SlideShare a Scribd company logo
1 of 7
Emily Davis


IG3 Production Log

10/09/2012

We have discussed about changing our location today because it will be easier if we stick to one
place which has all the locations we want. We talked about our costume and thought about how we
said we would have a modern twist so we have figured what all the actors are going to wear now.

11/09/2012

Today we had a meeting about main things we need to sort out for our filming which has now been
changed to Saturday. Jenny recorded notes while we all discussed changes and double checked
times, locations etc.

13/09/2012

Today I set up my Premier Pro project; we set up one in standard version and one it high definition.
This is ready for when I do my editing of the short film me and my group will be filming. We have all
set up a project and we will all do the editing. I set up one folder to the same computer to save all
my work so everything goes to the same document to make everything easy and organized. We have
rescheduled our filming and got a camera and tripod today so that we can be ready to film on
Monday.

17/09/2012

Today we went out into this woods bit to do some practice shots of the first scene because
tomorrow we hope to be filming this for our short film. We took out the camera were going to use
for all the film and tried out different angles, heights and the contrast of the image. Becky the
camera person tried out different things with the camera changing settings like zoom. Then she tried
out different pans to see if they looked right. In the end we decided that when we do the actual shot
we won’t have the camera moving and we will try a front shot and a high shot when I do the first
shot.

18/09/2012

Today we filmed the first shot of our short film. It was me the main girl walking down the road for
the first shot in the script. We took this shot in our location and Becky took about five of me. This is
so we can compare them and see which looks best for our final edit of the film. We got back to
college and put all the clips onto the computer and Becky has put them all into the shared folder so
that we can all open them up onto our individual premiere project.

20/09/2012

Today I have copied all the clips from the shared documents and pasted them into the local drive on
my computer so I will have to do all my editing on this one computer. I have opened my premiere
project and imported all the shots we took on Wednesday and watched them all to see which is
best. It was good that we got more than one shot because of some distractions where we were
filming. Today I can add the first shot to our film sequence.
Emily Davis




24/09/2012

Today we had a production meeting where we discussed our second date of filming and what was
going to be filmed on that day. We came to a conclusion that Sunday is a possibility for filming in our
two locations. We were thinking of splitting the day half in Monton half in Bolton so we can get
more scenes done. We have got a new actor for our piece now and so we are able to sort out filming
times better now that we aren’t being let down. We discussed days we could film with him next
week, so we should be. We also looked at different videos on YouTube to see what the old style film
credits and opening sequences looked like, then what the actual picture looked like and the quality
of it.

25/09/2012

Today I made the opening credit for our film. We are all making one for our own edit. We did this on
illustrator so we could trace round shapes and styles we found on the internet from the old films.

01/10/2012

Today we have discussed all the days we are free and everyone’s work times so that we can work
around them. We have arranged to film tomorrow and been out to book kit and we will collect it
tomorrow. We have also been to see the other tutors we have and asked to go out of their lessons
for the day so that we have a full day of filming. We have decided on our final location for all our
filming and it will be spread across local places so easier to get to.

02/10/2012

Today we got all the actors and crew and went out filming. Our original actor couldn’t come so we
found a new one and it worked out better and saved us time waiting around for the other person.
We filmed some of the first scene and got lots of extra shots and re takes so we had a lot of shots to
work with. We had to use some props which included us buying a rose for our first shot, and then I
had a bow tie on. We got a different range of shots so that we can edit them together and they will
look better. We discussed the next time we would be filming because it went so well today and we
want to get more done.

04/10/2012

Today I had to copy the shots from the shared drive and into the local drive on my computer so I
could rename them so they would be easily recognisable. I then copied them back into the shared
into a different folder so that everyone could copy the named files to their computers and use the
shots in their own edit. We looked at the shots and some are blurry or there is things wrong with
them so we are going to discuss when next we can go out for re shoots and more filming. Now I am
going to edit as much as I can in my HD Premier Pro project and add the right title scenes to it.

