SlideShare a Scribd company logo
1 of 2
INSTRUCTIONS FOR FILLING UP CHECKLIST

1. The checklist enumerates items that are to be accomplished in the planning of the project. This is not an
exhaustive list. For some of your projects, a number of items may not be applicable and can therefore be deleted for
the checklists for those projects. For other projects, some items may not be listed and therefore have to be added
to the checklists for those projects. The checklist template is flexible enough to incorporate these additions or
deletions for a specific project.

2. Enter the project start date and project end date in the space allocated for these information. Then enter the
checklist accomplishment date. This accomplishment date will allow you to monitor any changes that arise as a
result of completion of specific items in the checklist during the period between checklist accomplishment dates.

3. For each item, place a check in the Yes or No column depending on whether the item has been accomplished or
not. Enter the planned completion date and planned effort (hours) for each of the items. If you placed a check in
the Yes column for a specific item, enter the actual completion date and actual effort (hours).

4. You can decide to regularly monitor changes to this checklist by identifying schedules on when to update this
checklist. The updates can be monitored through the changing accomplishment dates for the checklist. This will
give the project team (specifically the project manager) an idea of how much is being accomplished throughout the
planning duration.
INFORMATION TECHNOLOGY PROJECT PLANNING CHECKLIST
Project Start Date:                                                           Checklist Accomplishment Date:
Project End Date:
        No.                              Item/Comments                            YES      NO     Planned      Planned      Actual   Actual
                                                                                                 Completion      Effort   Completion Effort
                                                                                                    Date        (hours)      Date    (hours)
         1            Goals and Objectives defined
         2            Scope and Limitations defined
         3            Major Deliverables defined (Deliverables Plan)
         4            Work Breakdown Structure completed
         5            Top-down planning estimates created
         6            Major Milestones defined
         7            Master Integrated Schedule completed
         8            Product and Services Requirements defined
         9            Organization Plan completed
        10            Performance, Evaluation and Test Plan completed
        11            Change Control Plan completed
        12            Problem Tracking Plan completed
        13            Documentation Plan completed
        14            Communication Plan completed
        15            Legal and Regulatory Requirements Plan completed
        16            Risk Management Plan completed
        17            Reliability, Availability, Usability Plan completed
        18            Preliminary Support Plan completed
        19            Resources Plan completed
        20            Project Plan completed
        21            Opportunity Costs calculated
        22            Budget specified
        23            Financial Analysis completed
        24            Functional Deliverables defined
        25            Top-level Architecture Specification completed
        26            High-level Functional Specification(s) completed
        27            Bottom-up task estimates created by Functional Groups
        28            Detailed Functional Planning and Schedules completed
        29            Functional Schedule Critical Path Analysis completed
        30            Master Schedule Critical Path Analysis completed
        31            Master Schedule & Path aligned with Functional Groups
        32            Planning Phase Checklist completed

More Related Content

What's hot

Ricardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_enRicardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_en
Juan Flores
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
Kittitouch Suteeca
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
eklaksh
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
Jeremy Heady
 
Introduction day 2 cert iv scope
Introduction day 2  cert iv scopeIntroduction day 2  cert iv scope
Introduction day 2 cert iv scope
Skript
 

What's hot (20)

Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
Ricardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_enRicardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_en
 
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
 
Project managment 4
Project managment 4Project managment 4
Project managment 4
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 
Project initiation transition checklist
Project initiation transition checklistProject initiation transition checklist
Project initiation transition checklist
 
Project implementation
Project implementationProject implementation
Project implementation
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 
integration management
 integration management integration management
integration management
 
Introduction day 2 cert iv scope
Introduction day 2  cert iv scopeIntroduction day 2  cert iv scope
Introduction day 2 cert iv scope
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
 
Oracle Primavera contractor
Oracle Primavera  contractorOracle Primavera  contractor
Oracle Primavera contractor
 
4.project integrationmanagement
4.project integrationmanagement4.project integrationmanagement
4.project integrationmanagement
 
