SlideShare a Scribd company logo
1 of 48
Download to read offline
Insitu’s PLM Journey (so far)

    When Life Hands You Lemons,
      Make Flavored Lemonade


      Insitu, Inc. (a Boeing Company)
                        ACE 2012
                   May 1-3, 2012



           | Insitu is a Boeing Company. | All rights reserved. |
                                                                    1
Company Overview




   | Insitu is a Boeing Company. | All rights reserved. |   2
Insitu Snapshot

 Leading provider of Small Long-Endurance
  Unmanned Aircraft Systems (UAS) and Services
     • Developer of ScanEagle System
     • Over 590,000 Combat Flight Hours
 Major Customers:
     • U.S. Marine Corps
     • U.S. Navy
     • U.S. Army
     • Special Operations Forces (SOF)
     • Australian Defense Force
     • Canadian Defense Forces
     • USAF, DoD Customers

 Strong Track Record of Historical Growth

 800+ Highly Qualified Employees

 Proprietary IP and technology partnerships

 Location: Columbia Gorge (near Portland, OR)


                                   | Insitu is a Boeing Company. | All rights reserved. |   3
Products & Services

Product Lines
Unmanned Aircraft     Launchers                                      Retrievers    Ground Control Station




           Services
           Training                                    Deployment Operations




                          | Insitu is a Boeing Company. | All rights reserved. |                            4
Hub & Spoke



                                                                                   MOBILE FGCS
                                                                                   SPOKE (Land)
                                                                                   -Empower embedded
                                                                                   operators with full
HUB                                                                                command and
                                                                                   control of Insitu
-Launch, control and                                                               aircraft directly from
retrieve unmanned                                                                  the front lines.
aircraft without
requiring a runway
for launch or
retrieval, land or sea.
                                                                                   MAN-PACKABLE
                                                                                   FORWARD EYES
                                                                                   -Keep troops and
                                                                                   decision makers in-
SPOKE                                                                              formed by feeding
                                                                                   Insitu UAS video to
-Take control of an
                                                                                   networked Forward
aircraft from a hub.
                                                                                   Eyes remote video
When the mission
                                                                                   terminals.
ends, it passes
control back to the
hub for retrieval and
maintenance.
                                                                                   MOBILE FGCS
                                                                                   SPOKE (Sea)
                                                                                   -Provide overwatch
                                                                                   to Vessel Boarding
                                                                                   Search and Seizure
                                                                                   (VBSS) teams.




                          | Insitu is a Boeing Company. | All rights reserved. |                            5
ScanEagle

              QUICK SPECS
  GTOW                          44.0 lbs
  Fuel + Payload                12.4 lbs
  Max level speed                 82 kts
  Cruise speed                    55 kts
  Ceiling                       20,000 ft
                                                                                                   4.5 f , 1.37 m
  Endurance                   24+ hours
  Total Operational Hours      590,000+            10.2 f
  Shipboard Sorties               2,800+           3.11 m

• 90% solution / 3% cost
• Heavy Fuel Option, JP-5, JP-8 or Jet-A
• Mode 3C Transponder
• Automated Launch / Retrieval
• Fully Autonomous
• Small physical and personnel footprint                                                     7.0 in , .17 m
• Wide weather envelope


                                    | Insitu is a Boeing Company. | All rights reserved. |                          6
NightEagle

                 QUICK SPECS
                                          o
Optical Zoom Steps         2.5o (4x) - 10 (1x) FOV
Added Digital Zoom Steps                        1x - 4x
Full Range of Zoom Steps                       1x -16x
(Optical & Digital)
Articulation                     +75 to -45 (120º)




                                 | Insitu is a Boeing Company. | All rights reserved. |   7
Integrator

                                                                         QUICK SPECS
                                                          Cruise Speed                     55 knots
                                                          Dash Speed                      80+ knots
                                                          Service Ceiling          >15,000 ft / 4572M
2.2 m                                                     Empty Weight               75 lbs / 34.0kg
 7.2f                                                     Max Takeoff Weight        135 lbs / 61.2 kg
                                                          Payload       25 lbs/11kg & 250W / 15hrs
                                                                        37.5 lbs/17kg max. payload
                                          4.8 m                          350W max. payload power
                                          16.0f

                                                           •     System interoperability with
                                                                 ScanEagle

                                                           •     Drastic payload envelope increase
                                                                 over ScanEagle

                                                           •     iPhoneTM like integration platform



        | Insitu is a Boeing Company. | All rights reserved. |                                          8
Launcher / Skyhook




  | Insitu is a Boeing Company. | All rights reserved. |   9
ScanEagle Operator Workstation

      Aircraft Health            Aircraft Operation                                     Camera
• Telemetry Data            • Topographical map view                                • Imagery
• Digital Checklists and    • Drag and Drop navigation                              • Operation
  Emergency Procedures      • Waypoint set up                                       • Manipulation




         Single Person Aircraft Operation / Video Manipulation

                           | Insitu is a Boeing Company. | All rights reserved. |                    10
Insitu Services Overview

Field Service Reps and   Training                                                      Demo Team
Ops Support




   Custom Engineering       Flight Demonstrations                                  Ship Installations




                              | Insitu is a Boeing Company. | All rights reserved. |                    11
Basic Maritime Installation

 32+ Completed Ship Installations
 2,800+ Sorties
 24/7 Ops
 Surveillance range over 100 – 200 km
 Offers complete integration
 Installation does not ‘foul’ or
  interfere with flight deck operations




                                    | Insitu is a Boeing Company. | All rights reserved. |   12
Aircraft Modularity


Modularity allows flexibility for operations and maintenance

        Winglet
                                                                           Tail

              Wing        Fuselage



                                                                       Engine Cowl   Winglet
   Forward
   Payload                                                                 Wing
   Bay


                                                         C. G. Payload
             Avionics Bay                                Bay



                  | Insitu is a Boeing Company. | All rights reserved. |                       13
NightEagle


                                                 • 1100’ AGL
                                                 • 3500’ Slant Range




• FOV: 25° - 2°
• Continuous Zoom
• Roll over tilt + forward look
• Same Modes as current
  production models
      •   Direct, Stabilized, Hold


                                     | Insitu is a Boeing Company. | All rights reserved. |   14
The Way We Were




   | Insitu is a Boeing Company. | All rights reserved. |   15
Why PLM?