08/10/2012

Today we have decided that tomorrow we will film. Jenny has been and booked the camera so we
can have it out all day and bring
Emily Davis


It and the tripod back at the end. I have also exported my titles for my edit from illustrator as JPEGs
so I will import these into my premier pro project next time. We have made a schedule of what we
are doing tomorrow so that we can stick to that and keep our time planned. We are going to reshoot
and we have wrote down stage directions to so that all the shots are the same and nothing changes
so that when we edit we can pick from any of the shots.

9/10/2012

Today we filmed in Monton we got most of the first shots of Ben for the first scene. This was a
reshoot of what we took the other day because we weren’t happy with it. We got a range of
different shots so that when it comes to editing it will have close up mid shots and long shots which
we can edit all together.

10/10/2012

Today we copied all the shots over from the camera onto the new volume drive onto the main
computer. This is so that when we have our next lesson they can be re-named and then copy into
the shared so everyone can have them and import them into their Premier Pro project.

11/10/2012

Today we have re-named the shots to what shot it is what scene it is and what’s happening in the
shot. Then we will copy them into the shared so we can all then copy them onto our new volume
folder just for our computer. When we import them into Premier Pro because they are named we
will know what each shot is so it will be easier.

15/10/2012

Today I imported all the shots into my Premier Pro HD project and sorted them all out into the ones I
wanted to use and needed to edit. I selected all the shots I needed and put them on my timeline into
my sequence once I had cut them and made sure they showed the bit I wanted. I added my titles
that I created in illustrator to my project as well and changed the size and made it fit to the screen
how I wanted it.

16/20/2012

Today I looked at the work and editing I did yesterday and decided to add some simple transitions. I
added some fades to make my shots run together more smoothly. I changed the duration time on
my titles because I don’t want them on there to long just enough to read them. I have exported out
all my illustrator images for my titles as a jpeg and have them all saved in my new volume folder so
they are just on my computer, ready to add to my short film when I need them.

18/10/2012

Today we did some reshoots of the second scene and got some new footage filmed. We have
started the beginning of scene three with mark playing Ben running around the park spying on Jenny
and George. We got different angles and shots for the same shot so we had a range to work with
and lots to choose from to edit.
Emily Davis


22/10/2012

Today I imported all the footage we filmed Thursday onto my Premier Pro project. A scene we filmed
last week made us think we needed a title for this particular part of the film so I went onto my
illustrator title template and made the new one and exported it from Illustrator and imported it into
my Premier Pro project and fitted it into the sequence at the right part. I have edited together all the
parts I can with the footage we have and put together Ben’s running around the park sequence. We
have discussed and deciding we are filming tomorrow and are going to get some re shoots done of
Jenny and George. Then we will film some new footage to add to our rough edit.

06/10/2012

Today I finished my rough edit and exported it as a video and then uploaded it to YouTube. This is so
that I could embed it into my blogger and then write a short summary on what I had done and what I
am going to improve about my edit.

08/11/2012

Today I finished my summary for my rough edit and embedded my YouTube video into the post.
Now I am print screening pictures of the work I have done creating my rough edit and explaining
why I did it and how.

13/11/2012

Today I updated my blog with all of the tasks I’ve done so far and linked them to task 4. I watched
through my Premier Pro project today and thought about the scenes and shots I’m going to add
when we next film some shots. We also talked today about getting some pictures of us filming and
our location to add to our picture diary.

15/11/2012

Today I have updated my picture diary of all the locations we have been to and shots of Becky
filming. I have written about why we chose these locations and whether they worked well or not.

27/11/2012

Today I have been looking for music for my short film edit. I have found some videos on YouTube
that have the old music going over some old films so I am going to convert this and see how it
sounds with my film. I have found some sounds effects to so I can add these to make my overall edit
sound better.

29/11/2012

Today I am going to listen to each of the songs I have found with my short film and see which one
goes best. Then I am going to look at more sound effects to add to my short film. I have cleaned up
some of my editing so that i it doesn’t look to jumpy in some parts and I have watched it through
again and know what shots we need to get to finish the short film.

03/12/2012
Emily Davis


Today I finished off my film and exported it out and saved it to my new volume folder. I named it IG3
finished short film. I then had to import it into after effects so that I could start all my editing of the
whole film. I have looked at how a few effects have looked on my footage and what type of black
and white I want. I have added an effect that makes the footage look jumpy and old.

