Sustainable Economic Development of the Sudurnes
       region, Iceland : Project Prioritisation




             JOSE MATEOS MORENO

            Ásbrú, 25 November 2011
AN INTRODUCTION TO PROJECT
     PRIORITISATION CRITERIA AND
             TECHNIQUES

• The Need for Prioritisation
• Approach to Prioritisation
• Outline Selection Procedures




                      2
PRIORITISATION CRITERIA
• Accession Criteria
• Competitiveness Criteria (e.g.. Relation with
  priority, effectiveness)
• Financial & Economic Criteria (efficiency,
  financial sustainability)
• Technical Criteria (e.g. maturity of proposals)
• Social & Political Criteria (e.g. commitment)
• Commercial & Institutional Criteria (e.g. quality
  of implementing institution)

Focus on a Limited Number of Key Criteria

                            3
APPROACH TO PRIORITISATION
• Select the prioritisation team
• Identify criteria that could be used for
  homogeneous projects.
• Select & Weight the most relevant criteria
• Agree how each selected criterion will be
  applied
• Obtain project data that will allow this to be
  done
• Apply the criteria to each project
• Calculate scores and apply weightings

   Make Sure the Approach is Consistent

                            4
Example Prioritisation Criteria – OP COMP
Priority Axis: Strenghtening Cooperation for R&D

• Durability of project effects: The result of project
  implementation will contribute to resolution of definite problems
  (e.g., technological ones)?
• Experience: Beneficiary’s experience in implementation of
  research projects
• Project’s innovative nature:The project relates to the problem
  not resolved?
• Project’s impact on increasing enterprises’ competitiv.: The
  future new product will enable the enterprise an effective
  competition in the market?
• Market demand for a given product: local, national,
  international?
• Number of new jobs: Project implementation will contribute to
  emergence of new jobs?
• EU horizontal policies implementation: environmental
  protection, IS, etc.
                                    5
Project Selection Procedures (1)

• Project selection procedures shall be
  outlined during OP preparation
  –   Responsible bodies (intermediate)
  –   Decision making process
  –   Potential final beneficiaries
  –   Main priorities and selection criteria
  –   Documentation
  –   Publicity

                           6
Project Selection Procedures (2)


• Intermediate bodies responsible for
  selection of projects for assistance
  within individual OP measures
• OP objectives and targets should be
  translated into project selection criteria.
  In the case of EU cofinanced projects,
  the objectives of IPA Fund should also
  be translated into selection criteria.
                        7
Selection of Project Proposals
Through Application Procedure

• Call for proposals – public or restricted
• A) Queue-based approval systems
• B) Competitive:
  – Regular intake of proposals (2-4 times per
    year)
  – One application round



                       8
EVALUATION PROCEDURE (2)
Consists of two elements:
• a) formal evaluation (is the application
  complete?)
• b) technical and economical Appraisal:
        –   Compatibility with the objective of the Priority Axis
        –   Economic analysis of feasibility
        –   financial evaluation
        –   analysis of the business plan (cost-effectiveness)




                                  9
Project Selection
– Transparency Issues
•   Public promotion
•   Eligibility criteria published
•   Criteria for selection available
•   Weightings for criteria available
•   Decisions made by Committee
•   Information given to unsuccessful applicants
•   Competitive or queuing basis
•   Appeals system in place




                              10
Principal Appraisal Techniques
  •   Financial Analysis
  •   Cost Benefit Analysis (CBA)
  •   Cost Effectiveness
  •   Scoring, Weighting, Ranking (SWR)
  •   Multi Criteria Analysis (MCA)

  Cost Benefit Analysis
  • Mandatory for projects €50m+
  • Recommended for other large infrastructural
    projects

                          11                      (
Project Appraisal – Scoring, Weighting,
Ranking (SWR)
• Identification of project appraisal criteria
• Weighting is assigned to each criteria based
  on importance (no weighting = equal value)
• Each project receives numerical score against
  different criteria
• Different project applications ranked against
  each other


                         12
Evaluation Grid (see example)

           Scoring Sheet
          1     Very Poor
          2    Poor
          3    Adequate
          4    Good
          5    Very Good


