Welders Qualification,
According
To
ASME Sec IX
POSITION
AND
DIAMETER LIMITS
(With OtherLimits Qw303)
PLATE - GROOVE
Plate andPipe Over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Plate -Groove 1G F F (NOTE 2) F
Plate -Groove 2G F, H F, H (NOTE2) F, H
Plate -Groove 3G F, V F, NOTE2 F, H,V
Plate -Groove 4G F,O F, NOTE2 F, H,O
Plate -Groove 3G& 4G F, V, O F, NOTE2 ALL
Plate -Groove
2G,3G,
&4G
ALL F,H NOTE2 ALL
Plate -Groove
Special
Position
SP,F SP,F SP,F
Groove Fillet
Weld Position
Qualification Test Position And Type Weld Qualified (Note 1)
NOTE1:
1)Position Of Welding As Shown As Shown In QW-461 And QW-461.2
F= Flat,H=Horizontal,V=Vertical,O=Overhead
2)Pipe 2 7/8 in (72mm) OD and over
3) See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
Plate andPipe over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Plate -Fillet 1F -- -- F NOTE 2
Plate -Fillet 2F -- -- F, H NOTE2
Plate -Fillet 3F -- -- F, H,V NOTE2
Plate -Fillet 4F -- -- F, H,O NOTE2
Plate -Fillet 3F &4F -- -- ALL NOTE2
Plate -Fillet
Special
Position
-- -- SP,F NOTE2
NOTE
F= Flat H=HorizontalV=Vertical, O=Overhead
3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
Groove Fillet
Weld Position
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
2)Pipe 2 7/8 in (72mm) od and over
Qualification Test Position And Type Weld Qualified (Note 1)
PLATE - FILLET
Plate andPipe Over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Pipe-Groove 1G F F F
Pipe-Groove 2G F,H F,H F, H
Pipe-Groove 5G F,V,O F,V,O ALL
Pipe-Groove 6G ALL ALL ALL
Pipe-Groove 2G&5G ALL ALL ALL
Pipe-Groove
Special
Position
SP,F SP,F SP,F
NOTE
F= Flat H=HorizontalV=Vertical,
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
O=Overhead
2)Pipe 2 7/8 in (72mm) od and over
3)See DiameterRestrictions In Qw-452.3, Qw452.4, Qw452.6
Groove Fillet
Weld Position
Qualification Test Position And Type Weld Qualified (Note 1)
PIPE-GROOVE
Plate and Pipe over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Pipe-Fillet 1F -- -- F
Pipe-Fillet 2F -- -- F, H
Pipe-Fillet 2FR -- -- F,H
Pipe-Fillet 4F -- -- F,H,O
Pipe-Fillet 5F -- -- ALL
Pipe-Fillet
Special
Position
-- -- SP,F
NOTE
F= Flat H=HorizontalV=Vertical,
Qualification Test Position And Type Weld Qualified (Note 1)
Groove Fillet
Weld Position
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
O=Overhead
2)Pipe 2 7/8 in (72mm) od and over
3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
PIPE – FILLET
POSITIONS
QW-461
PLATE-GROOVE
QW-461.3
1G
2G
3G
4G
PIPE-GROOVE
QW-461.4
1G
2G
5G
6G
PLATE-FILLET
QW-461.5
1F
2F
3F
4F
PIPE –FILLET
QW-461.6
1F(Rotated)
2F
2FR
(ROTATED)
4F
5F
Qualified With
