parallel operation, the primary windings of the transformers are connected to a common voltage source and the secondary windings are connected to a common load. This is a simple definition of parallel operation of transformers.
  • 20. Condition for parallel operation  Primary windings should be suitable for the supply system voltage and frequency.  The transformers should be properly connected with regard to polarity.  The voltage ratings of both primaries and secondaries should be identical.  The percentage impedence should be equal in magnetude and have the same X/R ratio in order to avoid calculating currents and operation at different power factor.
  • 21. Design procedure of transformer  Voltage per turn : Et=k√Q where Q is the rated KVA  The Value of ‘K’ for aluminum-wound transformer may b taken between 0.32 to 0.35  For our calculation, let us assume, k=0.33  Therefore, Et=0.33√100=3.3
  • 22. Design procedure of transformer  value of frequency as :  Et= 4.44 × 50 × Bm × Ag × 0.97 × 10-4  For determine the core diameter  Ag=K1πd2/4  is the rated frequency which is 50 Hz  Bm=is the maximum flux density in tesla  Ag=is the gross core area in sq cm  0.97=is the stacking factor  The approximate value of K1 may be assume as follows:  For steps 6:the approximate value of k1=0.92  For steps 7:the approximate value of k2=0.925  For steps 8:the approximate value of k3=0.93  For steps 9:the approximate value of k4=0.935  For steps 10:the approximate value of k5=0.94  For steps 11:the approximate value of k6=0.945
  • 23. According to the advance engineering design computer aided design is the most important part of whole design Problem- 1. 100 KVA, 11000 / 433 V, 50 Hz, 3 Phase Delta / Star connected, Core Type, ON cooled Power Transformer. Output MATLAB coding
  • 24. HV Side design values  Ph-Voltage in HV winding=11000V  Ph-Current in HV winding=3.03A  Conductor diameter in LV winding=1.700mm  Conductor Area in HV winding=2.270mm  Current density in HV winding=1.335A/sq mm  For Aluminium wound transformer K=0.33  EMF/Turn = 3.30  Turns in HV winding=3344T  5.00 Percent Turns towards Tapping=167T  Total Turns in HV winding=3511T  Assume number of coil per phase=4  Turns per c oil=878T  Gap between HV to yoke a top & bottom=25.00mm  Gap between two tap coil=10.00mm  Gap between plain coil=7.00mm  Assume no of layer=17  Turns per layer=53T  Axial length of HV coil=103.00mm  Radial build of HV coil=35.00mm  Total axial length of 4 coil=412.00mm  Inside diameter of coil in HV winding=187.00mm  Outside diameter of coil in HV winding=257.00mm
  • 25. LV Side design values  Ph-Voltage in LV winding=250V  Ph-Current in LV winding=133.34A  Conductor diameter in LV winding=10.640mm  Gap between to LV coil to yoke=10.00mm  Strip size=11.00 X 5.00 X 2 no in parallel A  Area of strip=108.280mm  Current density in LV winding=1.231A/sq mm  Turns in LV winding=76T  Assume no of layer=02  Turns per layer=38T  Radial build of LV coil=23.00mm  Inside diameter of coil in LV winding=121.00mm  Outside diameter of coil in LV winding=167.00mmm  Length of LV coil with packing=470.00mm
  • 26. Core design values  Assume 9 step core factor  Core diameter=115.000(mm)  Core window height=486.00mm  Core limb centre=270.000(mm)  Step width L=110/100/90/80/70/60/50/40/30/mm  Cores tack K=33.541/23.248/14.800/11.024/8.628/6.866/5.454/4.2 58/3.199mm  Total core stack K=111.018(mm)  Total gross core area=97.832sqcm  Net core area=94.897sqcm  Grade ofcore:27M-4  Weight of Core=197.984(kg)  Flux density=1.561(Tesla)
  • 27. Weight of LV Aluminium  Mean Diameter of coil=144.000mm  Mean Length of turns=453.000mm  Total Length of conductor=34428.000mm  Specific gravity of aluminium=2.760g/cc  Bare weight of conductor for 1 ph=10.289kgs  Bare weight of conductor for 3 ph=30.867kgs  Weight of the covered conductor=33.000kg  (Considering a coverage of 7 percent for LV strip
  • 28.  Mean Diameter of coil=222.000mm  Mean Length of turns=697.434mm  Total Length of conductor=2448828.748mm  Specific gravity of aluminium=2.760g/cc  Bare weight of conductor for 1ph=15.341kgs  Bare weight of conductor for 3ph=46.023kgs  Weight of the covered conductor=52.000kg  (Considering a coverage of 14 percent for HV strip) Weight of HV Aluminium
  • 29.  Resistance of HV site at 75 Deg-C=35.449ohm  Copper loss at 1 Ph of HV site at 75 Deg-C=325.516W  Copper loss at 3 Ph of HV site at 75 Deg-C=976.549W  Resistance of LV site at 75 Deg-C=0.011ohm  Copper loss at 1Ph of LV site at 75 Deg-C=195.023W  Copper loss at 3Ph of LV site at 75 Deg-C=585.069W  Total Copper loss 3Ph at 75 Deg-C=1561.617W  Approximate stray loss for 100.000 KVA=100.000W  Load loss as rated load=1662W  Load loss(maximum)=1762W Winding Resistance and Load Loss
