SlideShare a Scribd company logo
1 of 37
Bord and Pillar
development/depillaring with
LHD/SDL
LOAD HAUL DUMPER
Applicability Condition
• Seam Thickness : more than 1.8m
• Average seam Gradient : up to 1 in 7
• Suitable for weak floor as compared to SDL
• Maximum speed 8-12 KMPH
• Suitable for long distance
• Headings of 4.8 m width is driven
• In a gallery auger holes are drilled in the middle
of the face upto 2m depth and shot holes are
drilled upto 1.8m depth.
• P1 type permitted explosive with instantaneous
type electric copper detonator is used.
• Coal is loaded by LHD on to chain conveyor which
in turn transfer coal to the belt conveyor.
Load Haul Dumper
Model : EIMCO ELECON 811 LHD
Bucket capacity : 1.37 tons
Electric Motor : 37.5 KW 550 V
Height : 1.95-2 m
Length : 6.30 m
Width : 1.5 m
Speed : 1st gear 3.8 KMPH
2ND gear 7.2 KMPH
3rd gear 12.2 KMPH
Model EIMCO ELECON 912E
• Bucket Capacity : 2.7 tons
• Electric Motor : 440 V 64.15 KW
• Height : 2.11 – 2.78 m
• Length : 7.55m
• Payload : 4000 kg
• Cable reel : 120 m
Caterpillar 243-5577 186-9278 243-6143 243-6224 157-3622
Bucket
capacity(m3)
2.4 2.8 3.1 3.4 2.4
Bucket width
over cutting
edge (m)
1.950 2.010 2.200 2.400 2.200
Overall height-
bucket raised(m)
4.23 4.30 4.30 4.30 4.30
Max dump
height(m)
3.548 3.529 3.531 3.529 3.577
Dump clearance
at max lift (m)
1.662 1.558 1.560 1.561 1.561
Digging depth
(mm)
26 36 34 36 36
Dump angle at
max lift(degree)
43 43 43 43 43
Reach (m ) 1.476 1.588 1.583 1.584 1.584
Overall width(m) 2.155 2.185 2.318 2.518 2.318
SIDE DISCHARGE LOADER
SDL SPECIFICATION
MODEL BUCKET
CAPACITY
OPERATING
WEIGHT
ELECTRIC
MOTOR
GROUNG
PRESSURE
TRAVELLING
SPEED
EIMCO
ELECON 625
2.032 tons 8.9 tons 48.5 KW 0.94 Kg/cm2 3.0 kmph
M412 1.35 tons 8.5-9 tons 55 KW 0.9 kg/cm2 2.6 kmph
EIMCO
ELECON 611
0.9 tons 9 tons 48 KW 0.96 kg/cm2 3.0 kmph
HAZEMAG TL 600 TL 800 TL 1200 TL 1500
Gross Loading
capacity (m3/h)
40-55 50-80 60-100 80-130
Weight of
machine
8.6 10.5 15.0 14.5
Bucket capacity 0.6 0.8-1.0 1.2 1.5
Travelling
speed(m/s)
1.2 1.2 1.4 1.4
Discharge
height(m)
1.7 2.6 2.45 2.4
Digging
depth(mm)
350 600 500 650
Drive capacity 55-63 55-63 63-90 63-90
Length of
machine
5.8 6.18 6.9 6.6
Width 1.2 1.32 1.4 1.7
Height (without
canopy)
1.3 1.5 1.8 1.7
Ground
pressure(N/cm2)
10.4 7.8 10.0 10.0
Radiant hydraulic face drilling machine
• Model : RMTL-HFD-1800 Jumbo drill
• Operating pressure : 70 to 100 bar
• Rotational speed : 400 to 600 rpm
• Drilling diameter : 27 to 43 mm
• Medium : DGMS recommended hydraulic oil
• Noise level : below 70 dB
• Approx weight : 12 to 14 kg
Atlas Copco face drill
Sandvick
Chain Conveyor
MODEL Motor Power
(KW)
Capacity (tph)
Peak Avg
Width (mm) Speed( m/s)
LDCC Skat-60 2 X 15 90 60 420 0.87
LDCC PF-00 2 X 30 90 60 426 0.87
MDCC PF-I-500 1 X 45
2 X 30
250 200 632-640 0.65
MDCC PF-Iv-
500
1 X 45
2 X 30
300 220 632-640 0.65
MDCC MIV -
500
1 X 45
