Housekeeping
• The slides will be available on our SlideShare page; the link will be
emailed to you
• The recording of the webinar will be available to view; the link will be
emailed to you
• Please take the time to complete a post-webinar survey that will pop up
at the end
• You can type your questions throughout the session
• Time will be allocated in the end for the speaker to address your
questions
2
Your Presenter
Eric Evans has held Director level positions in the automotive,
retail, fast moving consumer goods and healthcare sectors. He is
the author of three books on procurement and negotiation, and a
speaker on MBA programmes across Europe and the Gulf region
As a management consultant, he has delivered improvement
programmes in demand management and inventory management,
and has coached organisations as they implement collaborative
replenishment and customer-led approaches to demand
management.
3
Why is this important?
A contract is a business
document that must be
written in a way which
makes it legally
enforceable.
It will contain legal
provisions, but must be
seen as a business
document
Don’t be
afraid of
Contracts
What drives the content of a contract?
The contract should be driven by
five things:
1.What is the contract trying to
achieve?
2.What risks and opportunities
do we want to manage?
3.What form of relationship do
we hope to have?
4.How will we manage the
business relationship?
5.What remedies do we want if
things go wrong
“A contracts simply says:
This is what you will do,
this is what we will do and
this is what happens if
things go wrong”
Examples
What are we trying to
achieve?
A low price or a fixed price?
Our risk or their risk?
An outcome or following our
instructions?
What risks and opportunities
do we need to manage?
What could go wrong?
What further opportunities
could arise?
What type of relationship do
we want?
Adversarial?
Risk sharing?
Absolute certainty of outcome?
How will we manage the
relationship?
Governance?
Coping with change?
Dispute resolution?
What happens if
things go
wrong?
The wrong way to start…….
Why is this important?
What the customer
wanted
What the supplier
understood
How it was
documented
What it actually didHow it was
designed
How it was billed
by the supplier 8
Risks and Opportunities
A contract is, at its heart, a risk management tool
10
Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8
Failure Mode and Effects Analysis (FMEA)
Risk Number Risk to be considered Probability Consequences Visibilty Risk Value Mitigation
1 Exchange rate changes 8 1 6 48
CR We buy in supplier currency and
hedge
2 Industrial relations dispute 3 7 7 147
CC disallowing disputes as force
majeure CC obliging supplier to advise
on state of industrial relations
3 Ownership of supplier IPR 3 9 8 216
CC Supplier to warrant IPR ownership
CC Supplier to indemnify us
4 Key man dependency 7 5 6 210
CC Supplier to agree long notice
clause with key man
5 Late delivery 5 5 7 175 CC Liquidated damages, back to back
6 Unacceptable quality 2 9 8 144
CC Uncapped damages for poor
quality
7 Supplier Bankrupcy 1 9 7 63 CR We take monthly credit checks
8 Takeover of company 3 7 9 189
CC Termination rights at our
discretion
9
Design proved to be
flawed
2 9 7 126
CC Uncapped damages for poor
quality
10
Supplier breaches
confidentiality
6 8 9 432 CC Liquidated damages
Notes
a) Risk values greater than 150 must have mitigation plans
b) Risk values less than 150: mitigation plans are optional
c)
CC stands for "Contract
Clause"
d) CR stands for "Commercial Remedy"
Risk Analysis
Brainstorm of
what could go
wrong
Likelihood of it
happening
(0 to 10)
Consequences if
it does
(0 to 10)
How much notice
we will get
(0 to 10)
Risk X
Consequences X
Visibility
Actions we could
take
What type of relationship do we want?
The Relationship Continuum
Adversarial Collaborative
Managing the Relationship:
the key role of Governance
The Commercial Framework:
The Point of the Deal
The Commercial Framework is
