Pool Asset Management



You can use the Pool Asset Management (PAM) component to manage physical assets such
as vehicles, LCD projectors, cell phones, and similar objects that you have grouped into a
pool. These pool assets can be used jointly and removed from the pool for a certain period of
time. You can control and monitor the use of your pool assets from the requirement coverage
request, through issue, to return and settlement of the service.

Using Pool Asset Management, you can:

   •   Schedule a pool asset request
   •   Reserve a pool asset

   •   Send a confirmation e-mail to the requester of a pool asset

   •   Issue and return a pool asset

   •   Complete the service

   •   Oversee repairs to a pool asset

A graphical planning board is available for these activities (transaction code PAM03).

Archiving

You can archive Requirements and Splits for Pool Asset Management. For this purpose, the
following two tables have been added to the archiving object for maintenance notifications
(PM_QMEL): Requirements (Objects to be Scheduled) (technical name: PAMS_NEED) and
Splits (Objects to be Scheduled) (technical name: PAMS_SPLIT).

Overview of Functions



Pool Asset Management allows you to plan pool assets from the point at which they are
requested right up to the point at which the service is settled. Demand notifications can be
entered in the system directly by the requester or by the planner. The graphical planning
board allows the planner to display and plan all demands. The planning board shows the
individual demands as a series of bars. The planner can then use drag and drop to assign these
demands to the available pool assets, which are also displayed graphically. The current status
of each demand notification is indicated by various bar colors, which means that the planner
can instantly see how each of the pool assets is being used and what the utilization and status
of the entire pool is.
Integration

The functions in Pool Asset Management and the graphical planning board are implemented
with standard SAP objects, thus providing a maximum level of integration with the SAP
system with minimum training requirements.

The demand notification is stored in the system as a maintenance notification with
notification type MF. The notification collects all of the data relating to the operation. It
documents the individual planning steps and their status changes. The individual pool assets
are modeled in the form of equipment master records. Functional locations are used to
combine individual assets in a pool (whereby the functional location must allow the
installation of multiple items of equipment). Service orders are used to collect the costs for
using a pool asset.

Prerequisites

You have configured the Customizing settings for Pool Asset Management and for the
integrated functions in Plant Maintenance and Customer Service.

Features

The process flow from the demand notification to the withdrawal and return of a pool asset is
as follows:

The employee enters a demand in the system in the form of a maintenance notification. The
planner for the pool can see all the demands and available pool assets in the graphical
planning board. When the planner assigns a demand to an available pool asset, the asset is
reserved and the employee automatically receives an e-mail confirming the reservation.
When the employee retrieves the pool asset, the data that is used later for settlement is
recorded.

If the asset is a pool vehicle, for example, the employee receives the keys to the vehicle along
with the registration documents, and the planner records the current mileage/kilometer
reading. When the vehicle is returned, the new mileage/kilometer reading is entered so that
the system can automatically calculate the cost of using the asset on the basis of the distance
driven and the duration. (The mileage/kilometer reading is modeled in the system in the form
of a measurement document.) In this way, the use of the pool asset can be settled as soon as
the asset is returned, and the asset is available again immediately.

If a demand cannot be fulfilled or is canceled, the relevant cancelation activities can be
carried out.

Status of the Demand Notification

When the demand notification is entered, it has the status "not planned". When the planner
assigns a pool asset to a demand, the status of the demand changes to "planned". When it is
reserved, its status changes to "reserved" and the requester is informed of the reservation.
When the requester picks up the pool asset, the notification status changes to "retrieved".
When the asset is returned, the status changes to "returned". The process flow ends when it is
settled and the status changes to "settled".

Activities

The following transactions are available:

   •   Graphical resource planning with planning board (transaction PAM03)
   •   Create pool (transaction PAM01)

   •   Edit pool (transaction PAM02)

You can access these transactions from the SAP menu by choosing:         Logistics
Customer Service     Service Processing     Pool Asset Management         .

