1. Indian Run Restoration Project
Department of Public Works and Environmental Services
A Fairfax County, VA, publication
Working for You!
Contract No. CN13125082
Project No. SD-000031-026
Task Order No. 8
Mason District
September 29, 2014
2. Indian Run Restoration Project
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
3. Indian Run Restoration Project
Project Details
The purpose of this project is to restore sections of Indian Run, stabilize outfalls, and install low impact development
(LID) facilities along Indian Run Parkway between Edsall Road and Bren Mar Drive. The project provides water quality
enhancement as well as prolonged channel protection. The project was substantially completed within budget on
September 26, 2014.
Project Overview:
• Channel improvement and stream bank stabilization.
• Installation of various in-stream structures to include: plunge pools, riffle grade control, imbricated stone wall, rock
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
vane.
• Installation of eight (8) low impact development (LID) facilities through out the project corridor.
• Installation of various storm drainage structures and outfall protection.
• Planting of native vegetation to promote the natural reforestation of the project site.
• Water quality benefits obtained include removal of 1.34 lbs./yr. total phosphorus, 11.18 lbs./yr. total nitrogen, and
263 lbs./yr. total suspended solids.
Project Team:
• Matthew Meyers – Stormwater Planning Department
• Ratna Pottumuthu – Stormwater Planning Department
• Mannan Qureshi – Utilities Design & Construction Division
• Ken Atkins – Utilities Design & Construction Division
• Yudhie Brownson – Utilities Design & Construction Division
• Environmental Quality Resources - Contractor
• McCormick Taylor – Design Consultant
4. Indian Run Restoration Project
Indian Run Project Site– Tax Map No. 81-1
Indian Run -
Approximate Project
Limits
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
5. Indian Run Restoration Project
Plunge Pool Improvements
Pre-Construction
Post-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
6. Indian Run Restoration Project
Plunge Pool Improvements
Pre-Construction
Post-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
7. Indian Run Restoration Project
Plunge Pool Improvements
Post-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
8. Indian Run Restoration Project
Stream Bank Stabilization – Rock Wall Installation
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Pre-Construction
Post-Construction
9. Indian Run Restoration Project
Low Impact Development (LID) Facility
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
10. Indian Run Restoration Project
Existing and New Outfall Structures Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
11. Indian Run Restoration Project
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
12. Additional Information
For additional Information, please call
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.gov
www.fairfaxcounty.gov/dpwes
Wakefield Run Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch