Maintenance Performance Evaluation Parameters “KPIs”
Indicator Current Value Target Value
Reliability/Maintainability
Eq Availability % <98%
Eq Reliability % <95%
Mean Time Between Failures MTBF (Eq hrs) Increasing trend
Mean Time Between Failures MTBF (Operating hrs) Increasing trend
Mean Time To Repair MTTR (hrs) Decreasing trend
Mean Time Between Repair MTBR Increasing trend
Overall Equipment Effectiveness (OEE)
Preventive Maintenance (include PdM)
CM/PM (number) 3-10%
CM/PM (duration) <10%
CM/PM (Cost) <10%
CM WO/PM WO (number) 3-10%
CM WO/PM WO (Cost) <10%
Backlog Ratio
Prepared by MHA Soliman
Indicator (Continue) Current Target
Work Order Overdue (number)
PPM Labor Hrs/ Emergency Labor Hrs 9:1
PPM WOs / CM WOs from inspection 6:1
Planning & Scheduling
Planned/schedule Compliance- All Labor Hrs Actually Completed to
Schedule/ Total
Maintenance Labor Hrs Available
>90%
Planned Work- Total Labor Hrs Planned/ Total Labor Hrs in Scheduled >95%
Maintenance Supervision
Maintenance Control-Unplanned Labor Hrs/ Total Labor Hrs <10%
Crew Efficiency- Actual Hrs Completed / Estimated Time
Work Process Productivity
Maintenance Cost/ Net Asset Value
Over Time Hrs as % of Total Labor Hrs <5%
Process Availability %- Actual Production/ Total Planned Production
Downtime Losses Trend
Annual Maintenance Cost/ Total Operation Cost Trend
Prepared by MHA Soliman
Indicator (Continue) Current Target
Organization/ Staffing relative to maintenance mission
Urgent response 10%
PPM inspection 30%
Relief of planned Backlog 60%
Ratio Planned/unplanned labor hours 9:1
% of Emergency WOs <10%
% of Planned Work >80%
% of Up Time >90%
% of Predictive Planned Maintenance Work
Annual Training Per Mechanic
Hrs: >100/yr
Pounds:
Percent of Maintenance Labor Budget Relative to Total
Maintenance Budget
10%
“Targets value are According to the Industrial Practice Benchmark”
Prepared by MHA Soliman
•Availability= Available Time/ Total Working Time
Available time=total working time – downtime
•Reliability=Total Working Time-Total Downtime/Total Working
Time-planned
•Mean Time Between Failures (MTBF)=Total Working Time/ Total No Of
Failures.
•Mean Time To Repair (MTTR)= Total Repair Time/ Total No Of Failures.
•Mean Time Between Repairs= MTBF-MTTR
•OEE= Availability x Quality x Efficiency
Quality=Total-Rejected/ Total
Calculation Formulas
Prepared by MHA Soliman

More Related Content

Viewers also liked

How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramSchoolDude
 
101 tips and tricks to improve your root cause analisys
101 tips and tricks to improve your root cause analisys101 tips and tricks to improve your root cause analisys
101 tips and tricks to improve your root cause analisysIONEL DUTU
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancePramod A
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)nfra erp
 
Vibration Monitoring
Vibration MonitoringVibration Monitoring
Vibration MonitoringPri Hadi
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
Vibration Monitoring
Vibration Monitoring Vibration Monitoring
Vibration Monitoring IONEL DUTU
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptRohit Kaushik
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementawantika diwan
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 

Viewers also liked (19)

How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
101 tips and tricks to improve your root cause analisys
101 tips and tricks to improve your root cause analisys101 tips and tricks to improve your root cause analisys
101 tips and tricks to improve your root cause analisys
 
Machinery Oil Analysis
Machinery Oil AnalysisMachinery Oil Analysis
Machinery Oil Analysis
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Vibration Monitoring
Vibration MonitoringVibration Monitoring
Vibration Monitoring
 
Root Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case StudyRoot Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case Study
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
Infrared thermography
Infrared thermographyInfrared thermography
Infrared thermography
 
Vibration
VibrationVibration
Vibration
 
RCM
RCMRCM
RCM
 
Vibration Monitoring
Vibration Monitoring Vibration Monitoring
Vibration Monitoring
 
FMEA - Electrical Motor
FMEA - Electrical MotorFMEA - Electrical Motor
FMEA - Electrical Motor
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Quality Risk management Application of FMEA
Quality Risk management  Application of FMEAQuality Risk management  Application of FMEA
Quality Risk management Application of FMEA
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 