Customizing



Since Pool Asset Management functions and the graphical planning board display use
standard SAP objects, the settings for the respective standard objects must be configured
alongside the Customizing settings for Pool Asset Management

In the Implementation Guide (IMG), configure the Customizing settings for the following
objects:

   •   Maintenance Notification (Demand Notification)

       You can configure the settings for notification type MF under      Cross-Application
       Components     Notification

       A BC set is available for these settings and is imported automatically.

   •   Functional Location (Car Pool)

       You configure the settings for the functional location under Plant Maintenance
       and Customer Service      Master Data in Plant Maintenance and Customer Service
          Technical Objects     Functional Locations

   •   Equipment (Pool Asset)

       You configure the settings for equipment under Plant Maintenance and Customer
       Service   Master Data in Plant Maintenance and Customer Service   Technical
       Objects   Equipment

   •   Order (Settlement)
Configure the settings for the order under Plant Maintenance and Customer
       Service    Maintenance and Service Processing    Maintenance and Service Orders


Settings for the Graphical Planning Board

The graphical planning board is based on the bar chart in the standard SAP system. You can
configure the basic settings under    SAP NetWeaver        Application Server    Frontend
Services    Bar Chart

A BC set is available for these settings and is imported automatically. Furthermore, you can
also configure some settings for the planning board directly in Customizing for Pool Asset
Management in the activities Define Settings for Planning Board and Edit Display Variants
of Planning Board.

Pool Asset Management Settings

Configure the settings for Pool Asset Management under         Plant Maintenance and
Customer Service      Maintenance and Service Processing        Pool Asset Management

Settings for Fleet Management

If you also want to use Pool Asset Management as fleet management, configure the settings
under      Plant Maintenance and Customer Service      Master Data in Plant Maintenance
and Customer Service      Technical Objects   Settings for Fleet Management      .

Demand Creation



Both the requester and the planner can create a demand. The requester creates a maintenance
notification in the system using transaction IW21. The planner can create the demand directly
from the graphical planning board by choosing Create New Demand Notification. On the
initial screen for creating the maintenance notification, enter the notification type MF (pool
request). The following data is necessary: Descriptive short text that is displayed to indicate
the relevant bar on the planning board; user (in the case of vehicles, the driver) and requester;
information about location and account assignment; start and end of use; the equipment of the
pool asset and the pool from which the demand is to be settled. By saving this maintenance
notification, the planner can view the demand on the planning board. You can create an
overview of all demands or the demands of a single requester using notification selection
(transaction IW59). Existing demand notifications can be changed by the requester and the
planner.

Demand Planning with the Graphical Planning Board



To call the planning board, the planner enters the selection period, the display variant, and the
pool that is to be planned on the initial screen. The system displays every demand for a pool
as a bar on the graphical planning board. The demands yet to be planned are displayed in the
lower half, and the demands already assigned to a pool asset are displayed in the top half.
Every pool asset in the top half of the planning board is represented by a row. The colors of
the bars show the status of the demand. The assignment of status and color can be changed in
Customizing for bar charts. When you double-click a bar, the system displays a dialog box
with the detailed data of the demand. You can cancel the demand here by choosing Cancel
Demand. By choosing Change Selected Demand Notification in the toolbar, you access the
maintenance notification and you can change it.

The planner schedules demands by dragging and dropping a bar onto a row in the top half of
the planning board. The times defined in the demand are retained. The status of the demand
notification changes from "Not Planned" to "Planned". When you double-click a planned
demand, the system now displays the Reserve pushbutton in the dialog box, which you can
use to reserve the selected pool asset for the demand. A further tab page with detailed data
about the assigned asset is also displayed.

As long as no reservation has been created for a planned demand, a demand can be
rescheduled. To do this, drag the relevant bar to the bottom half of the planning board. The
assignment to pool and pool asset is deleted again and the status of the demand notification is
reset to "Not Planned". It is also possible to assign another asset before creating the
reservation in "Planned" status.

