SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku
Omar, Perak.
Percentage of Assessment: 20%
Submission Date: 2nd July 2015
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements for the chosen building.
ī‚ˇ Pilecaps including excavations from reduce level.
ī‚ˇ Work below ground floor level including site clearance and excavation, ground floor slab etc.
ī‚ˇ All first floor to fourth floor slabs and beams
ī‚ˇ Roof slabs and beams
Notes:
ī‚ˇ Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.
ī‚ˇ
Assessment Criteria
Refer to matrix attached.
Teaching Objectives
ī‚ˇ To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
ī‚ˇ To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
ī‚ˇ To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
ī‚ˇ Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
ī‚ˇ Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
ī‚ˇ Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
ī‚ˇ Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission
Each section is to submit to the group leader in the following sequence:
ī‚ˇ Billing ( handwritten )
ī‚ˇ Query list
ī‚ˇ Taking off list
ī‚ˇ Dimension sheets
The Leader of each group is to collect from all the group members and attach the front cover page with the
names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges
the rest in the following sequence:
ī‚ˇ Billing ( to insert in front of BQ and hand written )
ī‚ˇ Pilecaps including excavations from reduce level.
ī‚ˇ Work below ground floor level including site clearance and excavation, ground floor slab etc.
ī‚ˇ First floor slabs to fourth floor slabs and beams.
ī‚ˇ Roof slabs and beams

More Related Content

What's hot (9)

Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
 
Cv with photo
Cv with photoCv with photo
Cv with photo
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
nkp
nkpnkp
nkp
 
New Resume for Hays
New Resume for HaysNew Resume for Hays
New Resume for Hays
 
NAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CVNAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CV
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-query
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)
 

Similar to BQS bq assignment

Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
KhangWei Chin
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
hitusp
 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)
Arvindhan Balasingam
 

Similar to BQS bq assignment (20)

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - Measurement
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degree
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEF
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notes
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
estimating and costing introduction ppt.pptx
estimating and costing  introduction ppt.pptxestimating and costing  introduction ppt.pptx
estimating and costing introduction ppt.pptx
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 

More from Felix Vong

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
Felix Vong
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
Felix Vong
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015
Felix Vong
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014
Felix Vong
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqs
Felix Vong
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqs
Felix Vong
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqs
Felix Vong
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1
Felix Vong
 

More from Felix Vong (20)

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014
 
Presentation
PresentationPresentation
Presentation
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqs
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqs
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqs
 
bqs Building materials presentation 2
bqs Building materials presentation 2bqs Building materials presentation 2
bqs Building materials presentation 2
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2
 
Epc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleEpc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun Temple
 
Epc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkEpc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara Park
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1
 
Psychology final journal 2.1
Psychology final journal 2.1Psychology final journal 2.1
Psychology final journal 2.1
 
Psy journal 2 1.2
Psy journal 2 1.2Psy journal 2 1.2
Psy journal 2 1.2
 
Psy 2 essay
Psy 2 essayPsy 2 essay
Psy 2 essay
 
Power bank presentation
Power bank presentationPower bank presentation
Power bank presentation
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 

BQS bq assignment

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku Omar, Perak. Percentage of Assessment: 20% Submission Date: 2nd July 2015 Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building. ī‚ˇ Pilecaps including excavations from reduce level. ī‚ˇ Work below ground floor level including site clearance and excavation, ground floor slab etc. ī‚ˇ All first floor to fourth floor slabs and beams ī‚ˇ Roof slabs and beams Notes: ī‚ˇ Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick. ī‚ˇ Assessment Criteria Refer to matrix attached. Teaching Objectives ī‚ˇ To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.
  • 2. ī‚ˇ To develop an awareness of the nature, content, and significance of tendering and contractual documentation. ī‚ˇ To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to: ī‚ˇ Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works. ī‚ˇ Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works. ī‚ˇ Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works. ī‚ˇ Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each section is to submit to the group leader in the following sequence: ī‚ˇ Billing ( handwritten ) ī‚ˇ Query list ī‚ˇ Taking off list ī‚ˇ Dimension sheets The Leader of each group is to collect from all the group members and attach the front cover page with the names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges the rest in the following sequence: ī‚ˇ Billing ( to insert in front of BQ and hand written ) ī‚ˇ Pilecaps including excavations from reduce level. ī‚ˇ Work below ground floor level including site clearance and excavation, ground floor slab etc. ī‚ˇ First floor slabs to fourth floor slabs and beams. ī‚ˇ Roof slabs and beams