  • 30. No Load Loss  From the figure for 1.561 tesla Flax density loss=0.911W/kg  Assume Handeling Factor=25percent  (ON account of sliting, shearing, knotching,air gap and human error during assemling)  Calculated No Load loss=226W
  • 31.  From the figure for 1.561 tesla Flax Magnetizing power=1.463VA/kg  Per phase Magnetizing Current=0.386 A  Assume ddd towads 200 percent Handeling Factor  (for stress developed duringsliting, shearing, knotching and thikness variation.)  Magnetizing Current=1.159A  Histeresis and eddy Current=0.301A  No load Current=1.197A  No load Currentat 100 perct. Voltage as a perct. of Full load current=0.898percent No Load Current at 100 percent voltage
  • 32.  From the figure for 1.757 tesla Flax Magnetizing power=4.289 VA/kg  Per phase Magnetizing Current=1.006A  Assume dddtowads200percentHandelingFactor  (for stress developed during sliting, shearing, knotching and thikness variation.)  Magnetizing Current=3.019A  Hysteresis and eddy Current=0.267A  No load Current=3.031A  No load Current at 112.5 perct. Voltage as a perct. Of Full load current=2.273percent No Load Current at 112.5 percent voltage
  • 33. Performance Calculations  Efficiency at Unity PF and Full Load: 98.15 percent  Efficiency at 0.8 pf: At 100 percent Ld: 97.70 percent, 75 percent Ld:98.10 percent and5 0percent Ld:98.42 percent  Max Efficiency=98.79 percent occur at Load =36.84 parcent  Mean Daimeter of LV & HV coil=183.0000mm,  Average stack Length of LV & HV coil=453.0000mm  Reactance= 4.31 percent, Resistance= 1.66 percent, Impedance= 4.62 percent  Regulation: at FL and0.8pf=3.94percent, at FL and UPF=1.75percent
  • 34.  Tank: Length = 847 mm, Width = 337 mm, Height = 901 mm and Volume=0.257m^3  Tank : Surface area for walls side=2.3680 sq.m andTemp-Rise=56is reduced to 40deg-C  Unit length of each tube=0.5900m, Surface length of elliptical tube =0.1620 m and No of Tubes =36  Tank Weight:  Side sheet ( 3 mm) =52 kg, Bottom sheet ( 5 mm)=11kg, Top sheet( 5 mm)=15kg  Base Channel=7kg, Tank Flange=7kg, Stiffeners on all 4s ides=10kg  Conservator and its supports=10kg, LV box=3kg, HV Busing adopter=4kg  Explosion Vent=4kg, Lifting lugs=2kg, Elliptical tube=39kg  Radiators Header=20kg, Miscellaneous items=4kg, Total weight of Tank=187kg  Volume of Oil in the tank=186.181litres  Volume of Oil in (Radiator + Header)=( 19.0 + 5.0)=24.0litres  Volume of Oil in the Conservator (Length= 508.0 mm, Diameter= 235.0 mm)=8.0litres  Volume of Oil in LV box and HV box=3.0&4.0litres  Total Volume of Oil in the transformer=226.00litresor193.00kg  Weight: HV-Wdg( 52.00)+ LV-Wdg( 33.00)+(Core + Yoke)( 197.98 ) Kg  Weight(Approx.): Insulation= 15.0 kg, Core Fittings=30.0kg, Other misc.=3.0kg  Total weight =735.68kg, Kg/KVA = 7.357 TANK Design and Weights
  • 35. Other 5 Problems Problem- 2. 600 VA, 240 / 12 V, 50 Hz, 1 Phase, Delta / Star connected, Core Type, ON cooled Power Transformer. Problem- 3. 1 KVA, 240 / 12 V, 50 Hz, 1 Phase Delta / Star connected, Core Type, ON cooled Power Transformer. Problem- 4. 630 KVA, 11000 / 440 V, 50 Hz, 3 Phase Delta / Star connected, Core Type, ON cooled Power Transformer: Problem- 5. 2 MVA, 33000 / 11000 V, 50 Hz, 3 Phase Delta / Star connected, Core Type, ON cooled Power Transformer: Problem- 6. 5 MVA, 33000 / 11000 V, 50 Hz, 3 Phase Delta / Star connected, Core Type, ON cooled Power Transformer.
  • 36. Discussion and Conclusion We have designed transformer according to the proposed specification including primary coil, number of turns, secondary coil, core diameter, step width, core stack, core area, flux density, coil diameter, winding details, loss, no load current, tank, conservator, oil and weights etc. As such, the derivation of various equations involved, explanation for the assumptions made in employing the approximate formula.
  • 37. Suggestion for Future work For batter results about transformer design need to internship. If anyone did an internship, they will have the value of specification and assume value those we assumed. They will know about how to design a transformer practically. We did not create the software as a professional one rather we have developed it. It is need to create a software that if give the values of rating and shown the output values.