To reserve a planned demand, choose Reserve on the detail screen. When the demand is
reserved, the status changes from "Planned" to "Reserved". Once this status has been set, you
cannot move the demand on the planning board and assign it to a different asset. When the
reservation is created, the system sends an e-mail to the requester informing him or her about
the reservation, so that the pool asset can be picked up from the issue location.

Cancel and Delete Demands

If a requester wants to cancel a demand notification, he or she can do this from the
notification created by setting the user status to "Canceled". When the notification is saved,
the system transfers the new status to the planning board where it can be viewed by the
planner. On the planning board, the planner can also cancel demands that are planned, not
planned, or reserved. A reservation can be canceled as long as the requester has not picked up
the pool asset. The requester automatically receives an e-mail about the cancelation of the
reservation. If a reservation or demand has been canceled, you can delete it in the detailed
view by choosing Delete Canceled Demand. The demand is not displayed on the planning
board anymore and the maintenance notification is assigned the status "Deleted".

Reporting Functions for the Planner

On the planning board, the following functions are available to the planner in the toolbar:

   •   Overlapping on/off

       If the times of scheduled demands in a row overlap, one bar may cover another bar
       completely. By choosing this pushbutton, you can display the overlapping demands
       below each other.

   •   Overview of Scheduled Demands
This pushbutton opens a dialog box, in which all scheduled demands for a pool are
       displayed with their respective status.

   •   Demand Overview

       This pushbutton opens a dialog box, in which all unscheduled demands for a pool are
       displayed with their respective status.

   •   Filter Functions

       By using the filter functions, you can filter the display according to certain demand
       characteristics, so that only the demands with the defined characteristics are
       displayed. With pool vehicles, it is also possible to filter according to license plate
       number.

Issue, Return, and Settlement



Issue Pool Asset

After the requester has received an e-mail informing him or her that the required pool asset
has been reserved, he or she can pick it up from the issue location. When the asset is issued,
the planner calls the detailed data of the reserved demand and changes the status from
"Reserved" to "Retrieved" by choosing Issue. The Pickup Data dialog box appears, where the
current data must be entered. If the reservation time period has already expired at the time of
pickup, the pool asset cannot be issued. The demand must be canceled and created again.

To post the pickup, choose Save Pickup Slip. The actual data is entered in the system as a
measurement document for the equipment. The colors of the bar chart of the demand are
adjusted on the planning board. For now on, you cannot cancel the demand. The demand
notification is assigned the status "Retrieved".

Return Pool Asset

As soon as the requester has returned the pool asset, the planner enters the return data on the
demand detail screen by choosing Return. In the Return Data dialog box, he or she enters the
current data. You post the return by choosing Save Pickup Slip, and another measurement
document is created for the equipment. The demand notification is assigned the status
"Returned".

Settlement

You settle the demand on the detailed data screen by choosing Settlement. In the settlement
detail dialog box, the system displays how the costs to be calculated are composed on the
basis of the assigned cost element. The system determines the cost element using the pool
category. Any flat rates are taken into account during the settlement. When you save the
settlement by choosing Settlement, the system creates a service order in the background that
collects the usage costs of the pool asset. The service order is linked to the demand
notification. When the settlement is posted, the bar-chart colors of the demand are adjusted
on the planning board. The demand notification is assigned the status "Settled".

Repair Measures



Maintenance and repair work carried out on a pool asset can also be represented and
monitored using the graphical planning board. The system automatically creates a reservation
for the asset in question for the period in which it is not available (because it is in the
workshop) so that it cannot be assigned to a demand during this time. A separate bar color is
used in the planning board to represent periods where an asset is in the workshop.

You can specify regular maintenance work as part of maintenance planning for the
equipment. Unscheduled repair work can be initiated by creating a maintenance notification
(transaction IW21) with the notification type M1.