2 X 30
350 250 632-640 0.65
Belt Conveyor
Depillaring with LHD
• Average seam thickness : 4.5 m
• Gradient : 1 in 7 to 1 in 8
• Higher productivity
• Minimum labour requirement
• Limited roadway dimension
Support system
Production of different jumbo drills
• Width of heading(w) = 4.8 m
• Height of gallery(h) = 3 m
• No of faces (N) = 9
• No of blast per face per shift = 1
• Specific gravity of coal(Sg) = 1.4
Production per blast = w*h*Hd*Sg *N
Where Hd= Hole depth in m
Model No Hole depth (m) Production per blast (t)
BMH2831 2.795 507.12
BMH2837 3.405 617.8
BMH 2843 4.015 728.5
BMH 2849 4.625 834.6
LHD
• Average lead dis of LHD (d) = 60 m
• Average speed of LHD (v) = 6 KMPH
• Bucket capacity = b
• Bucket fill factor(F) = 0.8
• Loose coal density(D) = 0.9
• Amount of coal loaded per trip = b*F*D = 0.72b
• Cycle Time of LHD = 1+1+1.5 = 3.5 min
• Hourly no of trips = 17
• Hourly production of LHD = Hourly no of trips * 0.72b =
12.24 b
For no. of LHD,
No. of LHD = (Total production/no. of hrs per
shift * no of shift * hourly production of LHD)
= 728 / 3 *3*12.24b
= 6.67/b
Model No Bucket capacity (m3) No of LHD required
CT243-5577 2.4 3
CT186-9278 2.8 3
CT243-6143 3.1 2
CT243-6224 3.4 2
CT157-3662 2.4 3
Eimco Elecon 811 1.52 5
Eimco Elecon 911 3 3
Production of different chain
conveyors
Model No Capacity (tph)
Peak Average
Capacity in tpd
Peak average
MDCC PF-I-500 250 200 2250 1800
MDCC PF-Iv-500 300 220 2700 1980
MDCC MIV -500 350 250 3150 2250
Production of belt conveyor
Sandvik Belt
speed(m/
s)
Power
required(
KW)
Belt
width(mm
)
Idler
angle(deg
ree)
Capacity(t
ph)
Productio
n (tpd)
HC 500 1.25 3-7.5 800 25 100 900
HC 650 1.37 3-15 950 30 250 2250
HC 800 1.42 5.5-30 1150 30 400 3600
HC 1000 1.65 5.5-60 1350 30 700 6300
HC 1200 1.80 7.5-90 1600 30 1000 9000
HC 1400 1.25 15-90 1800 30 1300 11700
HC 1600 1.25 22-110 1900 30 1500 22500
ENDLESS ROPE HAULAGE
• Avg Speed of Endless haulage = 5KMPH
• Amount of coal to be handled = a
• Length of the roadway on which ERH operates
= 800 m
• Capacity of coal tub = 1 ton
• No of tubs = 800 * Amount of coal to be
handled per hour(a)/(Distance travelled by
ERH per hour * capacity of coal tub)
Amount of coal to be handled per hour No of tubs
Loaded Empties
200 32 32
220 36 36
250 40 40
DRH
• Avg Speed of Direct rope haulage = 10KMPH
• Amount of coal to be handled = a
• Length of the roadway on which ERH operates
= 500 m
• Capacity of coal tub = 1 ton
• No of tubs = 500 * Amount of coal to be
handled per hour(a)/(Distance travelled by
DRH per hour * Capacity of coal tub )
Amount of coal to be handled per hour No of tubs
200 10
220 11
250 13
Power Supply Distribution
Equipment Load in KW
MAIN VENTILATION FAN 75
Belt conveyor 180
Direct Haulage 90
Endless haulage 111
Load Haul Dumper 37
Roof bolting machine 75
Auxiliary fan 15
Face pump 7.5
Chain conveyor 2 x 45
Bord and pillar working with LHD/SDL