More from Mohammed Hamed Ahmed Soliman

Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsMohammed Hamed Ahmed Soliman
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

More from Mohammed Hamed Ahmed Soliman (19)

Lean accounting VS Financial Management
Lean accounting VS Financial ManagementLean accounting VS Financial Management
Lean accounting VS Financial Management
 
Healthcare is ripe for lean
Healthcare is ripe for leanHealthcare is ripe for lean
Healthcare is ripe for lean
 
Pareto Analysis
Pareto AnalysisPareto Analysis
Pareto Analysis
 
Brainstorming Technique
Brainstorming TechniqueBrainstorming Technique
Brainstorming Technique
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
 
The Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business successThe Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business success
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
 
Problems Solving Techniques
Problems Solving TechniquesProblems Solving Techniques
Problems Solving Techniques
 
Ultrasound Detection - Applications
Ultrasound Detection - ApplicationsUltrasound Detection - Applications
Ultrasound Detection - Applications
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
OEE
OEEOEE
OEE
 
Reliability Centered Maintenance Case Study
 Reliability Centered Maintenance Case Study Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Strategic Planning
Strategic PlanningStrategic Planning
Strategic Planning
 
6Sigma
6Sigma6Sigma
6Sigma
 

Recently uploaded

The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsPAmudhaKumar
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Reviewyalehistoricalreview
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.aruny7087
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxssuserf63bd7
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importanceajay0134
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 

Recently uploaded (16)

The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

Maintenance KPIs

  • 1. Prepared by Eng.Mohammed Hamed Ahmed Soliman Industrial Engineering Consultant & Lecturer Email: mhamed206@yahoo.com : m.h.ahmed@ess.aucegypt.edu Tel : +201001309903 LinkedIn: eg.linkedin.com/in/mohammedhamed/ Prepared by MHA Soliman
  • 2. Maintenance Performance Evaluation Parameters “KPIs” Indicator Current Value Target Value Reliability/Maintainability Eq Availability % <98% Eq Reliability % <95% Mean Time Between Failures MTBF (Eq hrs) Increasing trend Mean Time Between Failures MTBF (Operating hrs) Increasing trend Mean Time To Repair MTTR (hrs) Decreasing trend Mean Time Between Repair MTBR Increasing trend Overall Equipment Effectiveness (OEE) Preventive Maintenance (include PdM) CM/PM (number) 3-10% CM/PM (duration) <10% CM/PM (Cost) <10% CM WO/PM WO (number) 3-10% CM WO/PM WO (Cost) <10% Backlog Ratio Prepared by MHA Soliman
  • 3. Indicator (Continue) Current Target Work Order Overdue (number) PPM Labor Hrs/ Emergency Labor Hrs 9:1 PPM WOs / CM WOs from inspection 6:1 Planning & Scheduling Planned/schedule Compliance- All Labor Hrs Actually Completed to Schedule/ Total Maintenance Labor Hrs Available >90% Planned Work- Total Labor Hrs Planned/ Total Labor Hrs in Scheduled >95% Maintenance Supervision Maintenance Control-Unplanned Labor Hrs/ Total Labor Hrs <10% Crew Efficiency- Actual Hrs Completed / Estimated Time Work Process Productivity Maintenance Cost/ Net Asset Value Over Time Hrs as % of Total Labor Hrs <5% Process Availability %- Actual Production/ Total Planned Production Downtime Losses Trend Annual Maintenance Cost/ Total Operation Cost Trend Prepared by MHA Soliman
  • 4. Indicator (Continue) Current Target Organization/ Staffing relative to maintenance mission Urgent response 10% PPM inspection 30% Relief of planned Backlog 60% Ratio Planned/unplanned labor hours 9:1 % of Emergency WOs <10% % of Planned Work >80% % of Up Time >90% % of Predictive Planned Maintenance Work Annual Training Per Mechanic Hrs: >100/yr Pounds: Percent of Maintenance Labor Budget Relative to Total Maintenance Budget 10% “Targets value are According to the Industrial Practice Benchmark” Prepared by MHA Soliman
  • 5. •Availability= Available Time/ Total Working Time Available time=total working time – downtime •Reliability=Total Working Time-Total Downtime/Total Working Time-planned •Mean Time Between Failures (MTBF)=Total Working Time/ Total No Of Failures. •Mean Time To Repair (MTTR)= Total Repair Time/ Total No Of Failures. •Mean Time Between Repairs= MTBF-MTTR •OEE= Availability x Quality x Efficiency Quality=Total-Rejected/ Total Calculation Formulas Prepared by MHA Soliman