More Related Content

What's hot

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
guest9d4260
 
Pm end-user-manual
Pm end-user-manualPm end-user-manual
Pm end-user-manual
navenaa
 

What's hot (20)

SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration document
 
Step by step lsmw tutorial
Step by step lsmw tutorialStep by step lsmw tutorial
Step by step lsmw tutorial
 
SAP SD configuration
SAP SD configuration SAP SD configuration
SAP SD configuration
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
 
Sap pm-master-data
Sap pm-master-dataSap pm-master-data
Sap pm-master-data
 
Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
 
SAP STO config
SAP STO configSAP STO config
SAP STO config
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
SAP PM
SAP PMSAP PM
SAP PM
 
Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919
 
Work clearance management config and steps
Work clearance management   config and stepsWork clearance management   config and steps
Work clearance management config and steps
 
Pm end-user-manual
Pm end-user-manualPm end-user-manual
Pm end-user-manual
 
SAP LES WM Multi Step Production Picking
SAP LES WM Multi Step Production PickingSAP LES WM Multi Step Production Picking
SAP LES WM Multi Step Production Picking
 
What is sap client
What is sap clientWhat is sap client
What is sap client
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
Product allocation during sales order entry
Product allocation during sales order entryProduct allocation during sales order entry
Product allocation during sales order entry
 
Sap mm
Sap mmSap mm
Sap mm
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
 
What is ticketing tool in sap
What is ticketing tool in sapWhat is ticketing tool in sap
What is ticketing tool in sap
 

Viewers also liked

Plm360 FrançAis
Plm360 FrançAisPlm360 FrançAis
Plm360 FrançAis
rayfinnigan
 

Viewers also liked (10)

Plm360 English
Plm360 EnglishPlm360 English
Plm360 English
 
συντομογραφιεσ
συντομογραφιεσσυντομογραφιεσ
συντομογραφιεσ
 
Plm360 FrançAis
Plm360 FrançAisPlm360 FrançAis
Plm360 FrançAis
 
Fleet management and vehicle tracking solutions
Fleet management and vehicle tracking solutionsFleet management and vehicle tracking solutions
Fleet management and vehicle tracking solutions
 
The 6 Key Elements of Vehicle Fleet Management
The 6 Key Elements of Vehicle Fleet ManagementThe 6 Key Elements of Vehicle Fleet Management
The 6 Key Elements of Vehicle Fleet Management
 
Odoo OpenERP 7 Fleet and Route Management
Odoo OpenERP 7 Fleet and Route ManagementOdoo OpenERP 7 Fleet and Route Management
Odoo OpenERP 7 Fleet and Route Management
 
Strategic Fleet and Transport Management
Strategic Fleet and Transport Management Strategic Fleet and Transport Management
Strategic Fleet and Transport Management
 
OpenERP / Odoo Fleet management
OpenERP / Odoo Fleet managementOpenERP / Odoo Fleet management
OpenERP / Odoo Fleet management
 
Fleet Management
Fleet Management Fleet Management
Fleet Management
 
Mrs doc
Mrs docMrs doc
Mrs doc
 

Similar to Pool asset management

Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892
HariharanMS5
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptx
NCHKRISHNATEJA
 

Similar to Pool asset management (20)

SAP Treasury
SAP TreasurySAP Treasury
SAP Treasury
 
AVReporter v2.5 energy management
AVReporter v2.5 energy managementAVReporter v2.5 energy management
AVReporter v2.5 energy management
 
Sd billing plan
Sd billing planSd billing plan
Sd billing plan
 
Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892
 
MD04 Report in BW
MD04 Report in BWMD04 Report in BW
MD04 Report in BW
 
Sap BPC concepts
Sap BPC conceptsSap BPC concepts
Sap BPC concepts
 
Project Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxProject Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptx
 
Returns and service
Returns and serviceReturns and service
Returns and service
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptx
 
Resume (3)
Resume (3)Resume (3)
Resume (3)
 
OPEN CABSTER PROJECT DOC
OPEN CABSTER PROJECT DOCOPEN CABSTER PROJECT DOC
OPEN CABSTER PROJECT DOC
 
V sphere perf_charts
V sphere perf_chartsV sphere perf_charts
V sphere perf_charts
 