Qualified For
X
X
X
X
F-No5 with out
Backing
X
F-No5 with
Backing
X
F-No4 with out
Backing
F-No 4 with
Backing X
X
F-No3 with out
Backing X
F-No 3 with
Backing X X X
X
F-No 2 with out
Backing X
F-No 2 with
Backing X X X X X
X X
F-No 1 with out
Backing X
F-No5
with
Backing
F-No5
with out
Backing
F-No 1 with
Backing X X X X X X X
F-No 3
with
Backing
F-No3
with out
Backing
F-No 4
with
Backing
F-No4
with out
Backing
F-No 1
with
Backing
F-No 1
with out
Backing
F-No 2
with
Backing
F-No 2
with out
Backing
QUALIFIED WITH QUALIFIED FOR QUALIFIED WITH QUALIFIED FOR
F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING F-NO 2 WITH BACKING
F-NO 1 WITH OUT BACKING F-NO 3 WITH BACKING
F-NO 1 WITH BACKING F-NO 4 WITH BACKING
F-NO 2 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING F-NO 2 WITH BACKING
F-NO 2 WITH BACKING F-NO 3 WITH BACKING
F-NO 4 WITH BACKING
F-NO 4 WITH OUT BACKING
F-NO 1 WITH BACKING F-NO 1 WITH BACKING
F-NO 2 WITH BACKING F-NO 5 WITH BACKING
F-NO 3 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING
F-NO 2 WITH BACKING
F-NO 3 WITH BACKING
F-NO 3 WITH OUT BACKING
F-No 2 WITH OUT BACKING
F-No 3 WITH BACKING
F-No5 WITH OUT BACKING
F-No3 WITH OUT BACKING
F-No 4 WITH BACKING
F-NO 5 WITH OUT BACKING
F-NO 5 WITH BACKING
F-NO 1 WITH OUT BACKING
F-No 2 WITH OUT BACKING
F-No 2 WITH BACKING
F-No4 WITH OUT BACKING
F-No5 WITH BACKING
Test Specimens
TEST SPECIMENS [ QW-452.1(a)]
Thickness of
weld metal,
IN(mm)
TYPE AND NUMBER OF EXAMINATIONS AND TEST SPECIMENS
REQUIRED
Visual
Examination per
QW-302.4
Side Bend
QW-462.2
[note (1)]
Face Bend QW-
462.3(a) Or
QW-462.3(b)
[Note (1),(2)]
Root Bend qw-
462.3(a) or QW-
462.3(b) [note(1),(2)]
LESS THAN
3/8 (10)
X --- 1 1
3/8(10) TO LESS
THAN 3/4(19mm)
X 2 [NOTE (3)] NOTE (3) NOTE (3)
3/4(19MM)
AND OVER
X 2 --- ---
Thickness Limits
Thickness of Weld Metal Qualified
Thickness,t,of weld metal inch,
The coupon inch(mm) [Note1&
2]
Thickness of weld metal Qualified
[Note3]
• Up to13 mm
•½(13mm) and over with a
minimum of three layers
•2t
•Maximum to be welded
DIAMETER
LIMITS
QW-452.3
GROOVE WELD DIAMETER
LIMITS QW-452.3
WELDER
PERFORMANCE
ESSENTIAL
VARIABLES
SMAW (QW-353)
PARAGRAPH BREAF OF
VARIABLES
QW-402 JOINTS DELETION OF BACKING
QW-403 BASE METAL
CHANGE OF
PIPEDIA(QW-403.16)
&CHANGE OF
P-NUM(QW-403.18)
QW-404 FILLERMETALS
CHANGE OF
FILLER (QW404.15) &
CHANGEOF
WELD t DEPOSIT (QW404.30)
QW-405 POSITIONS
ADDITION OF POSITION
(QW-405.1) &
VERTI& DOWN WELDING
(QW-405.3)
What Is UNS Number?
(Ans)
Unified Numbering System
What is SFA Number?
(Ans)
Specification of Filler Analysis
What is P-Number?
(Ans)
Material Group Number
Welders qualification