 Examples of Insitu-produced controlled documents:
   • Specifications, drawings, technical data packages
   • Product release files and change records
   • Policies, processes and procedures
   • Training manuals, maintenance manuals and schedules

 Multiple disconnected product data libraries:
   • PDMWorks (MCAD models, drawings, some part/document state
     information)
   • Shared drives (specifications, drawings, ECAD, change records, ...)
   • ERP system (product information to the “Buy” level only, no
     design-level data, no documents)




                        | Insitu is a Boeing Company. | All rights reserved. |   16
Why PLM? (cont)

 Major issues:
   • Manual change process, revisioning and status accounting – very
     labor intensive
   • Manual syncing of part property information amongst systems –
     usually one system was never correct
   • Disconnected data – no way to perform an impact analysis
   • Data access – most Engineers did not have an ERP account, most
     Manufacturing personnel did not have a PDMWorks account

 Rapid company growth and addition of new products required a
 more sophisticated documentation library and process




                       | Insitu is a Boeing Company. | All rights reserved. |   17
Goals

 Create efficiency in the storing and retrieval of Insitu product
  documents
 Provide a central definition of product configurations and a repository
  for their associated documents
 Alleviate rework and disorder with regard to document storage and
  version control
 Consolidate numerous legacy systems into a common system
 Ensure the speedy retrieval of the current document version
 Improve availability of product data across the extended enterprise
 Provide the ability to link data and documents, which will make
  possible and/or improve the retrieval of relevant data
 Allow Insitu employees and suitable vendors to access current and
  appropriate documents or sets of documents in an efficient manner



                          | Insitu is a Boeing Company. | All rights reserved. |   18
Strategy

 PDM will be the first step in Insitu’s PLM solution

 Dedicate a team to the
 project                                                        PDM
 Evaluate Insitu’s PLM
 needs and select a
 supplier/partner to meet
 those needs

 Recognize that processes,
 and therefore                                                                         MRO

 requirements, will change
 as we implement
                                                                                 PLM
                        | Insitu is a Boeing Company. | All rights reserved. |               19
Requirements Gathering and
    Solution Selection
           Jun – Dec 2009




        | Insitu is a Boeing Company. | All rights reserved. |   20
PDM Map Day

 Gathered Requirements, Enhancements, Business Rules, Risks




                     | Insitu is a Boeing Company. | All rights reserved. |   21
Vendor Demos

 PDM Team formalized requirements (Correlated to Map Day)
 Weighted requirements
 Evaluated demos – seven systems




                     | Insitu is a Boeing Company. | All rights reserved. |   22
Results

 Chose vendor short list – three systems,
  one of which was Aras Innovator
 Released a Request for Proposal to PDM vendors on short list
 Requested customized vendor demos using Insitu use cases and data
  sets
 Completed final weighted requirements matrix and determined scores
 First choice was Aras Innovator due to its capabilities and flexibility
 Executive leadership was not comfortable with “open source software”
  concept
 Parent company was recommending one of the Big-Box systems
 Went with second choice, one of the Big-Box systems



                          | Insitu is a Boeing Company. | All rights reserved. |   23
Big-Box Implementation




      | Insitu is a Boeing Company. | All rights reserved. |   24
Big-Box Implementation

 Jan 2010: Engaged vendor team of solution experts
 Three months and three complete revisions to
  produce an acceptable SOW
 Trained Insitu PDM Team
 Vendor PM #1 lost to personal constraints;|
  spin up new PM
 Vendor PM #2 relieved due to lack of progress
 Engaged third-party consulting team of process
  experts; spin up new team
 Three more months and little progress due to
  immature and changing processes

 By Nov 2010, we were almost ONE YEAR behind schedule and severely
  OVER BUDGET!
                         | Insitu is a Boeing Company. | All rights reserved. |   25
Reset, Please




 Aras was becoming more widely accepted in industry and we better
  understood their subscription service
 PDM Team met with Executive leadership and requested a re-eval
 Permission granted
 Conducted Aras Discovery Workshop which resulted in a SOW
  documenting the phasing, steps, project plan and cost
 Aras Innovator was the clear choice
 Feb 2011: Presented findings to Executive leadership; decision was
  unanimous to change course and proceed with Aras Innovator
                         | Insitu is a Boeing Company. | All rights reserved. |   26
Be Different




| Insitu is a Boeing Company. | All rights reserved. |   27
Root Cause

 Root cause of our big-box implementation issues was that we
 were trying to implement a solution which requires well-defined
 and stable processes
 Aras Innovator was the perfect solution because it allows us to
 quickly and easily change the solution as our processes mature
 and change
 Aras Innovator also allows us to approach our PDM
 implementation using Agile Software Development
 methodologies:
   • Attack one feature/process at a time and roll it out
   • Plan at a high-level, but gather detailed requirements only for the
     feature at hand – everything else is likely to change
   • Real-world use is the only way to determine the real requirements;
     everything prior to that is just guessing
   • Use visual and behavioral prototypes to flush out requirements
                         | Insitu is a Boeing Company. | All rights reserved. |   28
Feature List Sequence Diagram

Level 1
 Part            Level 2
Master                                                                          Level 3
             EBOM Master
                X200
                                                      Release for
                                                       Purchase
                                                    MBOM Master
                                                       X200                                    CAD
                                                                                              Master
              EBOM Master
                                                                                          NPI / Release for
                 X300
                                                                                            Production
                                                    MBOM Master
                                                       X300

             FPS Document
                 Mgmt

             DSS Document
                 Mgmt
                                                                                                         Visualization
               FAIR Record
                  Mgmt
                                                                                                  Complete
             Work Instruction                                                                     Solution
             Document Mgmt




                       | Insitu is a Boeing Company. | All rights reserved. |                                            29
PDM Project
       Phase I




| Insitu is a Boeing Company. | All rights reserved. |   30
Phase I Scope

Level 1
 Part         Level 2
Master                                                                       Level 3
          EBOM Master
             X200
                                                   Release for
                                                    Purchase
                                                 MBOM Master
                                                    X200                                    CAD
                                                                                           Master
           EBOM Master
                                                                                       NPI / Release for
              X300
                                                                                         Production
                                                 MBOM Master
                                                    X300

          FPS Document
              Mgmt

          DSS Document
              Mgmt
                                                                                                      Visualization
            FAIR Record
               Mgmt
                                                                                               Complete
          Work Instruction                                                                     Solution
          Document Mgmt




                    | Insitu is a Boeing Company. | All rights reserved. |                                            31
Where We Were



 Change in Design (CID) process issues
   ● Paper form – very manual, disconnected data
   ● Slow and cumbersome
   ● Large design change packages = bottlenecks
   ● Difficult to perform impact analysis
   ● Manual checks
   ● Lack of visibility of change status



       Yuck!

                            | Insitu is a Boeing Company. | All rights reserved. |   32
The Goal & The Challenge

 The Goal
   ● Speed up the release process, and
   ● Provide for formal change control earlier in the
     design process


 The Challenge
   ● Implement the following in Aras Innovator
     in 60 days:
       ○ Part Master
       ○ Engineering Bill of Materials (EBOM)
       ○ Problem Reporting (PR)
       ○ Engineering Change Request (ECR)
       ○ Engineering Change Notice (ECN)


                            | Insitu is a Boeing Company. | All rights reserved. |   33
Develop the Process

 Develop the Process:
   ● Process development led by CMII-trained personnel
   ● Assembled a multi-disciplined team, with representatives from each
     affected department
   ● Used CMII as the process model and made tweaks from there
       ○ Identified the deltas:
           ▪ CID Process vs. CMII Process
           ▪ CID Form vs. PR/ECR/ECN Forms

   ● Defined requirements
   ● Got buy-in!