                  13
Eligibility in EU Funds
• Constraints at National Level:
   –   Urban Planning
   –   Environmental Legislation
   –   Regional Development Plans /Strategies, etc.
   –   Operational Programmes
   –   Call for Proposal

• Constraints at EU Level:
   – Specific regulations of the Funds
   – Eligibility Rules for type of expenditure: VAT, Land
     acquisition, etc.
   – Size of the Project: Major Projects.
   – Distortion of the Internal Market: State aid regulations
   – Public procurement
   – Environmental Constraints: NATURA 2000
Checklist for Quality Appraisal of
project proposals (1)
QUALITY ASSESSMENT PARAMETERS

1. Relevance
    – Are the beneficiaries clearly identified?
    – Are the problems of the beneficiaries described
       sufficiently?
1.3 Is the problem analysis sufficiently comprehensive?
1.4 Do the Overall Objectives explain why the project is
   important for society?
1.5 Is the Project Purpose defined in terms of benefits to the
   beneficiaries?
1.6 Has the need for the results been demonstrated?

                                15
Checklist for Quality Appraisal of
project proposals (2)
2. Feasibility

2.1 Will the Project Purpose contribute to the Overall Objectives (if
   the assumptions hold)?
2.2 Are the Results described as services to be delivered to the
   target group?
2.3 Will the Project Purpose be achieved if the Results were
   delivered?
2.4 Are the means sufficiently justified by quantified objectives

2.5 Have important external conditions been identified?
2.6 Is the probability of realisation of the assumptions acceptable?
2.7 Will implementing agencies be able to implement the project?


                                   16
Checklist for Quality Appraisal of
project proposals (3)
3. Sustainability

3.1 Will the relevant authorities have a supportive policy after the
   project has ended?
3.2 Is the technology appropriate for the local conditions?
3.3 Will the ecological environment be preserved during and after
   the project?
3.4 Will there be adequate ownership of the project by the
   beneficiaries?
3.5 Will women (and other groups) have adequate access to
   benefits and production factors during and after the project?
3.6 Will the implementing agencies be able to provide follow-up
   after the project?
3.7 Does the financial and economic analysis confirm that the
   ‘incremental project’ is efficient, effective, viable and relevant?


                                    17

More Related Content

What's hot

Logical framework guide
Logical framework guideLogical framework guide
Logical framework guideTony
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Templatewilliam hartin
 
Critical Success Factors in Software Projects
Critical Success Factors in Software ProjectsCritical Success Factors in Software Projects
Critical Success Factors in Software ProjectsShelley Keith, MSIQ
 
Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...GerieOwen
 
4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder AnalysisTony
 

What's hot (18)

Chap012
Chap012Chap012
Chap012
 
Logical framework guide
Logical framework guideLogical framework guide
Logical framework guide
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Critical Success Factors in Software Projects
Critical Success Factors in Software ProjectsCritical Success Factors in Software Projects
Critical Success Factors in Software Projects
 
Chap007
Chap007Chap007
Chap007
 
Chap010
Chap010Chap010
Chap010
 
Chap004
Chap004Chap004
Chap004
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
Chap005
Chap005Chap005
Chap005
 
Chap002
Chap002Chap002
Chap002
 
Zmitrowicz SQA DAYS EU Riga
Zmitrowicz SQA DAYS EU RigaZmitrowicz SQA DAYS EU Riga
Zmitrowicz SQA DAYS EU Riga
 
Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...
 
Product project design
Product project designProduct project design
Product project design
 
4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis
 
Chap001
Chap001Chap001
Chap001
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Chap005
Chap005Chap005
Chap005
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
 

Similar to 5 project prioritization

Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisalHachnayen
 
2.requirements management
2.requirements management2.requirements management
2.requirements managementPanos Fitsilis
 
Introduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogIntroduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogInka Pibilova
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionAbigail Pugal-Somera
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...Dr Rupert Booth
 
Project Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh FoundationProject Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh FoundationKarl Donert
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.abuzertaju
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectivessombat nirund
 
Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...ILRI
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 

Similar to 5 project prioritization (20)

Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
3.4 project level lfa and quality
3.4 project level lfa and quality3.4 project level lfa and quality
3.4 project level lfa and quality
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
H2020 Infoday Proposals Submission
H2020 Infoday Proposals SubmissionH2020 Infoday Proposals Submission
H2020 Infoday Proposals Submission
 
Introduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogIntroduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / Trialog
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...
 