Sap bw lo extraction
Sap bw lo extractionSap bw lo extraction
Sap bw lo extraction
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogs
 
SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle counting
 
Dashboard
DashboardDashboard
Dashboard
 
Dashboard Doc
Dashboard DocDashboard Doc
Dashboard Doc
 
Salesforce Field Service Lightning introduction.pptx
Salesforce Field Service Lightning introduction.pptxSalesforce Field Service Lightning introduction.pptx
Salesforce Field Service Lightning introduction.pptx
 
sFIN - Process Area
sFIN - Process AreasFIN - Process Area
sFIN - Process Area
 
286648705 sap-bos
286648705 sap-bos286648705 sap-bos
286648705 sap-bos
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Pool asset management

  • 1. Pool Asset Management You can use the Pool Asset Management (PAM) component to manage physical assets such as vehicles, LCD projectors, cell phones, and similar objects that you have grouped into a pool. These pool assets can be used jointly and removed from the pool for a certain period of time. You can control and monitor the use of your pool assets from the requirement coverage request, through issue, to return and settlement of the service. Using Pool Asset Management, you can: • Schedule a pool asset request • Reserve a pool asset • Send a confirmation e-mail to the requester of a pool asset • Issue and return a pool asset • Complete the service • Oversee repairs to a pool asset A graphical planning board is available for these activities (transaction code PAM03). Archiving You can archive Requirements and Splits for Pool Asset Management. For this purpose, the following two tables have been added to the archiving object for maintenance notifications (PM_QMEL): Requirements (Objects to be Scheduled) (technical name: PAMS_NEED) and Splits (Objects to be Scheduled) (technical name: PAMS_SPLIT). Overview of Functions Pool Asset Management allows you to plan pool assets from the point at which they are requested right up to the point at which the service is settled. Demand notifications can be entered in the system directly by the requester or by the planner. The graphical planning board allows the planner to display and plan all demands. The planning board shows the individual demands as a series of bars. The planner can then use drag and drop to assign these demands to the available pool assets, which are also displayed graphically. The current status of each demand notification is indicated by various bar colors, which means that the planner can instantly see how each of the pool assets is being used and what the utilization and status of the entire pool is.
  • 2. Integration The functions in Pool Asset Management and the graphical planning board are implemented with standard SAP objects, thus providing a maximum level of integration with the SAP system with minimum training requirements. The demand notification is stored in the system as a maintenance notification with notification type MF. The notification collects all of the data relating to the operation. It documents the individual planning steps and their status changes. The individual pool assets are modeled in the form of equipment master records. Functional locations are used to combine individual assets in a pool (whereby the functional location must allow the installation of multiple items of equipment). Service orders are used to collect the costs for using a pool asset. Prerequisites You have configured the Customizing settings for Pool Asset Management and for the integrated functions in Plant Maintenance and Customer Service. Features The process flow from the demand notification to the withdrawal and return of a pool asset is as follows: The employee enters a demand in the system in the form of a maintenance notification. The planner for the pool can see all the demands and available pool assets in the graphical planning board. When the planner assigns a demand to an available pool asset, the asset is reserved and the employee automatically receives an e-mail confirming the reservation. When the employee retrieves the pool asset, the data that is used later for settlement is recorded. If the asset is a pool vehicle, for example, the employee receives the keys to the vehicle along with the registration documents, and the planner records the current mileage/kilometer reading. When the vehicle is returned, the new mileage/kilometer reading is entered so that the system can automatically calculate the cost of using the asset on the basis of the distance driven and the duration. (The mileage/kilometer reading is modeled in the system in the form of a measurement document.) In this way, the use of the pool asset can be settled as soon as the asset is returned, and the asset is available again immediately. If a demand cannot be fulfilled or is canceled, the relevant cancelation activities can be carried out. Status of the Demand Notification When the demand notification is entered, it has the status "not planned". When the planner assigns a pool asset to a demand, the status of the demand changes to "planned". When it is reserved, its status changes to "reserved" and the requester is informed of the reservation. When the requester picks up the pool asset, the notification status changes to "retrieved".
