The document provides production and financial details for Bhupalpalli Area of SCCL for the period up to July 2015. Some key points:
- Production achieved was 99.96% of target and 159.4% of previous year's production for the same period.
- Cost of production per ton was Rs. 2,861 against a budget of Rs. 2,965 and previous year of Rs. 3,631.
- A loss of Rs. 47.99 crores was incurred against a budgeted loss of Rs. 23.27 crores.
- Wages cost per ton was Rs. 1,673 against a budget of Rs. 1,802 and previous year of
2. Introduction
• Bhupalpalli is situated 65 Km from Warangal and 85 Km
from Godavarikhani.
• Bhupalpalli is situated in Mulugu Coalbelt. This coal belt
has reserves of 765 MT in a continuous stretch of about
100 Kms.
• The mines in Bhupalpalli Area are christened as
“KAKATIYA KHANI (KTK)”. Kakatiya Dynasty ruled this
part in 12th Century A.D. under which Art, Architecture
and Culture have reached their zenith.
• Bhupalpalli Area has started its functioning since July
1988. The first mine KTK 1 & 1A Incline was
inaugurated on 15.7.1988.
3. DETAILS OF EXISTING MINES AT
BHUPALPALLI
Sl No Mine Date of
starting the
Mine
Life as per
FR/RCE
1 KTK 1 INC 15-07-1988 30 Yrs
2 KTK 2 INC 03-02-1989 30 Yrs
3 KTK 5 INC 03-05-1993 25 Yrs
4 KTK 6 INC 07-09-1998 21 Yrs
5 KTK LWP 16-06-2003 24 Yrs
6 KTK OC Sector I 23-11-2008 09 Yrs
4. Performance Analysis up to July 2015
BHP AREA
Production achieved is 99.96% of the
targeted production.
-Targeted production 10.33 LTs
-Achieved production 10.32 LTs
Production achieved is 159.40 % of the
previous year production ( up to July
2014) 6.48 LTs
5. Performance Analysis up to July 2015
BHP AREA Cont..
•EMS is Rs.2687.96 against budget Rs.2676.61
and the previous year of Rs.2527.43
•OMS is 2.22 T against budget 2.06 T and the
previous year of 1.30 T
•SDL utilization is 27% against the availability of
94%.
•44 SDLs out of 49 SDLs were utilized below
40%.(MAH).
•Cost of Production per ton is Rs.2861 against
Budget Rs.2965 and previous year of Rs.3631
6. •Wages cost per ton is Rs.1673 against budget
Rs.1802 and previous year of Rs.2653
•Wages cost of Rs.17262.97 lakhs (being 58.46% of
Cost of production) are covered by the Sales of
Rs.24731.80 lakhs.
•Manpower in July ‘15 was 6043 against Prv.Year
of 6428
• Actual Manshifts up to July 2015 were 526420
against budgeted Manshifts of 569712 budget &
557172 of previous year corresponding period
Performance Analysis up to July 2015
BHP AREA Cont..
7. •Stores cost per ton is Rs.265 against budget
Rs.279 and previous year of Rs.284
•Explosives cost per ton is Rs.77 against budget
Rs.80 and previous year of Rs.51.
•Power Cost per ton is Rs.91 against budget of
Rs.106 and previous year of Rs.135
•Sand transport Cost per ton is Rs.45 against
budget of Rs.68 and previous year of Rs.102
•Other Expenses per ton is Rs.91 against budget
of Rs.86 and previous year of Rs.61
Performance Analysis up to July 2015
BHP AREA
8. •OB removal Cost per ton is Rs.467 against budget of
Rs.420 and previous year of Rs.209
•Coal Offloading expenses per Ton was Rs 12 against
Rs 1.50 budget and Rs.0.60
•Loss of Rs.47.99 crs is incurred as against budgeted
Loss of Rs.23.27crs and Prv. Year loss of Rs.39.72
Crs.
•BEP is 1408679 tonnes. Output of 376510 tonnes is
required to cover loss
Performance Analysis up to July 2015
BHP AREA
10. Financial Performance (Cr.Year Vs Prv.Year)
UPTO JULY 2015
BHP AREA
Details AREA U.G.Mines
Up to July
2015
Up to July
2014
Up to July
2015
Up to July
2014
PRODU-CTION
Target 10.32600 8.30700 5.57600 4.55700
Actual 10.32169 6.47545 4.27064 4.34395
Cost of Production
Rs.Lakhs 29531.08 23513.86 18960.88 19597.17
CPT (Rs.) 2861.07 3631.23 4439.82 4511.37
Sales Realization
Rs.Lakhs 24731.80 19542.07 14019.23 15185.63
PT (Rs.) 2396.10 3017.87 3282.70 3495.81
Profit (+) / Loss(-)
Rs.Lakhs -4799.28 -3971.79 -4941.65 -4411.54
PT (Rs.) -464.97 -613.36 -1157.12 -1015.56
11. Mine KTK 1 KTK 2 KTK 5
Up to July
2015
Up to July
2014
Up to July
2015
Up to July
2014
Up to July
2015
Up to July
2014
PRODU-
CTION
Target 1.62100 1.21500 0.81900 1.01300 1.63600 1.21500
Actual 1.09050 1.17983 0.98068 0.96880 1.16498 1.13258
Cost of
Production
Rs.Lakhs 4854.26 5308.88 4037.81 4189.29 4926.67 5290.76
CPT (Rs.) 4451.41 4499.70 4117.36 4324.20 4228.97 4671.43
Sales
Realization
Rs.Lakhs 3376.80 3447.68 4369.30 4402.51 3466.32 3966.97
PT (Rs.) 3096.56 2922.18 4455.38 4544.29 2975.43 3502.60
Profit (+) /
Loss(-)
Rs.Lakhs -1477.46 -1861.20 331.49 213.22 -1460.35 -1323.79
PT (Rs.) -1354.85 -1577.51 338.02 220.09 -1253.54 -1168.83
Financial Performance (Cr.Year Vs Prv.Year)
UPTO JULY 2015
12. Mine KTK 6 KTK LW KTK OC
Up to July
2015
Up to July
2014
Up to July
2015
Up to July
2014
Up to July
2015
Up to July
2014
PRODU-
CTION
Target 0.95500 0.70900 0.54500 0.40500 4.75000 3.75000
Actual 0.65084 0.71144 0.38364 0.35130 6.05105 2.13150
Cost of
Production
Rs.Lakhs 2935.55 2912.67 2206.59 1895.58 10570.20 3916.68
CPT (Rs.) 4510.40 4094.05 5751.72 5395.90 1746.84 1837.52
Sales
Realization
Rs.Lakhs 2114.24 2553.27 692.57 815.20 10712.57 4356.43
PT (Rs.) 3248.48 3588.88 1805.26 2320.53 1770.37 2043.83
Profit (+) /
Loss(-)
Rs.Lakhs -821.31 -359.40 -1514.02 -1080.38 142.37 439.75
PT (Rs.) -1261.93 -505.17 -3946.46 -3075.36 23.53 206.31
Financial Performance (Cr.Year Vs Prv.Year)
UPTO JULY 2015
17. WORKING RESULTS FOR THE
MONTH OF JUL, 2015
BHP AREA
UPTO THE MONTH
Pre.Year UPTO
JUL, 2014 Actual
VARIANCE
Budget Vs
Actual
Actual Vs
Pre. YearACTUAL BUDGET
Description UNITS 1 2 3 1-2 2-3
Gross Production L.Ts 10.32169 10.32600 6.47545 -0.00431 3.84624
OBR - Off Loading L.Cu.M 44.68394 37.00000 7.16531 7.68394 37.5186
Manshifts (Mines) Lakhs 4.65785 5.02424 4.99282 -0.36639 -0.33497
Manshifts (Depts) Lakhs 0.60635 0.67288 0.57890 -0.06653 0.02745
EMS (Sal&Wages/Paid M/shifts) Rs 2687.96 2676.61 2527.43 11.35 160.53
OMS (Rev.Prodn/Mine M/shifts) Tonnes 2.22 2.06 1.30 0.16 0.92
COST ELEMENTS Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs.Lakhs
Sal/Wages 17262.97 1672.49 18603.74 1801.64 17180.22 2653.13 -1340.77 82.75
Explosives 794.37 76.96 824.86 79.88 327.29 50.54 -30.49 467.08
Stores 2735.74 265.05 2883.46 279.24 1840.46 284.22 -147.71 895.28
Power 934.47 90.53 1090.55 105.61 871.80 134.63 -156.08 62.67
Other Expenses 940.67 91.14 884.56 85.66 395.08 61.01 56.11 545.59
Coal Transport
Sand Transport 469.52 45.49 699.98 67.79 660.68 102.03 -230.46 -191.16
Interest 0.12 0.01 0.05 0.01 0.12 0.07
Depreciation 1456.04 141.07 1275.62 123.53 878.69 135.70 180.42 577.35
OBR Expenses 4937.19 478.33 4350.17 421.28 1359.59 209.96 587.02 3577.60
W_OBR Adjustments (a) 2717.84 263.31 2241.77 217.10 995.83 153.79 476.07 1722.01
OBR Off loading expenditure (i) 2099.06 203.36 2093.39 202.73 360.10 55.61 5.67 1738.96
Coal Off loading expenditure (ii) 120.29 11.65 15.00 1.45 3.66 0.57 105.29 116.63
