International Roundtable on       Transboundary Waters Management      Extreme phenomena – Floods               pOverview ...
Overview• Legal basis for action (Framework Agreement on the Sava River Basin  (FASRB) and the Protocol on flood protectio...
FASRB• Signed in 2002, ratified in 2004    g             ,• Parties to the FASRB: Sl, HR, BA, RS• Objective:              ...
Sava Commission• FASRB implementation coordinated by the Sava Commission• Broadest scope of work among European river comm...
Protocol on flood protection to the FASRBP      l    fl d         i       h• Signed in 2010 - Ratification ongoing (BA√)• ...
Flood Management• Sava Flood Action Plan (2009)   – Example of cooperation on basin-     subbasin level   – First elaborat...
Flood Management• Linking FRM and the climate change assessment in the Sava RB   – Setting the basic elements of the Sava ...
Flood Management• Flood forecasting,warning and alarm system for the Sava RB   – Initiatated in 2003   – Cooperation of re...
Flood Management•   Hydrological model of the Sava RB and the hydraulic model of the Sava r.     – Initial models prepared...
Flood Management•   Hydrological model of the Sava RB and the hydraulic model of the Sava r.     – Dec2009 unsteady model ...
Hydro-meteorological Issues• Advances in the exchange of hydro-  meteorological information• Hydrological Yearbook of the ...
Climate change impacts• Water and Climate Change Adaptation Plan (WATCAP) for the Sava RB– Financed and implemented by WB–...
River Basin Management• Preparation of the Sava RBM Plan  (EU WFD)   – Sava River Basin Analysis Report      with Annex II...
Concluding remarks• Advatages of cooperation in the Sava Commission:   –   Good platform to solve regional/basin problems ...
Contact InformationInternational Sava River Basin CommissionKneza Branimira 29/II10000 ZagrebCroatiawww.savacommission.org...
Upcoming SlideShare
Loading in …5
×

Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko Dragan

339
-1

Published on

Overview of the Sava Commission activities
International Roundtable on Protection and Sustainable Use of Trans-boundary Waters in South East Europe, 15-16 December 2011, Zagreb, Croatia

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
339
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko Dragan

  1. 1. International Roundtable on Transboundary Waters Management Extreme phenomena – Floods pOverview of the Sava Commission activities Dragan Zeljko, ISRBC Deputy Secretary for integrated RBM and water planning
  2. 2. Overview• Legal basis for action (Framework Agreement on the Sava River Basin (FASRB) and the Protocol on flood protection)• Activities / Projects of the Sava Commission• Concluding remarks g International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 2
  3. 3. FASRB• Signed in 2002, ratified in 2004 g ,• Parties to the FASRB: Sl, HR, BA, RS• Objective: Transboundary cooperation T b d i for sustainable development of the region g• Specific goals: – To establish an international regime of navigation – To establish sustainable water management – To prevent/limit hazards (floods, droughts, ice and accidents) and reduce/eliminate their negative consequences International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 3
  4. 4. Sava Commission• FASRB implementation coordinated by the Sava Commission• Broadest scope of work among European river commissions• Coordination of: – Development of joint / integrated plans for the Sava RB – Establishment of integrated systems for the SRB – Preparation of development programs for the Sava RB International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 4
  5. 5. Protocol on flood protection to the FASRBP l fl d i h• Signed in 2010 - Ratification ongoing (BA√)• Protocol regulates the issues of sustainable flood protection in the Sava RB caused by: (a) natural phenomena such as high flows of rivers, as well as ice jamming, (b) artificial impacts• the Parties agree to cooperate on: (a) Preparation of the Program for development of the FRMP in the Sava RB; (b) Undertaking of Preliminary Flood Risk Assessment; ( ) (c) Preparation of Flood Maps; p p ; (d) Development of Flood Risk Management Plan in the Sava RB; (e) Establishment of the Flood Forecasting, Warning and Alarm System; (f) E change of information significant for sustainable flood protection; Exchange info mation fo s stainable p otection (g) Implementation of all measures and activities of mutual interest, originating from planning documents or activities from items (a) to (f) above or other mutually agreed measures and activities. b th t ll d d ti iti International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 5
  6. 6. Flood Management• Sava Flood Action Plan (2009) – Example of cooperation on basin- subbasin level – First elaboration of measures International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 6
  7. 7. Flood Management• Linking FRM and the climate change assessment in the Sava RB – Setting the basic elements of the Sava FRMP by • Preparing the overview of already completed or ongoing activities regarding flood risk management planning in the Sava River Basin, the Danube River Basin and UNECE region; • Identify and assess existing legislation, strategies and plans related to FRM planning and climate change adaptation (transboundary and national); l d l h d ( b d d l) • Assessing data and information needs for preparation of joint Sava FRMP; • Preparing an initial flood vulnerability assessment of the Sava RB; • Preliminary identification of possible adaptation measures; • Preparing a draft Program for preparation of the first Sava FRMP; – Financed by UNECE – Implementing period: 2010-2012 International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 7
  8. 8. Flood Management• Flood forecasting,warning and alarm system for the Sava RB – Initiatated in 2003 – Cooperation of relevant national institutions including HM services – Estimated costs: 2,2 mil EUR (without equipment) – Funding: not allocated yet (contacts with WMO) International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 8
  9. 9. Flood Management• Hydrological model of the Sava RB and the hydraulic model of the Sava r. – Initial models prepared in cooperation between USACE and Sava Commission – Proposal for the 2nd phase prepared – Expected commencement in 2012 International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 9
  10. 10. Flood Management• Hydrological model of the Sava RB and the hydraulic model of the Sava r. – Dec2009 unsteady model results (Mapping) International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 10
  11. 11. Hydro-meteorological Issues• Advances in the exchange of hydro- meteorological information• Hydrological Yearbook of the Sava River Basin (the first since 1986)• Planned projects (2012 – 2015) – Hydrological Study for the Sava River Basin (th first since 1976) Ri B i (the fi t i – Est. Costs: 1,0 mil EUR – Funding: not alocated yet g y International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 11
  12. 12. Climate change impacts• Water and Climate Change Adaptation Plan (WATCAP) for the Sava RB– Financed and implemented by WB– Expected finish in 2012– Project components: – Historic Climate Trend Analysis (Task 1) – Characterization of future climate scenarios (Task 2) – Hydrologic Model Including Data Gathering and Scenario Modeling (Task 3) – Guidance Notes (Task 4) for specific sectors incl. Flood management – WATCAP International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 12
  13. 13. River Basin Management• Preparation of the Sava RBM Plan (EU WFD) – Sava River Basin Analysis Report with Annex II: Flood management in the Sava RB – Plan drafted, public consultation to start in December 2011 – Adoption expected by the end of 2012 International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 13
  14. 14. Concluding remarks• Advatages of cooperation in the Sava Commission: – Good platform to solve regional/basin problems – Exchange of information/experiences – Possibility f d P ibili of development of integrated systems l fi d – ...• Chalenges / possible obstacles: – Differences between the Parties in the process of EU accession and related obligations – Financing of priority projects/strategic studies • The enhancement of the fund-raising efforts possible through strengthening g p g g g the ties and cooperation among, and with, the relevant national bodies – Intersectoral cooperation in the countries International Roundtable on Transboundary Waters Management Zagreb, December 15-16, 2011 14
  15. 15. Contact InformationInternational Sava River Basin CommissionKneza Branimira 29/II10000 ZagrebCroatiawww.savacommission.org 15