                              | Insitu is a Boeing Company. | All rights reserved. |   34
Implement the Solution

 PDM Core Team comprised of Aras Innovator-trained personnel and
 an Aras consultant
 Learned the OOTB functionality of the Product
 Engineering solution, which implements the CMII
 change process
 Trained the primary users (CM) on OOTB functionality
 Worked in parallel with process development – required tight
 collaboration with the process team
 Configured/customized as necessary – 140 item changes
 Migrated the data – 13,000 parts cleansed, formatted, migrated and
 validated
 UAT, UAT and more UAT
                         | Insitu is a Boeing Company. | All rights reserved. |   35
Problem Report (PR) Workflow

                                                                                   Legend:   PR state
                                                                                             Responsible Party
                                                                                             Activity




            Submitted      In Verification                           Verified         Pending
Requestor      CSI        Assigned Creator                             CSI               CM
Create PR   Review PR         Verify PR                            Approve PR         Close PR       Closed


  Start

                 Reject                    Not Verified




            Rejected            Unverified




                          | Insitu is a Boeing Company. | All rights reserved. |                                 36
Engineering Change Request (ECR)
                                 Workflow
                                                                                                 Legend:      ECR state
                                                                                                              Responsible Party
                                                                                                              Activity


                                                             Investigate further

           New        Submitted    In Tech Review                   In Review                    In CRB
         Requestor       CSI      Assigned Creator                     CSI                     FT Approver
        Submit ECR   Review ECR   Technical Review                  Route ECR                Disposition ECR             Approved

                                                                                    Fast Track             Approve
Start
                                                                              CRB
                                                    In Review
   Submitted                                           CSI
   Requestor                                       Prepare CRB
                      Resubmit
     Review
  Rejected ECR
                     Cancel                                                                                Disapprove

                                                                Investigate further             In CRB                  Disapproved
                                                                                                  CSI
                                                                                              CRB Meeting
               Cancelled


                                    | Insitu is a Boeing Company. | All rights reserved. |                                            37
Engineering Change Notice (ECN)
                                Workflow
                                                                                             Legend:   ECN state
                                                                                                       Responsible Party
                                                                                                       Activity




           New        In Planning           In Work                            In Review        In Review
           CM             CSII          Assigned Creator                          CSII             CSIII
        Submit ECN   ECN Planning         Update Docs                         Review Docs       ECN Audit    Released


Start
                                                                   Reject




                                                   Aras Innovator promotes New items to Released state

                                                   Aras Innovator promotes Old items to Superseded state




                                    | Insitu is a Boeing Company. | All rights reserved. |                                 38
Train and Roll Out

 Developed training materials
   ● Part I – General tool usage
       ○ Logging on, general navigation, searching, features, logging off
   ● Part II – Process
       ○ Parts, EBOMs, PR, ECR and ECN

 Hands-on training with user exercises
 160 users trained


 Rollout was a success and scarily quiet!
 Continue to release updates as necessary
   ● First update occurred two weeks after rollout
   ● Second update was four weeks after that

                             | Insitu is a Boeing Company. | All rights reserved. |   39
Achievements

 Early release of long-lead items
 Release from the bottom up vs. all at once
 Where-used visibility and ability to perform
 impact analysis
 Fast-track release vs. a required meeting
 Formal release and control of the design at point
 of purchase vs. at release for production
 Searchable and linked information
 Ability to easily build upon the base system put in
 place


                          | Insitu is a Boeing Company. | All rights reserved. |   40
Metrics – The Proof!

      Avg # Days/Part from Submittal to Approval
4


3
                                                                                              Fast Track vs. CRB

2


1                                                                                          CRB                Fast
                                                                                           40%               Track
0
              CID                            ECR
                                                                                                             60%


    Avg # Approvals & Releases per Week
7
                                                                                        CMII Standard: 75-85% of changes
6
                                                                                        should be Fast Track (FT)
5

4
                                                             CID
3
                                                             ECR/ECN
2

1

0
         Approvals           Releases
                               | Insitu is a Boeing Company. | All rights reserved. |                                      41
Key Elements of Success

 Executive support from the top
 Project sponsor
   ● Set schedule and committed to it
   ● Provided business resources
 Project team
   ● Business reps: CMII certified, committed to the project, willing to adopt
     the solution mainly out-of-the-box
   ● Solution reps: Trained in Aras Innovator, knowledgeable on Engineering
     and CM processes (some CMII certified), Aras developer
   ● Daily morning meetings
 Formal training provided to the user base, both on the new process
 and the new platform
 Aras Innovator is easily configurable, easily customizable, and very
 intuitive
                           | Insitu is a Boeing Company. | All rights reserved. |   42
The Goal & The Challenge

 Did we reach The Goal?
   ● Speed up the release process
         Yes! Less time in corrective action = faster release

   ● Provide for formal change control earlier in the
     design process
          Yes! Release at point of purchase, not production
         introduction


 Did we meet The Challenge?
   ● Implement in 60 days
         Yes! 4/11/11 - 6/6/11 = 56 days
          (including data cleansing, formatting, migration and validation)




                             | Insitu is a Boeing Company. | All rights reserved. |   43
To Infinity and Beyond!




      | Insitu is a Boeing Company. | All rights reserved. |   44
Accomplishments




| Insitu is a Boeing Company. | All rights reserved. |   45
Current Activity – Phase II




    | Insitu is a Boeing Company. | All rights reserved. |   46
Future Phases




| Insitu is a Boeing Company. | All rights reserved. |   47
| Insitu is a Boeing Company. | All rights reserved. |   48

More Related Content

What's hot

The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...
The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...
The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...DroneSec
 
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER Harshal Tiwari
 
Introduction to Drones
Introduction to DronesIntroduction to Drones
Introduction to DronesCarl Fugate
 
10 fighter aircraft avionics - part iii
10 fighter aircraft avionics - part iii10 fighter aircraft avionics - part iii
10 fighter aircraft avionics - part iiiSolo Hermelin
 
Drone-Unmanned Aerial Vehicle
Drone-Unmanned Aerial VehicleDrone-Unmanned Aerial Vehicle
Drone-Unmanned Aerial Vehicleshivu1234
 
data communication using unmanned aerial vehicle
data communication using unmanned aerial vehicledata communication using unmanned aerial vehicle
data communication using unmanned aerial vehicleSreejesh TR
 
