Complete list of all used KPIs in maintenance.
KPIs categories included in this presentation:
1. Reliability/Maintainability
2. Preventive/Predictive Maintenance
3. Planning & Scheduling
4. Maintenance Supervision
5. Work Process Productivity
6. Organization/ Staffing Relative to Maintenance Mission
7. Annual Training Per Mechanic
8. Maintenance Budgets and Costs.
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Maintenance KPIs
1. Prepared by Eng.Mohammed Hamed Ahmed Soliman
Industrial Engineering Consultant & Lecturer
Email: mhamed206@yahoo.com
: m.h.ahmed@ess.aucegypt.edu
Tel : +201001309903
LinkedIn: eg.linkedin.com/in/mohammedhamed/
Prepared by MHA Soliman
2. Maintenance Performance Evaluation Parameters “KPIs”
Indicator Current Value Target Value
Reliability/Maintainability
Eq Availability % <98%
Eq Reliability % <95%
Mean Time Between Failures MTBF (Eq hrs) Increasing trend
Mean Time Between Failures MTBF (Operating hrs) Increasing trend
Mean Time To Repair MTTR (hrs) Decreasing trend
Mean Time Between Repair MTBR Increasing trend
Overall Equipment Effectiveness (OEE)
Preventive Maintenance (include PdM)
CM/PM (number) 3-10%
CM/PM (duration) <10%
CM/PM (Cost) <10%
CM WO/PM WO (number) 3-10%
CM WO/PM WO (Cost) <10%
Backlog Ratio
Prepared by MHA Soliman
3. Indicator (Continue) Current Target
Work Order Overdue (number)
PPM Labor Hrs/ Emergency Labor Hrs 9:1
PPM WOs / CM WOs from inspection 6:1
Planning & Scheduling
Planned/schedule Compliance- All Labor Hrs Actually Completed to
Schedule/ Total
Maintenance Labor Hrs Available
>90%
Planned Work- Total Labor Hrs Planned/ Total Labor Hrs in Scheduled >95%
Maintenance Supervision
Maintenance Control-Unplanned Labor Hrs/ Total Labor Hrs <10%
Crew Efficiency- Actual Hrs Completed / Estimated Time
Work Process Productivity
Maintenance Cost/ Net Asset Value
Over Time Hrs as % of Total Labor Hrs <5%
Process Availability %- Actual Production/ Total Planned Production
Downtime Losses Trend
Annual Maintenance Cost/ Total Operation Cost Trend
Prepared by MHA Soliman
4. Indicator (Continue) Current Target
Organization/ Staffing relative to maintenance mission
Urgent response 10%
PPM inspection 30%
Relief of planned Backlog 60%
Ratio Planned/unplanned labor hours 9:1
% of Emergency WOs <10%
% of Planned Work >80%
% of Up Time >90%
% of Predictive Planned Maintenance Work
Annual Training Per Mechanic
Hrs: >100/yr
Pounds:
Percent of Maintenance Labor Budget Relative to Total
Maintenance Budget
10%
“Targets value are According to the Industrial Practice Benchmark”
Prepared by MHA Soliman
5. •Availability= Available Time/ Total Working Time
Available time=total working time – downtime
•Reliability=Total Working Time-Total Downtime/Total Working
Time-planned
•Mean Time Between Failures (MTBF)=Total Working Time/ Total No Of
Failures.
•Mean Time To Repair (MTTR)= Total Repair Time/ Total No Of Failures.
•Mean Time Between Repairs= MTBF-MTTR
•OEE= Availability x Quality x Efficiency
Quality=Total-Rejected/ Total
Calculation Formulas
Prepared by MHA Soliman