04/12/2012

Today I finished of editing my full film in after effects I change the contrast and other effects so my
edit looked different to everyone else’s. Then clicked on composition and render composition and
rendered my whole film with the effects and saved it to my new volume folder.

06/12/2012

Today I opened my rendered film with effects in premiere pro so that I could watch it back and see
how it looked and then start to add my music where I wanted it.

10/12/2012

Today I have looked at lots of different songs that I want to fit into certain parts of my film so it will
match the mood of the scene. I am going to use HD Downloader to download them all so then I can
import them into my premiere project of my final film and see how it looks.

11/12/2012

Today I imported all my songs to my premier project of the whole rendered film and put them on
the audio track where I wanted them. I used transitions where the song changed to a new song so
they linked together smoothly. I also started my evaluation for the final task of the project.

13/12/2012

Today because we never ended up shooting the last scene because of problems I rearranged all my
footage on my original project on premier and made the ending look more finished and professional.
I have added my music again and put it in the right places to match the right shots and scenes. I have
added a few other shots and another title to my short film. I will then just need to export my project
and put it into after effects with the effects I chose before and render it out again.

17/12/2012

Today I exported my film out from premiere pro so that tomorrow I can import it into after effects
and lay it underneath my effects I chose for my final film. I saved it to my local drive because it’s a
big file and named it something I would remember.I carried on writing up my evaluation as far as I
could.

18/12/2012

Today I imported my film into after effects and added the effects to my new final edit. Then I
rendered out the whole film in after effects. I saved this to my local drive also because it’s a big file
then when it was finished I watched it through to make sure it was right. Then I uploaded my short
film to YouTube so then on Thursday I can embed it into my blog and add my evaluation for the final
task.
Emily Davis


20/12/2012

Today I embedded my finished short film from YouTube into a post on my blog for task 4 and posted
it. I then finished my evaluation for the final task and also finished my personal production log.
Emily Davis

More Related Content

What's hot

Summary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladySummary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladyFirstClassProductions
 
Final edit evaluation
Final edit evaluationFinal edit evaluation
Final edit evaluationChristianO96
 
Preliminary evaluation
Preliminary evaluationPreliminary evaluation
Preliminary evaluationrachbrimson
 
production diary
production diaryproduction diary
production diaryjudeturner2
 
4. How did you use media technologies in the construction and research, plann...
4. How did you use media technologies in the construction and research, plann...4. How did you use media technologies in the construction and research, plann...
4. How did you use media technologies in the construction and research, plann...Chloe Jayde
 
Media studies powerpoint fin
Media studies powerpoint finMedia studies powerpoint fin
Media studies powerpoint finmike155
 
Evaluation question 6
Evaluation question 6Evaluation question 6
Evaluation question 6Jess Hordon
 
Media studies powerpoint
Media studies powerpointMedia studies powerpoint
Media studies powerpointmike155
 
Summary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladySummary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladyFirstClassProductions
 
Mv production assignment evaluation form 2021
Mv production assignment evaluation form 2021Mv production assignment evaluation form 2021
Mv production assignment evaluation form 2021AlexElsworth2
 
6. evaluation sf 2017
6. evaluation sf 20176. evaluation sf 2017
6. evaluation sf 2017Jude McMichan
 
Final Edit Evaluation
Final Edit EvaluationFinal Edit Evaluation
Final Edit Evaluationmegrobbo95
 
Mv production assignment evaluation form 2020
Mv production assignment evaluation form 2020Mv production assignment evaluation form 2020
Mv production assignment evaluation form 2020matthewturley1
 
Q6. Equipment and editing
Q6. Equipment and editing Q6. Equipment and editing
Q6. Equipment and editing amyflint1234
 
Evaluation q 6
Evaluation q 6Evaluation q 6
Evaluation q 6alvinaaaa
 

What's hot (20)

Summary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladySummary for rough edit two idiots and a lady
Summary for rough edit two idiots and a lady
 
Final edit evaluation
Final edit evaluationFinal edit evaluation
Final edit evaluation
 
Production log
Production logProduction log
Production log
 
Fmp evaluation
Fmp evaluationFmp evaluation
Fmp evaluation
 
Preliminary evaluation
Preliminary evaluationPreliminary evaluation
Preliminary evaluation
 
production diary
production diaryproduction diary
production diary
 
4. How did you use media technologies in the construction and research, plann...
4. How did you use media technologies in the construction and research, plann...4. How did you use media technologies in the construction and research, plann...
4. How did you use media technologies in the construction and research, plann...
 