Secondary Surveillance Radar, Mode-S and ADS-B
Secondary Surveillance Radar, Mode-S and ADS-BSecondary Surveillance Radar, Mode-S and ADS-B
Secondary Surveillance Radar, Mode-S and ADS-BAjay Kumar Singh
 
F-35, Stealth and Designing a 21st Century Fighter from the Ground Up
F-35, Stealth and Designing a 21st Century Fighter from the Ground UpF-35, Stealth and Designing a 21st Century Fighter from the Ground Up
F-35, Stealth and Designing a 21st Century Fighter from the Ground UpICSA, LLC
 
Secret History of Silicon Valley - Master Slide Deck
Secret History of Silicon Valley - Master Slide DeckSecret History of Silicon Valley - Master Slide Deck
Secret History of Silicon Valley - Master Slide DeckStanford University
 
Application of Drones for Mining Ooperations
Application of Drones for Mining OoperationsApplication of Drones for Mining Ooperations
Application of Drones for Mining OoperationsDr. Alex Vyazmensky
 
Stealth technology(supreeth)
Stealth technology(supreeth)Stealth technology(supreeth)
Stealth technology(supreeth)supreethmysore
 

What's hot (20)

The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...
The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...
The State of Drone Security – Analysing 1000+ drone incidents (Mike Monnik) -...
 
6 Drone
6   Drone6   Drone
6 Drone
 
F 35 Production
F 35 ProductionF 35 Production
F 35 Production
 
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER
Industrial report on HINDUSTAN AERONAUTICS LIMITED KANPUR PRODUCT -DORNIER
 
Introduction to Drones
Introduction to DronesIntroduction to Drones
Introduction to Drones
 
Principles of seismic data processing m.m.badawy
Principles of seismic data processing m.m.badawyPrinciples of seismic data processing m.m.badawy
Principles of seismic data processing m.m.badawy
 
Shearwaves2
Shearwaves2Shearwaves2
Shearwaves2
 
Unmanned aerial vehicle
Unmanned aerial vehicleUnmanned aerial vehicle
Unmanned aerial vehicle
 
Airborne radar
Airborne  radarAirborne  radar
Airborne radar
 
Instrument Landing System (ILS)
Instrument Landing System (ILS)Instrument Landing System (ILS)
Instrument Landing System (ILS)
 
Stealth technology
Stealth technologyStealth technology
Stealth technology
 
10 fighter aircraft avionics - part iii
10 fighter aircraft avionics - part iii10 fighter aircraft avionics - part iii
10 fighter aircraft avionics - part iii
 
Drone-Unmanned Aerial Vehicle
Drone-Unmanned Aerial VehicleDrone-Unmanned Aerial Vehicle
Drone-Unmanned Aerial Vehicle
 
data communication using unmanned aerial vehicle
data communication using unmanned aerial vehicledata communication using unmanned aerial vehicle
data communication using unmanned aerial vehicle
 
Making of Drone
Making of  DroneMaking of  Drone
Making of Drone
 
Secondary Surveillance Radar, Mode-S and ADS-B
Secondary Surveillance Radar, Mode-S and ADS-BSecondary Surveillance Radar, Mode-S and ADS-B
Secondary Surveillance Radar, Mode-S and ADS-B
 
F-35, Stealth and Designing a 21st Century Fighter from the Ground Up
F-35, Stealth and Designing a 21st Century Fighter from the Ground UpF-35, Stealth and Designing a 21st Century Fighter from the Ground Up
F-35, Stealth and Designing a 21st Century Fighter from the Ground Up
 
Secret History of Silicon Valley - Master Slide Deck
Secret History of Silicon Valley - Master Slide DeckSecret History of Silicon Valley - Master Slide Deck
Secret History of Silicon Valley - Master Slide Deck
 
Application of Drones for Mining Ooperations
Application of Drones for Mining OoperationsApplication of Drones for Mining Ooperations
Application of Drones for Mining Ooperations
 
Stealth technology(supreeth)
Stealth technology(supreeth)Stealth technology(supreeth)
Stealth technology(supreeth)
 

Viewers also liked

Webinar #8 Datamodel And Flexibility For Plm
Webinar   #8   Datamodel And Flexibility For PlmWebinar   #8   Datamodel And Flexibility For Plm
Webinar #8 Datamodel And Flexibility For PlmProdeos
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasAras
 
Data Modeling Presentations I
Data Modeling Presentations IData Modeling Presentations I
Data Modeling Presentations Icd_crisci
 
All data models in dbms
All data models in dbmsAll data models in dbms
All data models in dbmsNaresh Kumar
 
Data Modeling PPT
Data Modeling PPTData Modeling PPT
Data Modeling PPTTrinath
 
Class diagram presentation
Class diagram presentationClass diagram presentation
Class diagram presentationSayedFarhan110
 

Viewers also liked (12)

Webinar #8 Datamodel And Flexibility For Plm
Webinar   #8   Datamodel And Flexibility For PlmWebinar   #8   Datamodel And Flexibility For Plm
Webinar #8 Datamodel And Flexibility For Plm
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
 
Data Modeling Presentations I
Data Modeling Presentations IData Modeling Presentations I
Data Modeling Presentations I
 
All data models in dbms
All data models in dbmsAll data models in dbms
All data models in dbms
 
Data models
Data modelsData models
Data models
 
Class diagrams
Class diagramsClass diagrams
Class diagrams
 
Dbms models
Dbms modelsDbms models
Dbms models
 
Uml class-diagram
Uml class-diagramUml class-diagram
Uml class-diagram
 
Data Modeling PPT
Data Modeling PPTData Modeling PPT
Data Modeling PPT
 
Different data models
Different data modelsDifferent data models
Different data models
 
Class diagram presentation
Class diagram presentationClass diagram presentation
Class diagram presentation
 
Dbms slides
Dbms slidesDbms slides
Dbms slides
 

Similar to Slides Boeing Insitu Enterprise Plm Journey With Aras

Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU PresentationThomas Jeannin
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Avinc puma ae, usa unmanned aerial vehicle(uav)
Avinc puma ae, usa   unmanned aerial vehicle(uav)Avinc puma ae, usa   unmanned aerial vehicle(uav)
Avinc puma ae, usa unmanned aerial vehicle(uav)hindujudaic
 
EWM Yard Management
EWM Yard ManagementEWM Yard Management
EWM Yard Managementandyiska
 
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...IPv6no
 
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...eyefortransport
 
Airborne Recorders - Curtiss-Wright Controls Avionics & Electronics
Airborne Recorders - Curtiss-Wright Controls Avionics & ElectronicsAirborne Recorders - Curtiss-Wright Controls Avionics & Electronics
Airborne Recorders - Curtiss-Wright Controls Avionics & ElectronicsCurtiss-Wright Defense Solutions
 