Total Cost of Production 29531.08 2861.07 30612.91 2964.64 23513.86 3631.23 -1081.84 6017.22
Sale Realisaion (A)+(B)+(C)+(D) 24731.80 2396.10 28286.13 2739.31 19542.07 3017.87 -3554.33 5189.74
Value of Coal Transfer to CHP ( A) 4431.92 429.38 2373.83 229.89 -1420.07 -219.30 2058.08 5851.99
Realisation Through PHD (B) 18913.48 1832.40 23785.15 2303.42 18624.17 2876.12 -4871.67 289.31
Other Sales component (C) 964.24 93.42 931.66 90.22 1737.10 268.26 32.59 -772.86
Profit/Loss Transfers from CHP (D) 422.16 40.90 1195.49 115.77 600.86 92.79 -773.33 -178.70
Profit (+)/Loss (-) -4799.28 -464.97 -2326.79 -225.33 -3971.79 -613.36 -2472.49 -827.49
BREAK EVEN PRODUCTION (L.T.) 14.08679 11.76781 8.54330
18. ELEMENT WISE COST & % OF COST IN COST OF PRODUCTION
BHP AREA
COST ELEMENTS
UPTO JUL, 2015
ACTUAL BUDGET Actual Prv.Year
CPT (Rs.) % CPT (Rs.) % CPT (Rs.) %
Sal/Wages 1672.49 58.46 1801.64 60.77 2653.13 73.06
Explosives 76.96 2.69 79.88 2.69 50.54 1.39
Stores 265.05 9.26 279.24 9.42 284.22 7.83
Power 90.53 3.16 105.61 3.56 134.63 3.71
Other Expenses 91.14 3.19 85.66 2.89 61.01 1.68
Coal Transport 0.00 0.00 0.00 0.00 0.00 0.00
Sand Transport 45.49 1.59 67.79 2.29 102.03 2.81
Interest 0.01 0.00 0.00 0.00 0.01 0.00
Depreciation 141.07 4.93 123.53 4.17 135.70 3.74
OBR Expenses
478.33 16.72 421.28 14.21 209.96 5.78
Total Cost of
Production
2861.07 100.00 2964.64 100.00 3631.23 100.00
Sale Realisaion 2396.10 2739.31 3017.87
Profit (+)/Loss (-) -464.97 -225.33 -613.36
19. Cost Element Cost Element Name
AREA
Actual Upto
July,2015
Actual Upto
July,2014
Variance (+)
Increase / (-)
Decrease
4354701 Basic Pay & SPRA 5388.40 5463.22 -74.81
4354702 Dearness Allowances 2229.61 1830.51 399.10
4354703 UnderGround Allowanc 652.00 696.71 -44.71
4354704 HRA 325.16 78.11 247.05
4354707 Other Allowances 195.58 215.47 -19.89
4354708 CMPF-Admin Chgs 1241.74 1308.67 -66.93
4354710 Incentives 57.17 21.30 35.86
4354711 Play Day 167.82 431.91 -264.09
4354712 Overtime 14.33 124.89 -110.55
4354713 Paid Holiday 14.04 32.91 -18.87
4354715 Quarterly Bonus 445.66 489.90 -44.24
4354720
Sp/Acc/Mat Leave
Wag 55.62 36.27 19.35
4354735 Special allowance 243.43 260.72 -17.29
4354736 Telangana Inc Basic 189.52 0.00 189.52
4354760 CL-SL-LWP-PeiceRate 1042.54 997.25 45.28
4354761 Acting Wages 128.12 614.69 -486.57
Analysis of element wise wage cost
20. Cost Element Cost Element Name
AREA
Actual
Upto
July,2015
Actual Upto
July,2014
Variance (+)
Increase / (-)
Decrease
4365320 Free Gas to employee 78.86 76.75 2.12
4354709 Prdn/perf Link Bonus 805.39 668.30 137.09
4354714 Leave Encashment 269.61 284.23 -14.61
4355026 Gratuity 1096.12 1173.31 -77.19
4365325 Sp Inc Corporate Sch 172.58 184.73 -12.15
4365332 L.L.T.C. Employees 147.98 133.72 14.25
4365336 Matching Grant 0.95 0.25 0.70
4365337 Ex-Gratia -Fatal Acc 0.00 5.85 -5.85
6200001 AOHWAGES 1346.83 1209.11 137.72
6200011 ASWWAGES 513.13 405.08 108.05
6500001 WS WAGES 321.24 302.43 18.82
Analysis of element wise wage cost
21. Details
Acutals Up to
07/15
Actuals up to
07/14
Budget up to
Aug 2015
Total Units consumed 15055627 15164324 16986720
Production in Tonnes 1032169 647546 1032600
Units/Tonne 14.59 23.42 16.45
The power cost per Tonne was Rs.90.53 up to July 2015 as against
Rs.134.63 up to July 2014.( decreased by Rs.44.10/T)
Though there was increase in the power tariff w.e.f April 2015, the
reduction in power cost was on account of increase in production and
saving in power units per tonne.
When compared with the budget for 2015-16( up to July 2015) , the
power cost reduced by Rs.156.08 lakhs( decrease by Rs.15.08/T).