Media studies powerpoint fin
Media studies powerpoint finMedia studies powerpoint fin
Media studies powerpoint fin
 
Evaluation question 6
Evaluation question 6Evaluation question 6
Evaluation question 6
 
Media studies powerpoint
Media studies powerpointMedia studies powerpoint
Media studies powerpoint
 
Self evaluation
Self evaluationSelf evaluation
Self evaluation
 
Fmp evaluation
Fmp evaluationFmp evaluation
Fmp evaluation
 
Summary for rough edit two idiots and a lady
Summary for rough edit two idiots and a ladySummary for rough edit two idiots and a lady
Summary for rough edit two idiots and a lady
 
Minutes of meeting
Minutes of meetingMinutes of meeting
Minutes of meeting
 
Mv production assignment evaluation form 2021
Mv production assignment evaluation form 2021Mv production assignment evaluation form 2021
Mv production assignment evaluation form 2021
 
6. evaluation sf 2017
6. evaluation sf 20176. evaluation sf 2017
6. evaluation sf 2017
 
Final Edit Evaluation
Final Edit EvaluationFinal Edit Evaluation
Final Edit Evaluation
 
Mv production assignment evaluation form 2020
Mv production assignment evaluation form 2020Mv production assignment evaluation form 2020
Mv production assignment evaluation form 2020
 
Q6. Equipment and editing
Q6. Equipment and editing Q6. Equipment and editing
Q6. Equipment and editing
 
Evaluation q 6
Evaluation q 6Evaluation q 6
Evaluation q 6
 

Similar to Production log

A2 advanced portfolio_production_diary
A2 advanced portfolio_production_diaryA2 advanced portfolio_production_diary
A2 advanced portfolio_production_diaryemilyshep
 
Production log
Production logProduction log
Production logSamHill129
 
Production log
Production logProduction log
Production logSamHill129
 
Evaluation for preliminary task
Evaluation for preliminary taskEvaluation for preliminary task
Evaluation for preliminary tasksammarlow
 
Evaluation 6
Evaluation 6 Evaluation 6
Evaluation 6 roryd6
 
Richard o'connor production log final
Richard o'connor production log finalRichard o'connor production log final
Richard o'connor production log finalempentertainment
 
Production log
Production logProduction log
Production logSamHill129
 
Preliminary task evaluation
Preliminary task evaluationPreliminary task evaluation
Preliminary task evaluationSukhpreetBoora
 
Preliminary Task Evaluation
Preliminary Task EvaluationPreliminary Task Evaluation
Preliminary Task EvaluationSukhpreetBoora
 
Production Diary A level media
Production Diary A level media Production Diary A level media
Production Diary A level media Jack Francois
 
Ig3 music video production diary 19.03.13
Ig3 music video production diary 19.03.13Ig3 music video production diary 19.03.13
Ig3 music video production diary 19.03.13megrobbo95
 
Production diary
Production diaryProduction diary
Production diarykiki smart
 
Question 7
Question 7Question 7
Question 7HNMmedia
 

Similar to Production log (20)

Project log
Project logProject log
Project log
 
Project log
Project logProject log
Project log
 
A2 advanced portfolio_production_diary
A2 advanced portfolio_production_diaryA2 advanced portfolio_production_diary
A2 advanced portfolio_production_diary
 
Production log
Production logProduction log
Production log
 
Production log
Production logProduction log
Production log
 
Evaluation for preliminary task
Evaluation for preliminary taskEvaluation for preliminary task
Evaluation for preliminary task
 