  • 3. When the asset is returned, the status changes to "returned". The process flow ends when it is settled and the status changes to "settled". Activities The following transactions are available: • Graphical resource planning with planning board (transaction PAM03) • Create pool (transaction PAM01) • Edit pool (transaction PAM02) You can access these transactions from the SAP menu by choosing: Logistics Customer Service Service Processing Pool Asset Management . Customizing Since Pool Asset Management functions and the graphical planning board display use standard SAP objects, the settings for the respective standard objects must be configured alongside the Customizing settings for Pool Asset Management In the Implementation Guide (IMG), configure the Customizing settings for the following objects: • Maintenance Notification (Demand Notification) You can configure the settings for notification type MF under Cross-Application Components Notification A BC set is available for these settings and is imported automatically. • Functional Location (Car Pool) You configure the settings for the functional location under Plant Maintenance and Customer Service Master Data in Plant Maintenance and Customer Service Technical Objects Functional Locations • Equipment (Pool Asset) You configure the settings for equipment under Plant Maintenance and Customer Service Master Data in Plant Maintenance and Customer Service Technical Objects Equipment • Order (Settlement)
  • 4. Configure the settings for the order under Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Settings for the Graphical Planning Board The graphical planning board is based on the bar chart in the standard SAP system. You can configure the basic settings under SAP NetWeaver Application Server Frontend Services Bar Chart A BC set is available for these settings and is imported automatically. Furthermore, you can also configure some settings for the planning board directly in Customizing for Pool Asset Management in the activities Define Settings for Planning Board and Edit Display Variants of Planning Board. Pool Asset Management Settings Configure the settings for Pool Asset Management under Plant Maintenance and Customer Service Maintenance and Service Processing Pool Asset Management Settings for Fleet Management If you also want to use Pool Asset Management as fleet management, configure the settings under Plant Maintenance and Customer Service Master Data in Plant Maintenance and Customer Service Technical Objects Settings for Fleet Management . Demand Creation Both the requester and the planner can create a demand. The requester creates a maintenance notification in the system using transaction IW21. The planner can create the demand directly from the graphical planning board by choosing Create New Demand Notification. On the initial screen for creating the maintenance notification, enter the notification type MF (pool request). The following data is necessary: Descriptive short text that is displayed to indicate the relevant bar on the planning board; user (in the case of vehicles, the driver) and requester; information about location and account assignment; start and end of use; the equipment of the pool asset and the pool from which the demand is to be settled. By saving this maintenance notification, the planner can view the demand on the planning board. You can create an overview of all demands or the demands of a single requester using notification selection (transaction IW59). Existing demand notifications can be changed by the requester and the planner. Demand Planning with the Graphical Planning Board To call the planning board, the planner enters the selection period, the display variant, and the pool that is to be planned on the initial screen. The system displays every demand for a pool as a bar on the graphical planning board. The demands yet to be planned are displayed in the
  • 5. lower half, and the demands already assigned to a pool asset are displayed in the top half. Every pool asset in the top half of the planning board is represented by a row. The colors of the bars show the status of the demand. The assignment of status and color can be changed in Customizing for bar charts. When you double-click a bar, the system displays a dialog box with the detailed data of the demand. You can cancel the demand here by choosing Cancel Demand. By choosing Change Selected Demand Notification in the toolbar, you access the maintenance notification and you can change it. The planner schedules demands by dragging and dropping a bar onto a row in the top half of the planning board. The times defined in the demand are retained. The status of the demand notification changes from "Not Planned" to "Planned". When you double-click a planned demand, the system now displays the Reserve pushbutton in the dialog box, which you can use to reserve the selected pool asset for the demand. A further tab page with detailed data about the assigned asset is also displayed. As long as no reservation has been created for a planned demand, a demand can be rescheduled. To do this, drag the relevant bar to the bottom half of the planning board. The assignment to pool and pool asset is deleted again and the status of the demand notification is reset to "Not Planned". It is also possible to assign another asset before creating the reservation in "Planned" status. To reserve a planned demand, choose Reserve on the detail screen. When the demand is reserved, the status changes from "Planned" to "Reserved". Once this status has been set, you cannot move the demand on the planning board and assign it to a different asset. When the reservation is created, the system sends an e-mail to the requester informing him or her about the reservation, so that the pool asset can be picked up from the issue location. Cancel and Delete Demands If a requester wants to cancel a demand notification, he or she can do this from the notification created by setting the user status to "Canceled". When the notification is saved, the system transfers the new status to the planning board where it can be viewed by the planner. On the planning board, the planner can also cancel demands that are planned, not planned, or reserved. A reservation can be canceled as long as the requester has not picked up the pool asset. The requester automatically receives an e-mail about the cancelation of the reservation. If a reservation or demand has been canceled, you can delete it in the detailed view by choosing Delete Canceled Demand. The demand is not displayed on the planning board anymore and the maintenance notification is assigned the status "Deleted". Reporting Functions for the Planner On the planning board, the following functions are available to the planner in the toolbar: • Overlapping on/off If the times of scheduled demands in a row overlap, one bar may cover another bar completely. By choosing this pushbutton, you can display the overlapping demands below each other. • Overview of Scheduled Demands
  • 6. This pushbutton opens a dialog box, in which all scheduled demands for a pool are displayed with their respective status. • Demand Overview This pushbutton opens a dialog box, in which all unscheduled demands for a pool are displayed with their respective status. • Filter Functions By using the filter functions, you can filter the display according to certain demand characteristics, so that only the demands with the defined characteristics are displayed. With pool vehicles, it is also possible to filter according to license plate number. Issue, Return, and Settlement Issue Pool Asset After the requester has received an e-mail informing him or her that the required pool asset has been reserved, he or she can pick it up from the issue location. When the asset is issued, the planner calls the detailed data of the reserved demand and changes the status from "Reserved" to "Retrieved" by choosing Issue. The Pickup Data dialog box appears, where the current data must be entered. If the reservation time period has already expired at the time of pickup, the pool asset cannot be issued. The demand must be canceled and created again. To post the pickup, choose Save Pickup Slip. The actual data is entered in the system as a measurement document for the equipment. The colors of the bar chart of the demand are adjusted on the planning board. For now on, you cannot cancel the demand. The demand notification is assigned the status "Retrieved". Return Pool Asset As soon as the requester has returned the pool asset, the planner enters the return data on the demand detail screen by choosing Return. In the Return Data dialog box, he or she enters the current data. You post the return by choosing Save Pickup Slip, and another measurement document is created for the equipment. The demand notification is assigned the status "Returned". Settlement You settle the demand on the detailed data screen by choosing Settlement. In the settlement detail dialog box, the system displays how the costs to be calculated are composed on the basis of the assigned cost element. The system determines the cost element using the pool category. Any flat rates are taken into account during the settlement. When you save the settlement by choosing Settlement, the system creates a service order in the background that collects the usage costs of the pool asset. The service order is linked to the demand
  • 7. notification. When the settlement is posted, the bar-chart colors of the demand are adjusted on the planning board. The demand notification is assigned the status "Settled". Repair Measures Maintenance and repair work carried out on a pool asset can also be represented and monitored using the graphical planning board. The system automatically creates a reservation for the asset in question for the period in which it is not available (because it is in the workshop) so that it cannot be assigned to a demand during this time. A separate bar color is used in the planning board to represent periods where an asset is in the workshop. You can specify regular maintenance work as part of maintenance planning for the equipment. Unscheduled repair work can be initiated by creating a maintenance notification (transaction IW21) with the notification type M1.