The total number of units consumed and units per tonne are tabulated
hereunder :
Analysis of Power Cost - BHP Area
22. Cost
Element
Cost Element
Upto
July,2015
In Rs lakhs
Upto
July, 2014
in Rs lakhs
Variance
in Rs lakhs
3313719 SandStowin-Ass/Sbsdy -1066.394 -743.2272 323.17
4334522 Hiring of HEMM 16.230642 0 16.23
4344617 Other Expenses – topsoil
re-handling of KTK OC 610.53929 0 610.54
4365306 Med Reimb-Employees 125.23071 45.385773 79.84
4365321 Welfare expenses-Oth 17.937416 0 17.94
4365349 LS Pmt.Rs. 3.00 lakh 12.5 0 12.50
4375411 R&M-P & M 10.799899 0.8002 10.00
4426213 Prov-Mine closure pl 261.10997 248.6733 12.44
4436318 Settling Allowance 5.4129042 16.72508 -11.31
4436334 Consultancy Charges 0 21.758 -21.76
4436390 Misc. Expen(Others) 2.4916131 13.848098 -11.36
6200003 AOHBILLS 181.31539 157.20744 24.11
6200013 ASWBILLS 417.75857 386.84881 30.91
6200033 AREA DEPRECIATION 188.88181 111.90188 76.98
6500003 WS BILLS 55.345504 44.313251 11.03
Other Expenses Details – Up to July 2015
23. AREA UPTO THE MONTH OF JULY, 2015
Description 07/2015 Budget 07/15 Previous year 07/2014
Coal Production (LTs) 10.32169 10.32600 6.47545
Manshifts (Lakhs) 6.42232 6.95049 6.79750
OMS (Ts) 2.22 2.06 1.30
EMS (On Paid M/S) 2687.96 2676.61 2527.43
OBR Company (L.Cu.m) 0.15412 0.62099
OBR Off loading (L.cu.m) 44.52982 37.00000 6.54432
Lakhs /T Lakhs /T Lakhs /T
1.Salaries & Wages 14774.31 1431.39 15988.53 1548.38 14749.96 2277.83
2.Explosives 794.37 76.96 824.86 79.88 327.29 50.54
3.Stores 2735.74 265.05 2883.46 279.24 1840.46 284.22
4.Power ( Mines ) 934.47 90.53 1090.55 105.61 871.80 134.63
5.Other Elements * 6086.37 589.67 5673.58 549.45 2166.73 192.91
Sub Total (A) Controllable 25325.26 2453.60 26460.96 2562.56 19956.23 2940.13
1.Wage Provisions 2488.66 241.11 2615.21 253.26 2430.26 375.30
PLB / PLR 877.81 85.05 897.18 86.89 725.31 112.01
Leave Encashment 178.98 17.34 187.11 18.12 189.44 29.25
Gratuity 1237.09 119.85 1304.12 126.29 1309.35 202.20
Special Incentive 194.78 18.87 226.80 21.96 206.15 31.84
2488.66 241.11 2615.21 253.26 2430.26 375.30
2.Depreciation 1456.04 141.07 1275.62 123.53 878.69 135.70
3.Prov. for Mine Closure Plan 261.12 25.30 261.12 25.29 248.67 180.10
4.Provn. for OBR Back Filling
Sub Total (B) Uncontrollable 4205.82 407.47 4151.95 402.09 3557.62 691.10
Total Cost of Production (A + B) 29531.08 2861.07 30612.91 2964.64 23513.86 3631.23
Controllable and Un-Controllable costs
24. Details Up to July 2015
BEP Production in Tonnes 1408679
Actual Production in Tonnes 1032169
Variance in Tonnes -376510
Contribution in RS /Tonne
( ASR Rs.2396.10
– Variable Cost Rs.1121.42)
1274.68
Profit /Loss In Rs lakhs -4799.29
BEP Analysis BHPL Area
25. WORKING RESULTS FOR THE
MONTH OF JUL, 2015
UG MINES
UPTO THE MONTH
Pre.Year UPTO
JUL, 2014 Actual
VARIANCE
Budget Vs
Actual
Actual Vs
Pre. YearACTUAL BUDGET
Description UNITS 1 2 3 1-2 2-3
Gross Production L.Ts 4.27064 5.57600 4.34395 -1.30536 -0.07331
OBR - Off Loading L.Cu.M
Manshifts (Mines) Lakhs 4.42518 4.79960 4.78947 -0.37442 -0.36429
Manshifts (Depts) Lakhs 0.25404 0.37042 0.41216 -0.11638 -0.15812
EMS (Sal&Wages/Paid M/shifts) Rs 2729.49 2711.09 2544.63 18.39 184.86
OMS (Rev.Prodn/Mine M/shifts) Tonnes 0.97 1.16 0.91 -0.20 0.06
COST ELEMENTS Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs.Lakhs
Sal/Wages 15581.67 3648.56 17100.01 3066.72 16148.17 3717.39 -1518.33 -566.50
Explosives 177.54 41.57 234.52 42.06 185.96 42.81 -56.98 -8.42
Stores 916.70 214.65 1170.45 209.91 1059.77 243.96 -253.76 -143.07
Power 872.46 204.29 1049.11 188.15 844.35 194.37 -176.65 28.10
Other Expenses -151.67 -35.51 370.90 66.52 83.62 19.25 -522.56 -235.29
Coal Transport
Sand Transport 469.52 109.94 699.98 125.53 660.68 152.09 -230.46 -191.16
Interest 0.12 0.03 0.05 0.01 0.12 0.07
Depreciation 1094.54 256.29 876.09 157.12 614.57 141.48 218.45 479.97
OBR Expenses