the first step in in preparation
for contract drafting. It should
define clearly what we want to
achieve and the risks we want
to avoid. This step should be
done before we consider
drafting the contract. This is
the business proposition which
will be embedded in the
contract
14
Why do we need a “Commercial Framework”?
The Commercial Framework serves two main
purposes:
1. It establishes the priorities – in terms of issues
and clauses - for the commercial negotiations to
take place.
This ensures that the negotiating team
prioritise the issues which are important.
2. It provides the mandate for the negotiating team
by agreeing what the team have a remit to
accept on each issue, during the negotiations.
By defining the Most Desirable Outcome (MDO) we
agree what we are aiming to achieve; by
defining the Least Acceptable Alternative (LAA)
, we agree the minimum we can accept.
15
The Framework sets out deal principles &
objectives
What
We want from
the deal
Commercial Priorities:
• Meet business needs
• Value for money, end to end, by exploiting
value to maximise profitability
• Security against risk & commercial
assurance/contractual protection
• No surprises
• Managing contracts and relationships
throughout the term and beyond
Balance Risk & Opportunity:
• Both parties to be upfront about risk
allocation and the ‘value/price’ of risk
allocation.
• Increases awareness of risk
• Focus on understanding
risks/opportunities for a given
contract/relationship
Relationship Priorities:
• Commercially sensible relationship.
• ‘Necessary’ contractual depth to
support relationship and capture risk
allocation
• Focus on contract/delivery
management
• Continuity of personnel in order to
retain knowledge and relationships
Principles of conduct:
• Treat other party as a seamless
extension of ourselves (the “extended
enterprise”)
• Relationship premised on ‘What can
we do for each other’
• Senior stakeholder engagement &
access
• Build a mature, trusted relationships at
all management levels to embed a
commercial relationship
3
1 4
2
Commercial Priorities:
A word about: “Understanding the Deal”
Before we can start drafting the
contact, we must have absolute
clarity over what the business
need is. This means
understanding outcomes and
deliverables, risks,
dependencies, and the
commercial and contract
strategies which underpin the
contract
The Framework shapes the deal -early
Overview of dimensions included:
Services Remuneration Asset &
Business
Protection
Governance Termination Technical
Legal
Requirements
Contract
Management
• Statement of
business
requirements
• Technical
requirements
• Resource input
&
dependencies
• Staff expertise
• Term
• Knowledge
transfer &
embedding
• Co. policies
• Sub-contractor
& Third Party
• Charging
mechanisms
• Incentives
• Payment
schedule
• Currency
• Bench-
marking
• Liability
limitation
• Subsidiary/
Parent
exposure
• Warranties &
indemnities
• IPR
• Data
protection/
System
security
• Disaster
recovery
• Insurance
requirements
• Employee
Protection
• Governance
Structure
• Dispute
escalation &
resolution
• Supplier
performance
evaluation
• Change
control
procedure
• Tendering for
new work
• Customer
termination
rights
• Our
termination
rights
• Payments
upon
termination
• Exit
management
• Tax
• Regulatory
requirements
• Confidentiality
• Fraud
• Assignment &
novation
• Change of
control
• Divestment of
• General
‘boilerplate’
provisions
• Pre-contract
activities
• Contract
management
activities
• Close-
out/post
contract
activities
Tier2Tier1Tier0
Commercial Framework
Statement of commercial & contract
principles
Contract types supported by
Commercial Framework
Commercial Focus for various contract
categories
Note: Applied where relevant and to the extent relevant considering deal size/significance.
An example of Commercial
Priorities
Focus for contract dimensions related to Commercial Priorities
Lower Commercial Focus
• Business objectives (3.1.1)
• Service Level requirements
(3.1.2)