More Related Content

What's hot

What's hot (20)

Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
 
Lpdt
LpdtLpdt
Lpdt
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump ppt
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coal
 
Board & Pillar
Board & PillarBoard & Pillar
Board & Pillar
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Pillar design
Pillar designPillar design
Pillar design
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
Pillar design in coal mines
Pillar design in coal minesPillar design in coal mines
Pillar design in coal mines
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Shovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptxShovel and Dumper Combinatio by Auqib Javed.pptx
Shovel and Dumper Combinatio by Auqib Javed.pptx
 

Similar to Bord and pillar working with LHD/SDL

Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineSafdar Ali
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIYSagnik Datta
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt fileZuhair Bin Jawaid
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)Zorareh Nouri
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbeclAlibaba Construction Ltd.
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysOMPRAKASHCHAUBE
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdfDINESHRANJANPAL
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal HandlingNani Thirupathi
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder pptAMIT SAHU
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014Nikhil Jaipurkar
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxGholamRabbaniGhause
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSErik-André Albrecht
 

Similar to Bord and pillar working with LHD/SDL (20)

Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt file
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)
 
PROJECT DEMO final
PROJECT DEMO finalPROJECT DEMO final
PROJECT DEMO final
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian Railways
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling
 
Jonathan Mulosa ET'Al
Jonathan Mulosa ET'AlJonathan Mulosa ET'Al
Jonathan Mulosa ET'Al
 
CHP
CHP CHP
CHP
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
تصمم.pptx
تصمم.pptxتصمم.pptx
تصمم.pptx
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Underground mine
Underground mineUnderground mine
Underground mine
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptx
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