W_OBR Adjustments (a)
OBR Off loading expenditure (i)
Coal Off loading expenditure (ii)
Total Cost of Production 18960.88 4439.82 21501.05 3856.00 19597.17 4511.37 -2540.18 -636.29
Sale Realisaion (A)+(B)+(C)+(D) 14019.23 3282.70 19219.92 3446.90 15185.63 3495.81 2415.03 2263.85
Value of Coal Transfer to CHP ( A) 981.01 229.71 2373.83 425.72 432.28 99.51 -1392.83 548.72
Realisation Through PHD (B) 12216.94 2860.68 15286.15 2741.42 13195.97 3037.78 3069.20 979.02
Other Sales component (C) 399.12 93.46 364.45 65.36 956.52 220.20 -34.67 557.40
Profit/Loss Transfers from CHP (D) 422.16 98.85 1195.49 214.40 600.86 138.32 773.33 178.70
Profit (+)/Loss (-) -4941.65 -1157.12 -2281.13 -409.10 -4411.54 -1015.56 2660.52 530.11
BREAK EVEN PRODUCTION (L.T.) 6.50370 6.49217 6.21030
26. Performance Analysis up to July 2015
UG MINES
Production achieved is 76.59% of the
targeted production.
-Targeted production 5.58 LTs
-Achieved production 4.27 LTs
Production achieved is 98.31 % of the
previous year production ( up to July
2014) 4.34 LTs
27. Performance Analysis up to July 2015
UG mines Cont..
•EMS is Rs.2729.49 against budget Rs.2711.09
and the previous year of Rs.2544.63
•OMS is 0.97 T against budget 1.16 T and the
previous year of 0.91 T
•SDL utilization is 27% against the availability of
94%.
•44 SDLs out of 49 SDLs were utilized below
40%.(MAH).
•Cost of Production per ton is Rs.4440 against
Budget Rs.3856 and previous year of Rs.4511
28. •Wages cost per ton is Rs.3649 against budget
Rs.3066 and previous year of Rs.3717
•Wages cost of Rs.15581.67 lakhs (being 82.18% of
Cost of production) are not covered by the Sales of
Rs.14019.23 lakhs.
•Manpower in July ‘15 was 5806 against Prv.Year
of 6216
• Actual Manshifts up to July 2015 were 442518
against budgeted Manshifts of 479960 budget &
478947 of previous year corresponding period
Performance Analysis up to July 2015
UGMINES Cont..
29. •Stores cost per ton is Rs.215 against budget
Rs.210 and previous year of Rs.244
•Explosives cost per ton is Rs.41.57against
budget Rs.42.06 and previous year of Rs.42.81.
•Power Cost per ton is Rs.204 against budget of
Rs.188 and previous year of Rs.194
•Sand transport Cost per ton is Rs.110 against
budget of Rs.126 and previous year of Rs.152
•Other Expenses per ton is Rs.-35.51 against
budget of Rs.67 and previous year of Rs.19
Performance Analysis up to July 2015
UG Mines
30. •Loss of Rs.49.42 crs is incurred as against budgeted
Loss of Rs.22.81crs and Prv. Year loss of Rs.44.12
Crs.
•BEP is 650370 tonnes. Output of 223306 tonnes is
required to cover loss
Performance Analysis up to July 2015
UG Mines
31. UG MINES
COST ELEMENTS
UPTO JUL, 2015
ACTUAL BUDGET Actual Prv.Year
CPT (Rs.) % CPT (Rs.) % CPT (Rs.) %
Sal/Wages 3648.56 82.18 3066.72 79.53 3717.39 82.40
Explosives 41.57 0.94 42.06 1.09 42.81 0.95
Stores 214.65 4.83 209.91 5.44 243.96 5.41
Power 204.29 4.60 188.15 4.88 194.37 4.31
Other Expenses -35.51 -0.80 66.52 1.73 19.25 0.43
Coal Transport 0.00 0.00 0.00 0.00 0.00 0.00
Sand Transport 109.94 2.48 125.53 3.26 152.09 3.37
Interest 0.03 0.00 0.00 0.00 0.01 0.00
Depreciation 256.29 5.77 157.12 4.07 141.48 3.14
OBR Expenses
0.00 0.00 0.00 0.00 0.00 0.00
Total Cost of
Production
4439.82 100.00 3856.00 100.00 4511.37 100.00
Sale Realisaion 3282.70 3446.90 3495.81
Profit (-)/Loss (+) -1157.12 -409.10 -1015.56
ELEMENT WISE COST & % OF COST IN COST OF PRODUCTION
32. Details
Acutals Up to
07/15
Actuals up to
07/14
Budget up to
Aug 2015
Total Units consumed 14080403 14690043 16341280
Production in Tonnes 427064 434396 557600
Units/Tonne 32.97 33.82 29.31
The power cost per Tonne was Rs.204.29 up to July 2015 as against
Rs.194.37 up to July 2014. ( Increased by Rs.9.92/T)
When compared with the budget for 2015-16( up to July 2015) , the
power cost reduced by Rs.176.65 lakhs( Per tonne cost increased by
Rs.16.14/T).