• Technical requirements (3.2.1)
• Charging Mechanisms (e.g. Types
of Charges (4.1.1-4.1.6), Service
Credits (4.1.9), Currency (4.4.1),
Rebates (4.1.7), Expenses (4.1.8)
• Knowledge transfer (3.6.1)
• Flexibility in volumes & services
(6.4.1)
• System & technical changes
during contract (3.2.2)
• Benchmarking (4.5.1)
• Developed IPR & Licenses (5.4.1-
2)
• Removal of services (6.4.4)
• Contract Term (3.5.1)
• Extension of term (3.5.2)
• Gain Share (4.2.1)
High Commercial Focus
Medium Commercial
Focus
CommercialFocus
Contract dimension in the CF
Low
Med.
High
Knowledg
e Transfer
Develope
d IPR &
Licenses
Technical
changes
during
contract
Removal of
Services/Licen
se
Technic
al Req.
Charging
Mechanism
s & IP
Licenses
Service
Level
Req.
Business
Req.
Volume
flexibility
Term &
extension
Benchmark Gain
Share
Using a Precedent or Template
• Time can be saved by basing a contract on a
precedent or template. This is a more efficient way
of drafting a contract, and as long as the precedent
is a good pone, it reduces the potential for drafting
errors
• It is helpful to:
– Choose a precedent for the same type of transaction
– Choose a precedent where you started from a strong
negotiating position – based on spend, the relationship
with the supplier, the desirability fo doing business with
your company etc
– Use a starting agreement rather than an executed
agreement
Key Drafting Principles
1. Be consistent with the front end
• Check the front end and definitions
schedule
• Use definitions consistently
• Don’t cover provisions that are
covered in the front end (e.g. extra
limits on liability, indemnities)
• Don’t include extra obligations
• Say if you think the front
end/definitions are wrong
2. Use technical terms carefully
• Technical terms with a well-
understood meaning are okay
(e.g. Ethernet, anti-virus,)
• Explain/define ambiguous technical
terms
(e.g. IAM, CoS class 1)
3. Think about structure, and be
comprehensive and clear
• Structure
• Clarity
• Comprehensiveness
4. Points to avoid
• No new customer obligations or
joint obligations
• No liability or indemnity
provisions
• No assumptions
• No agreements to agree
• No charges (except in the
charges schedule)
• No repetition
21
Checklist: Good to Go?
1. Are the correct parties named in the contract?
2. Are the recitals accurate – what would the effect be if they were
published in a lawsuit?
3. Do the definitions work each time a provision is used?
4. Are the obligations in the “Actions” section clearly defined?
5. Are the representations and warranties that we are making
accurate?
6. Has the other party made warranties and representations which
are strong enough?
7. Were representations made pre-contract which we need to
capture or exclude?
8. Can we control our covenants?
9. Has the other party made sufficient covenants?
10. Are we able to control our dependencies to their covenants?
11. Could I misinterpret the scope if I tried?
12. Have we carried out a risk analysis?
13. Have we defined “completion” clearly enough?
14. Are acceptance procedures fully defined?
15. Are delivery dates clearly defined?
16. What happens if delivery dates are missed?
17. Have we explicitly defined “dependencies”?
18. When and how is payment triggered?
19. Are we comfortable with the cash flow throughout the contract?
20. When can the one party terminate, and what compensation does
the other party get?
21. What are our liabilities and how are they limited?
22. Who owns foreground and background IP?
23. Are IP licensing terms clearly understood?
24. Are there clear and agreed processes for change management?
25. What assumptions have we made?
26. Have we considered the things we need to exclude from the
contract?
27. Have we been clear on what warranty does and does not cover?
28. Are the representations and warranties that we are making
accurate?
29. Has the other party made warranties and representations which
are strong enough?
30. How will we resolve disputes?
Questions?