Project Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh FoundationProject Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh Foundation
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...
 
Re sakss presentation on project management mburu 2
Re sakss presentation on project management mburu 2Re sakss presentation on project management mburu 2
Re sakss presentation on project management mburu 2
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Horizon 2020 proposal writing tips
Horizon 2020 proposal writing tipsHorizon 2020 proposal writing tips
Horizon 2020 proposal writing tips
 

More from Dagný Gísladóttir

More from Dagný Gísladóttir (13)

3.1 procurement and prag rules
3.1 procurement and prag rules3.1 procurement and prag rules
3.1 procurement and prag rules
 
2.2 programming and tools swot & lfa
2.2 programming and tools swot & lfa2.2 programming and tools swot & lfa
2.2 programming and tools swot & lfa
 
2.1 pcm
2.1 pcm2.1 pcm
2.1 pcm
 
1.4 swot and needs assessment
1.4 swot and needs assessment1.4 swot and needs assessment
1.4 swot and needs assessment
 
1.3 contents and processes
1.3 contents and processes1.3 contents and processes
1.3 contents and processes
 
1.2 ipa overview
1.2 ipa overview1.2 ipa overview
1.2 ipa overview
 
Presentation workshop111208 ssg
Presentation workshop111208 ssgPresentation workshop111208 ssg
Presentation workshop111208 ssg
 
3 aspects of the eu methodology 19 october 2011
3   aspects of the eu methodology 19 october 20113   aspects of the eu methodology 19 october 2011
3 aspects of the eu methodology 19 october 2011
 
1 the national and regional perspectives seminar workshop 19 october-2011
1   the national and regional perspectives seminar workshop 19 october-20111   the national and regional perspectives seminar workshop 19 october-2011
1 the national and regional perspectives seminar workshop 19 october-2011
 
4 sept pcm
4 sept pcm4 sept pcm
4 sept pcm
 
3 programming and tools swot & lfa
3 programming and tools swot & lfa3 programming and tools swot & lfa
3 programming and tools swot & lfa
 
2 ipa overview
2 ipa overview2 ipa overview
2 ipa overview
 
1 content working group iii
1 content working group iii1 content working group iii
1 content working group iii
 