The total number of units consumed and units per tonne are tabulated
hereunder :
Analysis of Power Cost - UG MINES
33. Details Up to July 2015
BEP Production in Tonnes 650370
Actual Production in Tonnes 427064
Variance in Tonnes -223306
Contribution in RS /Tonne 2212.96
Profit /Loss In Rs lakhs -4941.65
BEP Analysis UG MINES
34. UG MINES UPTO THE MONTH OF JULY, 2015
Description 07/2015 Budget 07/15 Previous year 07/2014
Coal Production (LTs) 4.27064 5.57600 4.34395
Manshifts (Lakhs) 5.70865 6.30742 6.34599
OMS (Ts) 0.97 1.16 0.91
EMS (On Paid M/S) 2729.49 2711.09 2544.63
Lakhs /T Lakhs /T Lakhs /T
1.Salaries & Wages 13247.03 3101.88 14713.30 2638.68 13824.22 3182.41
2.Explosives 177.54 41.57 234.52 42.06 185.96 42.81
3.Stores 916.70 214.65 1170.45 209.91 1059.77 243.96
4.Power ( Mines ) 872.46 204.29 1049.11 188.15 844.35 194.37
5.Other Elements * 244.01 57.14 996.91 178.79 673.92 -183.52
Sub Total (A) Controllable 15457.74 3619.54 18164.30 3257.59 16588.23 3480.04
1.Wage Provisions 2334.64 546.67 2386.71 428.03 2323.95 534.98
PLB / PLR 805.53 188.62 823.00 147.60 688.79 158.56
Leave Encashment 170.03 39.81 170.30 30.54 181.72 41.83
Gratuity 1174.76 275.08 1186.97 212.87 1255.89 289.11
Special Incentive 184.32 43.16 206.43 37.02 197.55 45.48
2334.64 546.67 2386.71 428.03 2323.95 534.98
2.Depreciation 1094.54 256.29 876.09 157.12 614.57 141.48
3.Prov. for Mine Closure Plan 73.96 17.32 73.96 13.26 70.42 354.87
4.Provn. for OBR Back Filling
Sub Total (B) Uncontrollable 3503.14 820.28 3336.75 598.41 3008.94 1031.33
Total Cost of Production (A + B) 18960.88 4439.82 21501.05 3856.00 19597.17 4511.37
Controllable and Un-Controllable costs
35. WORKING RESULTS FOR THE
MONTH OF JUL, 2015
KTK 1 INCLINE
UPTO THE MONTH
Pre.Year UPTO
JUL, 2014 Actual
VARIANCE
Budget Vs
Actual
Actual Vs
Pre. YearACTUAL BUDGET
Description UNITS 1 2 3 1-2 2-3
Gross Production L.Ts 1.09050 1.62100 1.17983 -0.53050 -0.08933
OBR - Off Loading L.Cu.M
Manshifts (Mines) Lakhs 1.15129 ####### 1.34472 ####### 1.28813 ####### -0.19343 -0.13684
Manshifts (Depts) Lakhs 0.06503 ####### 0.10738 ####### 0.11317 ####### -0.04235 -0.04814
EMS (Sal&Wages/Paid M/shifts) Rs 2698.81 2704.51 2548.26 -5.70 150.55
OMS (Rev.Prodn/Mine M/shifts) Tonnes 0.95 1.21 0.92 -0.26 0.03
COST ELEMENTS Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs./T Rs.Lakhs Rs.Lakhs
Sal/Wages 4004.80 3672.44 4791.21 2955.71 4356.48 3692.46 -786.42 -351.68
Explosives 51.30 47.05 73.33 45.24 54.28 46.00 -22.02 -2.97
Stores 250.59 229.80 317.72 196.00 303.03 256.85 -67.13 -52.44
Power 190.40 174.60 307.46 189.67 229.83 194.80 -117.05 -39.42
Other Expenses -19.90 -18.25 147.12 90.76 63.65 53.94 -167.02 -83.55
Coal Transport
Sand Transport 185.24 169.87 168.67 104.05 189.44 160.57 16.57 -4.20
Interest 0.12 0.11 0.05 0.04 0.12 0.07
Depreciation 191.71 175.80 149.73 92.37 112.13 95.04 41.98 79.58
OBR Expenses
W_OBR Adjustments (a)
OBR Off loading expenditure (i)
Coal Off loading expenditure (ii)
Total Cost of Production 4854.26 4451.41 5955.24 3673.80 5308.88 4499.70 -1100.98 -454.62
Sale Realisaion (A)+(B)+(C)+(D) 3376.80 3096.56 5248.09 3237.56 3447.68 2922.18 -1871.29 -70.88
Value of Coal Transfer to CHP ( A) 146.14 134.01 -569.51 -482.71 146.14 715.66
Realisation Through PHD (B) 2906.58 2665.36 5087.36 3138.41 3561.94 3019.03 -2180.78 -655.36
Other Sales component (C) 155.15 142.27 160.73 99.16 455.25 385.86 -5.59 -300.10
Profit/Loss Transfers from CHP (D) 168.93 154.91 168.93 168.93
Profit (+)/Loss (-) -1477.46 -1354.85 -707.15 -436.24 -1861.20 -1577.51 -770.32 383.74
BREAK EVEN PRODUCTION (L.T.) 1.83994 1.92522 2.22709
36. Performance Analysis up to July 2015
KTK 1 INC
Production achieved is 67.27% of the
targeted production.