Bord and pillar working with LHD/SDL

  • 2.
  • 4. Applicability Condition • Seam Thickness : more than 1.8m • Average seam Gradient : up to 1 in 7 • Suitable for weak floor as compared to SDL • Maximum speed 8-12 KMPH • Suitable for long distance
  • 5. • Headings of 4.8 m width is driven • In a gallery auger holes are drilled in the middle of the face upto 2m depth and shot holes are drilled upto 1.8m depth. • P1 type permitted explosive with instantaneous type electric copper detonator is used. • Coal is loaded by LHD on to chain conveyor which in turn transfer coal to the belt conveyor.
  • 6.
  • 7.
  • 8.
  • 9. Load Haul Dumper Model : EIMCO ELECON 811 LHD Bucket capacity : 1.37 tons Electric Motor : 37.5 KW 550 V Height : 1.95-2 m Length : 6.30 m Width : 1.5 m Speed : 1st gear 3.8 KMPH 2ND gear 7.2 KMPH 3rd gear 12.2 KMPH
  • 10. Model EIMCO ELECON 912E • Bucket Capacity : 2.7 tons • Electric Motor : 440 V 64.15 KW • Height : 2.11 – 2.78 m • Length : 7.55m • Payload : 4000 kg • Cable reel : 120 m
  • 11. Caterpillar 243-5577 186-9278 243-6143 243-6224 157-3622 Bucket capacity(m3) 2.4 2.8 3.1 3.4 2.4 Bucket width over cutting edge (m) 1.950 2.010 2.200 2.400 2.200 Overall height- bucket raised(m) 4.23 4.30 4.30 4.30 4.30 Max dump height(m) 3.548 3.529 3.531 3.529 3.577 Dump clearance at max lift (m) 1.662 1.558 1.560 1.561 1.561 Digging depth (mm) 26 36 34 36 36 Dump angle at max lift(degree) 43 43 43 43 43 Reach (m ) 1.476 1.588 1.583 1.584 1.584 Overall width(m) 2.155 2.185 2.318 2.518 2.318
  • 13.
  • 14. SDL SPECIFICATION MODEL BUCKET CAPACITY OPERATING WEIGHT ELECTRIC MOTOR GROUNG PRESSURE TRAVELLING SPEED EIMCO ELECON 625 2.032 tons 8.9 tons 48.5 KW 0.94 Kg/cm2 3.0 kmph M412 1.35 tons 8.5-9 tons 55 KW 0.9 kg/cm2 2.6 kmph EIMCO ELECON 611 0.9 tons 9 tons 48 KW 0.96 kg/cm2 3.0 kmph
  • 15. HAZEMAG TL 600 TL 800 TL 1200 TL 1500 Gross Loading capacity (m3/h) 40-55 50-80 60-100 80-130 Weight of machine 8.6 10.5 15.0 14.5 Bucket capacity 0.6 0.8-1.0 1.2 1.5 Travelling speed(m/s) 1.2 1.2 1.4 1.4 Discharge height(m) 1.7 2.6 2.45 2.4 Digging depth(mm) 350 600 500 650 Drive capacity 55-63 55-63 63-90 63-90 Length of machine 5.8 6.18 6.9 6.6 Width 1.2 1.32 1.4 1.7 Height (without canopy) 1.3 1.5 1.8 1.7 Ground pressure(N/cm2) 10.4 7.8 10.0 10.0
  • 16.
  • 17. Radiant hydraulic face drilling machine • Model : RMTL-HFD-1800 Jumbo drill • Operating pressure : 70 to 100 bar • Rotational speed : 400 to 600 rpm • Drilling diameter : 27 to 43 mm • Medium : DGMS recommended hydraulic oil • Noise level : below 70 dB • Approx weight : 12 to 14 kg
  • 20. Chain Conveyor MODEL Motor Power (KW) Capacity (tph) Peak Avg Width (mm) Speed( m/s) LDCC Skat-60 2 X 15 90 60 420 0.87 LDCC PF-00 2 X 30 90 60 426 0.87 MDCC PF-I-500 1 X 45 2 X 30 250 200 632-640 0.65 MDCC PF-Iv- 500 1 X 45 2 X 30 300 220 632-640 0.65 MDCC MIV - 500 1 X 45 2 X 30 350 250 632-640 0.65
  • 22. Depillaring with LHD • Average seam thickness : 4.5 m • Gradient : 1 in 7 to 1 in 8 • Higher productivity • Minimum labour requirement • Limited roadway dimension
  • 23.
  • 25. Production of different jumbo drills • Width of heading(w) = 4.8 m • Height of gallery(h) = 3 m • No of faces (N) = 9 • No of blast per face per shift = 1 • Specific gravity of coal(Sg) = 1.4 Production per blast = w*h*Hd*Sg *N Where Hd= Hole depth in m
  • 26. Model No Hole depth (m) Production per blast (t) BMH2831 2.795 507.12 BMH2837 3.405 617.8 BMH 2843 4.015 728.5 BMH 2849 4.625 834.6
  • 27. LHD • Average lead dis of LHD (d) = 60 m • Average speed of LHD (v) = 6 KMPH • Bucket capacity = b • Bucket fill factor(F) = 0.8 • Loose coal density(D) = 0.9 • Amount of coal loaded per trip = b*F*D = 0.72b • Cycle Time of LHD = 1+1+1.5 = 3.5 min • Hourly no of trips = 17 • Hourly production of LHD = Hourly no of trips * 0.72b = 12.24 b
  • 28. For no. of LHD, No. of LHD = (Total production/no. of hrs per shift * no of shift * hourly production of LHD) = 728 / 3 *3*12.24b = 6.67/b
  • 29. Model No Bucket capacity (m3) No of LHD required CT243-5577 2.4 3 CT186-9278 2.8 3 CT243-6143 3.1 2 CT243-6224 3.4 2 CT157-3662 2.4 3 Eimco Elecon 811 1.52 5 Eimco Elecon 911 3 3
  • 30. Production of different chain conveyors Model No Capacity (tph) Peak Average Capacity in tpd Peak average MDCC PF-I-500 250 200 2250 1800 MDCC PF-Iv-500 300 220 2700 1980 MDCC MIV -500 350 250 3150 2250
  • 31. Production of belt conveyor Sandvik Belt speed(m/ s) Power required( KW) Belt width(mm ) Idler angle(deg ree) Capacity(t ph) Productio n (tpd) HC 500 1.25 3-7.5 800 25 100 900 HC 650 1.37 3-15 950 30 250 2250 HC 800 1.42 5.5-30 1150 30 400 3600 HC 1000 1.65 5.5-60 1350 30 700 6300 HC 1200 1.80 7.5-90 1600 30 1000 9000 HC 1400 1.25 15-90 1800 30 1300 11700 HC 1600 1.25 22-110 1900 30 1500 22500
  • 32. ENDLESS ROPE HAULAGE • Avg Speed of Endless haulage = 5KMPH • Amount of coal to be handled = a • Length of the roadway on which ERH operates = 800 m • Capacity of coal tub = 1 ton • No of tubs = 800 * Amount of coal to be handled per hour(a)/(Distance travelled by ERH per hour * capacity of coal tub)
  • 33. Amount of coal to be handled per hour No of tubs Loaded Empties 200 32 32 220 36 36 250 40 40
  • 34. DRH • Avg Speed of Direct rope haulage = 10KMPH • Amount of coal to be handled = a • Length of the roadway on which ERH operates = 500 m • Capacity of coal tub = 1 ton • No of tubs = 500 * Amount of coal to be handled per hour(a)/(Distance travelled by DRH per hour * Capacity of coal tub )
  • 35. Amount of coal to be handled per hour No of tubs 200 10 220 11 250 13
  • 36. Power Supply Distribution Equipment Load in KW MAIN VENTILATION FAN 75 Belt conveyor 180 Direct Haulage 90 Endless haulage 111 Load Haul Dumper 37 Roof bolting machine 75 Auxiliary fan 15 Face pump 7.5 Chain conveyor 2 x 45