More Related Content

What's hot

Procurement contract management
Procurement contract managementProcurement contract management
Procurement contract managementAavenir
 
Contract negotiations
Contract negotiationsContract negotiations
Contract negotiationsAdel Abouhana
 
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...ASpacone
 
Project risk analysis in Construction Industry
Project risk analysis in Construction IndustryProject risk analysis in Construction Industry
Project risk analysis in Construction IndustryIntaver Insititute
 
Procurement Audit Training - April 2015
Procurement Audit Training - April 2015Procurement Audit Training - April 2015
Procurement Audit Training - April 2015Andrew-Vans Bray
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management Serdar Temiz
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Saket Bansal
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practicestjcornish
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsTejari
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdfaxmedbaasaay
 
Overview to contract management
Overview to contract managementOverview to contract management
Overview to contract managementPriyesh Nair
 
12.1 Procurement Contracts
12.1 Procurement Contracts12.1 Procurement Contracts
12.1 Procurement ContractsDavidMcLachlan1
 
Procurement management by- Prateek kumar
Procurement management by- Prateek kumarProcurement management by- Prateek kumar
Procurement management by- Prateek kumarPrateek Kumar
 

What's hot (20)

Procurement contract management
Procurement contract managementProcurement contract management
Procurement contract management
 
Contract negotiations
Contract negotiationsContract negotiations
Contract negotiations
 
Contract management
Contract managementContract management
Contract management
 
Contract negotiation
Contract negotiationContract negotiation
Contract negotiation
 
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...
Common Mistakes Attorneys [and Their Clients] Make Drafting and Negotating Co...
 
Project risk analysis in Construction Industry
Project risk analysis in Construction IndustryProject risk analysis in Construction Industry
Project risk analysis in Construction Industry
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Procurement Audit Training - April 2015
Procurement Audit Training - April 2015Procurement Audit Training - April 2015
Procurement Audit Training - April 2015
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
Negotiation skills
Negotiation skillsNegotiation skills
Negotiation skills
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your Contracts
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdf
 
Contract management sys
Contract management sysContract management sys
Contract management sys
 
Overview to contract management
Overview to contract managementOverview to contract management
Overview to contract management
 
12.1 Procurement Contracts
12.1 Procurement Contracts12.1 Procurement Contracts
12.1 Procurement Contracts
 
Procurement management by- Prateek kumar
Procurement management by- Prateek kumarProcurement management by- Prateek kumar
Procurement management by- Prateek kumar
 
Contract Management
Contract Management Contract Management
Contract Management
 

Viewers also liked

The Benefits of Effective Contract Management
The Benefits of Effective Contract Management The Benefits of Effective Contract Management
The Benefits of Effective Contract Management Bradford Jacob (Virginia)
 
Addressing Contract Management Needs with SharePoint
Addressing Contract Management Needs with SharePointAddressing Contract Management Needs with SharePoint
Addressing Contract Management Needs with SharePointOptimus BT
 
Guide to Contract Management
Guide to Contract ManagementGuide to Contract Management
Guide to Contract ManagementBerkman Solutions
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practiceDr Gordon Murray
 
Go-to-Market Best Practices for Startups
Go-to-Market Best Practices for StartupsGo-to-Market Best Practices for Startups
Go-to-Market Best Practices for Startupsa16z
 

Viewers also liked (7)

The Benefits of Effective Contract Management
The Benefits of Effective Contract Management The Benefits of Effective Contract Management
The Benefits of Effective Contract Management
 
Addressing Contract Management Needs with SharePoint
Addressing Contract Management Needs with SharePointAddressing Contract Management Needs with SharePoint
Addressing Contract Management Needs with SharePoint
 
Guide to Contract Management
Guide to Contract ManagementGuide to Contract Management
Guide to Contract Management
 
Contract Management
Contract ManagementContract Management
Contract Management
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practice
 
Procurement: Strategies | Best Practices
Procurement: Strategies | Best PracticesProcurement: Strategies | Best Practices
Procurement: Strategies | Best Practices
 
Go-to-Market Best Practices for Startups
Go-to-Market Best Practices for StartupsGo-to-Market Best Practices for Startups
Go-to-Market Best Practices for Startups
 

Similar to Developing Contracts That Fit Your Needs: The Commercial Framework

Contract management for non specialists
Contract management for non specialistsContract management for non specialists
Contract management for non specialistsTom Hyner
 
The biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent themThe biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent themAli Zeeshan
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosPetro Nomics
 
Generating Real Value from your Contracts
Generating Real Value from your ContractsGenerating Real Value from your Contracts
Generating Real Value from your ContractsBravoSolution
 
Manage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalManage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalFred Travis
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7coryn
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7coryn
 
Ten risks to service quality from outsourcing
Ten risks to service quality from outsourcingTen risks to service quality from outsourcing
Ten risks to service quality from outsourcingiCore Limited
 
About Exigent Chameleon Sept 2016
About Exigent Chameleon Sept 2016About Exigent Chameleon Sept 2016
About Exigent Chameleon Sept 2016Mike Newman
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract managementRichard Austin
 
Building A CFO Ready Business Case For Contract Management
Building A CFO Ready Business Case For Contract ManagementBuilding A CFO Ready Business Case For Contract Management
Building A CFO Ready Business Case For Contract ManagementAlison Clarke
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorISHIR
 

Similar to Developing Contracts That Fit Your Needs: The Commercial Framework (20)

Contract management for non specialists
Contract management for non specialistsContract management for non specialists
Contract management for non specialists
 
The biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent themThe biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent them
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagos
 
Generating Real Value from your Contracts
Generating Real Value from your ContractsGenerating Real Value from your Contracts
Generating Real Value from your Contracts
 
Manage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalManage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks Final
 
Vendor management, lagos
Vendor management, lagosVendor management, lagos
Vendor management, lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 
Ten risks to service quality from outsourcing
Ten risks to service quality from outsourcingTen risks to service quality from outsourcing
Ten risks to service quality from outsourcing
 
About Exigent Chameleon Sept 2016
About Exigent Chameleon Sept 2016About Exigent Chameleon Sept 2016
About Exigent Chameleon Sept 2016
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract management
 
Outsourcing 101
Outsourcing 101Outsourcing 101
Outsourcing 101
 
Outsourcing 101
Outsourcing 101Outsourcing 101
Outsourcing 101
 
Building A CFO Ready Business Case For Contract Management
Building A CFO Ready Business Case For Contract ManagementBuilding A CFO Ready Business Case For Contract Management
Building A CFO Ready Business Case For Contract Management
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing Vendor
 

More from Ali Zeeshan

Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Ali Zeeshan
 
Your Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarYour Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarAli Zeeshan
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices Ali Zeeshan
 
Webinar: Strategy + Innovation
Webinar: Strategy + InnovationWebinar: Strategy + Innovation
Webinar: Strategy + InnovationAli Zeeshan
 
Time Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersTime Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersAli Zeeshan
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case StudyAli Zeeshan
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case StudyAli Zeeshan
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case StudyAli Zeeshan
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case StudyAli Zeeshan
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsAli Zeeshan
 
Webinar: Business Benefits Realisation
Webinar: Business Benefits RealisationWebinar: Business Benefits Realisation
Webinar: Business Benefits RealisationAli Zeeshan
 
Webinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseWebinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseAli Zeeshan
 
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItWebinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItAli Zeeshan
 
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Ali Zeeshan
 
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsWebinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsAli Zeeshan
 
Webinar: Leading Project Managers
Webinar: Leading Project ManagersWebinar: Leading Project Managers
Webinar: Leading Project ManagersAli Zeeshan
 
Webinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationWebinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationAli Zeeshan
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesAli Zeeshan
 
Internal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarInternal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarAli Zeeshan
 
Mixed use development and its usefulness in the region - Webinar
Mixed use development and its usefulness in the region - WebinarMixed use development and its usefulness in the region - Webinar
Mixed use development and its usefulness in the region - WebinarAli Zeeshan
 

More from Ali Zeeshan (20)

Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation
 
Your Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarYour Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment Webinar
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices
 
Webinar: Strategy + Innovation
Webinar: Strategy + InnovationWebinar: Strategy + Innovation
Webinar: Strategy + Innovation
 