A Phased Approach To Orbital Public Access
A Phased Approach To Orbital Public AccessA Phased Approach To Orbital Public Access
A Phased Approach To Orbital Public AccessA. Rocketeer
 
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...Nagios
 
From ci to cd - LavaJug 2012
From ci to cd  - LavaJug 2012From ci to cd  - LavaJug 2012
From ci to cd - LavaJug 2012Henri Gomez
 
Cisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGCisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGtovmug
 
Innovating in simulation architectures for Naval Warfare Training & Simulation
Innovating in simulation architectures for Naval Warfare Training & SimulationInnovating in simulation architectures for Naval Warfare Training & Simulation
Innovating in simulation architectures for Naval Warfare Training & SimulationJose Carlos Diaz
 
influence of it on port productivity
 influence of it on port productivity influence of it on port productivity
influence of it on port productivityAryaman Mishra
 
Alcatel-Lucent ETSI Workshop with Peleg Erlich
Alcatel-Lucent ETSI Workshop with Peleg ErlichAlcatel-Lucent ETSI Workshop with Peleg Erlich
Alcatel-Lucent ETSI Workshop with Peleg ErlichAlcatel-Lucent Cloud
 
2005 - Embraer Paris Air Show Presentation Business Aviation
2005 - Embraer Paris Air Show Presentation   Business Aviation2005 - Embraer Paris Air Show Presentation   Business Aviation
2005 - Embraer Paris Air Show Presentation Business AviationEmbraer RI
 

Similar to Slides Boeing Insitu Enterprise Plm Journey With Aras (20)

Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU Presentation
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Isis
IsisIsis
Isis
 
Avinc puma ae, usa unmanned aerial vehicle(uav)
Avinc puma ae, usa   unmanned aerial vehicle(uav)Avinc puma ae, usa   unmanned aerial vehicle(uav)
Avinc puma ae, usa unmanned aerial vehicle(uav)
 
EWM Yard Management
EWM Yard ManagementEWM Yard Management
EWM Yard Management
 
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...
IPv6 Seen From Statoil: Knut Sebastian Tungland, Chief Engineer Information T...
 
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...
Nick Cova from Savi Networks; ‘Globalize the Supply Chain: Establish a truly ...
 
Airborne Recorders - Curtiss-Wright Controls Avionics & Electronics
Airborne Recorders - Curtiss-Wright Controls Avionics & ElectronicsAirborne Recorders - Curtiss-Wright Controls Avionics & Electronics
Airborne Recorders - Curtiss-Wright Controls Avionics & Electronics
 
A Phased Approach To Orbital Public Access
A Phased Approach To Orbital Public AccessA Phased Approach To Orbital Public Access
A Phased Approach To Orbital Public Access
 
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...
Thomas Schmainda - Tracking Boeing Satellites With Nagios - Nagios World Conf...
 
Cnic brief
Cnic briefCnic brief
Cnic brief
 
From ci to cd - LavaJug 2012
From ci to cd  - LavaJug 2012From ci to cd  - LavaJug 2012
From ci to cd - LavaJug 2012
 
Cisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGCisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUG
 
Plenary1 rj lino pelindo ii
Plenary1 rj lino pelindo iiPlenary1 rj lino pelindo ii
Plenary1 rj lino pelindo ii
 
Innovating in simulation architectures for Naval Warfare Training & Simulation
Innovating in simulation architectures for Naval Warfare Training & SimulationInnovating in simulation architectures for Naval Warfare Training & Simulation
Innovating in simulation architectures for Naval Warfare Training & Simulation
 
influence of it on port productivity
 influence of it on port productivity influence of it on port productivity
influence of it on port productivity
 
Alcatel-Lucent ETSI Workshop with Peleg Erlich
Alcatel-Lucent ETSI Workshop with Peleg ErlichAlcatel-Lucent ETSI Workshop with Peleg Erlich
Alcatel-Lucent ETSI Workshop with Peleg Erlich
 
2005 - Embraer Paris Air Show Presentation Business Aviation
2005 - Embraer Paris Air Show Presentation   Business Aviation2005 - Embraer Paris Air Show Presentation   Business Aviation
2005 - Embraer Paris Air Show Presentation Business Aviation
 

More from Prodeos

Webinar #10 Document Management
Webinar   #10   Document ManagementWebinar   #10   Document Management
Webinar #10 Document ManagementProdeos
 
Webinar #9 Gestion Documentaire
Webinar   #9   Gestion DocumentaireWebinar   #9   Gestion Documentaire
Webinar #9 Gestion DocumentaireProdeos
 
Webinar #6 DFMEA
Webinar   #6   DFMEAWebinar   #6   DFMEA
Webinar #6 DFMEAProdeos
 
Webinar #4 Express Eco.Pptx
Webinar   #4   Express Eco.PptxWebinar   #4   Express Eco.Pptx
Webinar #4 Express Eco.PptxProdeos
 
Webinar #1 Amdec
Webinar   #1   AmdecWebinar   #1   Amdec
Webinar #1 AmdecProdeos
 
Aras Federation Web Services
Aras Federation Web ServicesAras Federation Web Services
Aras Federation Web ServicesProdeos
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsProdeos
 
Aras Role Based Clients
Aras Role Based ClientsAras Role Based Clients
Aras Role Based ClientsProdeos
 
Aras Keynote Peter Schroer
Aras Keynote Peter SchroerAras Keynote Peter Schroer
Aras Keynote Peter SchroerProdeos
 
Aras Converter Framework Overview
Aras Converter Framework OverviewAras Converter Framework Overview
Aras Converter Framework OverviewProdeos
 
Prodeos Innovator Procurement
Prodeos Innovator ProcurementProdeos Innovator Procurement
Prodeos Innovator ProcurementProdeos
 
15 Ace 2010 Share Point Plm
15 Ace 2010 Share Point Plm15 Ace 2010 Share Point Plm
15 Ace 2010 Share Point PlmProdeos
 
14 Ace 2010 Replication Workshop
14 Ace 2010 Replication Workshop14 Ace 2010 Replication Workshop
14 Ace 2010 Replication WorkshopProdeos
 
13 Ace 2010 Business Intelligence And Product Analytics
13 Ace 2010 Business Intelligence And Product Analytics13 Ace 2010 Business Intelligence And Product Analytics
13 Ace 2010 Business Intelligence And Product AnalyticsProdeos
 
12 Ace 2010 Solution Packaging Workshop
12 Ace 2010 Solution Packaging Workshop12 Ace 2010 Solution Packaging Workshop
12 Ace 2010 Solution Packaging WorkshopProdeos
 
11 Ace 2010 Aras Configuration And Change Management
11 Ace 2010 Aras Configuration And Change Management11 Ace 2010 Aras Configuration And Change Management
11 Ace 2010 Aras Configuration And Change ManagementProdeos
 
