SlideShare a Scribd company logo
1 of 17
Download to read offline
Design for Operations
Space Shuttle vs. Sea Launch

         Bo Bejmuk
Shuttle                            Sea Launch




                                                           Courtesy of the Sea Launch Company
Space Shuttle designed for ascent
performance, multi functionality    Zenit Rocket designed to strict
and minimum development cost        operational requirements

Result:                             Result:

Costly ground operations            Automation and robust design
Costly mission planning             Simple and cost effective operations
Costly flight operations            Great benefit to cost of ownership 2
Space Shuttle – Magnificent flying system
    but difficult and costly to operate




                                            3
Initial Naive Concept of Ground Operations




                                             4
Operational Reality




         NASA, KSC Photo, dated September 25, 1979, index number “KSC-79PC-500”   5
Lack of Robustness and Design Margins
  Complicated flight Planning and Increased Cost
Problem
• The launch probability predictions for early Shuttle flights was less than
  50%
   – More than half of the measured winds aloft violated the vehicle’s certified
     boundaries
Corrective Actions
• System Integration led the evolution from a single ascent I-load, through
  seasonal I-loads, alternate I-loads, and finally arriving at DOLILU
• This process extended over a 10+ year period
• Concurrently the Program executed 3 load cycles (Integrated Vehicle
  Baseline Characterization - IVBC) combined with hardware modifications
  to expand vehicle certified envelopes
• Current launch probability is well in excess of 95%
Lesson
• Commit to a DOLILU approach during early development
   – Significantly improves margins
• Use additional margins on not well understood environments
                                                                                   6
• Will enhance robustness and simplify operations
Ascent Design Operations Evolution
                                          100                                                                                     High
                                                                       Lesson Learned:   Reliance on Operations Process
Percent of Winds Violating Certification (%)



                                                                                         to Maintain Margin is Expensive




                                                                                                                                         Operations Overhead
                                                                                                Ascent Operations
                                                                                                Overhead
                                               50                                                                                 Med




                                                                                            Certification Violations

                                               0                                                                                  Low

                                                   1975                  1985                      1995                    2005
                                                            Seasonal              Alternate
                                               Annual                   Monthly           Day-of-Launch                            7
Day-of-Launch I-Loads Evolution
                          (10 years +)
             Early Flights                                       Present Flights
            Single I-Loads                                          DOLILU
                    Qa        Over 50% of winds                                  Qa
                              violated certified
                              envelope

                                   Qb                                                                     Qb




                                           Expanded Certified
                                               Envelope


                                                   3-Hour Wind
                                                   Variation


Certified                Annual Wind
Envelope                  Variation                              DOLILU drives toward center of Qa – Qb
                                                                 envelope and reduces winds violation to < 5%

                                                                                                      8
Where did We go Wrong?
Problem
• Insufficient definition of operational requirements during
  development phase
   – Concentration on performance requirements but not on operational
     considerations
   – Shuttle design organizations were not responsible for operational cost
   – Very few incentives for development contractors
Result
• Very labor intensive (high operational cost) vehicle was developed
  and put into operations
Lesson
• Must have the Concept of Operations defined
• Define and levy the operational requirements on contractors to
  support the Concept of Operations
• Must have continuity and integration between designers, ground
  operations, and flight operations requirements during the
  developmental phase                                                   9
Sea Launch Zenit Rocket Very Efficient and
Easy to Operate                  Courtesy of the Sea Launch Company




                                                         10
Launch Platform




                  Courtesy of the Sea Launch Company   11
Assembly and Command Ship




                        Courtesy of the Sea Launch Company
                                                  12
Launch




                                              13



         Courtesy of the Sea Launch Company
Sea Launch – Zenit Derived Launch System
                                     • Major integration of existing and new
                                       elements
                                        – Two stage Ukrainian Zenit
                                        – 3rd stage Russian Block DM
                                        – New payload accommodation &
                                          composite fairing
                                        – Modified semi-submersible oil drilling
                                          platform into a launch pad
                                        – New command and control and rocket
                                          assembly ship
Courtesy of the Sea Launch Company   • System was built and brought to
                                       operational state in less than 3.5 years
                                        – 24 flights to date

                                                                               14
Sea Launch Operations
                                          • Integration of rocket stages
                                            and payload at home port in
                                            Long Beach, CA
                                          • Launches performed from the
                                            Equator, 154 degrees west
                                            (south of Hawaii)
Courtesy of the Sea Launch Company

                       Small Team performs ground checkout and launch
                                      Ground Processing            Launch
                                            Team                   Team*
                     Americans                 80                    40
                     Russians                  200                   140
                     Ukrainians                50                    50
                     Norwegians                75                    70
                     Totals                    405                   300