Time Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersTime Management: Productivity and Time Stealers
Time Management: Productivity and Time Stealers
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case Study
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case Study
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case Study
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case Study
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For Results
 
Webinar: Business Benefits Realisation
Webinar: Business Benefits RealisationWebinar: Business Benefits Realisation
Webinar: Business Benefits Realisation
 
Webinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseWebinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or False
 
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItWebinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
 
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
 
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsWebinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
 
Webinar: Leading Project Managers
Webinar: Leading Project ManagersWebinar: Leading Project Managers
Webinar: Leading Project Managers
 
Webinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationWebinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the Organisation
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slides
 
Internal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarInternal financial control - how ready are you - Webinar
Internal financial control - how ready are you - Webinar
 
Mixed use development and its usefulness in the region - Webinar
Mixed use development and its usefulness in the region - WebinarMixed use development and its usefulness in the region - Webinar
Mixed use development and its usefulness in the region - Webinar
 

Recently uploaded

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactisticshameyhk98
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answersdalebeck957
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationNeilDeclaro1
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 

Recently uploaded (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 

Developing Contracts That Fit Your Needs: The Commercial Framework

  • 1. Eric Evans Developing Contracts That Fit Your Needs: The Commercial Framework
  • 2. Housekeeping • The slides will be available on our SlideShare page; the link will be emailed to you • The recording of the webinar will be available to view; the link will be emailed to you • Please take the time to complete a post-webinar survey that will pop up at the end • You can type your questions throughout the session • Time will be allocated in the end for the speaker to address your questions 2
  • 3. Your Presenter Eric Evans has held Director level positions in the automotive, retail, fast moving consumer goods and healthcare sectors. He is the author of three books on procurement and negotiation, and a speaker on MBA programmes across Europe and the Gulf region As a management consultant, he has delivered improvement programmes in demand management and inventory management, and has coached organisations as they implement collaborative replenishment and customer-led approaches to demand management. 3
  • 4. Why is this important? A contract is a business document that must be written in a way which makes it legally enforceable. It will contain legal provisions, but must be seen as a business document Don’t be afraid of Contracts
  • 5. What drives the content of a contract? The contract should be driven by five things: 1.What is the contract trying to achieve? 2.What risks and opportunities do we want to manage? 3.What form of relationship do we hope to have? 4.How will we manage the business relationship? 5.What remedies do we want if things go wrong “A contracts simply says: This is what you will do, this is what we will do and this is what happens if things go wrong”
  • 6. Examples What are we trying to achieve? A low price or a fixed price? Our risk or their risk? An outcome or following our instructions? What risks and opportunities do we need to manage? What could go wrong? What further opportunities could arise? What type of relationship do we want? Adversarial? Risk sharing? Absolute certainty of outcome? How will we manage the relationship? Governance? Coping with change? Dispute resolution? What happens if things go wrong?
  • 7. The wrong way to start…….
  • 8. Why is this important? What the customer wanted What the supplier understood How it was documented What it actually didHow it was designed How it was billed by the supplier 8
  • 9. Risks and Opportunities A contract is, at its heart, a risk management tool