08 Ace 2010 Aras Roadmap
08 Ace 2010 Aras Roadmap08 Ace 2010 Aras Roadmap
08 Ace 2010 Aras RoadmapProdeos
 
10 Ace 2010 Aras Federation Workshop
10 Ace 2010 Aras Federation Workshop10 Ace 2010 Aras Federation Workshop
10 Ace 2010 Aras Federation WorkshopProdeos
 
07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality SystemsProdeos
 
05 Ace 2010 Xerox Plm With Aras
05 Ace 2010 Xerox Plm With Aras05 Ace 2010 Xerox Plm With Aras
05 Ace 2010 Xerox Plm With ArasProdeos
 

More from Prodeos (20)

Webinar #10 Document Management
Webinar   #10   Document ManagementWebinar   #10   Document Management
Webinar #10 Document Management
 
Webinar #9 Gestion Documentaire
Webinar   #9   Gestion DocumentaireWebinar   #9   Gestion Documentaire
Webinar #9 Gestion Documentaire
 
Webinar #6 DFMEA
Webinar   #6   DFMEAWebinar   #6   DFMEA
Webinar #6 DFMEA
 
Webinar #4 Express Eco.Pptx
Webinar   #4   Express Eco.PptxWebinar   #4   Express Eco.Pptx
Webinar #4 Express Eco.Pptx
 
Webinar #1 Amdec
Webinar   #1   AmdecWebinar   #1   Amdec
Webinar #1 Amdec
 
Aras Federation Web Services
Aras Federation Web ServicesAras Federation Web Services
Aras Federation Web Services
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras Integrations
 
Aras Role Based Clients
Aras Role Based ClientsAras Role Based Clients
Aras Role Based Clients
 
Aras Keynote Peter Schroer
Aras Keynote Peter SchroerAras Keynote Peter Schroer
Aras Keynote Peter Schroer
 
Aras Converter Framework Overview
Aras Converter Framework OverviewAras Converter Framework Overview
Aras Converter Framework Overview
 
Prodeos Innovator Procurement
Prodeos Innovator ProcurementProdeos Innovator Procurement
Prodeos Innovator Procurement
 
15 Ace 2010 Share Point Plm
15 Ace 2010 Share Point Plm15 Ace 2010 Share Point Plm
15 Ace 2010 Share Point Plm
 
14 Ace 2010 Replication Workshop
14 Ace 2010 Replication Workshop14 Ace 2010 Replication Workshop
14 Ace 2010 Replication Workshop
 
13 Ace 2010 Business Intelligence And Product Analytics
13 Ace 2010 Business Intelligence And Product Analytics13 Ace 2010 Business Intelligence And Product Analytics
13 Ace 2010 Business Intelligence And Product Analytics
 
12 Ace 2010 Solution Packaging Workshop
12 Ace 2010 Solution Packaging Workshop12 Ace 2010 Solution Packaging Workshop
12 Ace 2010 Solution Packaging Workshop
 
11 Ace 2010 Aras Configuration And Change Management
11 Ace 2010 Aras Configuration And Change Management11 Ace 2010 Aras Configuration And Change Management
11 Ace 2010 Aras Configuration And Change Management
 
08 Ace 2010 Aras Roadmap
08 Ace 2010 Aras Roadmap08 Ace 2010 Aras Roadmap
08 Ace 2010 Aras Roadmap
 
10 Ace 2010 Aras Federation Workshop
10 Ace 2010 Aras Federation Workshop10 Ace 2010 Aras Federation Workshop
10 Ace 2010 Aras Federation Workshop
 
07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems
 
05 Ace 2010 Xerox Plm With Aras
05 Ace 2010 Xerox Plm With Aras05 Ace 2010 Xerox Plm With Aras
05 Ace 2010 Xerox Plm With Aras
 