          * Launch Team is a subset of the Ground Processing Team; Ground
          Processing team members that are not required to participate in launch at
                                                                                      15
          sea are sent back to their companies and are off the Sea Launch payroll
Lessons Learned from Sea Launch

• Zenit extremely automated launch vehicle
   – Very little interaction with crew during checkout, pre-launch, and
     flight
• Single string accountability, no duplications of effort (to
  some extent driven by export compliance restrictions)
• Low operational cost benefited from original design criteria
  of Zenit
   – Rollout to pad, fuel and launch in 90 minutes
   – Allows very little time for ground or flight crew involvement
   – Imposes requirements for automatic processes




                                                                     16
The Big Lesson

• If we want simple and cost effective
  operations we must design for operations
  – Shuttle designed for performance and minimum
    development cost
  – Sea Launch Zenit Rocket designed to strict
    operational requirements
• NASA is in control of operations destiny of
  new programs
  – Narrow window of opportunity




                                                   17

More Related Content

What's hot

Robert.bayt
Robert.baytRobert.bayt
Robert.bayt
NASAPMC
 
Short agilefordba
Short agilefordbaShort agilefordba
Short agilefordba
Shane Hayes
 

What's hot (11)

Robert.bayt
Robert.baytRobert.bayt
Robert.bayt
 
Supply Chain Vendor Management Success Storyborad
Supply Chain Vendor Management Success  StoryboradSupply Chain Vendor Management Success  Storyborad
Supply Chain Vendor Management Success Storyborad
 
Short agilefordba
Short agilefordbaShort agilefordba
Short agilefordba
 
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x  With a Proven FrameworkSuccessfully Migrate Cisco Call Manager 4x To 7x  With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Framework
 
MSC GPS TAPS Part 2 career counselor crash courses part 2
MSC GPS TAPS Part 2 career counselor crash courses part 2MSC GPS TAPS Part 2 career counselor crash courses part 2
MSC GPS TAPS Part 2 career counselor crash courses part 2
 
Performing Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin ForgePerforming Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin Forge
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)
 
Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)
 
Subversion Edge Overview
Subversion Edge OverviewSubversion Edge Overview
Subversion Edge Overview
 
Scaling product ownership product camp atlanta 2011
Scaling product ownership   product camp atlanta 2011Scaling product ownership   product camp atlanta 2011
Scaling product ownership product camp atlanta 2011
 
27ian2011 hp
27ian2011   hp27ian2011   hp
27ian2011 hp
 

Similar to Bejmuk bo

Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
Aras
 
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Amazon Web Services
 
Coates Product Brochure
Coates Product BrochureCoates Product Brochure
Coates Product Brochure
mckenzs
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Charlie Reith
 
8 jude correa-moderncontainership
8 jude correa-moderncontainership8 jude correa-moderncontainership
8 jude correa-moderncontainership
makarone
 
Flight Controls - Chapter 5
Flight Controls - Chapter 5Flight Controls - Chapter 5
Flight Controls - Chapter 5
junio_oliveira
 

Similar to Bejmuk bo (20)

Internship Portfolio
Internship PortfolioInternship Portfolio
Internship Portfolio
 
Jet Select Aviation
Jet Select AviationJet Select Aviation
Jet Select Aviation
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
 
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
Airbus military engineering update 2012
Airbus military engineering update 2012Airbus military engineering update 2012
Airbus military engineering update 2012
 
Coates Product Brochure
Coates Product BrochureCoates Product Brochure
Coates Product Brochure
 
Informa Airport Operations Brochure
Informa Airport Operations BrochureInforma Airport Operations Brochure
Informa Airport Operations Brochure
 
Innovation in Action Conference - Clean Sky with focus on engines, presented...
Innovation in Action Conference  - Clean Sky with focus on engines, presented...Innovation in Action Conference  - Clean Sky with focus on engines, presented...
Innovation in Action Conference - Clean Sky with focus on engines, presented...
 
Scrum and Lean - Om Band
Scrum and Lean - Om BandScrum and Lean - Om Band
Scrum and Lean - Om Band
 
DoDAF Integration Architecture
DoDAF Integration ArchitectureDoDAF Integration Architecture
DoDAF Integration Architecture
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
8 jude correa-moderncontainership
8 jude correa-moderncontainership8 jude correa-moderncontainership
8 jude correa-moderncontainership
 
Automate your way to agility
Automate your way to agilityAutomate your way to agility
Automate your way to agility
 
Flight Controls - Chapter 5
Flight Controls - Chapter 5Flight Controls - Chapter 5
Flight Controls - Chapter 5
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
The Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designThe Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities design
 
Win Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLsWin Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLs
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Recently uploaded (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 