Evaluation 6
Evaluation 6 Evaluation 6
Evaluation 6
 
Richard o'connor production log final
Richard o'connor production log finalRichard o'connor production log final
Richard o'connor production log final
 
Production Log
Production LogProduction Log
Production Log
 
Production log
Production logProduction log
Production log
 
Production log
Production logProduction log
Production log
 
Preliminary task evaluation
Preliminary task evaluationPreliminary task evaluation
Preliminary task evaluation
 
Preliminary Task Evaluation
Preliminary Task EvaluationPreliminary Task Evaluation
Preliminary Task Evaluation
 
Production Diary A level media
Production Diary A level media Production Diary A level media
Production Diary A level media
 
Ig3 music video production diary 19.03.13
Ig3 music video production diary 19.03.13Ig3 music video production diary 19.03.13
Ig3 music video production diary 19.03.13
 
Production diary
Production diaryProduction diary
Production diary
 
Question 7
Question 7Question 7
Question 7
 
Prelim Production Notes
Prelim Production NotesPrelim Production Notes
Prelim Production Notes
 
Ig3 evaluation
Ig3 evaluationIg3 evaluation
Ig3 evaluation
 
Q7
Q7Q7
Q7
 

More from Mystifyingproductions (20)

Fourth recreation – toothpaste photo
Fourth recreation – toothpaste photoFourth recreation – toothpaste photo
Fourth recreation – toothpaste photo
 
Iron man
Iron manIron man
Iron man
 
Emily Davis Production Log
Emily Davis Production LogEmily Davis Production Log
Emily Davis Production Log
 
Magazine Evaluation PowerPoint
Magazine Evaluation PowerPointMagazine Evaluation PowerPoint
Magazine Evaluation PowerPoint
 
Iron man 3 script
Iron man 3 scriptIron man 3 script
Iron man 3 script
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Pitch
PitchPitch
Pitch
 
Editing butlins photo
Editing butlins photoEditing butlins photo
Editing butlins photo
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Second Recreation Editing Butlins Photo
Second Recreation Editing Butlins PhotoSecond Recreation Editing Butlins Photo
Second Recreation Editing Butlins Photo
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Portrait Shoot PowerPoint
Portrait Shoot PowerPointPortrait Shoot PowerPoint
Portrait Shoot PowerPoint
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and My Movies
Me and My MoviesMe and My Movies
Me and My Movies
 

Production log

  • 1. Emily Davis IG3 Production Log 10/09/2012 We have discussed about changing our location today because it will be easier if we stick to one place which has all the locations we want. We talked about our costume and thought about how we said we would have a modern twist so we have figured what all the actors are going to wear now. 11/09/2012 Today we had a meeting about main things we need to sort out for our filming which has now been changed to Saturday. Jenny recorded notes while we all discussed changes and double checked times, locations etc. 13/09/2012 Today I set up my Premier Pro project; we set up one in standard version and one it high definition. This is ready for when I do my editing of the short film me and my group will be filming. We have all set up a project and we will all do the editing. I set up one folder to the same computer to save all my work so everything goes to the same document to make everything easy and organized. We have rescheduled our filming and got a camera and tripod today so that we can be ready to film on Monday. 17/09/2012 Today we went out into this woods bit to do some practice shots of the first scene because tomorrow we hope to be filming this for our short film. We took out the camera were going to use for all the film and tried out different angles, heights and the contrast of the image. Becky the camera person tried out different things with the camera changing settings like zoom. Then she tried out different pans to see if they looked right. In the end we decided that when we do the actual shot we won’t have the camera moving and we will try a front shot and a high shot when I do the first shot. 18/09/2012 Today we filmed the first shot of our short film. It was me the main girl walking down the road for the first shot in the script. We took this shot in our location and Becky took about five of me. This is so we can compare them and see which looks best for our final edit of the film. We got back to college and put all the clips onto the computer and Becky has put them all into the shared folder so that we can all open them up onto our individual premiere project. 20/09/2012 Today I have copied all the clips from the shared documents and pasted them into the local drive on my computer so I will have to do all my editing on this one computer. I have opened my premiere project and imported all the shots we took on Wednesday and watched them all to see which is best. It was good that we got more than one shot because of some distractions where we were filming. Today I can add the first shot to our film sequence.
  • 2. Emily Davis 24/09/2012 Today we had a production meeting where we discussed our second date of filming and what was going to be filmed on that day. We came to a conclusion that Sunday is a possibility for filming in our two locations. We were thinking of splitting the day half in Monton half in Bolton so we can get more scenes done. We have got a new actor for our piece now and so we are able to sort out filming times better now that we aren’t being let down. We discussed days we could film with him next week, so we should be. We also looked at different videos on YouTube to see what the old style film credits and opening sequences looked like, then what the actual picture looked like and the quality of it. 25/09/2012 Today I made the opening credit for our film. We are all making one for our own edit. We did this on illustrator so we could trace round shapes and styles we found on the internet from the old films. 01/10/2012 Today we have discussed all the days we are free and everyone’s work times so that we can work around them. We have arranged to film tomorrow and been out to book kit and we will collect it tomorrow. We have also been to see the other tutors we have and asked to go out of their lessons for the day so that we have a full day of filming. We have decided on our final location for all our filming and it will be spread across local places so easier to get to. 02/10/2012 Today we got all the actors and crew and went out filming. Our original actor couldn’t come so we found a new one and it worked out better and saved us time waiting around for the other person. We filmed some of the first scene and got lots of extra shots and re takes so we had a lot of shots to work with. We had to use some props which included us buying a rose for our first shot, and then I had a bow tie on. We got a different range of shots so that we can edit them together and they will look better. We discussed the next time we would be filming because it went so well today and we want to get more done. 04/10/2012 Today I had to copy the shots from the shared drive and into the local drive on my computer so I could rename them so they would be easily recognisable. I then copied them back into the shared into a different folder so that everyone could copy the named files to their computers and use the shots in their own edit. We looked at the shots and some are blurry or there is things wrong with them so we are going to discuss when next we can go out for re shoots and more filming. Now I am going to edit as much as I can in my HD Premier Pro project and add the right title scenes to it. 08/10/2012 Today we have decided that tomorrow we will film. Jenny has been and booked the camera so we can have it out all day and bring
  • 3. Emily Davis It and the tripod back at the end. I have also exported my titles for my edit from illustrator as JPEGs so I will import these into my premier pro project next time. We have made a schedule of what we are doing tomorrow so that we can stick to that and keep our time planned. We are going to reshoot and we have wrote down stage directions to so that all the shots are the same and nothing changes so that when we edit we can pick from any of the shots. 9/10/2012 Today we filmed in Monton we got most of the first shots of Ben for the first scene. This was a reshoot of what we took the other day because we weren’t happy with it. We got a range of different shots so that when it comes to editing it will have close up mid shots and long shots which we can edit all together. 10/10/2012 Today we copied all the shots over from the camera onto the new volume drive onto the main computer. This is so that when we have our next lesson they can be re-named and then copy into the shared so everyone can have them and import them into their Premier Pro project. 11/10/2012 Today we have re-named the shots to what shot it is what scene it is and what’s happening in the shot. Then we will copy them into the shared so we can all then copy them onto our new volume folder just for our computer. When we import them into Premier Pro because they are named we will know what each shot is so it will be easier. 