This presentation was presented in Unicom World Business Summit Conference 2015. It talks about using Lean Startup method for situation where both the problem and solution is not clear. Team can using Lean Ux and Lean analytics techniques. We presented our experience about using Lean Startup and Lean Ux techniques in one of our product development. In this development we iteratively developed the product using the Lean startup method. We covered the experience of how Lean Ux methods like ethnographic studies, Wireframing, Landing pages can be used effectively to get feedback
Marel Q1 2024 Investor Presentation from May 8, 2024
Unknown terrain Use lean startup
1. Unknown Terrain-
Use Lean Startup
Prepared by :
Anish Cheriyan, Director, Huawei
& Ranjit Nath, Director, Huawei Drawing by Laurent Meurisse
2. Topics
• Typical Challenges of Large Organization
• Development method based on degree of uncertainty
• Background of the Business Problem
• Lean Startup in the context of the project
3. Typical Challenges of Big Organization
• One size fits all solution for the management
method
• Failure is a failure
• Delayed Validated Learning
4. One size fits all solution for the management
method
Picture Courtesy: wikimedia.org
Large Organization have ready made past proven life cycle following waterfall, scrum,
scrumban or related life cycle. Teams somehow forcefiet the project into such framework.
5. What happens if you fail
Failure is not considered good in most situations or may be in all situations.
Picture Courtesy: dietlogo.com
6. Delayed Validated Learning
In most cases the validated learning comes after we do the big bang development.
Concept Plan
Design
and
Develop
Testing Release
Beta
Test
Final
Release
Most
learning
happen here
2 week to 3 months duration
7. Method based on degree of uncertainty
Based on degree of uncertainty development method can be used.
8. Background of the Business Problem
• Embedded Development.
• Customer was not clear about the
problem.
• Not clear about what feature is
required.
9. “A Startup is a
human
institution
designed to
deliver a product
or service
under conditions
of extreme
uncertainty”
Eric Ries
10.
11. Our Approach
Concept Plan …
Problem
Validation
Solution
Validation
Scale
We used the Lean Startup framework to validate the problem and the solution and for
scaling we used the product development life cyde
12. Key Practices used
We used the Lean Startup framework to validate the problem and the solution and for
scaling we used the product development life cycle.
Problem
Validation
Solution
Validation
Scale
We are here
Build
Measure
Learn
13. Key Practices used
. Lean Canvas
. Interview, . Survey
. Presentation
. Go out of the
building
. Wireframing
. Wireframing
. Working Prototype
. Iterative
Development
. Customer Demo
. One Metric that
matters
. Scrum Life Cycle
. Continuous Delivery
. All related practices
Lean Canvas, Wireframing and iterative development practices were extensively used.
14. Key Results
• We have been able to finalize around 15 key features
of the product using Lean Startup.
• Right now realization is in progress.
• We are 100% confident about the success of these
features as customer has seen the working feature.
15. My Personal Learning
• For every work which I do, I use the problem and
solution validation approach and use the Build
measure and learn cycle .