User acceptance-report
User acceptance-reportUser acceptance-report
User acceptance-report
 

Similar to Project planningchecklist

Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docx
Addisu15
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle origination
Mujtaba Masood
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
Ram Srivastava
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
NASAPMC
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
Talha Siddiqui
 
Law.richard
Law.richardLaw.richard
Law.richard
NASAPMC
 
File 2 removed word 1
File 2 removed word 1File 2 removed word 1
File 2 removed word 1
test prod1
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
Irefuser1
 

Similar to Project planningchecklist (20)

Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docx
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle origination
 
PM Training Slides
PM Training SlidesPM Training Slides
PM Training Slides
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
2. Project Scope Management.ppt
2. Project Scope Management.ppt2. Project Scope Management.ppt
2. Project Scope Management.ppt
 
Project managment 2
Project managment 2Project managment 2
Project managment 2
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 
project time management
 project time management project time management
project time management
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Guidence M& E
Guidence  M& EGuidence  M& E
Guidence M& E
 
Law.richard
Law.richardLaw.richard
Law.richard
 
File 2 removed word 1
File 2 removed word 1File 2 removed word 1
File 2 removed word 1
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Project Execution
Project ExecutionProject Execution
Project Execution
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Recently uploaded (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

Project planningchecklist

  • 1. INSTRUCTIONS FOR FILLING UP CHECKLIST 1. The checklist enumerates items that are to be accomplished in the planning of the project. This is not an exhaustive list. For some of your projects, a number of items may not be applicable and can therefore be deleted for the checklists for those projects. For other projects, some items may not be listed and therefore have to be added to the checklists for those projects. The checklist template is flexible enough to incorporate these additions or deletions for a specific project. 2. Enter the project start date and project end date in the space allocated for these information. Then enter the checklist accomplishment date. This accomplishment date will allow you to monitor any changes that arise as a result of completion of specific items in the checklist during the period between checklist accomplishment dates. 3. For each item, place a check in the Yes or No column depending on whether the item has been accomplished or not. Enter the planned completion date and planned effort (hours) for each of the items. If you placed a check in the Yes column for a specific item, enter the actual completion date and actual effort (hours). 4. You can decide to regularly monitor changes to this checklist by identifying schedules on when to update this checklist. The updates can be monitored through the changing accomplishment dates for the checklist. This will give the project team (specifically the project manager) an idea of how much is being accomplished throughout the planning duration.
  • 2. INFORMATION TECHNOLOGY PROJECT PLANNING CHECKLIST Project Start Date: Checklist Accomplishment Date: Project End Date: No. Item/Comments YES NO Planned Planned Actual Actual Completion Effort Completion Effort Date (hours) Date (hours) 1 Goals and Objectives defined 2 Scope and Limitations defined 3 Major Deliverables defined (Deliverables Plan) 4 Work Breakdown Structure completed 5 Top-down planning estimates created 6 Major Milestones defined 7 Master Integrated Schedule completed 8 Product and Services Requirements defined 9 Organization Plan completed 10 Performance, Evaluation and Test Plan completed 11 Change Control Plan completed 12 Problem Tracking Plan completed 13 Documentation Plan completed 14 Communication Plan completed 15 Legal and Regulatory Requirements Plan completed 16 Risk Management Plan completed 17 Reliability, Availability, Usability Plan completed 18 Preliminary Support Plan completed 19 Resources Plan completed 20 Project Plan completed 21 Opportunity Costs calculated 22 Budget specified 23 Financial Analysis completed 24 Functional Deliverables defined 25 Top-level Architecture Specification completed 26 High-level Functional Specification(s) completed 27 Bottom-up task estimates created by Functional Groups 28 Detailed Functional Planning and Schedules completed 29 Functional Schedule Critical Path Analysis completed 30 Master Schedule Critical Path Analysis completed 31 Master Schedule & Path aligned with Functional Groups 32 Planning Phase Checklist completed