15/10/2012 Today I imported all the shots into my Premier Pro HD project and sorted them all out into the ones I wanted to use and needed to edit. I selected all the shots I needed and put them on my timeline into my sequence once I had cut them and made sure they showed the bit I wanted. I added my titles that I created in illustrator to my project as well and changed the size and made it fit to the screen how I wanted it. 16/20/2012 Today I looked at the work and editing I did yesterday and decided to add some simple transitions. I added some fades to make my shots run together more smoothly. I changed the duration time on my titles because I don’t want them on there to long just enough to read them. I have exported out all my illustrator images for my titles as a jpeg and have them all saved in my new volume folder so they are just on my computer, ready to add to my short film when I need them. 18/10/2012 Today we did some reshoots of the second scene and got some new footage filmed. We have started the beginning of scene three with mark playing Ben running around the park spying on Jenny and George. We got different angles and shots for the same shot so we had a range to work with and lots to choose from to edit.
  • 4. Emily Davis 22/10/2012 Today I imported all the footage we filmed Thursday onto my Premier Pro project. A scene we filmed last week made us think we needed a title for this particular part of the film so I went onto my illustrator title template and made the new one and exported it from Illustrator and imported it into my Premier Pro project and fitted it into the sequence at the right part. I have edited together all the parts I can with the footage we have and put together Ben’s running around the park sequence. We have discussed and deciding we are filming tomorrow and are going to get some re shoots done of Jenny and George. Then we will film some new footage to add to our rough edit. 06/10/2012 Today I finished my rough edit and exported it as a video and then uploaded it to YouTube. This is so that I could embed it into my blogger and then write a short summary on what I had done and what I am going to improve about my edit. 08/11/2012 Today I finished my summary for my rough edit and embedded my YouTube video into the post. Now I am print screening pictures of the work I have done creating my rough edit and explaining why I did it and how. 13/11/2012 Today I updated my blog with all of the tasks I’ve done so far and linked them to task 4. I watched through my Premier Pro project today and thought about the scenes and shots I’m going to add when we next film some shots. We also talked today about getting some pictures of us filming and our location to add to our picture diary. 15/11/2012 Today I have updated my picture diary of all the locations we have been to and shots of Becky filming. I have written about why we chose these locations and whether they worked well or not. 27/11/2012 Today I have been looking for music for my short film edit. I have found some videos on YouTube that have the old music going over some old films so I am going to convert this and see how it sounds with my film. I have found some sounds effects to so I can add these to make my overall edit sound better. 29/11/2012 Today I am going to listen to each of the songs I have found with my short film and see which one goes best. Then I am going to look at more sound effects to add to my short film. I have cleaned up some of my editing so that i it doesn’t look to jumpy in some parts and I have watched it through again and know what shots we need to get to finish the short film. 03/12/2012
  • 5. Emily Davis Today I finished off my film and exported it out and saved it to my new volume folder. I named it IG3 finished short film. I then had to import it into after effects so that I could start all my editing of the whole film. I have looked at how a few effects have looked on my footage and what type of black and white I want. I have added an effect that makes the footage look jumpy and old. 04/12/2012 Today I finished of editing my full film in after effects I change the contrast and other effects so my edit looked different to everyone else’s. Then clicked on composition and render composition and rendered my whole film with the effects and saved it to my new volume folder. 06/12/2012 Today I opened my rendered film with effects in premiere pro so that I could watch it back and see how it looked and then start to add my music where I wanted it. 10/12/2012 Today I have looked at lots of different songs that I want to fit into certain parts of my film so it will match the mood of the scene. I am going to use HD Downloader to download them all so then I can import them into my premiere project of my final film and see how it looks. 11/12/2012 Today I imported all my songs to my premier project of the whole rendered film and put them on the audio track where I wanted them. I used transitions where the song changed to a new song so they linked together smoothly. I also started my evaluation for the final task of the project. 13/12/2012 Today because we never ended up shooting the last scene because of problems I rearranged all my footage on my original project on premier and made the ending look more finished and professional. I have added my music again and put it in the right places to match the right shots and scenes. I have added a few other shots and another title to my short film. I will then just need to export my project and put it into after effects with the effects I chose before and render it out again. 17/12/2012 Today I exported my film out from premiere pro so that tomorrow I can import it into after effects and lay it underneath my effects I chose for my final film. I saved it to my local drive because it’s a big file and named it something I would remember.I carried on writing up my evaluation as far as I could. 18/12/2012 Today I imported my film into after effects and added the effects to my new final edit. Then I rendered out the whole film in after effects. I saved this to my local drive also because it’s a big file then when it was finished I watched it through to make sure it was right. Then I uploaded my short film to YouTube so then on Thursday I can embed it into my blog and add my evaluation for the final task.
  • 6. Emily Davis 20/12/2012 Today I embedded my finished short film from YouTube into a post on my blog for task 4 and posted it. I then finished my evaluation for the final task and also finished my personal production log.