Slides Boeing Insitu Enterprise Plm Journey With Aras

  • 1. Insitu’s PLM Journey (so far) When Life Hands You Lemons, Make Flavored Lemonade Insitu, Inc. (a Boeing Company) ACE 2012 May 1-3, 2012 | Insitu is a Boeing Company. | All rights reserved. | 1
  • 2. Company Overview | Insitu is a Boeing Company. | All rights reserved. | 2
  • 3. Insitu Snapshot  Leading provider of Small Long-Endurance Unmanned Aircraft Systems (UAS) and Services • Developer of ScanEagle System • Over 590,000 Combat Flight Hours  Major Customers: • U.S. Marine Corps • U.S. Navy • U.S. Army • Special Operations Forces (SOF) • Australian Defense Force • Canadian Defense Forces • USAF, DoD Customers  Strong Track Record of Historical Growth  800+ Highly Qualified Employees  Proprietary IP and technology partnerships  Location: Columbia Gorge (near Portland, OR) | Insitu is a Boeing Company. | All rights reserved. | 3
  • 4. Products & Services Product Lines Unmanned Aircraft Launchers Retrievers Ground Control Station Services Training Deployment Operations | Insitu is a Boeing Company. | All rights reserved. | 4
  • 5. Hub & Spoke MOBILE FGCS SPOKE (Land) -Empower embedded operators with full HUB command and control of Insitu -Launch, control and aircraft directly from retrieve unmanned the front lines. aircraft without requiring a runway for launch or retrieval, land or sea. MAN-PACKABLE FORWARD EYES -Keep troops and decision makers in- SPOKE formed by feeding Insitu UAS video to -Take control of an networked Forward aircraft from a hub. Eyes remote video When the mission terminals. ends, it passes control back to the hub for retrieval and maintenance. MOBILE FGCS SPOKE (Sea) -Provide overwatch to Vessel Boarding Search and Seizure (VBSS) teams. | Insitu is a Boeing Company. | All rights reserved. | 5
  • 6. ScanEagle QUICK SPECS GTOW 44.0 lbs Fuel + Payload 12.4 lbs Max level speed 82 kts Cruise speed 55 kts Ceiling 20,000 ft 4.5 f , 1.37 m Endurance 24+ hours Total Operational Hours 590,000+ 10.2 f Shipboard Sorties 2,800+ 3.11 m • 90% solution / 3% cost • Heavy Fuel Option, JP-5, JP-8 or Jet-A • Mode 3C Transponder • Automated Launch / Retrieval • Fully Autonomous • Small physical and personnel footprint 7.0 in , .17 m • Wide weather envelope | Insitu is a Boeing Company. | All rights reserved. | 6
  • 7. NightEagle QUICK SPECS o Optical Zoom Steps 2.5o (4x) - 10 (1x) FOV Added Digital Zoom Steps 1x - 4x Full Range of Zoom Steps 1x -16x (Optical & Digital) Articulation +75 to -45 (120º) | Insitu is a Boeing Company. | All rights reserved. | 7
  • 8. Integrator QUICK SPECS Cruise Speed 55 knots Dash Speed 80+ knots Service Ceiling >15,000 ft / 4572M 2.2 m Empty Weight 75 lbs / 34.0kg 7.2f Max Takeoff Weight 135 lbs / 61.2 kg Payload 25 lbs/11kg & 250W / 15hrs 37.5 lbs/17kg max. payload 4.8 m 350W max. payload power 16.0f • System interoperability with ScanEagle • Drastic payload envelope increase over ScanEagle • iPhoneTM like integration platform | Insitu is a Boeing Company. | All rights reserved. | 8
  • 9. Launcher / Skyhook | Insitu is a Boeing Company. | All rights reserved. | 9
  • 10. ScanEagle Operator Workstation Aircraft Health Aircraft Operation Camera • Telemetry Data • Topographical map view • Imagery • Digital Checklists and • Drag and Drop navigation • Operation Emergency Procedures • Waypoint set up • Manipulation Single Person Aircraft Operation / Video Manipulation | Insitu is a Boeing Company. | All rights reserved. | 10
  • 11. Insitu Services Overview Field Service Reps and Training Demo Team Ops Support Custom Engineering Flight Demonstrations Ship Installations | Insitu is a Boeing Company. | All rights reserved. | 11
  • 12. Basic Maritime Installation  32+ Completed Ship Installations  2,800+ Sorties  24/7 Ops  Surveillance range over 100 – 200 km  Offers complete integration  Installation does not ‘foul’ or interfere with flight deck operations | Insitu is a Boeing Company. | All rights reserved. | 12
  • 13. Aircraft Modularity Modularity allows flexibility for operations and maintenance Winglet Tail Wing Fuselage Engine Cowl Winglet Forward Payload Wing Bay C. G. Payload Avionics Bay Bay | Insitu is a Boeing Company. | All rights reserved. | 13
  • 14. NightEagle • 1100’ AGL • 3500’ Slant Range • FOV: 25° - 2° • Continuous Zoom • Roll over tilt + forward look • Same Modes as current production models • Direct, Stabilized, Hold | Insitu is a Boeing Company. | All rights reserved. | 14
  • 15. The Way We Were | Insitu is a Boeing Company. | All rights reserved. | 15
  • 16. Why PLM?  Examples of Insitu-produced controlled documents: • Specifications, drawings, technical data packages • Product release files and change records • Policies, processes and procedures • Training manuals, maintenance manuals and schedules  Multiple disconnected product data libraries: • PDMWorks (MCAD models, drawings, some part/document state information) • Shared drives (specifications, drawings, ECAD, change records, ...) • ERP system (product information to the “Buy” level only, no design-level data, no documents) | Insitu is a Boeing Company. | All rights reserved. | 16
  • 17. Why PLM? (cont)  Major issues: • Manual change process, revisioning and status accounting – very labor intensive • Manual syncing of part property information amongst systems – usually one system was never correct • Disconnected data – no way to perform an impact analysis • Data access – most Engineers did not have an ERP account, most Manufacturing personnel did not have a PDMWorks account  Rapid company growth and addition of new products required a more sophisticated documentation library and process | Insitu is a Boeing Company. | All rights reserved. | 17
  • 18. Goals  Create efficiency in the storing and retrieval of Insitu product documents  Provide a central definition of product configurations and a repository for their associated documents  Alleviate rework and disorder with regard to document storage and version control  Consolidate numerous legacy systems into a common system  Ensure the speedy retrieval of the current document version  Improve availability of product data across the extended enterprise  Provide the ability to link data and documents, which will make possible and/or improve the retrieval of relevant data  Allow Insitu employees and suitable vendors to access current and appropriate documents or sets of documents in an efficient manner | Insitu is a Boeing Company. | All rights reserved. | 18
  • 19. Strategy  PDM will be the first step in Insitu’s PLM solution  Dedicate a team to the project PDM  Evaluate Insitu’s PLM needs and select a supplier/partner to meet those needs  Recognize that processes, and therefore MRO requirements, will change as we implement PLM | Insitu is a Boeing Company. | All rights reserved. | 19
  • 20. Requirements Gathering and Solution Selection Jun – Dec 2009 | Insitu is a Boeing Company. | All rights reserved. | 20
  • 21. PDM Map Day  Gathered Requirements, Enhancements, Business Rules, Risks | Insitu is a Boeing Company. | All rights reserved. | 21
  • 22. Vendor Demos  PDM Team formalized requirements (Correlated to Map Day)  Weighted requirements  Evaluated demos – seven systems | Insitu is a Boeing Company. | All rights reserved. | 22
  • 23. Results  Chose vendor short list – three systems, one of which was Aras Innovator  Released a Request for Proposal to PDM vendors on short list  Requested customized vendor demos using Insitu use cases and data sets  Completed final weighted requirements matrix and determined scores  First choice was Aras Innovator due to its capabilities and flexibility  Executive leadership was not comfortable with “open source software” concept  Parent company was recommending one of the Big-Box systems  Went with second choice, one of the Big-Box systems | Insitu is a Boeing Company. | All rights reserved. | 23
  • 24. Big-Box Implementation | Insitu is a Boeing Company. | All rights reserved. | 24
  • 25. Big-Box Implementation  Jan 2010: Engaged vendor team of solution experts  Three months and three complete revisions to produce an acceptable SOW  Trained Insitu PDM Team  Vendor PM #1 lost to personal constraints;| spin up new PM  Vendor PM #2 relieved due to lack of progress  Engaged third-party consulting team of process experts; spin up new team  Three more months and little progress due to immature and changing processes  By Nov 2010, we were almost ONE YEAR behind schedule and severely OVER BUDGET! | Insitu is a Boeing Company. | All rights reserved. | 25