  • 10. 10 Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8 Failure Mode and Effects Analysis (FMEA) Risk Number Risk to be considered Probability Consequences Visibilty Risk Value Mitigation 1 Exchange rate changes 8 1 6 48 CR We buy in supplier currency and hedge 2 Industrial relations dispute 3 7 7 147 CC disallowing disputes as force majeure CC obliging supplier to advise on state of industrial relations 3 Ownership of supplier IPR 3 9 8 216 CC Supplier to warrant IPR ownership CC Supplier to indemnify us 4 Key man dependency 7 5 6 210 CC Supplier to agree long notice clause with key man 5 Late delivery 5 5 7 175 CC Liquidated damages, back to back 6 Unacceptable quality 2 9 8 144 CC Uncapped damages for poor quality 7 Supplier Bankrupcy 1 9 7 63 CR We take monthly credit checks 8 Takeover of company 3 7 9 189 CC Termination rights at our discretion 9 Design proved to be flawed 2 9 7 126 CC Uncapped damages for poor quality 10 Supplier breaches confidentiality 6 8 9 432 CC Liquidated damages Notes a) Risk values greater than 150 must have mitigation plans b) Risk values less than 150: mitigation plans are optional c) CC stands for "Contract Clause" d) CR stands for "Commercial Remedy" Risk Analysis Brainstorm of what could go wrong Likelihood of it happening (0 to 10) Consequences if it does (0 to 10) How much notice we will get (0 to 10) Risk X Consequences X Visibility Actions we could take
  • 11. What type of relationship do we want?
  • 13. Managing the Relationship: the key role of Governance
  • 14. The Commercial Framework: The Point of the Deal The Commercial Framework is the first step in in preparation for contract drafting. It should define clearly what we want to achieve and the risks we want to avoid. This step should be done before we consider drafting the contract. This is the business proposition which will be embedded in the contract 14
  • 15. Why do we need a “Commercial Framework”? The Commercial Framework serves two main purposes: 1. It establishes the priorities – in terms of issues and clauses - for the commercial negotiations to take place. This ensures that the negotiating team prioritise the issues which are important. 2. It provides the mandate for the negotiating team by agreeing what the team have a remit to accept on each issue, during the negotiations. By defining the Most Desirable Outcome (MDO) we agree what we are aiming to achieve; by defining the Least Acceptable Alternative (LAA) , we agree the minimum we can accept. 15
  • 16. The Framework sets out deal principles & objectives What We want from the deal Commercial Priorities: • Meet business needs • Value for money, end to end, by exploiting value to maximise profitability • Security against risk & commercial assurance/contractual protection • No surprises • Managing contracts and relationships throughout the term and beyond Balance Risk & Opportunity: • Both parties to be upfront about risk allocation and the ‘value/price’ of risk allocation. • Increases awareness of risk • Focus on understanding risks/opportunities for a given contract/relationship Relationship Priorities: • Commercially sensible relationship. • ‘Necessary’ contractual depth to support relationship and capture risk allocation • Focus on contract/delivery management • Continuity of personnel in order to retain knowledge and relationships Principles of conduct: • Treat other party as a seamless extension of ourselves (the “extended enterprise”) • Relationship premised on ‘What can we do for each other’ • Senior stakeholder engagement & access • Build a mature, trusted relationships at all management levels to embed a commercial relationship 3 1 4 2
  • 17. Commercial Priorities: A word about: “Understanding the Deal” Before we can start drafting the contact, we must have absolute clarity over what the business need is. This means understanding outcomes and deliverables, risks, dependencies, and the commercial and contract strategies which underpin the contract
  • 18. The Framework shapes the deal -early Overview of dimensions included: Services Remuneration Asset & Business Protection Governance Termination Technical Legal Requirements Contract Management • Statement of business requirements • Technical requirements • Resource input & dependencies • Staff expertise • Term • Knowledge transfer & embedding • Co. policies • Sub-contractor & Third Party • Charging mechanisms • Incentives • Payment schedule • Currency • Bench- marking • Liability limitation • Subsidiary/ Parent exposure • Warranties & indemnities • IPR • Data protection/ System security • Disaster recovery • Insurance requirements • Employee Protection • Governance Structure • Dispute escalation & resolution • Supplier performance evaluation • Change control procedure • Tendering for new work • Customer termination rights • Our termination rights • Payments upon termination • Exit management • Tax • Regulatory requirements • Confidentiality • Fraud • Assignment & novation • Change of control • Divestment of • General ‘boilerplate’ provisions • Pre-contract activities • Contract management activities • Close- out/post contract activities Tier2Tier1Tier0 Commercial Framework Statement of commercial & contract principles Contract types supported by Commercial Framework Commercial Focus for various contract categories Note: Applied where relevant and to the extent relevant considering deal size/significance.