More Related Content

What's hot

criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects Saqib Rasool
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualificationvaasuBandaru
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 
Pqr asme ix completed
Pqr asme ix  completed Pqr asme ix  completed
Pqr asme ix completed CEDEYN
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteriaAnand Kishor
 
Wps report
Wps reportWps report
Wps reportsohirooy
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdfVENKATESAN S
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
Welding technology by A.Vinoth Jebaraj
Welding technology by A.Vinoth JebarajWelding technology by A.Vinoth Jebaraj
Welding technology by A.Vinoth JebarajVinoth Jebaraj A
 
Flange Bolt Chart
Flange Bolt ChartFlange Bolt Chart
Flange Bolt ChartSHORTBUS101
 

What's hot (20)

criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
Pqr asme ix completed
Pqr asme ix  completed Pqr asme ix  completed
Pqr asme ix completed
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Pipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & MaintenancePipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & Maintenance
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteria
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Wps report
Wps reportWps report
Wps report
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Welding Defects
Welding DefectsWelding Defects
Welding Defects
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdf
 
Asmecodesstandards
AsmecodesstandardsAsmecodesstandards
Asmecodesstandards
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Welding technology by A.Vinoth Jebaraj
Welding technology by A.Vinoth JebarajWelding technology by A.Vinoth Jebaraj
Welding technology by A.Vinoth Jebaraj
 
Aws d1.1 guides
Aws d1.1 guidesAws d1.1 guides
Aws d1.1 guides
 
Flange Bolt Chart
Flange Bolt ChartFlange Bolt Chart
Flange Bolt Chart
 

Similar to Welders qualification

WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
 
BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36AKBAR TRADING
 
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )AKBAR TRADING
 
BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)AKBAR TRADING
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingJeremy J. Manning
 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.pptmrujjavalsinghvarana
 
BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N AKBAR TRADING
 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTAbrahamAby3
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsMiller Energy, Inc.
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXAntonius Pompi Bramono
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXWeld Maniac
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfHadiSwts
 
PFS Flange Stock
PFS Flange StockPFS Flange Stock
PFS Flange StockAli Faben
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 

Similar to Welders qualification (20)

Welder_Quals smaw IX.ppt
Welder_Quals smaw IX.pptWelder_Quals smaw IX.ppt
Welder_Quals smaw IX.ppt
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36
 
wps_variable
wps_variablewps_variable
wps_variable
 
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
 
BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air Tubing
 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.ppt
 
BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N
 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPT
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement Instruments
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
Conexoes
ConexoesConexoes
Conexoes
 
Infinitidesign 2013 a
Infinitidesign 2013 aInfinitidesign 2013 a
Infinitidesign 2013 a
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdf
 
Wellhead Valves Technical Data
Wellhead Valves Technical DataWellhead Valves Technical Data
Wellhead Valves Technical Data
 
PFS Flange Stock
PFS Flange StockPFS Flange Stock
PFS Flange Stock
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 

Recently uploaded

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 

Recently uploaded (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Welders qualification