  • 26. Reset, Please  Aras was becoming more widely accepted in industry and we better understood their subscription service  PDM Team met with Executive leadership and requested a re-eval  Permission granted  Conducted Aras Discovery Workshop which resulted in a SOW documenting the phasing, steps, project plan and cost  Aras Innovator was the clear choice  Feb 2011: Presented findings to Executive leadership; decision was unanimous to change course and proceed with Aras Innovator | Insitu is a Boeing Company. | All rights reserved. | 26
  • 27. Be Different | Insitu is a Boeing Company. | All rights reserved. | 27
  • 28. Root Cause  Root cause of our big-box implementation issues was that we were trying to implement a solution which requires well-defined and stable processes  Aras Innovator was the perfect solution because it allows us to quickly and easily change the solution as our processes mature and change  Aras Innovator also allows us to approach our PDM implementation using Agile Software Development methodologies: • Attack one feature/process at a time and roll it out • Plan at a high-level, but gather detailed requirements only for the feature at hand – everything else is likely to change • Real-world use is the only way to determine the real requirements; everything prior to that is just guessing • Use visual and behavioral prototypes to flush out requirements | Insitu is a Boeing Company. | All rights reserved. | 28
  • 29. Feature List Sequence Diagram Level 1 Part Level 2 Master Level 3 EBOM Master X200 Release for Purchase MBOM Master X200 CAD Master EBOM Master NPI / Release for X300 Production MBOM Master X300 FPS Document Mgmt DSS Document Mgmt Visualization FAIR Record Mgmt Complete Work Instruction Solution Document Mgmt | Insitu is a Boeing Company. | All rights reserved. | 29
  • 30. PDM Project Phase I | Insitu is a Boeing Company. | All rights reserved. | 30
  • 31. Phase I Scope Level 1 Part Level 2 Master Level 3 EBOM Master X200 Release for Purchase MBOM Master X200 CAD Master EBOM Master NPI / Release for X300 Production MBOM Master X300 FPS Document Mgmt DSS Document Mgmt Visualization FAIR Record Mgmt Complete Work Instruction Solution Document Mgmt | Insitu is a Boeing Company. | All rights reserved. | 31
  • 32. Where We Were  Change in Design (CID) process issues ● Paper form – very manual, disconnected data ● Slow and cumbersome ● Large design change packages = bottlenecks ● Difficult to perform impact analysis ● Manual checks ● Lack of visibility of change status Yuck! | Insitu is a Boeing Company. | All rights reserved. | 32
  • 33. The Goal & The Challenge  The Goal ● Speed up the release process, and ● Provide for formal change control earlier in the design process  The Challenge ● Implement the following in Aras Innovator in 60 days: ○ Part Master ○ Engineering Bill of Materials (EBOM) ○ Problem Reporting (PR) ○ Engineering Change Request (ECR) ○ Engineering Change Notice (ECN) | Insitu is a Boeing Company. | All rights reserved. | 33
  • 34. Develop the Process  Develop the Process: ● Process development led by CMII-trained personnel ● Assembled a multi-disciplined team, with representatives from each affected department ● Used CMII as the process model and made tweaks from there ○ Identified the deltas: ▪ CID Process vs. CMII Process ▪ CID Form vs. PR/ECR/ECN Forms ● Defined requirements ● Got buy-in! | Insitu is a Boeing Company. | All rights reserved. | 34
  • 35. Implement the Solution  PDM Core Team comprised of Aras Innovator-trained personnel and an Aras consultant  Learned the OOTB functionality of the Product Engineering solution, which implements the CMII change process  Trained the primary users (CM) on OOTB functionality  Worked in parallel with process development – required tight collaboration with the process team  Configured/customized as necessary – 140 item changes  Migrated the data – 13,000 parts cleansed, formatted, migrated and validated  UAT, UAT and more UAT | Insitu is a Boeing Company. | All rights reserved. | 35
  • 36. Problem Report (PR) Workflow Legend: PR state Responsible Party Activity Submitted In Verification Verified Pending Requestor CSI Assigned Creator CSI CM Create PR Review PR Verify PR Approve PR Close PR Closed Start Reject Not Verified Rejected Unverified | Insitu is a Boeing Company. | All rights reserved. | 36
  • 37. Engineering Change Request (ECR) Workflow Legend: ECR state Responsible Party Activity Investigate further New Submitted In Tech Review In Review In CRB Requestor CSI Assigned Creator CSI FT Approver Submit ECR Review ECR Technical Review Route ECR Disposition ECR Approved Fast Track Approve Start CRB In Review Submitted CSI Requestor Prepare CRB Resubmit Review Rejected ECR Cancel Disapprove Investigate further In CRB Disapproved CSI CRB Meeting Cancelled | Insitu is a Boeing Company. | All rights reserved. | 37
  • 38. Engineering Change Notice (ECN) Workflow Legend: ECN state Responsible Party Activity New In Planning In Work In Review In Review CM CSII Assigned Creator CSII CSIII Submit ECN ECN Planning Update Docs Review Docs ECN Audit Released Start Reject Aras Innovator promotes New items to Released state Aras Innovator promotes Old items to Superseded state | Insitu is a Boeing Company. | All rights reserved. | 38
  • 39. Train and Roll Out  Developed training materials ● Part I – General tool usage ○ Logging on, general navigation, searching, features, logging off ● Part II – Process ○ Parts, EBOMs, PR, ECR and ECN  Hands-on training with user exercises  160 users trained  Rollout was a success and scarily quiet!  Continue to release updates as necessary ● First update occurred two weeks after rollout ● Second update was four weeks after that | Insitu is a Boeing Company. | All rights reserved. | 39
  • 40. Achievements  Early release of long-lead items  Release from the bottom up vs. all at once  Where-used visibility and ability to perform impact analysis  Fast-track release vs. a required meeting  Formal release and control of the design at point of purchase vs. at release for production  Searchable and linked information  Ability to easily build upon the base system put in place | Insitu is a Boeing Company. | All rights reserved. | 40
  • 41. Metrics – The Proof! Avg # Days/Part from Submittal to Approval 4 3 Fast Track vs. CRB 2 1 CRB Fast 40% Track 0 CID ECR 60% Avg # Approvals & Releases per Week 7 CMII Standard: 75-85% of changes 6 should be Fast Track (FT) 5 4 CID 3 ECR/ECN 2 1 0 Approvals Releases | Insitu is a Boeing Company. | All rights reserved. | 41
  • 42. Key Elements of Success  Executive support from the top  Project sponsor ● Set schedule and committed to it ● Provided business resources  Project team ● Business reps: CMII certified, committed to the project, willing to adopt the solution mainly out-of-the-box ● Solution reps: Trained in Aras Innovator, knowledgeable on Engineering and CM processes (some CMII certified), Aras developer ● Daily morning meetings  Formal training provided to the user base, both on the new process and the new platform  Aras Innovator is easily configurable, easily customizable, and very intuitive | Insitu is a Boeing Company. | All rights reserved. | 42
  • 43. The Goal & The Challenge  Did we reach The Goal? ● Speed up the release process Yes! Less time in corrective action = faster release ● Provide for formal change control earlier in the design process Yes! Release at point of purchase, not production introduction  Did we meet The Challenge? ● Implement in 60 days Yes! 4/11/11 - 6/6/11 = 56 days (including data cleansing, formatting, migration and validation) | Insitu is a Boeing Company. | All rights reserved. | 43
  • 44. To Infinity and Beyond! | Insitu is a Boeing Company. | All rights reserved. | 44
  • 45. Accomplishments | Insitu is a Boeing Company. | All rights reserved. | 45
  • 46. Current Activity – Phase II | Insitu is a Boeing Company. | All rights reserved. | 46
  • 47. Future Phases | Insitu is a Boeing Company. | All rights reserved. | 47
  • 48. | Insitu is a Boeing Company. | All rights reserved. | 48