Recently uploaded

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 

Recently uploaded (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 

5 project prioritization

  • 1. Sustainable Economic Development of the Sudurnes region, Iceland : Project Prioritisation JOSE MATEOS MORENO Ásbrú, 25 November 2011
  • 2. AN INTRODUCTION TO PROJECT PRIORITISATION CRITERIA AND TECHNIQUES • The Need for Prioritisation • Approach to Prioritisation • Outline Selection Procedures 2
  • 3. PRIORITISATION CRITERIA • Accession Criteria • Competitiveness Criteria (e.g.. Relation with priority, effectiveness) • Financial & Economic Criteria (efficiency, financial sustainability) • Technical Criteria (e.g. maturity of proposals) • Social & Political Criteria (e.g. commitment) • Commercial & Institutional Criteria (e.g. quality of implementing institution) Focus on a Limited Number of Key Criteria 3
  • 4. APPROACH TO PRIORITISATION • Select the prioritisation team • Identify criteria that could be used for homogeneous projects. • Select & Weight the most relevant criteria • Agree how each selected criterion will be applied • Obtain project data that will allow this to be done • Apply the criteria to each project • Calculate scores and apply weightings Make Sure the Approach is Consistent 4
  • 5. Example Prioritisation Criteria – OP COMP Priority Axis: Strenghtening Cooperation for R&D • Durability of project effects: The result of project implementation will contribute to resolution of definite problems (e.g., technological ones)? • Experience: Beneficiary’s experience in implementation of research projects • Project’s innovative nature:The project relates to the problem not resolved? • Project’s impact on increasing enterprises’ competitiv.: The future new product will enable the enterprise an effective competition in the market? • Market demand for a given product: local, national, international? • Number of new jobs: Project implementation will contribute to emergence of new jobs? • EU horizontal policies implementation: environmental protection, IS, etc. 5
  • 6. Project Selection Procedures (1) • Project selection procedures shall be outlined during OP preparation – Responsible bodies (intermediate) – Decision making process – Potential final beneficiaries – Main priorities and selection criteria – Documentation – Publicity 6
  • 7. Project Selection Procedures (2) • Intermediate bodies responsible for selection of projects for assistance within individual OP measures • OP objectives and targets should be translated into project selection criteria. In the case of EU cofinanced projects, the objectives of IPA Fund should also be translated into selection criteria. 7
  • 8. Selection of Project Proposals Through Application Procedure • Call for proposals – public or restricted • A) Queue-based approval systems • B) Competitive: – Regular intake of proposals (2-4 times per year) – One application round 8
  • 9. EVALUATION PROCEDURE (2) Consists of two elements: • a) formal evaluation (is the application complete?) • b) technical and economical Appraisal: – Compatibility with the objective of the Priority Axis – Economic analysis of feasibility – financial evaluation – analysis of the business plan (cost-effectiveness) 9
  • 10. Project Selection – Transparency Issues • Public promotion • Eligibility criteria published • Criteria for selection available • Weightings for criteria available • Decisions made by Committee • Information given to unsuccessful applicants • Competitive or queuing basis • Appeals system in place 10
  • 11. Principal Appraisal Techniques • Financial Analysis • Cost Benefit Analysis (CBA) • Cost Effectiveness • Scoring, Weighting, Ranking (SWR) • Multi Criteria Analysis (MCA) Cost Benefit Analysis • Mandatory for projects €50m+ • Recommended for other large infrastructural projects 11 (
  • 12. Project Appraisal – Scoring, Weighting, Ranking (SWR) • Identification of project appraisal criteria • Weighting is assigned to each criteria based on importance (no weighting = equal value) • Each project receives numerical score against different criteria • Different project applications ranked against each other 12
  • 13. Evaluation Grid (see example) Scoring Sheet 1 Very Poor 2 Poor 3 Adequate 4 Good 5 Very Good 13
  • 14. Eligibility in EU Funds • Constraints at National Level: – Urban Planning – Environmental Legislation – Regional Development Plans /Strategies, etc. – Operational Programmes – Call for Proposal • Constraints at EU Level: – Specific regulations of the Funds – Eligibility Rules for type of expenditure: VAT, Land acquisition, etc. – Size of the Project: Major Projects. – Distortion of the Internal Market: State aid regulations – Public procurement – Environmental Constraints: NATURA 2000
  • 15. Checklist for Quality Appraisal of project proposals (1) QUALITY ASSESSMENT PARAMETERS 1. Relevance – Are the beneficiaries clearly identified? – Are the problems of the beneficiaries described sufficiently? 1.3 Is the problem analysis sufficiently comprehensive? 1.4 Do the Overall Objectives explain why the project is important for society? 1.5 Is the Project Purpose defined in terms of benefits to the beneficiaries? 1.6 Has the need for the results been demonstrated? 15
  • 16. Checklist for Quality Appraisal of project proposals (2) 2. Feasibility 2.1 Will the Project Purpose contribute to the Overall Objectives (if the assumptions hold)? 2.2 Are the Results described as services to be delivered to the target group? 2.3 Will the Project Purpose be achieved if the Results were delivered? 2.4 Are the means sufficiently justified by quantified objectives 2.5 Have important external conditions been identified? 2.6 Is the probability of realisation of the assumptions acceptable? 2.7 Will implementing agencies be able to implement the project? 16
  • 17. Checklist for Quality Appraisal of project proposals (3) 3. Sustainability 3.1 Will the relevant authorities have a supportive policy after the project has ended? 3.2 Is the technology appropriate for the local conditions? 3.3 Will the ecological environment be preserved during and after the project? 3.4 Will there be adequate ownership of the project by the beneficiaries? 3.5 Will women (and other groups) have adequate access to benefits and production factors during and after the project? 3.6 Will the implementing agencies be able to provide follow-up after the project? 3.7 Does the financial and economic analysis confirm that the ‘incremental project’ is efficient, effective, viable and relevant? 17