  • 19. An example of Commercial Priorities Focus for contract dimensions related to Commercial Priorities Lower Commercial Focus • Business objectives (3.1.1) • Service Level requirements (3.1.2) • Technical requirements (3.2.1) • Charging Mechanisms (e.g. Types of Charges (4.1.1-4.1.6), Service Credits (4.1.9), Currency (4.4.1), Rebates (4.1.7), Expenses (4.1.8) • Knowledge transfer (3.6.1) • Flexibility in volumes & services (6.4.1) • System & technical changes during contract (3.2.2) • Benchmarking (4.5.1) • Developed IPR & Licenses (5.4.1- 2) • Removal of services (6.4.4) • Contract Term (3.5.1) • Extension of term (3.5.2) • Gain Share (4.2.1) High Commercial Focus Medium Commercial Focus CommercialFocus Contract dimension in the CF Low Med. High Knowledg e Transfer Develope d IPR & Licenses Technical changes during contract Removal of Services/Licen se Technic al Req. Charging Mechanism s & IP Licenses Service Level Req. Business Req. Volume flexibility Term & extension Benchmark Gain Share
  • 20. Using a Precedent or Template • Time can be saved by basing a contract on a precedent or template. This is a more efficient way of drafting a contract, and as long as the precedent is a good pone, it reduces the potential for drafting errors • It is helpful to: – Choose a precedent for the same type of transaction – Choose a precedent where you started from a strong negotiating position – based on spend, the relationship with the supplier, the desirability fo doing business with your company etc – Use a starting agreement rather than an executed agreement
  • 21. Key Drafting Principles 1. Be consistent with the front end • Check the front end and definitions schedule • Use definitions consistently • Don’t cover provisions that are covered in the front end (e.g. extra limits on liability, indemnities) • Don’t include extra obligations • Say if you think the front end/definitions are wrong 2. Use technical terms carefully • Technical terms with a well- understood meaning are okay (e.g. Ethernet, anti-virus,) • Explain/define ambiguous technical terms (e.g. IAM, CoS class 1) 3. Think about structure, and be comprehensive and clear • Structure • Clarity • Comprehensiveness 4. Points to avoid • No new customer obligations or joint obligations • No liability or indemnity provisions • No assumptions • No agreements to agree • No charges (except in the charges schedule) • No repetition 21
  • 22. Checklist: Good to Go? 1. Are the correct parties named in the contract? 2. Are the recitals accurate – what would the effect be if they were published in a lawsuit? 3. Do the definitions work each time a provision is used? 4. Are the obligations in the “Actions” section clearly defined? 5. Are the representations and warranties that we are making accurate? 6. Has the other party made warranties and representations which are strong enough? 7. Were representations made pre-contract which we need to capture or exclude? 8. Can we control our covenants? 9. Has the other party made sufficient covenants? 10. Are we able to control our dependencies to their covenants? 11. Could I misinterpret the scope if I tried? 12. Have we carried out a risk analysis? 13. Have we defined “completion” clearly enough? 14. Are acceptance procedures fully defined? 15. Are delivery dates clearly defined? 16. What happens if delivery dates are missed? 17. Have we explicitly defined “dependencies”? 18. When and how is payment triggered? 19. Are we comfortable with the cash flow throughout the contract? 20. When can the one party terminate, and what compensation does the other party get? 21. What are our liabilities and how are they limited? 22. Who owns foreground and background IP? 23. Are IP licensing terms clearly understood? 24. Are there clear and agreed processes for change management? 25. What assumptions have we made? 26. Have we considered the things we need to exclude from the contract? 27. Have we been clear on what warranty does and does not cover? 28. Are the representations and warranties that we are making accurate? 29. Has the other party made warranties and representations which are strong enough? 30. How will we resolve disputes?