Bejmuk bo

  • 1. Design for Operations Space Shuttle vs. Sea Launch Bo Bejmuk
  • 2. Shuttle Sea Launch Courtesy of the Sea Launch Company Space Shuttle designed for ascent performance, multi functionality Zenit Rocket designed to strict and minimum development cost operational requirements Result: Result: Costly ground operations Automation and robust design Costly mission planning Simple and cost effective operations Costly flight operations Great benefit to cost of ownership 2
  • 3. Space Shuttle – Magnificent flying system but difficult and costly to operate 3
  • 4. Initial Naive Concept of Ground Operations 4
  • 5. Operational Reality NASA, KSC Photo, dated September 25, 1979, index number “KSC-79PC-500” 5
  • 6. Lack of Robustness and Design Margins Complicated flight Planning and Increased Cost Problem • The launch probability predictions for early Shuttle flights was less than 50% – More than half of the measured winds aloft violated the vehicle’s certified boundaries Corrective Actions • System Integration led the evolution from a single ascent I-load, through seasonal I-loads, alternate I-loads, and finally arriving at DOLILU • This process extended over a 10+ year period • Concurrently the Program executed 3 load cycles (Integrated Vehicle Baseline Characterization - IVBC) combined with hardware modifications to expand vehicle certified envelopes • Current launch probability is well in excess of 95% Lesson • Commit to a DOLILU approach during early development – Significantly improves margins • Use additional margins on not well understood environments 6 • Will enhance robustness and simplify operations
  • 7. Ascent Design Operations Evolution 100 High Lesson Learned: Reliance on Operations Process Percent of Winds Violating Certification (%) to Maintain Margin is Expensive Operations Overhead Ascent Operations Overhead 50 Med Certification Violations 0 Low 1975 1985 1995 2005 Seasonal Alternate Annual Monthly Day-of-Launch 7
  • 8. Day-of-Launch I-Loads Evolution (10 years +) Early Flights Present Flights Single I-Loads DOLILU Qa Over 50% of winds Qa violated certified envelope Qb Qb Expanded Certified Envelope 3-Hour Wind Variation Certified Annual Wind Envelope Variation DOLILU drives toward center of Qa – Qb envelope and reduces winds violation to < 5% 8
  • 9. Where did We go Wrong? Problem • Insufficient definition of operational requirements during development phase – Concentration on performance requirements but not on operational considerations – Shuttle design organizations were not responsible for operational cost – Very few incentives for development contractors Result • Very labor intensive (high operational cost) vehicle was developed and put into operations Lesson • Must have the Concept of Operations defined • Define and levy the operational requirements on contractors to support the Concept of Operations • Must have continuity and integration between designers, ground operations, and flight operations requirements during the developmental phase 9
  • 10. Sea Launch Zenit Rocket Very Efficient and Easy to Operate Courtesy of the Sea Launch Company 10
  • 11. Launch Platform Courtesy of the Sea Launch Company 11
  • 12. Assembly and Command Ship Courtesy of the Sea Launch Company 12
  • 13. Launch 13 Courtesy of the Sea Launch Company
  • 14. Sea Launch – Zenit Derived Launch System • Major integration of existing and new elements – Two stage Ukrainian Zenit – 3rd stage Russian Block DM – New payload accommodation & composite fairing – Modified semi-submersible oil drilling platform into a launch pad – New command and control and rocket assembly ship Courtesy of the Sea Launch Company • System was built and brought to operational state in less than 3.5 years – 24 flights to date 14
  • 15. Sea Launch Operations • Integration of rocket stages and payload at home port in Long Beach, CA • Launches performed from the Equator, 154 degrees west (south of Hawaii) Courtesy of the Sea Launch Company Small Team performs ground checkout and launch Ground Processing Launch Team Team* Americans 80 40 Russians 200 140 Ukrainians 50 50 Norwegians 75 70 Totals 405 300 * Launch Team is a subset of the Ground Processing Team; Ground Processing team members that are not required to participate in launch at 15 sea are sent back to their companies and are off the Sea Launch payroll
  • 16. Lessons Learned from Sea Launch • Zenit extremely automated launch vehicle – Very little interaction with crew during checkout, pre-launch, and flight • Single string accountability, no duplications of effort (to some extent driven by export compliance restrictions) • Low operational cost benefited from original design criteria of Zenit – Rollout to pad, fuel and launch in 90 minutes – Allows very little time for ground or flight crew involvement – Imposes requirements for automatic processes 16
  • 17. The Big Lesson • If we want simple and cost effective operations we must design for operations – Shuttle designed for performance and minimum development cost – Sea Launch Zenit Rocket designed to strict operational requirements • NASA is in control of operations destiny of new programs – Narrow window of opportunity 17