-Targeted production 1.62 LTs
-Achieved production 1.09 LTs
Production achieved is 92.43 % of the
previous year production ( up to July
2014) 1.18 LTs
37. Performance Analysis up to July 2015
KTK 1 Inc Cont..
•EMS is Rs.2698.81 against budget
Rs.2704.51and the previous year of Rs.2548.26
•OMS is 0.95 T against budget 1.21 T and the
previous year of 0.92 T
•SDL utilization is 20% against the availability of
95%.
•All 13 SDLs were utilized below 40%.(MAH).
•Cost of Production per ton is Rs.4451 against
Budget Rs.3674 and previous year of Rs.4500
38. •Wages cost per ton is Rs.3672 against budget
Rs.2956 and previous year of Rs.3692
•Wages cost of Rs.4004.8 lakhs (being 82.50% of
Cost of production) are not covered by the Sales of
Rs.3376.80 lakhs.
•Manpower in July ‘15 was 1517 against Prv.Year
of 1667
• Actual Manshifts up to July 2015 were 115129
against budgeted Manshifts of 134472 budget &
128813 of previous year corresponding period
Performance Analysis up to July 2015
Cont..
KTK 1 Inc
39. •Stores cost per ton is Rs.230 against budget
Rs.196 and previous year of Rs.257
•Explosives cost per ton is Rs.47.05against
budget Rs.45.24 and previous year of Rs.46.
•Power Cost per ton is Rs.175 against budget of
Rs.190 and previous year of Rs.195
•Sand transport Cost per ton is Rs.170 against
budget of Rs.104 and previous year of Rs.161
•Other Expenses per ton is Rs.-19.90 against
budget of Rs.90.76 and previous year of Rs.53.94
Performance Analysis up to July 2015
KTK 1 Inc
40. •Loss of Rs.14.77 crs is incurred as against budgeted
Loss of Rs.7.07crs and Prv. Year loss of Rs.18.61
Crs.
•BEP is 183994 tonnes. Output of 74944 tonnes is
required to cover loss
Performance Analysis up to July 2015 KTK 1 Inc
41. KTK 1 INCLINE
COST ELEMENTS
UPTO JUL, 2015
ACTUAL BUDGET Actual Prv.Year
CPT (Rs.) % CPT (Rs.) % CPT (Rs.) %
Sal/Wages 3672.44 82.50 2955.71 80.45 3692.46 82.06
Explosives 47.05 1.06 45.24 1.23 46.00 1.02
Stores 229.80 5.16 196.00 5.34 256.85 5.71
Power 174.60 3.92 189.67 5.16 194.80 4.33
Other Expenses -18.25 -0.41 90.76 2.47 53.94 1.20
Coal Transport 0.00 0.00 0.00 0.00 0.00 0.00
Sand Transport 169.87 3.82 104.05 2.83 160.57 3.57
Interest 0.11 0.00 0.00 0.00 0.04 0.00
Depreciation 175.80 3.95 92.37 2.51 95.04 2.11
OBR Expenses
0.00 0.00 0.00 0.00 0.00 0.00
Total Cost of
Production
4451.41 100.00 3673.80 100.00 4499.70 100.00
Sale Realisaion 3096.56 3237.56 2922.18
Profit (-)/Loss (+) -1354.85 -436.24 -1577.51
ELEMENT WISE COST & % OF COST IN COST OF PRODUCTION
44. Details
Acutals Up to
07/15
Actuals up to
07/14
Budget up to
Aug 2015
Total Units consumed 3078144 3993727 4789040
Production in Tonnes 109050 117984 162100
Units/Tonne 28.23 33.85 29.54
The power cost per Tonne was Rs.174.60 up to July 2015 as against
Rs.194.80 up to July 2014.
Though there was increase in the power tariff w.e.f April 2015, the
decrease in power cost power was on account of increase in production
and saving in power units per tonne.
When compared with the budget for 2015-16( up to July 2015) , the
power cost reduced Rs.117.06 lakhs( Rs.15.07/T).