  • 3. PLATE - GROOVE Plate andPipe Over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Plate -Groove 1G F F (NOTE 2) F Plate -Groove 2G F, H F, H (NOTE2) F, H Plate -Groove 3G F, V F, NOTE2 F, H,V Plate -Groove 4G F,O F, NOTE2 F, H,O Plate -Groove 3G& 4G F, V, O F, NOTE2 ALL Plate -Groove 2G,3G, &4G ALL F,H NOTE2 ALL Plate -Groove Special Position SP,F SP,F SP,F Groove Fillet Weld Position Qualification Test Position And Type Weld Qualified (Note 1) NOTE1: 1)Position Of Welding As Shown As Shown In QW-461 And QW-461.2 F= Flat,H=Horizontal,V=Vertical,O=Overhead 2)Pipe 2 7/8 in (72mm) OD and over 3) See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
  • 4. Plate andPipe over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Plate -Fillet 1F -- -- F NOTE 2 Plate -Fillet 2F -- -- F, H NOTE2 Plate -Fillet 3F -- -- F, H,V NOTE2 Plate -Fillet 4F -- -- F, H,O NOTE2 Plate -Fillet 3F &4F -- -- ALL NOTE2 Plate -Fillet Special Position -- -- SP,F NOTE2 NOTE F= Flat H=HorizontalV=Vertical, O=Overhead 3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6 Groove Fillet Weld Position 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 2)Pipe 2 7/8 in (72mm) od and over Qualification Test Position And Type Weld Qualified (Note 1) PLATE - FILLET
  • 5. Plate andPipe Over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Pipe-Groove 1G F F F Pipe-Groove 2G F,H F,H F, H Pipe-Groove 5G F,V,O F,V,O ALL Pipe-Groove 6G ALL ALL ALL Pipe-Groove 2G&5G ALL ALL ALL Pipe-Groove Special Position SP,F SP,F SP,F NOTE F= Flat H=HorizontalV=Vertical, 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 O=Overhead 2)Pipe 2 7/8 in (72mm) od and over 3)See DiameterRestrictions In Qw-452.3, Qw452.4, Qw452.6 Groove Fillet Weld Position Qualification Test Position And Type Weld Qualified (Note 1) PIPE-GROOVE
  • 6. Plate and Pipe over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Pipe-Fillet 1F -- -- F Pipe-Fillet 2F -- -- F, H Pipe-Fillet 2FR -- -- F,H Pipe-Fillet 4F -- -- F,H,O Pipe-Fillet 5F -- -- ALL Pipe-Fillet Special Position -- -- SP,F NOTE F= Flat H=HorizontalV=Vertical, Qualification Test Position And Type Weld Qualified (Note 1) Groove Fillet Weld Position 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 O=Overhead 2)Pipe 2 7/8 in (72mm) od and over 3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6 PIPE – FILLET
  • 9. 1G
  • 10. 2G
  • 11. 3G
  • 12. 4G
  • 14. 1G
  • 15. 2G
  • 16. 5G
  • 17. 6G
  • 19. 1F
  • 20. 2F
  • 21. 3F
  • 22. 4F
  • 25. 2F
  • 27. 4F
  • 28. 5F
  • 29.
  • 30.
  • 31. Qualified With Qualified For X X X X F-No5 with out Backing X F-No5 with Backing X F-No4 with out Backing F-No 4 with Backing X X F-No3 with out Backing X F-No 3 with Backing X X X X F-No 2 with out Backing X F-No 2 with Backing X X X X X X X F-No 1 with out Backing X F-No5 with Backing F-No5 with out Backing F-No 1 with Backing X X X X X X X F-No 3 with Backing F-No3 with out Backing F-No 4 with Backing F-No4 with out Backing F-No 1 with Backing F-No 1 with out Backing F-No 2 with Backing F-No 2 with out Backing
  • 32. QUALIFIED WITH QUALIFIED FOR QUALIFIED WITH QUALIFIED FOR F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 1 WITH OUT BACKING F-NO 3 WITH BACKING F-NO 1 WITH BACKING F-NO 4 WITH BACKING F-NO 2 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 2 WITH BACKING F-NO 3 WITH BACKING F-NO 4 WITH BACKING F-NO 4 WITH OUT BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 5 WITH BACKING F-NO 3 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 3 WITH BACKING F-NO 3 WITH OUT BACKING F-No 2 WITH OUT BACKING F-No 3 WITH BACKING F-No5 WITH OUT BACKING F-No3 WITH OUT BACKING F-No 4 WITH BACKING F-NO 5 WITH OUT BACKING F-NO 5 WITH BACKING F-NO 1 WITH OUT BACKING F-No 2 WITH OUT BACKING F-No 2 WITH BACKING F-No4 WITH OUT BACKING F-No5 WITH BACKING
  • 34. TEST SPECIMENS [ QW-452.1(a)] Thickness of weld metal, IN(mm) TYPE AND NUMBER OF EXAMINATIONS AND TEST SPECIMENS REQUIRED Visual Examination per QW-302.4 Side Bend QW-462.2 [note (1)] Face Bend QW- 462.3(a) Or QW-462.3(b) [Note (1),(2)] Root Bend qw- 462.3(a) or QW- 462.3(b) [note(1),(2)] LESS THAN 3/8 (10) X --- 1 1 3/8(10) TO LESS THAN 3/4(19mm) X 2 [NOTE (3)] NOTE (3) NOTE (3) 3/4(19MM) AND OVER X 2 --- ---
  • 36. Thickness of Weld Metal Qualified Thickness,t,of weld metal inch, The coupon inch(mm) [Note1& 2] Thickness of weld metal Qualified [Note3] • Up to13 mm •½(13mm) and over with a minimum of three layers •2t •Maximum to be welded
  • 40. SMAW (QW-353) PARAGRAPH BREAF OF VARIABLES QW-402 JOINTS DELETION OF BACKING QW-403 BASE METAL CHANGE OF PIPEDIA(QW-403.16) &CHANGE OF P-NUM(QW-403.18) QW-404 FILLERMETALS CHANGE OF FILLER (QW404.15) & CHANGEOF WELD t DEPOSIT (QW404.30) QW-405 POSITIONS ADDITION OF POSITION (QW-405.1) & VERTI& DOWN WELDING (QW-405.3)
  • 41. What Is UNS Number?
  • 43. What is SFA Number?