The total number of units consumed and units per tonne are tabulated
hereunder :
Analysis of Power Cost - KTK1
45. Cost Element Cost Element
Upto
July,2015
In Rs lakhs
Upto
July, 2014
in Rs lakhs
Variance
in Rs lakhs
3313719SandStowin-Ass/Sbsdy -239.52 -147.26 92.25
4334526Hirechg Offi Veh(FBT 2.19 2.15 0.04
4365306Med Reimb-Employees 20.00 11.94 8.07
4365321Welfare expenses-Oth 4.74 0.00 4.74
4375435Miscellaneou Service 8.10 5.32 2.78
4395725Civic Taxe(Water et) 1.30 0.00 1.30
4436311Travel TA Exp- Emplo 2.36 3.18 -0.81
4436318Settling Allowance 0.00 1.60 -1.60
4436356Training Expe-Exec 1.14 1.61 -0.48
4436390Misc. Expen(Others) 0.47 3.13 -2.66
6200003AOHBILLS 20.76 26.66 -5.89
6200013ASWBILLS 105.07 103.19 1.88
6200033AREA DEPRECIATION 20.21 21.91 -1.70
6400233AGENT'S OFFICE BILLS -0.42 -0.49 0.07
6500003WS BILLS 6.08 8.47 -2.39
Other Expenses Details – Up to July 2015
46. BEP CALCULATION KTK 1 Inc
UPTO July 2015
Pre.Year UPTO
JUL, 2014 ActualACTUAL BUDGET
Cost of Element Fixed Variable Fixed Variable Fixed Variable Fixed Variable
WAGES-FILLERS 80 20 3203.84 800.96 3832.97 958.24 3485.18 871.30
EXPLOSIVES 100 51.30 73.33 54.28
STORES 40 60 100.24 150.36 127.09 190.63 121.21 181.82
POWER 60 40 114.24 76.16 184.47 122.98 137.90 91.93
OTHER EXPENSES 100 -19.90 147.12 63.65
COAL TRANSPORT 100
SAND TRANSPORT 20 80 37.05 148.19 33.73 134.94 37.89 151.55
INTEREST 100 0.12 0.05
DEPRECIATION 100 191.71 149.73 112.13
OBR EXPENSES 100
Total cost in Rs lakhs 3627.28 1226.97 4475.11 1480.12 3958.00 1350.88
Sales including Profit from
CHP
Lakhs 3376.80 5248.09 3447.68
Contribution (Sales -
Variable Cost)
Lakhs 2149.82 3767.97 2096.80
Contribution per tonne Rs. 1971.41 2324.47 1777.20
BEP (Fixed
Cost/Contribution per tonne
LT 1.83994 1.92522 2.22709
Break Even Analysis
47. Details Up to July 2015
BEP Production in Tonnes 183994
Actual Production in Tonnes 109050
Variance in Tonnes -74944
Contribution in RS /Tonne 1971.41
Profit /Loss In Rs lakhs -1477.46
BEP Analysis KTK 1 INC
48. Controllable and Un-Controllable costs
KTK 1 INCLINE UPTO THE MONTH OF JULY, 2015
Description 07/2015 Budget 07/15 Previous year 07/2014
Coal Production (LTs) 1.09050 1.62100 1.17983
Manshifts (Lakhs) 1.48391 1.77156 1.70959
OMS (Ts) 0.95 1.21 0.92
EMS (On Paid M/S) 2698.81 2704.51 2548.26
Lakhs /T Lakhs /T Lakhs /T
1.Salaries & Wages 3397.05 3115.13 4120.70 2542.07 3727.69 3159.52
2.Explosives 51.30 47.05 73.33 45.24 54.28 46.00
3.Stores 250.59 229.80 317.72 196.00 303.03 256.85
4.Power ( Mines ) 190.40 174.60 307.46 189.67 229.83 194.80
5.Other Elements * 158.85 145.67 309.19 190.74 246.84 209.22
Sub Total (A) Controllable 4048.20 3712.25 5128.40 3163.72 4561.67 3866.38
1.Wage Provisions 607.75 557.31 670.51 413.64 628.78 532.94
PLB / PLR 209.91 192.49 231.17 142.61 188.84 160.05
Leave Encashment 44.24 40.57 47.85 29.52 48.87 41.43
Gratuity 305.64 280.28 333.49 205.73 337.84 286.35
Special Incentive 47.96 43.98 58.00 35.78 53.23 45.12
607.75 557.31 670.51 413.64 628.78 532.94
2.Depreciation 191.71 175.80 149.73 92.37 112.13 95.04
3.Prov. for Mine Closure Plan 6.60 6.05 6.60 4.07 6.29 5.33
4.Provn. for OBR Back Filling
Sub Total (B) Uncontrollable 806.06 739.16 826.84 510.08 747.20 633.31
Total Cost of Production (A + B) 4854.26 4451.41 5955.24 3673.80 5308.88 4499.70